2021 Stumps/Sidewalks Project OneCopyrighted November 15, 2021 City of Dubuque Consent Items # 20. City Council Meeting ITEM TITLE: 2021 Stumps/Sidewalks Project One SUMMARY: City Manager recommending acceptance of the construction contract for the 2021 Stumps/Sidewalks Project One, as completed by G & R Tree Service, in the final contract amount of $105,940.88. SUGGESTED DISPOSITION: ATTACHMENTS: Description RESOLUTION Accepting the 2021 Stumps / Sidewalks Project One and authorizing the payment to the contractor Suggested Disposition: Receive and File; Adopt Resolution(s) 2021 Stumps/Sidewalk Project One-MVM Memo Staff Memo Type City Manager Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Stumps/Sidewalks Project One (CIP 1022830) (CIP 3001425) DATE: November 9, 2021 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2021 Stumps/Sidewalks Project One, as completed by G & R Tree Service, in the final contract amount of $105,940.88. This is an 8.10% increase over the original contract amount of $98,002.25 due to additional stumps on Wilson Street and additional sidewalk needed to be removed because of stump root impact. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Marie Ware, Leisure Services Manager THE C DUj!B9kFE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2021 Stumps / Sidewalks Project One (CIP 1022830) (CIP 3001425) DATE: November 8, 2021 INTRODUCTION Dubuque AII•Amarica City 2007-2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the construction contract for the 2021 Stumps / Sidewalks Project One. BACKGROUND The project was coordinated between the Engineering and Parks departments for the purpose of removing stumps in the city parkway and replacing abutting sidewalk where necessary throughout the city. As a result, 111 tree stumps ranging from 10 inches in diameter to in excess of 100 inches (includes large leader roots) in diameter were removed. 74 of those locations had sidewalk replacement associated ranging from approximately 30 to 135 square feet. DISCUSSION The 2021 Stumps / Sidewalks Project One was completed by G & R Tree Service, of Dubuque, IA in the final contract amount of $105,940.88. This is an 8.10% increase over the original contract amount of $98,002.25. The increase was due to the following factors: • Addition of stumps to the project on Wilson St. • Additional sidewalk needed to be removed because of stump root impact. BUDGETIMPACT The summary of project costs for the 2021 Stumps / Sidewalks Project One is as follows: Description Estimate Award Final Construction Contract $ 104,950.00 $98,002.25 $ 105,940.88 Contingency $10,495.00 $9,800.23 0.00 Construction Administration & Inspection $11,544.50 $10,780.25 $10,594.08 Total Construction Cost $ 126,989.50 $118,582.73 1 $116,534.96 The project funding is summarized below: CIP No. Fund Description Fund Amount 1022830 Stump Removal $ 42,828.12 3001425 City Owned Sidewalk $ 73,706.84 Total Project Funding $ 116,534.96 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $105,940.88 to G & R Tree Service, for the 2021 Stumps / Sidewalks Project One. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech Stephen Fehsal, Park Division Manager Tom Kramer, Urban Forester 2 Prepared by: Jon Dienst. City of Dubuque Engineering, 50 W. 1311 Street, Dubuque IA 52001 (563)589-4270 Return to: Adrienne N. Breitfelder, City Clerk, 50W 13'h Street, Dubuque, IA 52001 (563)5894100 RESOLUTION NO. 395-21 ACCEPTING THE 2021 STUMPS / SIDEWALKS PROJECT ONE AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2021 Stumps / Sidewalks Project One, (the Project) has been completed by the Contractor, G & R Tree Service, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $105,940.88; and WHEREAS, the Contractor has previously been paid $100,643.84, leaving a balance of $5,297.04; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $5,297.04 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 15th day of November 2021. — J, PX"/ Roy D. %ol, Mayor Attest: W�� /� A4& Adrienne N. Breitfelder, City Clerk CITY ENGINEER’S CERTIFICATE OF FINAL COMPLETION OF THE 2021 STUMPS / SIDEWALKS PROJECT ONE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2021 Stumps / Sidewalks Project One has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $116,534.96. Dated this 8th day of November 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 8th day of November 2021. ______________________________ Adrienne N. Breitfelder, City Clerk