Loading...
Dillon Street Drain Tile Project 2021Copyrighted October 18, 2021 City of Dubuque Consent Items # 13. City Council Meeting ITEM TITLE: Dillon Street Drain Tile Project 2021 SUMMARY: City Manager recommending acceptance of the construction contract for the Dillon Street Drain Tile Project 2021, as completed by Drew Cook & Sons Excavating Company, Inc., in the final contract amount of $59,756.48, which is an increase of 11.9% over the original contract amount of $53,377.50. RESOLUTION Accepting the Dillon Street Drain Tile Project 2021 and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Dillon Street Drain Tile Project 2021-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dillon Street Drain Tile Project 2021 (CIP 7201354) DATE: October 10, 2021 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Dillon Street Drain Tile Project 2021, as completed by Drew Cook & Sons Excavating Company, Inc., in the final contract amount of $59,756.48, which is an increase of 11.9% over the original contract amount of $53,377.50. The increase was due to additional topsoil, concrete and stone base required to complete the work.. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUj!B9kFE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Dillon Street Drain Tile Project 2021 (CIP 7201354) DATE: October 8, 2021 Dubuque AII•Amarica City 2007-2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Dillon Street Drain Tile Project 2021. BACKGROUND The Dillon Street Drain Tile Project 2021 provided for the installation of approximately 945 linear feet of 6-inch solid drain tile and 4-inch perforated drain tile, two single grate stormwater intakes were also replaced, approximately 665 linear feet of curb and gutter, driveway approaches and sidewalk replacement in impacted areas. This project allowed for private property tie-ins to the drain tile to prevent future icing and storm water issues. The asphalt street patching was done by the Public Works Department. DISCUSSION The Dillon Street Drain Tile Project 2021 was completed by Drew Cook & Sons Excavating Company, Inc. of Dubuque, IA in the final contract amount of $59,756.48. This is a 11.9% increase over the original contract amount of $53,377.50. The increase was due to additional topsoil, concrete and stone base required to complete the work. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $59,756.48 to Drew Cook & Sons Excavating Company, Inc. of Dubuque, IA for the Dillon Street Drain Tile Project 2021. BUDGETIMPACT The summary of project costs for the Dillon Street Drain Tile Project 2021 is as follows: Description Award Final Construction Contract $53,377.50 $ 59,756.48 Contingency $5,337.75 0.00 Construction Administration & Inspection $8,807.29 $8,963.47 Total Construction Cost $67,522.54 $68,719.95 The project funding is summarized below: CIP No. Fund Description Fund Amount 7201354 Drain Tile Program $ 68,719.95 Total Project Funding $ 68,719.95 REQUESTED ACTION I recommend that the City Council adopt the attached resolution to accept the improvements and authorize the final payment of the contract amount of $59,756.48 to Drew Cook & Sons Excavating Company, Inc. for the Dillon Street Drain Tile Project 2021. cc: John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Paul Davis, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 Pared by Jon Dienst City of Dubuque Engineering 50 W. 13'" St. Dubuque IA 52001 (5631589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 1 P St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 353-21 ACCEPTING THE DILLON STREET DRAIN TILE PROJECT 2021 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Dillon Street Drain Tile Project 2021, (the Project) has been completed by the Contractor, Drew Cook & Sons Excavating Company, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $59,756.48; and WHEREAS, the Contractor has previously been paid $56,768.66, leaving a balance of $2,987.82; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $2,987.82 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 181h day of October 2021. Attest: aeAlcP�. /V A� Adrienne N. Breitfelder, City Clerk Roy D. B461, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DILLON STREET DRAIN TILE PROJECT 2021 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Dillon Street Drain Tile Project 2021 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $68,719.95. Dated this 8t" day of October 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 8t" day of October 2021. Nl��v In' - Adrienne N. Breitfelder, City Clerk