Acceptance of Multicultural Family Center (MFC) Expansion and Renovation ProjectCopyrighted December 20, 2021 City of Dubuque Consent Items # 28. City Council Meeting ITEM TITLE: Acceptance of Multicultural Family Center (MFC) Expansion and Renovation Project SUMMARY: City Manager recommending acceptance of the construction contract for the Multicultural Family Center Expansion and Renovation Project, as completed by Sheets Design Build, LLC, in the final contract amount of $1,280,840.53, which is a 9% increase from the original contract amount of $1,177,000.00. RESOLUTION Accepting the Multicultural Family Center Expansion and Renovation Project and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type MFC Expansion and Renovation Project-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Acceptance of Multicultural Family Center (MFC) Expansion and Renovation Project (CIP 360-2742) DATE: December 15, 2021 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Project Manager Steve Sampson Brown is recommending acceptance of the construction contract for the Multicultural Family Center Expansion and Renovation Project, as completed by Sheets Design Build, LLC, in the final contract amount of $1,280,840.53, which is a 9% increase from the original contract amount of $1,177,000.00. The increase was due to structural framing repairs, HVAC modifications, building fagade improvements and electrical panel upgrades. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Steve Sampson Brown, Project Manager THE CF Dubuque D!Uj--B Eh ANneriea City axnuervx a an. Masterpiece on the Mississippi � pp zoo�-o 13 zoi7*20*zoi9 TO: Michael C. Van Milligen - City Manager FROM: Steve Sampson Brown -Project Manager SUBJECT: Acceptance the Multicultural Family Center (MFC) Expansion and Renovation Project (CIP 360-2742) DATE: December 10, 2021 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Multicultural Family Center Expansion and Renovation Project. DISCUSSION The Ruby Sutton Building and the former Colts Building was separated by a narrow two - foot gap between the buildings. This project connected the two buildings to create one interconnected facility. The expanded facility now features the following amenities: • A large flexible meeting space with movable screens that can seat approximately 200 people at tables, or be divided by screens into smaller areas • A kitchen with plenty of room for the many events and activities that the MFC is known for • Two large multipurpose rooms • Two meeting rooms • Six individual/family style restrooms • Additional storage to accommodate the equipment & supplies for the many programmed events • The existing kitchen area was renovated to a reception area and the computer area was expanded The award recommendation also included selection of two bid alternates. The first alternate replaced the existing carpet and wall base molding with new flooring at front living room area of the existing building. The second bid alternate included the renovation of the office suite area at the rear of the Ruby Sutton Building to allow the Human Rights Department to relocate from City Hall Annex to the MFC. As part of the office suite renovation the multipurpose room was converted into fixed wall offices and a staff collaboration space/meeting room. Page 1 of 3 In addition, the project team also distributed two Requests for Proposal to select vendors for providing furnishings and audio-visual equipment. The Multicultural Family Center Expansion and Renovation Project was completed by Sheets Design Build, LLC of Maquoketa, Iowa in the final contract amount of $1,280,840.53 which is a 9.0% increase from the original contract amount of $1,177,000.00. The increase was due to structural framing repairs, HVAC modifications, building facade improvements, and electrical panel upgrades. RECOMMENDATION I recommend that the City Council accept the public improvements and authorize the payment of the final contract amount of $1,280,840.53 to Sheets Design Build LLC for the Multicultural Family Center Expansion and Renovation Project. BUDGETIMPACT The project cost summary for the Multicultural Family Center Expansion and Renovation Project is summarized below: PROJECT COSTS AWARD FINAL Construction Hard Costs Construction Contract — Base Bid $1,096,000 Alt. 1 — Replace existing carpet and wall base with new at front living room area of existing building. $8,000 Alt. 2 — Renovation existing MFC offices and Multi -Purpose Room into new office space. $73,000 Construction Contract — Base Bid $1,177,000 Contingency (10%) $117,700 Change Order Amounts $103,840.53 TOTAL PROJECT COST $1,524,650 1,280,840.53 The project funding summary is as follows: CIP Funding Source Amount 360-2742 MFC Addition Remodel $1,280,840.53 TOTAL PROJECT FUNDING $1,280,840.53 Page 2of3 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the public improvements in the contract amount of $1,280,840.53 with Sheets Design Build, LLC for the Multicultural Family Center Expansion and Renovation Project. SSB\kb Attachments cc: Jenny Larson, Budget and Finance Director Gus Psihoyos, City Engineer Marie Ware — Leisure Services Manager Justin Hogan — Facility Manager Page 3of3 Prepared by Steve Sampson Brown City of Dubuque Engineering 50 W. 13`" St Dubuque IA 52001 (563)589 4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131" St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 440-21 ACCEPTING THE MULTICULTURAL FAMILY CENTER EXPANSION AND RENOVATION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Multicultural Family Center Expansion and Renovation Project, (the Project) has been completed by the Contractor, Sheets Design Build, LLC of Maquoketa, Iowa (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $1,280,840.53; and WHEREAS, the Contractor has previously been paid $1,280,840.53, leaving a balance of $0.00; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $0.00 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 20tb day of December 2021. Attest: Adrienne N. Breitfelder,'City Clerk , /" � &tom/" Roy D. uol, Mayor Prepared by Steve Sampson Brown City of Dubuque Engineering 50 W. 131h St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF MULTICULTURAL FAMILY CENTER EXPANSION AND RENOVATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Multicultural Family Center Expansion and Renovation Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total project cost of the completed work is $1,280,840.53. Dated this 10nd day of December 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 10t" day of December 2021. Adrienne N. Breitfelder, City Clerk