2021 Airport Parking Lot Resurfacing ProjectCopyrighted December 20, 2021 City of Dubuque Consent Items # 27. City Council Meeting ITEM TITLE: 2021 Airport Parking Lot Resurfacing Project SUMMARY: City Manager recommending acceptance of the construction contract for the 2021 Airport Parking Lot Resurfacing Project, as completed by River City Paving, in the final contract amount of $117,061.62, which is a 0.6% increase over the original contract amount of $116,316.31 due to additional milling and paving quantities required. RESOLUTION Accepting the 2021 Airport Parking Lot Resurfacing Project and authorizing the final payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: FIN ik[91:ILyil21ZIII l+] Description Type 2021 Airport Parking Lot Resurfacing Project-MVM City Manager Memo Memo Staff Memo Resolution Staff Memo Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Airport Parking Lot Resurfacing Project DATE: December 10, 2021 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2021 Airport Parking Lot Resurfacing Project, as completed by River City Paving, in the final contract amount of $117,061.62, which is a 0.6% increase over the original contract amount of $116,316.31 due to additional milling and paving quantities required.. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUj!B9kFE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2021 Airport Parking Lot Resurfacing Project DATE: December 10, 2021 Dubuque AIIā€¢Amarica City 2007-2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2021 Airport Parking Lot Resurfacing Project. BACKGROUND The 2021 Airport Parking Lot Resurfacing Project provided for the milling of 1-1/2" of existing HMA pavement and resurfacing of 2" of HMA pavement. Total SY of milling and resurfacing equals 6788.22 SY. DISCUSSION The 2021 Airport Parking Lot Resurfacing Project was completed by River City Paving of Dubuque, IL in the final contract amount of $117,061.62. This is a 0.6% increase over the original contract amount of $116,316.31. The increase was due to additional milling and paving quantities required. BUDGETIMPACT The summary of project costs for the 2021 Airport Parking Lot Resurfacing Project is as follows: Description Estimate Award Final Construction Contract $ 127,671.00 $116,316.31 $117,061.62 Contingency $12,767.10 $12,767.10 0.00 Construction Administration & Inspection $ 21,065.72 1 $21,065.72 $11,706.17 Total Construction Cost $ 161,503.82 $150,149.13 $128,767.79 The project funding is summarized below: CIP No. Fund Description Fund Amount 3902664 Airport Asphalt Repair $ 128,767.79 Total Project Funding $ 128,767.79 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $117,061.62 to River City Paving for the 2021 Airport Parking Lot Resurfacing Project. cc: Todd Dalsing, Airport Director 2 Prepared by Jon Dienst City of Dubuque Engineedng 50 W. 13'" St Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13' St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 439-21 ACCEPTING THE 2021 AIRPORT PARKING LOT RESURFACING PROJECT AND AUTHORIZING THE FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2021 Airport Parking Lot Resurfacing Project, (the Project) has been completed by the Contractor, River City Paving (Contractor), and the City Engineer has examined the work and signed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $117,061.62; and WHEREAS, the Contractor has previously been paid $111,208.54, leaving a balance of $5,853.08; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Airport Asphalt Repair appropriations for the contract amount of $117,061.62 less any retained percentage provided for therein as provided in Iowa Code. Section 3. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $5,853.08 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 2011 day of December 021. Roy D. B ol, Mayor Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2021 AIRPORT PARKING LOT RESURFACING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2021 Airport Parking Lot Resurfacing Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $128,767.79. Dated this loth day of December 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 10th day of December 2021. .fir+ f: / Adrienne N. Breitfelder, City Clerk