Loading...
Asbury Road Fiber Optic Collaboration Project Phase 1 - ClP 1002871City of Dubuque City Council Meeting Consent Items # 18. Copyrighted August 2, 2021 ITEM TITLE: Asbury Road Fiber Optic Collaboration Project Phase 1 - Cl P 1002871 SUMMARY: City Manager recommending acceptance of the construction contract for the Asbury Road Fiber Optic Collaboration Project Phase I, as completed by Utility Service Contractors, in the final contract amount of $79,145.14. RESOLUTION Accepting the Asbury Road Fiber Optic Collaboration Project Phase I and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Asbury Road Fiber Optic Collaboration Phase 1-MVM City Manager Memo Memo Staff Memo Staff Memo Acceptance Resolution Resolutions THE C DUUB-.-*.-TE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Asbury Road Fiber Optic Collaboration Project Phase 1 CIP 1002871 DATE: July 28, 2021 Dubuque *Amrin Cia 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Asbury Road Fiber Optic Collaboration Project Phase I, as completed by Utility Service Contractors, in the final contract amount of $79,145.14. I concur with the recommendation and respectfully request Mayor and City Council approval. I�Lvw �� Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Asbury Road Fiber Optic Collaboration Project Phase I CIP 1002871 DATE: July 27, 2021 INTRODUCTION Dubuque AII•Ameriea City r I I® ► I� 2007-2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the construction contract for the Asbury Road Fiber Optic Collaboration Project Phase I. BACKGROUND The Asbury Road Fiber Optic Collaboration Project Phase I is a collaborative effort with Alliant Energy and the City of Dubuque. This collaborative effort involves multiple departments of the City working with Dave Lyons of Greater Dubuque Development Corporation to coordinate with Alliant Energy installing fiber assets. This reduces costs for Alliant Energy and the City since the work is done jointly. This project is one phase of a multi -phase effort that allows Alliant Energy to connect its assets between Madison, WI and Cedar Rapids, IA. This project phase provides fiber duct and vault installation along Asbury Road from Carter Road to John F. Kennedy Road. Other phases include Asbury Road from John F. Kennedy Road to the NW Arterial and Asbury Road from the NW Arterial to Radford Road. DISCUSSION This project consisted of the boring of 2,700 linear feet of a joint package of fiber duct for the City of Dubuque and Alliant Energy. This route is along Asbury Road from Carter Road to John F. Kennedy Road. The construction included a fiber package of 7-way Futurepath for the City, (2) 2" duct for the City, and (2) 1.25" for Alliant Energy. In preparation for future partnerships, one (1) of the 2" ducts that the City installed along this route could be bought or leased by other telecommunication providers. The final project costs were under the awarded contract value due to less than required concrete repairs. Since the project is joint with Alliant Energy, the cost savings are split with them. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $79,145.14 to Utility Service Contractors for the Asbury Phase 1 from Carter Rd. to JFK Rd. Fiber Joint Project. BUDGETIMPACT The project cost breakdown summary for the Asbury Road Fiber Optic Collaboration Project Phase I is summarized below: Description Award FINAL Construction — City $52,416.00 $47,034.07 Construction - Alliant 37,493.00 32,111.07 Design/Contract Admin/Construction Engineering 18,000.00 15,800.00 Total Project Cost $107,909.00 $94,945.14 The project funding summary is as follows: CIP Funding Source Amount 1002871 Alliant Energy Broadband CIP $62,834.07 1002871 Alliant Energy Reimbursement 32,111.07 Available Project Funding $94,945.14 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $79,145.14 to Utility Service Contractors for the Asbury Road Fiber Optic Collaboration Project Phase 1. cc: Justine Hull, Traffic Engineer Dave Ness, Civil Engineer II Prepared by: Justine Hull City of Dubuque Engineering 50 W. 13" Street Dubuque IA 52001 (563)589 4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 269-21 ACCEPTING THE ASBURY ROAD FIBER OPTIC COLLABORATION PROJECT PHASE I AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Asbury Road Fiber Optic Collaboration Project Phase I, (the Project) has been completed by the Contractor, Utility Service Contractors, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $79,145.14; WHEREAS, the Contractor has previously been paid $75,187.87, leaving a balance of $3,957.27; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $3,957.27 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 2nd day of August 2021. Attest: HI/vtt2i/f✓/t� i'/ A4A Adrienne N. Breitfelder, City Clerk '/ �' IdI - Roy D. Fol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF ASBURY PHASE 1 FROM CARTER RD. TO JFK RD. JOINT FIBER PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Asbury Phase 1 from Carter Rd. to JFK Rd. Joint Fiber Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $94,945.14. Dated this 27th day of July 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 27th day of July 2021. Adrienne N. Breitfelder, City Clerk