IA 32 and Asbury Road Turn Lane Improvements ProjectMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: IA 32 and Asbury Road Turn Lane Improvements (Iowa DOT Project No. STP -32- 1(30)-- 2C -31) (CIPs 2501815, 3002029) DATE: June 29, 2010 City Engineer Gus Psihoyos recommends City Council approval of the specifications, form of contract and the estimated cost of $670,700 for Asbury Road Turn Lane Improvements Project. I concur with the recommendation and respectfully request Mayor and approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Dubuque hitil AA- AmedcaCiry 11111! 2007 plans, the IA 32 and City Council Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: IA 32 and Asbury Road Turn Lane Improvements (Iowa DOT Project No. STP -32- 1(30)-- 2C -31) (CIPs 2501815, 3002029) DATE: June 29, 2010 INTRODUCTION DISCUSSION RECOMMENDATION BUDGET IMPACT Dubuque ae,Arnericacnr 11 1 1 I 2007 The enclosed resolution is in reference to the public hearing for the IA 32 and Asbury Road Turn Lane Improvements Project, Iowa DOT Project No. Iowa DOT Project No. STP -32- 1(30)-- 2C -31. The IA 32 and Asbury Road Turn Lane Improvements Project will provide for the following at the Asbury Road and IA 32 intersection: — Southbound dual left -turn lane construction: Existing pavement removal; and replacement with HMA along with PCC curb and gutter installation. — Northbound PCC dual left -turn lane construction: PCC median; PCC sidewalks; fl- inch surface course on the entire southbound corridor from access road north of Asbury to Holliday Drive; pavement marking. This project completes the left -turn lane construction and roadway paving component of the widening contract at this intersection which is already under construction. Traffic on the Northwest Arterial will be reduced to one lane in each direction in the vicinity of Asbury Road with a right- and left -turn lane provided at the Asbury Road intersection. I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the IA 32 and Asbury Road Turn Lane Improvements Project. The estimate of probable cost for the IA 32 and Asbury Road Turn Lane Improvements Project is as follows: Estimate Construction Contract $520,000.00 Contingency 52,000.00 Engineering /Contract Administration 98,700.00 Total Project Cost $670,700.00 The project funding summary is as follows: CIP Funding Source Amount STP Funding $500,000.00 U -STEP Funding 68,750.00 3002029 NW Arterial TSF Capacity Improvements — FY2009 45,000.00 3002029 NW Arterial TSF Capacity Improvements — FY2010 11,250.00 2501815 Traffic Consultant Services 98,700.00 Total Project Funding $723,700.00 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution approving the plans, specifications, form of contract and the estimated cost for the IA 32 and Asbury Road Turn Lane Improvements Project, Iowa DOT Project No. STP -32- 1(30)-- 2C -31. Prepared by David Ness, Civil Engineer II cc: Julie Neebel, IIW Engineers & Surveyors, PC Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer RESOLUTION NO. 240-10 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE IA 32 AND ASBURY ROAD TURN LANE IMPROVEMENTS PROJECT, IOWA DOT PROJECT NO. STP -32- 1(30)- -2C -31 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the IA 32 and Asbury Road Turn Lane Improvements Project, Iowa DOT Project No. STP -32- 1(30)-- 2C -31, in the estimated amount $670,700.00, are hereby approved. Attest: Passed, adopted and approved this 6th day of July 2010. Jeanne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor