Phase 3 - HMA Pavement Milling and Resurfacing Project: White St and 11th St Acceptance of Public Improvement ProjectCity of Dubuque
City Council Meeting
Consent Items # 21.
Copyrighted
December 6, 2021
ITEM TITLE: Phase 3 - HMA Pavement Milling and Resurfacing Project: White Street
(9th to 11 th) and 11 th Street (White to Elm)Acceptance of Public
Improvement Project
SUMMARY: City Manager recommending acceptance of the construction contract for
the HMA Pavement Milling and Resurfacing Project on White Street
(formerly US52) from 9th to 11 th Street and on 11 th Street from White to
Elm Street, as completed by Eastern Iowa Excavating & Concrete, LLC,
in the final contract amount of $659,031.01, which is a 0.71 % decrease
from the original contact amount of $663,771.22.
RESOLUTION Accepting the HMA Pavement Milling and Resurfacing
Project on White Street (formerly US52) from 9th to 11 th Street and on
11 th Street from White to Elm Street and authorizing the payment to the
contractor
SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s)
DISPOSITION:
ATTACHMENTS:
Description
HMA Pavement Milling & Resurfacing Project-MVM
Memo
Staff Memo
Resolution
Final Payment Form
Type
City Manager Memo
Staff Memo
Resolutions
Supporting Documentation
THE C
DUj!BQTE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Phase 3 - HMA Pavement Milling and Resurfacing Project
White Street (9th to 11th) and 11th Street (White to Elm)
Acceptance of Public Improvement Project
Iowa DOT Project No. NHSN-052-2 (141)--2R-31
C I P 2502274, 7101335, 7202274, 7401405
DATE: December 2, 2021
Dubuque
WAWca 914
ii
2007-2012.2013
2017*2019
Assistant City Engineer Bob Schiesl is recommending acceptance of the construction
contract for the HMA Pavement Milling and Resurfacing Project on White Street
(formerly US52) from 9th to 11th Street and on 11th Street from White to Elm Street, as
completed by Eastern Iowa Excavating & Concrete, LLC, in the final contract amount of
$659,031.01, which is a 0.71 % decrease from the original contact amount of
$663,771.22.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen
MCVM:jh
Attachment
CC' Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Robert Schiesl, Assistant City Engineer
THE C
DUUB�QFE
Masterpiece an the Mississippi
TO: Michael C. Van Milligen, City Manager
Gus Psihoyos, City Engineer
FROM: Robert Schiesl, Assistant City Engineer
DATE: December 2, 2021
SUBJECT: Phase 3 - HMA Pavement Milling and Resurfacing Project
White Street (9th to 11th) and 11th Street (White to Elm)
Acceptance of Public Improvement Project
Iowa DOT Project No. NHSN-052-2 (141)--2R-31
C I P 2502274, 7101335, 7202274, 7401405
INTRODUCTION
Dubuque
All -America City
n 1x�u.�rvM:i�n zn'
I
2007-2012.2013
2017*2019
The enclosed resolution provides for the acceptance of the construction contract for the
HMA Pavement Milling and Resurfacing Project on White Street (formerly US52) from
9th to 11 th Street and on 11 th Street from White to Elm Street.
BACKGROUND
The HMA Milling and Resurfacing Project on White Street and 11 th Street was the 3rd
phase of a 4-phase project that is a joint partnership between the City and the Iowa
Department of Transportation (Iowa DOT) as part of the Southwest Arterial local
roadway transfer of jurisdiction (TOJ) and the associated roadway state of good repair
work.
The scope of the multi -year joint pavement rehabilitation project includes the following:
• Phase 1 - Central Ave (21 st to 32nd) Pavement Rehab Project (completed in 2011)
• Phase 2 - White Street (11 th to 21 st) Pavement Rehab Project (completed in 2014)
• Phase 3 - White (9th to 11th), 11th (White to Elm) Pavement Rehab (completed in 2019)
• Phase 4 - Central Ave (9th to 21 st) Pavement Rehab Project (completed in 2020)
• Northwest Arterial (US20 - JFK) Rehabilitation / Reconstruction (complete in 2022)
DISCUSSION
The Phase 3 - HMA Milling and Resurfacing Project on White Street and 11 th Street
provided for the following improvements:
• Pavement milling on White Street, from 9t" to 11 th Street and 11t" Street from White
Street to Elm Street.
9 Transverse and longitudinal joint repair as needed.
• Pavement sub -base repair and patching as needed.
• Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas.
• Spot curb, driveway, and sidewalk replacement.
• Storm sewer improvements.
• Water main replacement.
• Installation of ADA pedestrian access curb ramps (4 total).
Through the state of good repair cooperative agreement, the Iowa DOT is responsible
for the eligible construction costs associated with pavement rehabilitation for the center
24 feet (12 feet in each direction from roadway centerline) and 50% of the costs
associated with the pedestrian access curb ramps at all the intersection quadrants on
White Street (formerly Us52). The City is responsible for the costs associated with
pavement rehabilitation of the parking lanes and the costs for curb and sidewalk
replacement, underground utility work, 50% of the costs associated with the pedestrian
access curb ramps at all the intersection quadrants on White Street and landscape
restoration. All other associated costs, such as engineering design, contract
administration, construction engineering and inspection is funded solely with City
funding.
The HMA Pavement Milling and Resurfacing Project on White Street from 9th to 11 th
Street and on 11 th Street from White to Elm Street was completed by Eastern Iowa
Excavating & Concrete, LLC of Cascade, Iowa in the final contract amount of
$659,030.01 which is a 0.71 % decrease from the original contract amount of
663,771.22.
RECOMMENDATION
I recommend that the City Council accept the public improvements and authorize the
payment of the final contract amount of $659,030.01 to Eastern Iowa Excavating &
Concrete, LLC for the HMA Pavement Milling and Resurfacing Project on White Street
from 9th to 11 th Street and on 11 th Street from White to Elm Street.
BUDGETIMPACT
The project cost summary for the HMA Pavement Milling and Resurfacing Project on
White Street from 9th to 11 th Street and on 11 th Street from White to Elm Street is
summarized below:
Description
Award
Final
Construction
$ 663,771.22
$ 659,030.01
Contingency
50,200.00
Engineering Design and Administration
93,800.00
111,146.40
Total Construction Cost Estimate
$ 807,771.22
$ 770,176.41
2
The project funding summary is as follows:
CIP
Funding Source
Amount
2502274
Iowa DOT Funding
$ 143,809.69
2502274
Hwy 52 - White Street / 11th Street Pavement Rehab
465,299.91
7202274
Storm Sewer / Intake Improvement
87,504.91
7101335
Sanitary Manhole Replacement
4,400.00
7401405
1 Water Main Replacement
69,161.90
Total Project Funding
$ 770,176.41
REQUESTED ACTION
The City Council is requested to adopt the attached resolution to accept the public
improvements and to authorize the payment of the contract amount of $659,030.01 to
Eastern Iowa Excavating & Concrete, LLC for the HMA Pavement Milling and
Resurfacing Project on White Street from 9th to 11th Street and on 11th Street from
White to Elm Street.
cc: Jenny Larson, Director of Finance and Budget
Nathan Steffen, Civil Engineer
Deron Muehring, Civil Engineer
Chris Lester, Brant Schueller, Water Department
Roger Walton, Iowa DOT
F:\PROJECTS\HWY 52 -White 9th-11th and 11th White-Elm\Council & Staff Documents\Acceptance
3
Prepared by Robert Schiesl City of Dubuque Engineering 50 W. 13'" St Dubuque IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 1311 St. Dubuque, IA 52001 (563)589-4100
RESOLUTION NO. 414-21
ACCEPTING THE HMA PAVEMENT MILLING AND RESURFACING PROJECT ON
WHITE STREET (FORMERLY US52) FROM 9TH TO 11TH STREET AND ON 11TH
STREET FROM WHITE TO ELM STREET AND AUTHORIZING THE PAYMENT TO
THE CONTRACTOR
WHEREAS, the public improvement contract for the HMA Pavement Milling and
Resurfacing Project on White Street (formerly US52) from 9th to 11th Street and on 11th
Street from White to Elm Street, (the Project) has been completed by the Contractor,
Eastern Iowa Excavating & Concrete, LLC of Cascade, Iowa (Contractor), the City
Engineer has examined the work and recommends that the Project be accepted; and
WHEREAS, the final contract amount for the Project is $659,030.01; and
WHEREAS, the Contractor has previously been paid $635,884.19, leaving a
balance of $23,145.82; and
WHEREAS, the City Council finds that the recommendation of the City Engineer
should be accepted.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved, and the
Project is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor the
balance of the retainage of $23,145.82 as provided in Iowa Code chapter 573, and to pay
such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code
chapter 26.13.
Passed, approved and adopted this 6th day of December 2021.
Attest:
Adrienne N. Breitfelder, City Clerk
r t M .4
Roy D. uol, Mayor
Prepared by Robert Schiesl City of Dubuque Engineering 50 W. 131h St. Dubuque, IA 52001 (563)589-4270
Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF HMA PAVEMENT
MILLING AND RESURFACING PROJECT ON WHITE STREET (FORMERLY US52)
FROM 9TH TO 11TH STREET AND ON 11TH STREET FROM WHITE TO ELM
STREET
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the HMA Pavement Milling and Resurfacing Project on White Street
from 9th to 11th Street and on 11th Street from White to Elm Street has been performed
in compliance with the terms of the Public Improvement Contract, and that the total
project cost of the completed work is $770,176.41.
Dated this 2nd day of
December
2021.
Gus Psihoyos, City Engineer
Filed in the office of the City Clerk on the 2nd day of December 2021.
Adrienne N. Breitfelder, City Clerk
F:\PROJECTS\HWY 52 - White 9th-11th and 11th White-Elm\Council & Staff Documents\Acceptance
PAGE 1 of 4
City of Dubuque - Engineering Department
City Council Final Payment Form
PAYMENT NO: COUNCIL FINAL
PROJECT NAME: HMA Resurfacing and Milling Project
US52 - White Street (9th - 11th) and 11th Street (White Street to Elm Street)
CONTRACTOR: Eastern Iowa Excavating & Concrete, LLC AWARDED CONTRACT AMOUNT:
ADDRESS: 121 Nixon Street SE, PO Box 189 CONTRACT RECONCILIATION:
CITY, STATE, ZIP: Cascade, IA 52033 FINAL CONTRACT AMOUNT:
$ 663,771.22
$ (4,741.21)
$ 659,030.01 -0.71
THE CITY OF
DUB E
Masterpiece on the Mississippi
FINAL COST ACCEPTANCE
DATE: December 6, 2021
LINE
INE
L:::]
CONTRACT
TOTAL TO -DATE
CURRENT PAY PERIOD
NO.
ITEM NUMBER
BID ITEM DESCRIPTION
QUANTITY
UNIT
UNIT COST
QUANTITY
AMOUNT
QUANTITY AMOU NT
QUANTITY
AMOUNT
0010
2101 - 0850002
Clearing & Grubbing
13.50
UNIT
$82.25
13.50
$
1,110.38
$ -
13.50
$
1,110.38
0020
2102 - 0425070
Special Backfill
1240.00
TON
$18.25
3221.59
$
58,794.02
$ -
3221.59
$
58,794.02
0030
2105 - 8425005
Topsoil, Furnish & Spread
10.00
CY
$60.00
18.00
$
1,080.00
$ -
18.00
$
1,080.00
0040
22 12 - 0475095
Cleaning and Preparation of Base
0.29
MILE
$14,000.00
0.29
$
4,060.00
$ -
0.29
$
4,060.00
0050
2212 - 5070310
Patch, Full -Depth Repair
150.00
SY
$90.00
36.05
$
3,244.50
$ -
36.05
$
3,244.50
0060
2212 - 5075001
Hot Mix Asphalt Surface Patches
10.00
TON
$625.00
1.00
$
625.00
$ -
1.00
$
625.00
0070
2214 - 5145150
Pavement Scarification
6590.00
SY
$1.43
5716.16
$
8,174.11
$ -
5716.16
$
8,174.11
0080
2303 - 0000100
HMA Commercial Mix ( Includes Asphalt Binder), As Per Plan
35.00
TON
$170.00
42.80
$
7,276.00
$
42.80
$
7,276.00
0090
2303 - 0002380
HMA Interlayer Base Course, 3/8 IN. Mix
430.00
TON
$55.00
$
-
$
0.00
$
-
0100
2303 - 1041500
HMA HT, Base Course, 1/2 - IN. Mix
284.00
TON
$80.00
422.11
$
33,768.80
$ -
422.11
$
33,768.80
0110
2303-1042500
HMA HT, Internediate Course, 1/2 IN. Mix
625.00
TON
$62.00
726.89
$
45,067.18
$ -
726.89
$
45,067.18
0120
2303 - 1043500
HMA HT, Surface Course, 1/2 - IN. Mix, NO SPECIAL FRIC REQ
625.00
TON
$62.00
574.01
$
35,588.62
$
574.01
$
35,588.62
0130
2303 - 1258284
Asphalt Binder, PG 58-28H, High Traffic
92.04
TON
$625.00
97.99
$
61,243.75
$ -
97.99
$
61,243.75
0140
2303 - 1258346
Asphalt Binder, PG 58-34E, Extremely High Traffic
34.40
TON
$650.00
$
-
$ -
0.00
$
-
0150
2303 - 6911000
HMA Pavement Samples
1.00
LS
$3,500.00
1.00
$
3,500.00
$ -
1.00
$
3,500.00
0160
2506 - 4984000
Flowable Mortar
2.05
CY
$350.00
1.75
$
612.50
$ -
1.75
$
612.50
0170
2510 - 6745850
Removal of Pavement
1105.00
SY
$15.00
1679.04
$
25,185.60
$ -
1679.04
$
25,185.60
0180
2511 - 6745900
Removal of Sidewalk
150.00
SY
$9.50
425.02
$
4,037.69
$ -
425.02
$
4,037.69
0190
2511 - 7526004
Sidewalk, PCC, 4-IN.
95.00
SY
$49.50
166.83
$
8,258.09
$ -
166.83
$
8,258.09
0200
2511 - 7526006
Sidewalk, PCC, 6-IN.
20.00
SY
$80.00
20.92
$
1,673.60
$ -
20.92
$
1,673.60
0210
2511 - 7528101
Detectable Warnings
52.00
SF
$36.50
72.00
$
2,628.00
$ -
72.00
$
2,628.00
0220
2512 - 1725256
Curb and Gutter, P.C. Concrete, 2.5 FT.
565.00
LF
$22.50
861.45
$
19,382.63
$ -
861.45
$
19,382.63
0230
2513 - 0001040
Concrete Barrier, BA-104
250.00
LF
$1.00
250.00
$
250.00
$ -
250.00
$
250.00
0240
2515 - 2475006
Driveway, P.C. Concrete, 6 IN.
100.00
SY
$48.50
127.96
$
6,206.06
$ -
127.96
$
6,206.06
0250
2515 - 6745600
Removal of Paved Driveway
100.00
SY
$13.00
76.02
$
988.26
$ -
76.02
$
988.26
0260
2527 - 9263109
Painted Pavement Marking, Waterborne or Solvent - Based
53.72
STA
$72.00
65.78
$
4,736.16
$ -
65.78
$
4,736.16
0270
2528 - 8445110
Traffic Control
1.00
LS
$48,000.00
1.00
$
48,000.00
$ -
1.00
$
48,000.00
0280
2528 - 8445113
Flaggers
20.00
EACH
$462.00
$
-
$
0.00
$
-
0290
2533 - 4980005
Mobilization
1.00
LS
$50,000.00
1.00
$
50,000.00
$ -
1.00
$
50,000.00
0300
2601 - 2639010
Sodding
4.90
SQ
$450.00
14.32
$
6,444.00
$ -
14.32
$
6,444.00
0310
2601 - 2643110
Watering for Sod, Special Ditch Control or Slope Protection
5.00
MGAL
$300.00
2.80
$
840.00
$ -
2.80
$
840.00
0320
2602 - 0000312
Perimeter and Slope Sediment Control Device, 12 IN. DIA.
200.00
LF
$4.80
$
-
$
0.00
$
-
0330
2602 - 0000350
Removal of Perimeter and Slope Sediment Control Device
200.00
LF
$2.00
$
$
0.00
$
-
0340
2599 - 9999005
Water Valve Fixture, Adjustment
17.00
EACH
$375.00
22.00
$
8,250.00
$ -
22.00
$
8,250.00
0350
2599 - 9999005
Epoxy Coated Deformed Tie Bar, 5/8-Inch, 24"
220.00
EACH
$4.00
32.00
$
128.00
$ -
32.00
$
128.00
0360
2599 - 9999009
PCC Barrier Curb, 6" Wide
75.00
LF
$30.50
$
$
0.00
$
-
0370
2599 - 9999009
Sawcut, Full -Depth, HMA, Concrete & HMA/Concrete Composite Pave
1940.00
LF
$4.00
1622.00
$
6,488.00
$ -
1622.00
$
6,488.00
0380
2599 - 9999009
Milling Transverse Joints
385.00
LF
$18.00
$
-
$
0.00
$
-
0390
2599 - 9999009
Milling Longitudinal Joints
280.00
LF
$23.00
$
-
$ -
0.00
$
-
0400
2599 - 9999010
Safety Wedge Cut
1.00
LS
$1,350.00
1.00
$
1,350.00
$ -
1.00
$
1,350.00
0410
2599 - 9999010
Milling Mobilization
1.00
LS
$3,500.00
1.00
$
3,500.00
$ -
1.00
$
3,500.00
0420
2599 - 9999014
Remove, Salvage & Replace Brick Pavers
50.00
SF
$30.00
85.54
$
2,566.20
$ -
85.54
$
2,566.20
0430
2599 - 9999018
Decorative Concrete Sidewalk, 6 IN., Reverse Mix
53.00
SY
$96.00
24.37
$
2,339.52
$ -
24.37
$
2,339.52
0440
2599 - 9999020
HMA Joint Repair, 3" Depth ( Max.)
25.00
TON
$175.00
$
-
$
0.00
$
-
0450
2599 - 9999020
3" Breaker Run Macadam
150.00
TON
$23.50
16.89
$
396.92
$ -
16.89
$
396.92
0460
2435 - 0600010
Manhole Adjustment, Minor
14.00
EACH
$1,300.00
18.00
$
23,400.00
$ -
18.00
$
23,400.00
STREET AMOUNT EARNED TO DATE
SUB TOTAL:
$
491,193.57
PAGE 2 of 4
City of Dubuque - Engineering Department
City Council Final Payment Form
PAYMENT NO: COUNCIL FINAL
PROJECT NAME: HMA Resurfacing and Milling Project
US52 - White Street (9th - 11th) and 11th Street (White Street to Elm Street)
CONTRACTOR: Eastern Iowa Excavating & Concrete, LLC AWARDED CONTRACT AMOUNT:
ADDRESS: 121 Nixon Street SE, PO Box 189 CONTRACT RECONCILIATION:
CITY, STATE, ZIP: Cascade, IA 52033 FINAL CONTRACT AMOUNT:
THE CITY OF
DUB E
Masterpiece on the Mississippi
$ 663,771.22 FINAL COST ACCEPTANCE
$ (4,741.21)
$ 659,030.01 -0.71
DATE: December 6, 2021
LINE ITEM NUMBER BID ITEM DESCRIPTION CONTRACT TOTAL TO -DATE CURRENT PAY PERIOD:::] FINAL
NO. QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT
QUANTITY
AMOUNT
STORM SEWER ITEMS '
0470
2503 - 0114215
Storm SWR, G-Main, Trenched, RCP, 15 IN.
50.00
LF
$84.00
37.88
$
3,181.92
$
37.88
$ 3,181.92
0480
2503 - 0114236
Storm SWR, G-Main, Trenched, RCP, 36 IN.
315.00
LF
$136.00
318.25
$
43,282.00
$ -
318.25
$ 43,282.00
0490
2503 - 0200036
Remove Storm Sewer Pipe Less Than or Equal to 36 IN.
60.00
LF
$42.85
44.00
$
1,885.40
$
44.00
$ 1,885.40
0500
2510 - 6750600
Removal of Intakes and Utility Accesses
4.00
EACH
$885.00
3.00
$
2,655.00
$
3.00
$ 2,655.00
0510
2435 - 0140160
Manhole, Storm Sewer, SW-401, 60 IN.
2.00
EACH
$5,950.00
2.00
$
11,900.00
$
2.00
$ 11,900.00
0520
2435 - 0140172
Manhole, Storm Sewer, SW-401, 72 IN.
1.00
EACH
$6,800.00
1.00
$
6,800.00
$
1.00
$ 6,800.00
0530
2435 - 0140300
Manhole, Storm Sewer, SW403
1.00
EACH
$7,200.00
1.00
$
7,200.00
$ -
1.00
$ 7,200.00
0540
2599 - 9999005
Intake 101-B
2.00
EACH
$2,850.00
2.00
$
5,700.00
$ -
2.00
$ 5,700.00
0550
2599 - 9999005
Intake 101-13, Construct New Concrete Top
1.00
EACH
$1,375.00
1.00
$
1,375.00
$ -
1.00
$ 1,375.00
STORM SEWER AMOUNT EARNED TO DATE
Sub Total
$ 83,979.32
0560
2435 - 0130148
SANITARY SEWER ITEMS
Manhole, Sanitary Sewer, SW-301, 48 IN.
1.00
EACH
$4,400.00
1.00
$
4,400.00
$ -
1.00
$ 4,400.00
0570
2554 - 0112006
WATER MAIN ITEMS
Water Main, Trenched, Ductile Iron
Pipe (DIP), 6 IN.
20.00
LF
$110.00
13.00
$
SANITARY
1,430.00
SEWER AMOUNT EARNED TO DATE
$
Sub Total
13.00
$ 4,400.00
$ 1,430.00
0580
2554 - 0112008
Water Main, Trenched, Ductile Iron
Pipe (DIP), 8 IN.
420.00
LF
$73.00
406.50
$
29,674.50
$ -
406.50
$ 29,674.50
0590
2554 - 0112010
Water Main, Trenched, Ductile Iron
Pipe (DIP), 10 IN.
8.00
LF
$225.00
1.00
$
225.00
$
1.00
$ 225.00
0600
2554 - 0112012
Water Main, Trenched, Ductile Iron
Pipe (DIP), 12 IN.
30.00
LF
$230.00
27.08
$
6,228.40
$
27.08
$ 6,228.40
0610
2554 - 0207006
Valve, Gate, DIP, 6 IN.
1.00
EACH
$1,150.00
1.00
$
1,150.00
$
1.00
$ 1,150.00
0620
2554 - 0207008
Valve, Gate, DIP, 8 IN.
4.00
EACH
$1,550.00
4.00
$
6,200.00
$ -
4.00
$ 6,200.00
0630
2554 - 0207010
Valve, Gate, DIP, 10 IN.
1.00
EACH
$2,250.00
1.00
$
2,250.00
$ -
1.00
$ 2,250.00
0640
2554 - 0207012
Valve, Gate, DIP, 12 IN.
1.00
EACH
$2,600.00
1.00
$
2,600.00
$ -
1.00
$ 2,600.00
0650
2599 - 9999005
12" x 12" Tee
1.00
EACH
$950.00
1.00
$
950.00
$ -
1.00
$ 950.00
0660
2599 - 9999005
12" x 8" Anchoring Tee
1.00
EACH
$950.00
1.00
$
950.00
$ -
1.00
$ 950.00
0670
2599 - 9999005
8" x 8" Anchoring Tee
1.00
EACH
$650.00
1.00
$
650.00
$ -
1.00
$ 650.00
0680
2599 - 9999005
8" x 6" Anchoring Tee
1.00
EACH
$650.00
1.00
$
650.00
$ -
1.00
$ 650.00
0690
2599 - 9999005
12" - 90 DEG Bend
1.00
EACH
$820.00
1.00
$
820.00
$ -
1.00
$ 820.00
0700
2599 - 9999005
12" - 45 DEG Bend
1.00
EACH
$750.00
1.00
$
750.00
$ -
1.00
$ 750.00
0710
2599 - 9999005
10" - 45 DEG Bend
1.00
EACH
$475.00
1.00
$
475.00
$ -
1.00
$ 475.00
0720
2599 - 9999005
8" - 45 DEG Bend
2.00
EACH
$375.00
2.00
$
750.00
$ -
2.00
$ 750.00
0730
2599 - 9999005
12" x 10" Reducer
1.00
EACH
$575.00
1.00
$
575.00
$ -
1.00
$ 575.00
0740
2599 - 9999005
12" x 8" Reducer
1.00
EACH
$575.00
1.00
$
575.00
$ -
1.00
$ 575.00
0750
2599 - 9999005
12" Coupling
1.00
EACH
$725.00
$
-
$
0.00
$ -
0760
2599 - 9999005
10" Coupling
1.00
EACH
$650.00
$
-
$
0.00
$ -
0770
2599 - 9999005
8" Coupling
1.00
EACH
$450.00
1.00
$
450.00
$ -
1.00
$ 450.00
0780
2599 - 9999005
6" Coupling
1.00
EACH
$375.00
1.00
$
375.00
$ -
1.00
$ 375.00
0790
2599 - 9999005
12" Mega Lugs
13.00
EACH
$175.00
13.00
$
2,275.00
$ -
13.00
$ 2,275.00
0800
2599 - 9999005
10" Mega Lugs
7.00
EACH
$170.00
4.00
$
680.00
$ -
4.00
$ 680.00
PAGE 3 of 4
City of Dubuque - Engineering Department
City Council Final Payment Form THE crrY OF
PAYMENT NO: COUNCIL FINAL DUB
E
PROJECT NAME: HMA Resurfacing and Milling Project U
Masterpiece on the Mississippi
US52 - White Street (9th - 11th) and 11th Street (White Street to Elm Street)
CONTRACTOR: Eastern Iowa Excavating & Concrete, LLC AWARDED CONTRACT AMOUNT: $ 663,771.22 FINAL COST ACCEPTANCE
ADDRESS: 121 Nixon Street SE, PO Box 189
CONTRACT RECONCILIATION:
$
(4,741.21)
DATE:
December 6, 2021
CITY, STATE, ZIP: Cascade, IA 52033
FINAL CONTRACT AMOUNT:
$
659,030.01 -0.71
INE
LINE
L:::]
CONTRACT
TOTAL TO -DATE
CURRENT PAY PERIOD
NO.
ITEM NUMBER
BID ITEM DESCRIPTION
QUANTITY
UNIT
UNIT COST
QUANTITY
AMOUNT
QUANTITY AMOU NT
QUANTITY
AMOUNT
0810 2599 - 9999005
8" Mega Lugs
21.00
EACH
$100.00 19.00
$ 1,900.00
$ -
19.00
$
1,900.00
0820 2599 - 9999005
6" Mega Lugs
3.00
EACH
$95.00 7.00
$ 665.00
$ -
7.00
$
665.00
WATER MAIN AMOUNT EARNED TO DATE
Sub Total
$
63,247.90
LINE
CONTRACT
TOTAL TO -DATE
FINAL
CURRENT PAY PERIOD
NO.
ITEM NUMBER
DESCRIPTION - CHANGE ORDER / EXTRA WORK ITEMS
QUANTITY
UNIT
UNIT COST
QUANTITY
AMOUNT
QUANTITY AMOUNT
QUANTITY
AMOUNTT
0830 2599 - 9999018
Decorative Concrete Sidewalk, 4 IN., Reverse Mix
131.99
SY
$78.00
131.99
$
10,295.22
$ 131.99
$ 10,295.22
0840
Abandoned Gas Main Removal, 20-IN
247.00
LF
$16.00
247.00
$
3,952.00
$ - 247.00
$ 3,952.00
0850
Storm SWR, ADS, 15 IN.
24.00
LF
$60.00
24.00
$
1,440.00
$ - 24.00
$ 1,440.00
0860
Storm SWR, PVC, 12 IN.
9.00
LF
$58.00
9.00
$
522.00
$ - 9.00
$ 522.00
$
-
$ - 0.00
$ -
CHANGE ORDER AMOUNT EARNED TO DATE Sub Total
$ 16,209.22
FINAL CHANGE ORDER AMOUNT EARNED:
$ 16,209.22
FINAL TOTAL CONTRACT AMOUNT EARNED:
$ 659,030.01
FINAL PROJECT COST SUMMARY
AWARDED CONTRACT AMOUNT:
$663,771.22
BID ITEM(S) OVER / UNDER RECONCILIATION:
$ (20,950.43)
TOTAL CONTRACT CHANGE ORDER(S):
1 $ 16,209.22
FINAL CONTRACT AMOUNT / TOTAL DUE CONTRACTOR:
$659,030.01
RIGHT-OF-WAY ACQUISITION:
$ -
ENVIRONMENTAL -ARCHEOLOGICAL SERVICES:
$
GEOTECHNICAL SERVICES:
$
ENGINEERING DESIGN SERVICES:
$ 69,222.00
ADMIN / CONSTRUCTION ENGINEERING & INSPECTION:
$ 41,924.40
TOTAL PUBLIC IMPROVEMENT CONSTRUCTION COST:
$770,776.41
PAGE 4 of 4
City of Dubuque - Engineering Department
City Council Final Payment Form
PAYMENT NO: COUNCIL FINAL
PROJECT NAME: HMA Resurfacing and Milling Project
US52 -White Street (9th -11th) and 11th Street (White Street to Elm Street)
CONTRACTOR: Eastern Iowa Excavating & Concrete, LLC AWARDED CONTRACT AMOUNT:
ADDRESS: 121 Nixon Street SE, PO Box 169 CONTRACT RECONCILIATION:
CITY, STATE, ZIP: Cascade, IA 52033 FINAL CONTRACT AMOUNT:
CERTIFICATE OF THE CITY MANAGER
I hereby certify that the above statement shows in detail the correct
amount of all work required to complete the above improvement.
APPROVED:
Michael Van Milligen, City Manager
City of Dubuque, Iowa
$ 663,771.22
S fa 741.21 i
$ 659,030.01 -0.71%
btr�
Masterpiece on the Mississippi
FINAL COST ACCEPTANCE
DATE: December 6, 2021
CERTIFICATE OF THE CITY ENGINEER
I hereby certify that the above statement shows in detail the correct
amount of all work required to complete the above improvement.
CERTIFICATE OF THE CONTRACTOR
APPROVED:
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
The undersigned, Eastern Iowa Excavating & Concrete, LLC contractor for the above public improvement, does hereby accept the above "Total Due Contractor',
as full settlement for all costs and claims for said puplic improvement construction project.
CONTRACTOR: Eastern Iowa Excavating 3 Concrete, LLC
BY: Matt Menster
M S` /
DATE: December 2, 2021
TITLE: Project Manager