Loading...
Multicultural Family Center Sidewalk Replacement ProjectCity of Dubuque City Council Meeting Consent Items # 16. Copyrighted August 2, 2021 ITEM TITLE: Multicultural Family Center Sidewalk Replacement Project (CI P 2602833, 3602742, 3001425, 3002142) SUMMARY: City Manager recommending acceptance of the construction contract for the Multicultural Family Center Sidewalk Replacement Project, as completed by McDermott Excavating, in the final amount of $73,963.76. RESOLUTION Accepting the Multicultural Family Center Sidewalk Replacement Project and authorizing the final payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Multicultural Family Center Sidewalk Replacement City Manager Memo Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF DUB E-E Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Multicultural Family Center Sidewalk Replacement Project (CIP 2602833, 3602742, 3001425, 3002142) DATE: July 26, 2021 Dubuque All -America Cily I i 2007.2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Multicultural Family Center Sidewalk Replacement Project, as completed by McDermott Excavating, in the final amount of $73,963.76, which is a 77% increase over the original contract price of $41,780.00 due to the following reasons: As part of the Multicultural Family Center remodel project, two water services were added to this project that needed to be abandoned in the alley. The existing green alley required the removal of pervious brick pavers, services abandoned and then the alley re -instated. • Additional sidewalk was removed and replaced to the north of this original project due to its poor condition. • Also, after the removal of the contracted sidewalk because of the poor condition of the curb and gutter, 170 linear feet of curb and gutter was replaced. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: July 21, 2021 RE: Multicultural Family Center Sidewalk Replacement Project (CIP 2602833, 3602742, 3001425, 3002142) Dubuque All•Meriea Cif? W41�.NL\L�_n'l�l N.iF 2007.2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Multicultural Family Center Sidewalk Replacement Project. BACKGROUND The project provided for the removal of existing concrete sidewalk in need of replacement and installation of approximately 1,620 square feet of 5-inch concrete sidewalk and 486 square feet of brick accent pavement. The sidewalk also provides an accessible access to the Multicultural Family Center. DISCUSSION The Multicultural Family Center Sidewalk Replacement Project was completed by McDermott Excavating of Dubuque, IA in the final amount of $73,963.76. This is a 77% increase over the original contract price of $41,780.00. The increase was due to several factors: • As part of the Multicultural Family Center remodel project, two water services were added to this project that needed to be abandoned in the alley. The existing green alley required the removal of pervious brick pavers, services abandoned and then the alley re -instated. • Additional sidewalk was removed and replaced to the north of this original project due to its poor condition. • Also, after the removal of the contracted sidewalk because of the poor condition of the curb and gutter, 170 linear feet of curb and gutter was replaced. BUDGETIMPACT The summary of project costs for the Multicultural Family Center Sidewalk Replacement Project is as follows: CIP No. Fund Description Award Final 3001425 City Sidewalk Program $ 16,780.00 $ 29,950.26 2602833 MFC Sidewalk Concrete Improvements $ 25,000.00 $ 25,000.00 3602742 MFC Addition Remodel $ 7,450.00 3002142 General Street Construction $ 11,563.50 Engineering Design & Administration $7,396.38 TOTAL FUNDING $ 41,780.00 $ 81,360.14 Engineering design and administration costs of $7,396.38 will be divided proportionately to the City Sidewalk Program, MFC Addition Remodel and General Street Construction. REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $73,963.76 to McDermott Excavating, Inc. for the Multicultural Family Center Sidewalk Replacement Project. Prepared By: Jon Dienst, P.E. cc: Marie Ware, Leisure Services Manager Alexis Steger, Housing & Community Services Director Steve Brown, Project Manager 2 Prepared by Jon Dienst Citv of Dubuque Enaineering 50 W 13'" St Dubuque Iowa 52001 (563)589 4270 Return to Adrienne N. BreikIder City of Dubuque City Clerk 50 W 13'" St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 267-21 ACCEPTING THE MULTICULTURAL FAMILY CENTER SIDEWALK REPLACEMENT PROJECT AND AUTHORIZING THE FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Multicultural Family Center Sidewalk Replacement Project, (the Project) has been completed by the Contractor, McDermott Excavating, Inc. (Contractor), and the City Engineer has examined the work and signed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $73,963.76; WHEREAS, the Contractor has previously been paid $70,265.58, leaving a balance of $3,698.18; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the City Sidewalk Program, MFC Sidewalk Concrete Improvements, MFC Addition Remodel and General Street Construction appropriations for the contract amount of $73,963.76 less any retained percentage provided for therein as provided in Iowa Code. Section 3. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $3,698.18 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 2nd day of A yr lOt uusst 2021. ./ Attest: I Roy . B , Mayor Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF MULTICULTURAL FAMILY CENTER SIDEWALK REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Multicultural Family Center Sidewalk Replacement Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $81,360.14. Dated this 231d day of July 2021. Filed in the office of the City Clerk on the Gus Psihoyos, City Engineer 23rd day of July , 2021. Adrienne N. Breitfelder, City Clerk