Iowa State Energy Program Grant Application_Building ImprovementsMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Approval of Iowa State Energy Program Grant Submission DATE: July 1, 2010 Dubuque kratell All-Am t1caCity 1111 ! 2007 Stimulus Coordinator Will Hoyer is recommending approval of a $69,831 grant application to the Iowa Office of Energy Independence to cover 1/3 of the total cost related to the building envelope, lighting, HVAC systems and energy monitoring equipment in the 18 and Central Building. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Will Hoyer, Stimulus Coordinator Michael C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Will Hoyer, Stimulus Coordinator SUBJECT: Approval of Iowa State Energy Program grant submission DATE: June 28, 2010 INTRODUCTION RECOMMENDATION: Staff requests Council approval of the State of Iowa SEP grant submission. cc: Cindy Steinhauser, Assistant City Manager Cori Burbach, Sustainable Community Coordinator Steve Brown, Project Manager Jenny Larson, Budget Director Dubuque btall AJ AmedcaCily 11111 ! 2007 The purpose of this memorandum is to bring to your attention that the City of Dubuque has submitted a grant application to the Iowa Office of Energy Independence for $69,831 to cover 1/3 of the total costs related to the building envelope, lighting, HVAC systems and energy monitoring equipment in the 18 and Central Building slated for re- construction in the upcoming year. BACKGROUND The State Energy Program (SEP) grant is an ARRA- funded program intended to fund municipal energy efficiency improvements. This particular SEP grant required a 2:1 match and was intended for a "comprehensive" project — one that addressed windows, insulation, lighting, hot water, etc. As such the planned retrofit of the old Housing building for use by Operation: New View and the Crescent Community Health Center, which was already funded in the FY2010 -11 CIP made it a logical choice. DISCUSSION Using modeling completed by EcoSmart Building, recommended building envelope (windows, insulation, etc), lighting, solar thermal hot water, and HVAC systems were selected along with a building energy monitoring and sensing system. When combined these improvements are expected to cost a total of $209,493, but will save $14,430 annually in energy costs in the building. wen%irants l of 11 3646 - Iowa ARRA State Energy Program (SEP -R2) 4700 - Comprehensive Retrofit of 18th and Central Building State Energy Program Status: Signature: Applicant Information Project Officer First Name* Will First Name Title: Email: Address: City Dubuque Iowa 52001 -4805 City State /Province Postal Code /ZIp Phone:* 563 - 589 -4110 Phone Ext. Program Area of American Recovery & Interest Reinvestment Act Fax: Cover Sheet Authorized Official Name Title Organization Address City /State /Zip* Telephone Number E -Mail Fiscal Officer Name Title Application Submitted Submitted Date: Will Hoyer Submitted By: Middle Name whoyer@cityofdubuque.org City Manager's Office 50 West 13th St Hoyer Last Name Phone: https: // www. iowagrants. gov/ getApplicationPrintPreview .do ?docume... 2010 -06 -21 08:47:32 Will Hoyer Organization Information Organization Name: City of Dubuque Organization Type: City Government Tax ID: 42- 6004596 DUNS: 09- 310 -5302 Organization Website: Address: www.cityofdubuque.org City Hall 50 West 13th St Fax: 563- 589 -4149 Dubuquelowa 52001-48b5 City State /ProvincePostal Code /Zip 563 -589 -4110 Michael Van Milligen City Manager City of Dubuque 50 West 13th St Ken Tekippe Finance Director Ext. Dubuquelowa52001 -4805 City State Zip 563 -589 -4110 ctymgr@cityofdubuque.org 6/28/2010 2:56 PM WebGrants Organization Address City /State /Zip Telephone Number E -Mail County(ies) Participating, Involved, or Affected by this Proposal Congressional District(s) Involved or Affected by this Proposal Iowa Senate District(s) Involved or Affected by this Proposal Iowa House District(s) Involved or Affected by this Proposal SEP Applicant Information Name of Applicant Entity: Street Address 1: Street Address 2: City: State: ZipCode: County State Tax ID (example XX- XXXXXXX): Federal Tax ID (example XX- XXXXXXX): Phone Number: Fax Number: E -mail Address: If you do not have a DUNS number, please contact DNB to acquire. DUNS Number (example)XX - XXXXXXX: Congressional District: SEP Applicant's Chief Executive Office Person Authorized to Sign Contract Chief Executive Officer's Name: Chief Executive Officer's Salutation: Chief Executive Officer's Title: Chief Executive Officer's Mailing Address 1: Chief Executive Officer's Mailing Address 2: Chief Executive Officer's City: Chief Executive Officer's State: Chief Executive Officer's ZipCode: Chief Executive Officer's Phone Number: Chief Executive Officer's Fax Number: Chief Executive Officer's E -mail Address: https: // www. iowagrants. gov/ getApplicationPrintPreview .do ?docume... City of Dubuque 50 West 13th St City of Dubuque 50 West 13th St Dubuquelowa52001 City State Zip 563 -589 -4133 ktekippe @cityofdubuque.org Dubuque County 1 - Bruce Braley Congressional Map 14 District Map 28 District Map Dubuque Iowa 52001 Dubuque County 42- 6004596 42- 6004596 563 - 589 -4110 563 -589 -4149 sbrown @cityofdubuque.org 1- 866- 705 -5711 09- 3105302 1 - Bruce Braley Michael Van Milligen Mr. City Manager City Manager's Office 50 West 13th Street Dubuque Iowa 52001 563- 589 -4110 563 - 589 -4149 ctymgr@cityofdubuque.org 2of11 6/2R/201n2.56 PM Weblirants SEP Preparer /Staff Contact Information Name of Preparer: Salutation of Preparer: Title of Preparer: Affiliation: Address of Preparer: City: State: ZipCode: Phone Number: Fax Number: E -Mail Address: Certification Enter your full legal name. Signature of Preparer: Date: Budget Detail Budget Detail Cost Estimates Administrative Costs (limited to 5% of the total project cost or $5,000 whichever is smaller) Cost of Improvements (must match table 10. Energy Savings) List all costs separately Other Costs 1 Other Costs 2 Other Costs 3 Other Costs 4 Other Costs Detail Other Costs 1 Detail Other Costs 2 Detail Other Costs 3 Detail Other Costs 4 Detail Project Budget Factors https: / /www. iowagrants. gov/ getApplicationYrmtYreview .do7docume... Steve Brown Mr. Project Manager City of Dubuque 50 West 13th Street Dubuque Iowa 52001 563- 589 -4270 563 - 589 -4205 sbrown@cityofdubuque.org Steven Sampson Brown 04/09/2010 SEP Requested ($) $0.00 $69,831.00 $0.00 $0.00 $0.00 $0.00 Totals $69,831.00 Other Funding Total Project Sources ($) Budget $0.00 $139,662.00 $0.00 $0.00 $0.00 $0.00 $139,662.00 $0.00 $209,493.00 $0.00 $0.00 $0.00 $0.00 $209,493.00 3 of 11 6/28/2010 2:56 PM weourants This project budget reflects the cost to comply with the Davis -Bacon Act, National Environmental Policy Act, National Historic Preservation Act, and the Buy American Act. Budget Attachments(CLICK BACK BUTTON TO USE) SEP Sources of Other Funds Source and Cash In -Kind Type of Funds Value Total ($) Amount of In -kind + Cash Value Date Funds Will Be Secured DRA Distribution $985,000.00 $0.00 $985,000.00 07/01/2010 - local EcoSmart Building LLC $0.00 $25,000.00 Federal ARRA funding to City $200,000.00 $0.00 $200,000.00 for CCHC Federal cash rebate for EE $58,657.00 $0.00 $58,657.00 10/31/2011 improvements $58,657.00 Utility rebates $40,000.00 $0.00 $40,000.00 06/30/2011 estimated No https: // www. iowagrants. gov /getApplicationPrintPreview.do ?docume... Yes Budget r narrative.doc Briefly explain any other funding sources, whether funds are sufficienct to complete the project, and your determination as to whether the project will be cost - effective. Please attach support letters from all sources of leverage. Applicants must consider whether their projects are eligible for a local utility rebate and note this in the narrative. This money is for the overall renovation of the building and is not exclusively for the energy management improvements. It would cover some improvements but not to the level of energy performance we would like to achieve. $985,000.00 $25,000.00 06/15/2010 Funds for energy management improvement modeling $25,000.00 $200,000.00 $40,000.00 $1,308,657.00 SEP Project Information Please enter same project title as named above under "Project Title ". Project Name: Comprehensive Retrofit of 18th and Central Bldg Project Site Address, City, State, Zip and County(Site of 1805 Central Avenue Physical Address Where Dubuque, IA 52001 Project is Taking Place, if applicable. If multiple Dubuque County places, please list all locations): Age of Building: 100 Is the Building Location in a Historic District? This money is intended for capital improvements for the Crescent Community Health Center's portion of 05/01/2010 the 1805 Central Ave building and will help cover some of the energy management improvements, but will not allow for the achievement of the level of energy performance desired for the project. Rebate amount estimate based on estimated cost for improvements by EcoSmart Building. Final rebate amount can not yet be determined but is estimated by EcoSmart Building 4 of 11 6/28/2010 2:56 PM W e u 5 of 11 Does this project disturb Yes ground? SEP Scope of Work Estimated Project Start Date Estimated Project Completion Date: Project Narrative /Scope of Work: Description must answer: WHO Project Narrative /Scope of Work: Description must answer: WHAT Project Narrative /Scope of Work: Description must answer: WHEN Project Narrative /Scope of Work: Description must answer: WHERE Project Narrative /Scope of Work: Description must answer: WHY Project Narrative /Scope of Work: Description must answer: HOW Describe the Projects Goals and Objectives: 07/01/2010 naps:// w ww. iowagranis. govigeuippncationrrmtrrevlew .uo: uocume... 09/01/2011 The City of Dubuque is pleased to submit this application for funding from the Offic( The City of Dubuque will hire contractors to do all installations of windows, doors, in The City of Dubuque will comprehensively retrofit and remodel an old firestation that Proposed project details: Lighting system 3 Cree Lighting model LR24- 32SKA35 2x4 recessed static troffer. 43W LED lamp. ( Service Hot Water System 2 Indirect HWH from condensing boiler, 80 gal., 50 gaVhour at 90degF recovery. Effie Solar thermal system 3 Panel Flat Plate Propylene Glycol Collection Systems 119 Gallon Double Wall, Double Coil Heat exchanger tank (boiler backup) 20 Gallon Drain Back Tank for the Propylene Glycol fluid Pump and Piping Options TBD HVAC System 3: (4) Air handling units. (2) units /zones per floor. Geoexchange water -water heat purr Envelope System 1 Highest performing thermal, air and moisture barrier. Walls - R -35 (assembly) with R -14 c.i. and closed cell spray foam filling joist cavities Roof - R-48 (assembly) with R -14 c.i. and closed cell spray foam filling 5" of joist ca Slab - R -14 (assembly), $1.58/s.f. slab area Agilewaves Monitoring — is a real -time utility grade monitoring system. Deployment Either utility smart meter for water, gas and electric for building energy use, if there Complete modeling details for the above improvements are included in the Life Cyc The project will begin immediately with construction scheduled to begin in Decembei All work will occur in or around the building located at 1805 Central Ave in downtown This building has been vacant for many years due to significant water issues but the The project will comprehensively address lighting, hot water heating, the building env The project aims to comprehensively retrofit an unused municipal building with state 6/28/2010 2:56 PM VV cuvi ttuw Explain your status in obtaining necessary licenses and permits Describe the Expected Project Benefits to the Community Tasks and Performance Measures Task RFPs distributed RFPs due Design contract awarded Commence design Schematic design Design development 09/02/2010 Construction documents Initiate bidding Award project by City Council Commence construction Deconstruction Building envelope MEP Rough In Finish carpentry work FF & E installation Substantially complete Final completion Job Impact Row Jobs Created Jobs Retained Start Date Completion Performance Measures Date 07/01/2010 07/01/2010 RFPs are made available and distributed to consultants 07/15/2010 07/15/2010 RFPs submitted to City Hall- Engineering Department by 2 pm 07/22/2010 07/22/2010 Prepared design contract is sent to consultant for execution 08/19/2010 08/19/2010 Consultant receives "Notice to Proceed" with design 08/19/2010 09/02/2010 11/04/2010 12/16/2010 01/13/2011 02/03/2011 02/03/2011 02/24/2011 05/26/2011 06/24/2011 07/29/2011 08/31/2011 https : / /www. iowagrants. gov /getApplicationPrintPreview.do ?docume... The only permits necessary at this time are construction and building permits. Thes The scope of work falls under a NEPA categorical exclusion and for a variety of rea The project will provide numerous benefits to the community as it will give useful cor 11/04/2010 12/02/2010 12/16/2010 01/13/2011 02/03/2011 02/24/2011 05/26/2011 03/24/2011 06/23/2011 07/28/2011 07/22/2011 07/29/2011 08/31/2011 First stage of design commences and is completed with an owner review of the 30% design plans Second stage of design commences which considers changes stated in the schematic design review. Review of 60% design plan is approved. Final stage of design includes changes state in design development review. Includes owner review of the 90% plans and specifications Construction plans and specs are completed and prepared for City Council approval to bid project. Plans and specs are distributed to contractors. Lowest bid is presented to the City Council for award of the project General Contractor prepares construction site and begins construction according to the design plans and specs Complete work according to plans and specifications Complete work according to plans and specifications (payment = 15 %) Complete work according to plans and specifications (payment = 60 %) Complete work according to plans and specifications (payment = 25 %) Deliver and install Design consultant performs a final inspection and reviews any remaining punchlist items All pumchlist items are completed. Narrative Information Regarding Jobs Created or Retained Expected Payment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31,424.00 $125,696.00 $52,373.00 $0.00 $0.00 $0.00 Total Hours Effective Date Duration in Months 11720 08/15/2010 12 6 of l l 6/28/2010 2:56 PM WebGrants If you would like to add narrative information regarding jobs created or retained, please do so here: Summary of Projects Electricity Savings (kWh) If you would like to add narrative information regarding energy savings, please do so here: Hours were estimated as follows Design phase 8/15 -12/15 (18 weeks) Assumption: 4 FTE, 40hr /wk 2880 total hours Construction phase 2/1 -8/1 (26 weeks) Assumption 8.5 FTE, 40hr /wk 8840 total hours https: / /www. iow agrants. gov /getApplicationPrintPreview. do ?docume... Energy Management Improvement Title HVAC3 /Building Envelope 1 Lighting System 3* Service hot water system 2 * Building Submetering and 19153.37 67343.24 168.8 $3,122.40 $30,000.00 9.61 25 Yes Control System Solar Thermal System Electric Natural Other Annual Cost Net Estimated Simple Useful Demand Gas Fuel Savings Cost ($) Payback Life Reduction Savings Savings ($IYr) (Yrs) (Yrs) (kW) (Therms) (units) 40619.63 142818.61 4378.0 $6,621.00 $128,993.00 19.48 25 Yes 11717.8 41199.78 0.0 $1,910.00 $35,250.00 18.46 25 Yes 0.0 0.0 323.3 $277.00 $4,000.00 14.44 25 Yes 0.0 0.0 2500.0 71,490.80 251,361.63 7,370.10 0 $14,430.40 $209,493.00 66.49 120 Narrative Information Regarding Energy Savings If using other fuel savings, please specify unit type and cost per unit. SEP Readiness If you choose No ", please explain why and whether there are plans for that item to be completed All necessary funds other than SEP resources have Yes been secured Explanation (if necessary): Plans and specifications are completed and Yes documentation is attached Explanation (if necessary): Is this project cost effective? $2,500.00 $11,250.00 4.5 20 Yes 7 of 11 6/28/2010 2:56 PM WebUrants https:// www. iowagrants. gov/ getApplicationPrintPreview .do ?docume... Energy assessment or audit is completed and Yes documentation is attached Explanation (if necessary): Staffing and/or Contractors No are in Place Explanation (if necessary): Contractors will be hired nearer to the anticipated start of construction through the C SEP Comprehensiveness Briefly describe how this project encompasses a comprehensive approach to energy improvements. You may include past energy projects completed by your entity as well as current energy plans. Comprehensiveness The City of Dubuque is taking a comprehensive approach to energy improvements I SEP Administrative Capability Briefly describe why your organization has the ability or will have the ability to provide all of the required oversight reporting, and accounting for timely and accurate reporting. Specifically address how you will meet weekly, monthly, and quarterly state and federal reporting requirements. Additionally, address how your office will comply with the following federal laws affecting the Iowa SEP funds: National Environmental Policy Act (NEPA), National Historic Preservation Act, Davis -Bacon Act, and Buy American Act. Please attach resumes or other biographical information for project managers. Administrative Dubuque has a strong record of meeting the reporting requirements for state and fel Capability Please upload ALL attachments as one pdf file. Administrative Capability Attachments(CLICK BACK BUTTON TO USE) StevenBrown resume.pdf SEP Waste Stream Prior to the expenditure of Federal funds to dispose of sanitary or hazardous waste, 0E1 is required to provide documentation to U.S. Department of Energy demonstrating that an adequate disposal plan has been prepared for sanitary or hazardous waste generated by the proposed activities. Applicants are therefore required to submit information on the expected waste stream of the proposed project. Sanitary or hazardous waste includes, but is not limited to, old light bulbs, lead ballasts, piping, roofing material, discarded equipment, debris, asbestos, etc. Applicants should: • indicate if the proposed project will generate a waste stream. • Describe the identified waste stream, if applicable. • Describe the proposed methodology for waste handling and disposal. For example, how would mercury or sodium vapor lamps be disposed of? How will potentially hazardous material (e.g. asbestos containing materials, PBC's, etc.) be handled and disposed of? Waste This project will generate a waste stream. The waste stream consists of standard bL Stream 8of11 6/7R /20111 7•56PM weourants 9 of 11 Please upload ALL attachments as one pdf file. Any other Attachments (CLICK BACK BUTTON TO ,r`; USE) https: / /www. iow agrants. gov /getAppl icationPrintPreview .do ?docume... SEP National Historic Preservation Act Exhibit C - National Historic Preservation Act (REQUIRED SHPO REVIEW° I have completed Attachment B and Attachment C or D as applicable and this will be included as an attachment. Download Attachment B here, fill out your form, scan and name your file and attach your Attachment B here. Attachment B Preparer Checklist (CLICK BACK BUTTON TO USE) Download Attachment C here, fill out your form, scan and name your file and attach your Attachment C here, if applicable. Attachment C Exempt from SHPO Review, Project Determination (CLICK BACK BUTTON TO USE) Download Attachment D here, fill out your form, scan and name your file and attach your Attachment D here, if applicable. Attachment D Request for SHPO Comment on a Project (CLICK BACK BUTTON TO USE) National Environmental Protection Act By checking this box, the applicant certifies that its proposed project is categorically excluded from NEPA because it falls within the categories described in Attachment E of this RFP and does not involve extraordinary circumstances" within the meaning of 10 C.F.R. Section 1021.410. All applicants are required to fill out Attachment E, if not categorically excluded in Attachment E applicants are required to fill out Attachment F in addition to Attachment E. 1 certify that this proposed project is categorically excluded from NEPA Yes Download Attachment E here, fill out your form, scan and name your file and attach your Attachment E here. Attachment E NEPA Certification (CLICK BACK BUTTON TO USE) Download Attachment F here, fill out your form, scan and name your file and attach your Attachment F here. Attachment F NEPA Environmental Checklist(CLICK BACK BUTTON TO USE) Yes L E,J SEP Other If there are other relevant details about the proposed project or applicant that have not been expressed elsewhere in the application, please enter them here. Other Because the iowagrants.gov website is responding with error messages whenever v Attachment B (Preparer Checklist) 1) The structure, object, or building, associated with this project is less than forty five (45) years of age and there are no ground disturbing activities. If you checked box 1, please fill out the "Exempt from SHPO review" form (ATTACHMENT C). No further action is required — sign, and submit this form to OEI. If box one is NOT checked, please continue to number2. 2) I am receiving Weatherization Assistance Program (WAP) funds. If you checked box 2, please continue to box number 3. If you did not check box 2, please proceed to box 5. 3) All my project activities are included within Appendix A, either in sub - section A (exterior work), or /and sub - section B (interior work), and I have no ground disturbing activities associated with my project. [See pages 2 -3 of this document] if you checked box number 3, please stop and fill out the "Exempt from SHPO review" form (ATTACHMENT C). No further action is required — sign, and submit this form to OEI. If you did NOT check box 3, proceed to number 4. 4) A single work item, or numerous items, do not fit within the excluded activities specified in Appendix A, Yes and /or I have ground disturbing activities. [See pages 4 -6 of this document]. 6/28/2010 2:56 PM Weblirants https:// www. iowagrants. gov/ getApplicationPrintPreview .do ?dacume... If you checked box number 4, please fill out the "Request for SHPO Comment on a Project" form (ATTACHMENT D) along with all the requested information, documentation, and project specifications for review. 5) I am receiving either State Energy Program (SEP) and /or Energy Efficiency Community Block Grant Yes (EECBG) funds for my project. If box 5 is checked, please continue to box number 6. If box 5 is not applicable, and you are sure box 2 is also not applicable, then fill. out the "Request for SHPO Comment on a Project" form (ATTACHMENT D) along with all requested material and submit to OEI for review. 6) My project is excluded from review because all my activities are included in Appendix B and I have no ground disturbing activities. [See pages 4 -6 of this document]. If box 6 is checked, stop and fill out the "Exempt from SHPO review" form (ATTACHMENT C). No further action is required — sign, and submit this form to OE1. If box 6 is NOT checked, please continue to number 7. 7) Not all my project activities for this project are excluded under Appendix B and /or I have ground Yes disturbing activities associated with my project. [See pages 4 -6 of this document] Preparer's Name: Steve Brown Date: 04/26/2010 Minority Impact Statement Question # 1 1. The proposed grant programs or policies could have a disproportionate or No unique POSITIVE IMPACT on minority persons. If YES, describe the positive impact expected from this project Indicate the group(s) positively impacted. Question # 2 2. The proposed grant project programs or policies could have a No disproportionate or unique NEGATIVE IMPACT on minority persons. If YES, describe the negative impact expected from this project. If YES, present the rationale for the existence of the proposed program or policy. If YES, provide evidence of consultation with representatives of the minority groups impacted. Indicate the group(s) negatively impacted. Question # 3 3. The proposed grant project programs or policies are NOT EXPECTED TO HAVE A Yes DISPROPORTIONATE OR UNIQUE IMPACT on minority persons. If YES, present the rationale We have no reason to believe that an energy efficient building renovation project sul for determining no impact. 10 of 11 6/28/2010 2:56 PM ry cuvi aiiw • 11 of 11 Certification I hereby certify that the information on this form is complete and accurate, to the best of my knowledge. Name of Person Submitting Certification. Title of Person Submitting Certification SEP Attachments Description Yes WiII Hoyer Stimulus Coordinator naps ://www.lowagants.govigetApplicationPrmtlleview.do?docume... File Name 6/28/2010 2:56 PM