Feasibility Study for Converting Trenkle Building into Municipal Offices_02.07.1978FEASIBILITY STUDY FOR CONVERTING TRENKLE BUILDING INTO MUNICIPAL OFFICES DUBUQUE, IOWA CITY OF DUBUQUE, IOWA Mayor Thomas A. Tully, Jr. COUNCIL James E. Brady Sr. Carolyn Farrell D. Michael King Richard P. Wertzberger CITY MANAGER Gilbert D. Chevanelle ARCHITECTS & ENGINEERS February 7, 1978 Rossiter & Hamm 169 Main Street Dubuque, IA 52001 Tel. (319) 582-7241 INTRODUCTION The purpose of this feasibility study is to present several thought-out proposals of how the old Trenkle property can, in conjunction with the City Hall, be used for consolidating the municipal offices now spread around town. The City Administration provided space needs for each depart- ment to be housed in this annex. No restriction was placed by the administration on which part of the Trenkle Building is to be saved nor on which part could be demolished. In fact, one alterante is to demolish the entire building and erect a new building. The building was carefully examined for the structural feas- ibility of its reuse. The mechanical and electrical systems were also explored, including the sprinklers. SPACE REQUIREMENTS Space needs for each department to be housed in the City Hall Annex are as follows: Area Sq. Ft. Community Development 2500 Health 1000 Youth Service 400 Finance 1000 Public Works - Engineering Water Dock Commission 5000 Total net office space needs 9900 Required services such as elevator, stairways, corridors, vest- ibules, toilets and storage were also included as space needs. -2- EXISTING CONDITIONS A careful review of the building shows that it was built in three parts as follows: The 2-story retail portion in front is 90 or 100 years old. 2. The 2-story manufacturing area at the rear is about 50 years old. 3. The 1-story administration, smoking and shipping area is about 25 years old. Sheet 4 is the first floor plan indicating the room arrange- ment and numbering of rooms. Sheet 5 is the second floor plan, which likewise shows the room arrangement and numbering. Sheet 6 is a schedule of existing conditions which tabulates concisely the most important information needed for this study. You will see that 8 of the 20 rooms have a pronounced slope, one of which is over 9 inches. To level these rooms with a concrete leveling slab usually exceeds the carrying capacity of the joists, leaving nothing for the live load of people, furniture and partitions. Another real problem for remodeling is that the floor levels of adjacent rooms vary so drastically. On the first floor there are 8 different levels. On the second, there are 2. Adjacent room levels vary from 4 inches to 14 inches. Since there are overloaded wood joists in the 100 year old building, it is necessary to go to a stronger construction, so a steel joist and concrete slab system is being used in the remodeling. The heating system cannot be reused, the electrical power and lighting system cannot be adapted to these needs. The plumb- ing system with the exception of services, are not properly located to be useable. -3- Sn1�� J 1 .1 j om ■o■�■■o■■■a a o■■■■ o■■■ non®�■■o■o■■■■■!■■a■■■■io■■■ S� e DESIGN DEVELOPMENT After mature thought, it was decided to explore 4 designs. In all designs a new electrical and mechanical system would be included. I. Remodel 1-Story Portion Only a. Remove partitions, toilets and brick pavers. b. Install new toilets. C. Provide interior finish. II: Remodel Entire Existing Building a. Replace wood joist floors with steel and con- crete floors. b. All new interior finish. c. Leave existing granite, Winona Travertine and buff brick. Tuckpoint original red brick. III. Partial Remodeling and Partial New Building a. Reuse 1955 1-story building, but install new in- terior finish. b. Demolish old 2-story building and haul away. c. Build new 2-story building using existing found- ations as much as possible. Enlarge new building where necessary. d. Veneer 1-story building with brick to match new building and City Hall. IV. New Building a. Demolish entire Trenkle Building and haul away. b. Erect new building in best location for circul- ation, parking and design arrangement. -7- SCHEME I - REMODEL 1-STORY PORTION ONLY An inspection of the existing 1-story building shows a number of different floor materials,.but not too many different levels and slopes as can be seen by the "Schedule of Existing Condi- tions". This is the easiest part of the Trenkle plant to re- model, consequently the remodeling dollar will go farther per square foot in this area. The brick pavers, concrete curb, concrete equipment bases would be removed in Rooms 106, 107 and 108, and a number of partitions and toilet fixtures removed. New ceilings, floors and wall finishes would be added. A new heating, ventilating and air conditioning unit would be supplied for this building. Plumbing needed for the new toilets would be furnished. A new electrical system for both power and lighting is included. As long as the 2-story building remains, even though it is un- used, a sprinkler system must be installed in the basement of that building. No work is contemplated on the exterior of the building and, when finished, it will look exactly like it does now. COST ESTIMATE FOR SCHEME #1 (Existing Two Story Portion of Build- ing To Remain) Cost of remodeling one-story portion of building for usable office space Architect's Fees Contract Documents 8% Supervision 2,10% 10% of $83,000 Contingency - 10% of $83,000 Administrative Cost - Legal Notice, consult= ants, etc. Total Costs - Building, Architects Fees, Con- tingency and administrative costs $83,000.00 8,300.00 8,300.00 1.000.00 $100,600.00 Ian- PjAin- a 3 is to Sch Am 1 I SJali 9 SCHEME II - REMODEL ENTIRE EXISTING BUILDING All of the adminstrations space needs are met except for about 1500 square feet of that needed by Engineering. All roof clutter including water tower, tall chimneys, elevator penthouse will be removed. Wood joisted floors would be removed and steel joists and con- crete slabs would be installed in their place. All interior floor, wall and ceiling finishes would be new. There would be two new stair towers, one new elevator and a pair of toilet rooms. All electrical, heating, ventilating, air conditioning and plumbing would be new, as well as sprinklers in basement. There would, however, be nothing done on the exterior ex- cept the removal of two small additions on the north side and tuckpointing the north, west and south brick walls of the 2- story portion. This scheme, in addition to not meeting the space needs of 9,900 square feet of offices, has the disadvantage of not blending with the red brick faced city hall. In fact, the Trenkle building has polished granite, machined Winona tra- vertine, buff brick and some red brick. COST ESTIMATE FOR SCHEME #2 Cost of Remodeling Existing Building For Usable Office Space. $540,000.00 Architect's Fees Contract Documents 8% Supervision 2Y. 10% of $540,000 54,000.00 Contingency - loq of $540,000 54,000.00 Administrative Cost -Legal Notice, Consultants, etc. 5,500.00 Total Costs - Building, Architect's Fees, Contin- gency and Administrative Costs $653,500.00 -10- °'1 N Cjut to dqu-b ii a . Sc.hem� 2 S.kan� 12 z apt �L �6'-LA" ZL"O-&- G h,. 2 I S 13 N Iw,- -'LLLI L_2n.Z2d_C LLo[.et.ctP. SCHEME III - PARTIAL REMODELING AND PARTIAL NEW BUILDING This scheme reuses the 1-story building. The 2-story build- ing would be demolished except for the foundation walls on which the new 2-story construction is built. In order to meet the 9,900 square feet of office space, the second floor is built north of the north wall. The required two stair towers, elevator and pair of toilets are incorporated. The same improvments in the 1-story building as shown in Scheme 1 with the omission of the toilets, but with the addition of a brick veneered exterior to match City Hall. All electrical, heating, ventilating, air conditioning, plumbing and basement sprinklers would be new. This scheme, in addition to meeting the space needs of offices, is finished on the exterior with a brick and an architectural style that blends harmoniously with City Hall. COST OF SCHEME #3 Cost of demolition of existing two-story portion of building, remodeling existing one-story section and constructing new two-story addition to give building as much area as is required by the program. $716,000.00 Architect's Fee Contract Documents 80% Supervision T1. 10% of $716,000 71,600.00 Contingency - 10 of $716,000 71,600.00 Administrative Cost - Legal Notice, Consultants, etc. 7,000.00 Total Costs - Building, Architect's Fees, Con- tingency and administrative costs $866,200.00 -15- C o &A Lt lv� F �,Al Flz� ply j M. �f Schame_ 9 SJiacf I LI AJ LILX. S I OYL I'. LIA— S LLAL- 3 1 Si aL 17 �&LI ZLwltf� Him n�--1 == Imo... S &.._cf I N �uDE �fnrIr 11MIN Srtin,x�e 3 �iitnn� l9 SCHEME IV - NEW BUILDING This scheme provides all the needs requested by staff with respect to office space, also a full basement; includes needed circulation in the form of stairs, elevators, corri- dors and the necessary pair of toilet rooms. There was space left over for a conference room on the first floor. Included is electrical, heating, ventilating, air conditioning, plumbing and basement sprinklers. The materials and architectural style of this edifice matches that of the Georgian Style of City Hall. Its siting onthe newly acquired Trenkle property, blends well with City Hall, is located close enough so a tunnel can connect the two and provides a landscaped court between the two. COST OF SCHEME #4 Cost of demolition of existing building, fill and of compaction of existing basement and construction of new building. $748,000.00 Architect's Fees Contract Documents 4.8Y Supervision 1.2% — of $748,000 45,000.00 Contingency - 6% of $748,000 45,000.00 Administrative cost - Legal Notice, Consultants, etc. 7,500.00 Total Costs - Building, Architect's Fees, Con- tingency and Administrative Costs $845,500.00 -20- IDDO SO. FT. ' MOD S Q. FT ' a i LArbA L o rt�n rim VJ. T�� 300 SQ.FT. 1000 SQ. FT. b. Ci-m-ffiA1L r i n of F-k rL- PIA-�YL- a 5 10 f0 ■ -- cur-a. i i S r h e w 4 S-ILLd 2I ■ 45 U U S Q . FT. ■ N r L • V 17 4= im S J-C-� f Q ink PI&AL- ODb IG SO r R S cAasxa_ 4 Shuat 2 2 1 1 i 1 ScAew_ 4 Sh.cf 15 SUMMARY DESCRIPTION SCHEME #1 SCHEME #2 SCHEME #3 SCHEME #4 Remodel 1- Remodel en- Partial New Story only tire exist- rmdlg. & Building ing bldg. partial new bldg. Useable Office Area sq. ft. 2500 8790 lo,470 12,000 Gross area of building incl. walls, corridors, - toilets, stairs, ele- vators and offices in sq. ft. 3820 12,780 14,360 15,400 -� Number of parking spaces 37 37 33 38 Cost/sq. ft. of bldg. $21.73 $42.25 $49.86 $48.57 Cost of Building $83,000 $540,Oo0 $716,000 $748,000 Cost of Project $100,600 $653,500 $866,200 $845,500 * Weighted average to include 1500 sq. ft. basement. -25-