2022 John F. Kennedy Road Sidewalk Installation Project_InitiateCity of Dubuque
City Council Meeting
Copyrighted
November 15, 2021
Items to be set for Public Hearing # 4.
ITEM TITLE: 2022 John F. Kennedy Road Sidewalk Installation Project
SUMMARY: City Manager recommending City Council approval of the Resolution of
Necessity, approval of the Preliminary Schedule of Assessments and
establishing December 6 as the date of the public hearing for the 2022
John F. Kennedy Road Sidewalk Installation Project between Asbury
Road and the Northwest Arterial.
RESOLUTION Necessity for the 2022 John F. Kennedy Road Sidewalk
Installation Project
RESOLUTION Approving the preliminary plats, schedule of
assessments and estimate of total cost for the 2022 John F. Kennedy
Road Sidewalk Installation Project
SUGGESTED Receive and File; Adopt Resolution(s), Set Public Hearing for
DISPOSITION: December6, 2021Suggested Disposition:
ATTACHMENTS:
Description
2022 JFK Road Sidewalk Installation Project-MVM
Memo
JFK Sidewalks Memo
J FK Sidewalk Resolution of Necessity
J FK Sidewalks Resolution Approving Plat
J FK Sidewalks Schedule of Assessment —Added
11/12/21
J FK sidewalks Notice to Property Owners
JFK Sidewalks Notice of Public Hearing
Type
City Manager Memo
Staff Memo
Resolutions
Resolutions
Supporting Documentation
Supporting Documentation
Supporting Documentation
THE C
DUj!BQTE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: 2022 John F. Kennedy Road Sidewalk Installation Project
(CIP 3002773)
DATE: November 9, 2021
Dubuque
WAWca 914
ii
2007-2012.2013
2017*2019
City Engineer Gus Psihoyos recommends City Council approval of the Resolution of
Necessity, approval of the Preliminary Schedule of Assessments and establishing
December 6 as the date of the public hearing for the 2022 John F. Kennedy Road
Sidewalk Installation Project between Asbury Road and the Northwest Arterial.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen
MCVM:jh
Attachment
CC' Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
THE CIOF
DiU!B E
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: November 8, 2021
SUBJECT: 2022 John F. Kennedy Road Sidewalk Installation Project
(CIP 3002773)
INTRODUCTION
Dubuque
AII-AmeNu City
•.111 Ni�1L(IYM.. I I I
2007,2012.2013
2017*2019
The enclosed resolutions request preliminary approval to the Resolution of Necessity,
approve the Preliminary Schedule of Assessments, and establish the date of the public
hearing for the 2022 John F. Kennedy Road Sidewalk Installation Project between Asbury
Road and the NW Arterial.
BACKGROUND
Since 1999 there have been discussions in the community concerning sidewalks along
John F. Kennedy Road between Asbury Road and the NW Arterial. Numerous petitions
were received both for and against the installation of sidewalks. At the July 2, 2018, City
Council meeting, the city council voted 5-2 to proceed with the installation of sidewalks with
City staff directed to proceed with the development of a sidewalk installation project and
use special assessments to fund the project. In October 2018, the project failed to get the
required unanimous support from the City Council, failing on a 5-2 vote.
At their May 17, 2021, meeting the City Council unanimously agreed City staff provide the
council with an updated John F. Kennedy Road sidewalk project. This is the fourth time the
John F. Kennedy sidewalk installation issue has been presented to the City Council for
consideration. The other times that the City Council considered JFK sidewalks was July of
1999, December of 2007, and October of 2018.
The project was brought to the City Council for consideration on June 7, 2021. The project
was approved to have plans developed and go to bidding. At the July 6, 2021 City Council
meeting, city staff requested the bidding process stop in order to pursue a Transportation
Alternatives Program (TAP) grant. The grant can be used for Safe Routes to School
projects, of which this project qualifies.
In July 2021 the City of Dubuque was notified it will receive a $190,000 grant to be used
toward a Safe Routes to School project on John F. Kennedy Road.
Additionally, Community Development Block Grant funds will be used to provide financial
assistance to owner occupied homes that meet income guidelines for low/moderate
income.
DISCUSSION
The John F. Kennedy Road Sidewalk Installation Project would provide installation of 4-
foot-wide sidewalks along John F. Kennedy Road on both sides of the street from Asbury
Road to the NW Arterial adjacent to abutting properties that do not currently have sidewalks
and would include the following elements:
— Excavation to allow for the installation of the sidewalk
— Installation of base stone for the sidewalk
— Installation of 4" thick public sidewalk in most areas
— Installation of 6" thick sidewalk at driveway crossings
— Installation of retaining walls where needed due to topography to accommodate the
sidewalk.
— Restoration of disturbed area with topsoil and seed.
As a result of going through the federal aid process, engineering costs and construction
costs are expected to increase. This increase in construction costs is due to federal auditing
requirements, required paperwork and Davis -Bacon wages. The higher engineering costs
are due to the increased workload to provide federal aid plans, administer the project and
the auditing process afterwards.
This project will have special assessments and the project construction documents will
follow the Statewide Urban Design and Specifications (SUDAS). The $190,000 TAP grant
is proposed to offset all costs on the project and thus reduce the special assessments
applied to abutting property owners.
The estimate for the costs includes the sidewalk costs, retaining wall costs, ADA ramps
costs, engineering costs and contingency costs. These costs are estimated as follows:
Items
Total Costs
TAP Grant
Applied
Net Costs
Sidewalk (Assessed)
$138,404.93
($74,747.59)
$63,657.34
Retaining Walls/ADA
Ramps (City)
$139,705.60
($75,450.04)
$64,255.56
Contingency
$27,811.05
($15,019.76)
$12,791.29
Engineering
$45,888.24
($24,782.61)
$21,105.63
Total
$351,809.82
($190,000.00)
$161,809.82
SIDEWALKS
Based on the sidewalk costs, and respective engineering and contingency costs after the
grant is applied, sidewalk assessments total $80,526.54. The sidewalk portion of the
assessment to property owners is reduced 54% from the previous calculated assessments
2
due to the TAP grant. Those assessments were calculated from earlier in 2021. The TAP
grant provides a significant savings to the abutting property owners.
The sidewalk ordinance has been revised over the years and requires that sidewalks be
installed when development of a subdivision or as part of a site plan. The new policy states
assessments over $500, may be paid in fifteen (15) annual installments. Sidewalks are also
required when the footprint of a building or dwelling has changed when curb and gutter are
present. The City manager has the right to waive this requirement on a case -by -case basis.
Please see Attachment A for City of Dubuque sidewalk requirements.
RETAINING WALLS
This project includes the City of Dubuque assuming all costs for the construction of the
retaining walls. Abutting property owners will pay 0% of the retaining wall costs. Previously,
the retaining walls were to be assessed to the abutting property owner. This is a savings of
$75,450.04 to the abutting property owners requiring retaining walls.
SCHEDULE
Due to the TAP funding, the project will need to be bid and let through the Iowa DOT in
Ames. We anticipate the bid letting would occur 6/21/2022 based on the project
development critical paths for the Iowa DOT.
MAINTENANCE OF SIDEWALKS
In 2018, the motion included, that the property owners on Gordon Drive that have a
sidewalk on John F. Kennedy Road would not have to maintain their sidewalks for snow
and ice removal. City staff does not recommend this since no other private sidewalks are
maintained by the City. Many private sidewalks abut more than one street, and the City
does not maintain those sidewalks. Some areas, much like Gordon Drive that illustrate this
are Glenwood Court, Cora Drive, Amy Court, Kimberly Drive, Council Hill Drive, Arrowhead
Lane, LaVista Court, Wartburg Place, Pego Court, Autumn Ridge, Aspen Drive, Aspen
Court and Clarke Drive.
RECOMMENDATION
I recommend that the City Council approve the Resolution of Necessity, approve the
Preliminary Schedule of Assessments, establish December 6, 2021, as the date of the
public hearing, and hereby authorize the City Clerk to advertise for bid proposals for the
John F. Kennedy Road Sidewalk Installation Project.
3
BUDGETIMPACT
The estimate of probable cost for the 2022 John F. Kennedy Road Sidewalk Installation
Project is as follows:
Description
Estimate
Construction Contract
$ 278,110.53
Contingency
27,811.05
Construction Engineering & Inspection
45,888.24
Total Project Cost
$351,809.82
The project funding summary is as follows:
CIP No.
Fund Description
Fund
Amount
3001425
City Owned Sidewalk Program City Costs
$ 81,283.28
TAP — Safe Routes to School Funding
190,000.00
Special Assessments
80,526.54
Total Project Funding
$ 351,809.82
PROPERTY ASSESSMENTS
The estimated assessment, including contingency and engineering for a 100-foot lot would
be $2,219 or $22.19 per lineal foot.
If the property owners choose to have the City install their sidewalk for them with this
assessment project, they would have 15 years to pay for the improvement at 3% interest
on their property tax bill. For every $1,000 of assessment the property owner could expect
to pay approximately $83.77 a year or $7/month for principal and interest cost for their
sidewalk.
According to State Code Section 384.62, the assessment shall not exceed twenty-five
percent of the value of the lot as shown by the plat and schedule approved by the council.
There is no assessment for this project that meets these criteria.
Low- to moderate -income property owners subject to street assessment will be eligible for
financial assistance of the street assessment for the owner -occupied resident property
depending on family size and income level. This financial assistance program is made
available through the Community Development Block Grant Funds. City staff will review
and process financial assistance applications for owner occupied properties once final
costs are developed for the project. See attachment B.
51
OPPOSITION TO ASSESSMENTS
A resolution of necessity requires passage by three -fourths (3/4) of all members of the City
Council unless written opposition to the assessment has been filed with the City Clerk prior
to the public hearing, signed by individuals representing 75% of the amount of the proposed
assessments for the entire public improvement. In the event a protest/petition is received
representing 75% of the amount of the proposed assessments for the entire public
improvement the City Council vote must be unanimous.
See Iowa Code 384.51.
In 2018, property owners representing over 90% of the proposed assessments were
opposed to the project assessment, triggering the requirement for a unanimous vote. The
determination of whether a three -fourths (3/4) vote or unanimous vote will be made at the
time of the vote following the public hearing in consultation with the City Clerk and the City
Attorney.
REQUESTED ACTION
The City Council is requested to give preliminary approval to the Resolution of Necessity,
approve the Preliminary Schedule of Assessments, and establish the date of the public
hearing through the adoption of the enclosed resolutions for the 2022 John F. Kennedy
Road Sidewalk Installation Project.
Prepared By: Jon Dienst, P.E.
CC' Crenna Brumwell, City Attorney
Jenny Larson, Director of Finance and Budget
John Klostermann, Public Works Director
5
Prepared by: Jan Dienst. City of Dubuque Engineering 50 W 131' Street Dubuque IA 52001 (563)589-4270
Return to: Adrienne N. Breitfelder, City Clerk 50 W 13" Street Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 402-21
RESOLUTION OF NECESSITY FOR THE 2022 JOHN F. KENNEDY ROAD SIDEWALK
INSTALLATION PROJECT
Whereas, the plat, preliminary schedule of assessments, and estimate of total cost
for the 2022 John F. Kennedy Road Sidewalk Installation Project have been duly
prepared and approved by the City Council of the City of Dubuque and ordered placed
on file in the office of City Clerk.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
The 2022 John F. Kennedy Road Sidewalk Installation Project will provide:
Installation of sidewalks along John F. Kennedy Road from Asbury Road to the
NW Arterial in areas sidewalks do not exist.
— Installation of 3884 LF of 4' wide concrete sidewalk
— Installation of 1164 SF of retaining wall at 7 locations
— Installation of new ADA pedestrian access ramps at street intersections
— Restoration of disturbed areas with seed, fertilizer and mulch
There is on file in the office of the City Clerk an estimated total cost of the work,
and a preliminary plat and schedule showing the amount proposed to be assessed to
each lot for the improvement.
The Council will hear property owners subject to the assessment and interested
parties for or against the improvement, its cost, the assessment, or the boundaries of the
district on the 6th of December, 2021 at 6:30 p.m. at the Historic Federal Building Council
Chambers, 350 West 6th Street, Dubuque, Iowa.
That the City Council deems it advisable and necessary for the public welfare to
make the herein mentioned improvements.
Unless a property owner files objections with the City Clerk at the time of hearing
on the resolution of necessity, the property owner is deemed to have waived all objections
pertaining to the regularity of the proceeding and the legality of using the special
assessment procedure. .
Said improvements shall be constructed in accordance with the plans and
specifications which have been approved by the City Council and are now on file in the
Office of the City Clerk. The cost of making such improvement will be assessed against
property lying with the assessment limits.
The above resolution was introduced, approved and ordered placed on file with
the City Clerk this 15th day of November 2021. 2
oy D. Buol, Mayor
Attest:
Adrienne N. Breitfelder, City Clerk
Prepared by: Jon Dienst, City of Dubuque Engineering 50 W 13" Street Dubuque IA 52001 (563)589-4270
Return to: Adrienne N. Breitfelder, City Clerk 50 W 13" Street Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 403-21
APPROVING THE PRELIMINARY PLATS, SCHEDULE OF ASSESSMENTS AND
ESTIMATE OF TOTAL COST FOR THE 2022 JOHN F. KENNEDY ROAD SIDEWALK
INSTALLATION PROJECT
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE. IOWA:
That the attached preliminary plats, schedule of assessments, and estimate of total
cost for the 2022 John F. Kennedy Road Sidewalk Installation Project are hereby
approved.
Passed, approved and adopted this 15th
Attest:
Adrienne Breitfelder, City Clerk
day of November, 2021
oy D. Buol, Mayor
CITY OF DUBUQUE, IOWA
JFK ROAD SIDEWALK INSTALLATION PROJECT
PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS
DATE: NOVEMBER 9, 2021
Parcel Address
Lot Description
Property Owners
Mailing Address
City/State
Valuation 2021
Valuation w/Improvements Sidewalk Cost
Deficiency
Total Assessment
1016279021
3298 W 32ND ST
BAL OF BAL OF LOT 8 BRUECKS SUB
ARIN C. PASK
3298 W 32ND ST
Dubuque IA 52002
$152,160.00
$156,200.55
$4,040.55
$4,040.55
1016279010
JOHN F KENNEDY RD
LOT 4 BRUECKS SUB
JOHN J. KOHNEN TRUST 3/26/07
7326 N CITRUS RD
Waddell AZ. 85355
$38,250.00
$40,447.98
$2,197.98
$2,197.98
1016279011
3038 JOHN F KENNEDY RD
LOT 3 BRUECKS SUB
JOHN J. KOHNEN TRUST 3/26107
7326 N CITRUS RD
Waddell AZ. 85355
$158,720.00
$160,917.98
$2,197.98
$2,197.98
1016279012
3038 JOHN F KENNEDY RD
LOT 2 BRUECKS SUB
JOHN J. KOHNEN TRUST 3/26/07
7326 N CITRUS RD
Waddell AZ. 85355
$36,680.00
$38,877.98
$2,197.98
$2,197.98
1016279023
2986 JOHN F. KENNEDY RD
BAL LOT 1 BRUECKS SUB
MOZENA, RODNEY M ETAL
14862 OLD HIGHWAY RD
Dubuque IA 52002
$36,680.00
$38,592.24
$1,912.24
$1,912.24
1015308001
3260 RAVEN OAKS DR
LOT 2 RAVEN OAKS
DOLLINC LLC
E 10002 COUNTY RD P
Wisconsin Dells WI. 53965
$1,261,380.00
$1,264,347.27
$2,967.27
$2,967.27
1015351001
2690 MARYWOOD DR
LOT 1 BLK 27 CLOVER HILLS SUB
MEDLEY, THOMAS J & TINA S
2690 MARYWOOD DR
Dubuque IA 52001
$180,000.00
$183,296.97
$3,296.97
$3,296.97
1015353001
2691 MARYWOOD DR
LOT 14 BLK 22 CLOVER HILLS SUB
CLANCY, PATRICK J & SHERI A
2691 MARYWOOD DR
Dubuque IA 52001
$128,620.00
$132,048.85
$3,428.85
$3,428.85
1015353019
2644 JOHN F KENNEDY RD
LOT 2 CAROL MEYER PLACE
GREVE, DENNY C & SHERRY L
2644 JFK RD
Dubuque IA 52001
$182,650.00
$184,078.69
$1,428.69
$1,428.69
1015353004
2640 JOHN F KENNEDY RD
LOT 1-1-3-1 & LOT 1-2-1-2-3-1 HIGHLAND FARM
PFOHL, JOHN A& JUDY M
2640 JOHN F KENNEDY RD
Dubuque IA 52001
$131,490.00
$133,687.98
$2,197.98
$2,197.98
1015353005
2636 JOHN F KENNEDY RD
LOT 2-1-3-1 & LOT 2-2-1-2-3-1 HIGHLAND FARM
TIMMERMAN, LE ROY J & JULIE K
2636 JOHN F KENNEDY RD
Dubuque IA 52001
$184,240.00
$185,998.38
$1,758.38
$1,758.38
1015353014
2549 ROSEWOOD DR
LOT 1 BLK 22 CLOVER HILLS SUB
MCKEON, JACOB J & EMMA G
2549 ROSEWOOD DR
Dubuque IA 52001
$133,910.00
$136,224.03
$2,314.03
$2,314.03
1015354026
2548 ROSEWOOD DR
LOT 23 BLK 21 CLOVER HILLS SUB
MC DONNELL, DANIEL C & MARGIE J
2548 ROSEWOOD DR
Dubuque IA 52001
$148,320.00
$150,517.98
$2,197.98
$2,197.98
1015354030
2511 MARYWOOD DR
LOT 1 BLK 21 CLOVER HILLS SUB
YOUTZY, LARRY J & LINDAA
2511 MARYWOOD DR
Dubuque IA 52001
$131,900.00
$134,097.98
$2,197.98
$2,197.98
1015358001
2512 MARYWOOD DR
LOT 1 BLK 20 CLOVER HILLS SUB
BURTON, JAMES MICHAEL
2512 MARYWOOD DR
Dubuque IA 52001
$113,990.00
$116,038.08
$2,048.08
$2,048.08
1022101001
3299 KAUFMANN AVE
LOT 1 BLK 18 CLOVER HILLS SUB
GAGNE, PAMELA P
3299 KAUFMANN AVE
Dubuque IA 52001
$133,370.00
$135,128.38
$1,758.38
$1,758.38
1022103001
JOHN F KENNEDY RD
LOT 11 EXC E 100' BLK 17 CLOVER HILLS SUB
LAW BUILDING COMPANY
2345 JOHN F KENNEDY RD
Dubuque IA 52002
$56,020.00
$56,899.19
$879.19
$879.19
1022103003
2455 GORDON DR
LOT 10 BLK 17 CLOVER HILLS SUB
SPLINTER, JOHN I & POLLYANNA
2455 GORDON DR
Dubuque IA 52002
$136,390.00
$137,736.26
$1,346.26
$1,346.26
1022103004
2419 GORDON DR
LOT 9 BLK 17 CLOVER HILLS SUB
MC KILLIP, JOSEPH L & NANCY A
2419 GORDON DR
Dubuque IA 52002
$125,700.00
$127,046.26
$1,346.26
$1,346.26
1022103005
2395 GORDON DR
LOT 8 BLK 17 CLOVER HILLS SUB
LINDECKER, CRAIG M & JASPER, DEANNE M
2395 GORDON DR
Dubuque IA 52002
$130,250.00
$131,596.26
$1,346.26
$1,346.26
1022103006
2381 GORDON DR
LOT 7 BLK 17 CLOVER HILLS SUB
LYNN, LEIGH ANN
2381 GORDON DR
Dubuque IA 52002
$164,470.00
$165,816.26
$1,346.26
$1,346.26
1022103007
2361 GORDON DR
LOT 6 BLK 17 CLOVER HILLS SUB
STRUB, JAMIE M
2361 GORDON DR
Dubuque IA 52002
$142,070.00
$143,416.26
$1,345.26
$1,346.26
1022103008
2343 GORDON DR
LOT 5 BLK 17 CLOVER HILLS SUB
SHAUL, AUSTIN J & OBERBROECKLING, ZACHARY J & FRANCOIS, CLINTON
2343 GORDON DR
Dubuque IA 52002
$120,600.00
$121,946.26
$1,346.26
$1,346.26
1022103009
2333 GORDON DR
LOT 4 BLK 17 CLOVER HILLS SUB
HOWE, JUDYA/K/A JUDITH M HOWE
2333 GORDON DR
Dubuque IA 52002
$131,980.00
$133,326.26
$1,346.26
$1,346.26
1022103010
2315 GORDON DR
LOT 3 BLK 17 CLOVER HILLS SUB
BUOL, RICK J & DANA K
2315 GORDON DR
Dubuque IA 52002
$148,210.00
$149,556.26
$1,346.26
$1,346.26
1022103011
2299 GORDON DR
LOT 2 BLK 17 CLOVER HILLS SUB
SCHMITT, JOSHUA D & JAYNA M ETAL
14643 YANCY ST NE
Dubuque IA 52002
$127,170.00
$128,516.26
$1,346.26
$1,346.26
1022103012
2291 GORDON DR
LOT 2-1 NEIL PLACE & LOT 1-1 BLK 17 CLOVER HILLS SUB
RETTENBERGER, MICHAEL D & JOLENE L
2291 GORDON DR
Dubuque IA 52002
$172,470.00
$174,233.22
$1,763.22
$1,763.22
1022103020
2300 JOHN F KENNEDY RD
LOT 2 NEIL PLACE; LOT 1 & 2 OF NEIL PLACE #2
J&K REAL ESTATE LLC
2300 JOHN F KENNEDY RD
Dubuque IA 52002
$687,850.00
$688,113.76
$263.76
$263.76
1016277015
3199 JOHN F KENNEDY RD
BAL OF LOT 2-1-1-1-1-1-1-1-1-1-9 NE 1/4 SEC 16 T89N R2E
JAHNKE, VIRGINIA E
1771 Rosemont St
Dubuque IA 52002
$89,930.00
$91,894.34
$1,964.34
$1,964.34
1016277014
3169 JOHN F KENNEDY RD
BAL LOT 1-2-9 NE 1/4 SEC 16 T89N R2E
SCHEMMEL, CHARLES J & SHARON L
3169 JOHN F KENNEDY RD
Dubuque IA 52002
$145,520.00
$145,805.74
$285.74
$285.74
1016277006
3057 JOHN F KENNEDY RD
LOT 2-1-1-1-1-9 NE 1/4 SEC 16 T89N R2E
KEY CITY RENTALS LLC
3253 Arrowwood Ln
Dubuque IA 52001
$166,860.00
$168,508.49
$1,648.49
$1,648.49
1016277007
3037 JOHN F KENNEDY RD
LOT 1-2-1-1-9 NE 1/4 - SEC 16 T89N R2E
KEY CITY RENTALS LLC
3253 Arrowwood Ln
Dubuque IA 52001
$142,100.00
$144,188.08
$2,088.08
$2,088.08
1016277008
3017 JOHN F KENNEDY RD
LOT 2-2-1-1-9 NE 114 - SEC 16 T89N R2E
WINDERS, JACQUELINE A
3017 John F Kennedy Rd
Dubuque IA 52002
$138,260.00
$140,150.26
$1,890.26
$1,890.26
1016277009
2995 JOHN F KENNEDY RD
LOT 2-1-1-1-9 NE 1/4 SEC 16 T89N R2E
HANKINS, CHRISTOPHER B & TESS M
2995 John F Kennedy Rd
Dubuque IA 52002
$156,480.00
$158,238.38
$1,758.38
$1,758.38
1016277012
2935 JOHN F KENNEDY RD
LOT 2-1-1-1-1-1-1-1-1-9 NE 1/4 SEC 16 T89N - R2E LANDS IN
MEYER, LORI ANN
2935 John F Kennedy Rd
Dubuque IA 52002
$124,090.00
$125,188.99
$1,098.99
$1,098.99
1016479011
2699 JOHN F KENNEDY RD
LOT 2 OLD TIMERS ATHLETIC & SUPPER CLUB PLACE
SULLIVAN, SAMUEL J
2699 John F Kennedy Rd
Dubuque IA 52002
$449,640.00
$450,409.29
$769.29
$769.29
1016483029
2659 JOHN F KENNEDY RD
LOTS 1-1 & 2-1 OLD TIMERS ATHLETIC & SUPPER CLUB PLA
LYNN SIEGERT BUILDING LLC
2659 John F Kennedy Rd
Dubuque IA 52002
$825,730.00
$829,972.10
$4,242.10
$4,242.10
1016483017
2639 JOHN F KENNEDY RD
LOT 2-1-2 S1/2 OF 2-1 MIN LOT 452
LYNN SIEGERT BUILDING LLC
2659 John F Kennedy Rd
Dubuque IA 52002
$113,710.00
$115,358.49
$1,648.49
$1,648.49
1016483019
2571 JOHN F KENNEDY RD
LOT 2-1-2 OF E 2.00 AC OF LOT 1 J P METTELS SUB NO 2
NAUMAN, VICTORIA L & GREGORY H
2571 John F Kennedy Rd
Dubuque IA 52002
$69,340.00
$70,812.65
$1,472.65
$1,472.65
1016483020
2571 JOHN F KENNEDY RD
LOT 2-1-1-2 E 2.00 AC OF 1 J P METTELS SUB NO 2
NAUMAN, VICTORIA L & GREGORY H
12571 John F Kennedy Rd
Dubuque IA 52002
$110,750.00
$111,783.05
$1,033.05
$1,033.05
1016483021
2551 JOHN F KENNEDY RD
LOT 1-1-1-2-E 2 AC LOT 1 JOHN METTEL SUB # 2
LESLEIN, KENNETH A & COLLEEN
2551 John F Kennedy Rd
Dubuque IA 52002
$157,340.00
$158,570.87
$1,230.87
$1,230.87
1016483022
2531 JOHN F KENNEDY RD
LOT 2-2 OF E 2.00 AC OF 1 JOHN METTELS SUB # 2
SPEAR, KATHY L
2531 Kenned Rd
Dubuque IA 52002
$149,950.00
$152,665.17
$2,715.17
$2,715.17
1016483028
3305 KAUFMANN AVE
LOT 5 BLK 1 JOHANSEN SUB #1
JZULIC, ZUHDIJA & MINE
13305 Kaufmann Ave
Dubuque IA 52002
$142,650.00
$146,166.77
$3,516.77
$3,516.77
$80,526.54
$80,526.54
NOTICE TO PROPERTY OWNERS
2022 JOHN F. KENNEDY ROAD SIDEWALK INSTALLATION PROJECT
Notice is given that there is now on file for public inspection in the office of
the clerk of the City of Dubuque, Iowa, a proposed resolution of necessity, an estimate of
cost and a plat and schedule showing the amounts proposed to be assessed against
each lot and the valuation of each lot within a district approved by the council of Dubuque,
Iowa for a public improvement of the type(s) and in the location(s) as follows:
Installation of public sidewalk of the following Street:
2022 John F. Kennedy Road Sidewalk Installation Project
— Installation of 3884 LF of 4' wide concrete sidewalk
— Installation of 1164 SF of retaining wall at 7 locations
— Installation of new ADA pedestrian access ramps at street intersections
— Restoration of disturbed areas with seed, fertilizer and mulch
The proposed district to be benefited and subject to assessment for the cost of
such improvements is described as follows:
All properties abutting or served by utilities in the following street:
• John F. Kennedy Road from Asbury Road to the NW Arterial
The council will meet at 6:30 p.m. on the 6t" day of December 2021, at the Historic Federal
Building Council Chambers (and/or by virtual means), 350 West V Street, Dubuque,
Iowa, at which time the owners of property subject to assessment for the proposed
improvement or any other person having an interest in the matter may appear and be
heard for or against the making of the improvement, the boundaries of the district, the
cost, the assessment against any lot, or the final adoption of a resolution of necessity. A
property owner will be deemed to have waived all objections unless at the time of hearing
the property owner has filed objections with the clerk.
Any visual or hearing -impaired persons needing special assistance or persons with
special accessibility needs should contact the City Clerk's office at (563) 589-4120 or
TDD at (563) 690-6678 at least 48 hours prior to the meeting.
Published by order of the City Council given on the day of
2021.
Adrienne N. Breitfelder, City Clerk
NOTICE OF PUBLIC HEARING ON RESOLUTION OF NECESSITY AND ESTIMATED
COST:
The City Council will hold a public hearing on the resolution of necessity and estimated
cost for the 2022 John F. Kennedy Road Sidewalk Installation Project, in accordance with
the provisions of Chapter 26, Code of Iowa on the 6t" day of December, 2021, at 6:30
p.m. in the Historic Federal Building Council Chambers (and/or by virtual means), 350
West 6th Street, Dubuque, Iowa, at which time the owners of property subject to
assessment for the proposed improvement or any other person having an interest in the
matter may appear and be heard for or against the making of the improvement, said
proposed plans, specifications, form of contract, estimated cost, the boundaries of the
district, the assessment against any lot, or the final adoption of a resolution of necessity.
A property owner will be deemed to have waived all objections unless at the time of
hearing the property owner has filed objections with the clerk.
Any visual or hearing -impaired persons needing special assistance or persons with
special accessibility needs should contact the City Clerk's office at (563) 589-4120 or
TDD at (563) 690-6678 at least 48 hours prior to the meeting.
Published by order of the City Council given on the day of