Dillon Street Drain Tile Project 2021Copyrighted
October 18, 2021
City of Dubuque Consent Items # 13.
City Council Meeting
ITEM TITLE: Dillon Street Drain Tile Project 2021
SUMMARY: City Manager recommending acceptance of the construction contract for
the Dillon Street Drain Tile Project 2021, as completed by Drew Cook &
Sons Excavating Company, Inc., in the final contract amount of
$59,756.48, which is an increase of 11.9% over the original contract
amount of $53,377.50.
RESOLUTION Accepting the Dillon Street Drain Tile Project 2021 and
authorizing the payment to the contractor
SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
Description Type
Dillon Street Drain Tile Project 2021-MVM Memo City Manager Memo
Staff Memo Staff Memo
Resolution Resolutions
THE C
DUj!BQTE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Dillon Street Drain Tile Project 2021
(CIP 7201354)
DATE: October 10, 2021
Dubuque
WAWca 914
ii
2007-2012.2013
2017*2019
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Dillon Street Drain Tile Project 2021, as completed by Drew Cook & Sons
Excavating Company, Inc., in the final contract amount of $59,756.48, which is an
increase of 11.9% over the original contract amount of $53,377.50. The increase was
due to additional topsoil, concrete and stone base required to complete the work..
I concur with the recommendation and respectfully request Mayor and City Council
approval.
v
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
THE C
DUj!B9kFE
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Dillon Street Drain Tile Project 2021
(CIP 7201354)
DATE: October 8, 2021
Dubuque
AII•Amarica City
2007-2012.2013
2017*2019
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Dillon Street Drain Tile Project 2021.
BACKGROUND
The Dillon Street Drain Tile Project 2021 provided for the installation of approximately
945 linear feet of 6-inch solid drain tile and 4-inch perforated drain tile, two single grate
stormwater intakes were also replaced, approximately 665 linear feet of curb and gutter,
driveway approaches and sidewalk replacement in impacted areas. This project allowed
for private property tie-ins to the drain tile to prevent future icing and storm water issues.
The asphalt street patching was done by the Public Works Department.
DISCUSSION
The Dillon Street Drain Tile Project 2021 was completed by Drew Cook & Sons
Excavating Company, Inc. of Dubuque, IA in the final contract amount of $59,756.48.
This is a 11.9% increase over the original contract amount of $53,377.50. The increase
was due to additional topsoil, concrete and stone base required to complete the work.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the contract amount of $59,756.48 to Drew Cook & Sons Excavating Company, Inc.
of Dubuque, IA for the Dillon Street Drain Tile Project 2021.
BUDGETIMPACT
The summary of project costs for the Dillon Street Drain Tile Project 2021 is as follows:
Description
Award
Final
Construction Contract
$53,377.50
$ 59,756.48
Contingency
$5,337.75
0.00
Construction Administration & Inspection
$8,807.29
$8,963.47
Total Construction Cost
$67,522.54
$68,719.95
The project funding is summarized below:
CIP No.
Fund Description
Fund
Amount
7201354
Drain Tile Program
$ 68,719.95
Total Project Funding
$ 68,719.95
REQUESTED ACTION
I recommend that the City Council adopt the attached resolution to accept the
improvements and authorize the final payment of the contract amount of $59,756.48 to
Drew Cook & Sons Excavating Company, Inc. for the Dillon Street Drain Tile Project
2021.
cc: John Klostermann, Public Works Director
Arielle Swift, Assistant Public Works Director
Paul Davis, Public Works Supervisor
Jenny Larson, Budget Director
Jon Dienst, Civil Engineer II
2
Pared by Jon Dienst City of Dubuque Engineering 50 W. 13'" St. Dubuque IA 52001 (5631589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 1 P St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 353-21
ACCEPTING THE DILLON STREET DRAIN TILE PROJECT 2021 AND AUTHORIZING
THE PAYMENT TO THE CONTRACTOR
WHEREAS, the public improvement contract for the Dillon Street Drain Tile Project
2021, (the Project) has been completed by the Contractor, Drew Cook & Sons Excavating
Company, Inc. (Contractor), the City Engineer has examined the work and recommends
that the Project be accepted; and
WHEREAS, the final contract amount for the Project is $59,756.48; and
WHEREAS, the Contractor has previously been paid $56,768.66, leaving a
balance of $2,987.82; and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved, and the
Project is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor the
balance of the retainage of $2,987.82 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code
chapter 26.13.
Passed, approved and adopted this 181h day of October 2021.
Attest:
aeAlcP�. /V A�
Adrienne N. Breitfelder, City Clerk
Roy D. B461, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DILLON
STREET DRAIN TILE PROJECT 2021
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Dillon Street Drain Tile Project 2021 has been performed in
compliance with the terms of the Public Improvement Contract, and that the total cost of
the completed work is $68,719.95.
Dated this 8t" day of October 2021.
Gus Psihoyos, City Engineer
Filed in the office of the City Clerk on the 8t" day of October 2021.
Nl��v In' -