Loading...
Kennedy Road Water Main Extension Project 2021 Award ResolutionCopyrighted October 4, 2021 City of Dubuque Action Items # 2. City Council Meeting ITEM TITLE: Kennedy Road Water Main Extension Project 2021 Award Resolution SUMMARY: City Manager requesting City Council adoption of a resolution which gives authorization to award the construction contract for the Kennedy Road Water Main Extension Project 2021 to Drew Cook & Sons Excavating in the amount of $752,852.00. RESOLUTION Awarding Public Improvement Contract for the Kennedy Road Water Main Extension 2021 Project SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Kennedy Rd Water Main Ext Const Award Resolution- City Manager Memo MVM Memo Staff Memo Staff Memo Kennedy Rd Water Main Extension Award Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 SUBJECT: Kennedy Road Water Main Extension Project 2021 Award Resolution DATE: September 29, 2021 Water Department Manager Christopher Lester and City Engineer Gus Psihoyos are requesting City Council adoption of a resolution which gives authorization to award the construction contract for the Kennedy Road Water Main Extension Project 2021 to Drew Cook & Sons Excavating in the amount of $752,852.00. This amount is 16.8% under the estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Manager Gus Psihoyos, City Engineer THE CITYF DUiYB_ E-E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Christopher Lester, Water Department Manager Gus Psihoyos, City Engineer DATE: September 29, 2021 RE: Kennedy Road Water Main Extension Project 2021 Award Resolution Dubuque AN -Americo CRY 2007-2012.2013 2017*2019 INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the Kennedy Road Water Main Extension Project 2021. BACKGROUND The FY21 CIP Budget included funding for the John F. Kennedy water main extension — Forest Glen Ct. to Daisy Trail Project. This is commonly known as the Wildflower Ridge Water Main Project. The City of Dubuque was contacted by Vendors Unlimited Corporation which owns, operates, and maintains the private water system serving Wildflower Ridge. The Vendors Unlimited Corporation water distribution system serves 55 lots. City of Dubuque staff and Vendors Unlimited Corporation have had several discussions and meetings over the last few years, which have resulted in the preparation of an MOU between the City of Dubuque and Vendors Unlimited Corporation for the connection of Wildflower Ridge's water distribution system to the City of Dubuque's water system. DISCUSSION The project will provide for the installation of approximately 4,250 lineal feet of 12-inch ductile iron pipe (DIP) water main along the north ditch line of John F. Kennedy Road from Forest Glen Court to Daisy Trail. Additionally, four hydrants will be placed with 8- inch ductile iron pipe (DIP) leads to the south side of John F. Kennedy Road to provide fire protection and future connection to the water main. BID RESULTS Sealed bids were received and publicly opened on September 29, 2021, for the Kennedy Road Water Main Extension Project 2021. Item No. Contractor Name Base Bid Amount 1 Drew Cook & Sons Excavating $752,852.00 2 Top Grade Excavating $765,456.80 3 Midwest Concrete $821,203.70 4 Portzen Construction $865,579.00 Drew Cook & Sons Excavating of Dubuque, Iowa submitted the apparent low bid in the amount of $752,852.00. This amount is 16.8% under the estimate of probable cost. RECOMMENDATION The recommendation is to award the contract for the Kennedy Road Water Main Extension Project 2021 to Drew Cook & Sons Excavating of Dubuque, Iowa in the amount of $752,852.00. BUDGETIMPACT Funding for the project will be from CIP 740-2836 Water Line Extensions to New Developments. The table below shows the estimate of probable cost for the Kennedy Road Water Main Extension Project 2021: Description Original Cost Estimate Bid Cost Estimate Construction Cost Estimate, Water + Public Works $904,523.00 $752,852.00 Contingency (10%) $90,452.00 $75,285.20 Engineering Design (Preliminary and Final) - Consultant $43,000.00 $43,000.00 Engineering Services - City $10,000.00 $10,000.00 Total Estimate Project Cost $1,047,975.00 $881,137.00 ACTION TO BE TAKEN The City Council is requested to award the construction contract for the Kennedy Road Water Main Extension Project 2021 to Drew Cook & Sons Excavating in the amount of $752,852.00, through the adoption of the attached resolution. CC' Jenny Larson, Director of Finance & Budget Jon Dienst, Civil Engineer II Kerry Leppert, Water Engineering Assistant 1 Prepared by: Christopher Lester Water Department Manager, 901 Hawthorn St Dubuque IA 52001 (563) 589 4290 Return to Adrienne N. Breitfelder, City Clerk, 50 W. 13'h St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 345-21 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE KENNEDY ROAD WATER MAIN EXTENSION 2021 PROJECT Whereas, sealed proposals have been submitted by contractors for the Kennedy Road Water Main Extension 2021 Project (the Project) pursuant to Resolution No. 307- 21 and Notice to Bidders published on the City of Dubuque Website and posted to the Construction Update Network www.mbionline.com on the 10th day of September, 2021; and Whereas, said sealed proposals were opened and read on the 28th day of September, 2021, and it has been determined that Drew Cook and Sons Excavating of Dubuque, Iowa, with a bid in the amount of $752,852.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Drew Cook and Sons Excavating and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 4th day of October, 2021. i CY Roy D. Buol, Mayor Attest: Adrienne Breitfelder, City Clerk