Loading...
Chaplain Schmitt Island Fiber Collaboration Project - CI P 1002871City of Dubuque City Council Meeting Consent Items # 21. Copyrighted August 2, 2021 ITEM TITLE: Chaplain Schmitt Island Fiber Collaboration Project- CIP 1002871 SUMMARY: City Manager recommending acceptance of the construction contract for the Chaplain Schmitt Island Fiber Collaboration Phase, as completed by Utility Service Contractors, in the contract amount of $143,412. RESOLUTION Accepting the Chaplain Schmitt Island Fiber Collaboration Project and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Chaplain Schmitt Island Fiber Collaboration Project- City Manager Memo MVM Memo Staff Memo Staff Memo Acceptance Resolution Resolutions THE C DUUB-.-*.-TE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Chaplain Schmitt Island Fiber Collaboration Project CIP 1002871 DATE: July 28, 2021 Dubuque *Amrin Cia 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Chaplain Schmitt Island Fiber Collaboration Phase, as completed by Utility Service Contractors, in the contract amount of $143,412. I concur with the recommendation and respectfully request Mayor and City Council approval. I�Lvw �� Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Chaplain Schmitt Island Fiber Collaboration Project CIP 1002871 DATE: July 27, 2021 INTRODUCTION Dubuque AII•Amerin City r I I® ► I� 2007-2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the construction contract for the Chaplain Schmitt Island Fiber Collaboration Project. BACKGROUND The Chaplain Schmitt Island Fiber Collaboration Project is a collaborative effort with Alliant Energy and the City of Dubuque. This collaborative effort involves multiple departments of the City working with Dave Lyons of Greater Dubuque Development Corporation to coordinate with Alliant Energy installing fiber assets. This reduces costs for Alliant Energy and the City since the work is done jointly. This project is one phase of a multi -phase effort that allows Alliant Energy to connect its assets between Madison, WI and Cedar Rapids, IA. The Chaplain Schmitt Island Fiber Collaboration Project provides fiber optic conduit and associated vaults and handholes around Chaplain Schmitt Island. This project connects to the existing fiber on Kerper Boulevard that will continue to the City of Dubuque and connect to the US 151/61 - Wisconsin Bridge. DISCUSSION The project consisted of the directional boring 4,200 linear feet of a joint package of fiber duct along Chaplin Schmitt Drive from the 16t" Street to US 151/61 Wisconsin Bridge. A joint package duct is when the contractor bores all the conduit in one bore. This particular fiber construction included a fiber package of one 7-way Futurepath and one 2" conduit for the City and two 1.25" conduits for Alliant Energy. The project was over the contracted amount due to unforeseen issues with the abandoned landfill on the island, abandoned roads that are buried under the surface. This was a joint boring project between the City and Alliant Energy, the original route was modified by the City to follow Chaplain Schmitt Drive and Admiral Sheehy Drive to allow the City to connect to key sites along the route. Therefore, the City was responsible for the extra costs associated that were encountered with this alignment. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $143,412.00 to Utility Service Contractors for the Chaplain Schmitt Island Fiber Collaboration Project on Chaplain Schmitt Island. BUDGETIMPACT The project cost breakdown summary for the Chaplain Schmitt Island Fiber Collaboration Project is summarized below: Description Award FINAL Construction — City $53,340.50 $94,301.50 Construction—Alliant 50,590.50 49,110.50 Design / Contract Admin / Construction Engineering 20,780.00 28,680.00 Total Project Cost $124,711.00 $172,092.00 The project funding summary is as follows: CIP Funding Source Amount 1002871 Alliant Energy Broadband CIP $123,161.50 1002871 Alliant Energy Reimbursement 49,110.50 Available Project Funding $172,092.00 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $143,412.00 to Utility Service Contractors for the Chaplain Schmitt Island Fiber Collaboration Project. cc: Justine Hull, Traffic Engineer Dave Ness, Civil Engineer II Prepared by: Justine Hull City of Dubuque Engineering 50 W. 13" Street Dubuque IA 52001 (563)589-4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13'^ Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 272-21 ACCEPTING THE CHAPLAIN SCHMITT ISLAND FIBER COLLABORATION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for Chaplain Schmitt Island Fiber Collaboration Project, (the Project) has been completed by the Contractor, Utility Service Contractors, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $143,412.00; WHEREAS, the Contractor has previously been paid $136,241.40, leaving a balance of $7,170.60; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $7,170.60 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 2nd day of August 2021. Roy D. Attest: 11 '2�� � ' ° A4W4 Adrienne N. Breitfelder, City Clerk 1) CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF CHAPLAIN SCHMITT ISLAND FIBER COLLABORATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Chaplain Schmitt Island Fiber Collaboration Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $172,092.00. Dated this 26th day of July 2021. Filed in the office of the City Clerk on the Gus Psihoyos, City Engineer 26th day of July 2021. N. uem"V-1.4- 1'rl. Adrienne N. Breitfelder, City Clerk