Sealed bids were received for the US 52 Traffic Flow Enhancement Project. City
Engineer Gus Psihoyos recommends award of the contract to the low bidder, Portzen
Construction, Inc., in the amount of $970,792.42, which is 14.3% over the estimate of
probable cost. Much of this project is located in the downtown area where there are
many underground obstacles and unknowns which could lead to additional costs versus
similar work at other locations. City Engineer Gus Psihoyos has identified additional
funding sources.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
Michael C. Van Milligen
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
1 C)
FROM: Gus Psihoyos, City Engineer
(2
Dubuque
all- anedcacnr
'1 11 '
2007
SUBJECT: US 52 Traffic Flow Enhancement Project
CIPs 3001266 (FY10/11), 3001133 (FY 10/11), 1001818, 3002256,
3002803, 3001549, 3501608, 1021609, 2501816
DATE: July 28, 2010
INTRODUCTION
The enclosed resolution authorizes the award of the construction contract for the US 52
Traffic Flow Enhancement Project.
DISCUSSION
The US 52 Traffic Flow Enhancement Project will provide for the reconstruction of traffic
signals along US 52 (Central Avenue) including 32 " 22 20 17 and 14 Streets.
New fiber optics conduit and cable will be installed and will connect the signalized
intersections along Central Avenue between City Hall and IA 32 (NW Arterial). The
reconstructed signals will include the standard ITS components including battery
backup, pre - emption, PTZ cameras and network switches. These newly - rebuilt signals,
along with the 9 and Central and the IA 32 signal, will all be tied into the City -wide
traffic management software located in the traffic operations center at City Hall.
BID RESULTS
Sealed bids were received on the project on July 27, 2010. Portzen Construction, Inc. of
Dubuque, Iowa, submitted the low bid in the amount of $970,792.42. This amount is
14.3% over the estimate of probable cost. Much of this project is located in the
downtown area where there are many underground obstacles and unknowns which
could lead to additional costs versus similar work at other locations. A summary of the
bid proposals received is as follows:
Contractor Name
Portzen Construction, Inc.
Price Industrial Electric
Total Bid
$ 970,792.42
$1,354,228.26
RECOMMENDATION
recommend that the contract be awarded to Portzen Construction, Inc. in the amount
of $970,792.42.
PROJECT COST - BUDGET IMPACT
The estimate of probable cost for the US 52 Traffic Flow Enhancement Project is as
follows:
Construction Contract
Contingency
Engineering /Contract Administration
Equipment Pre - Purchase
Total Project Cost
The project funding summary is as follows:
Estimate
$ 849,720.00
102,372.00
125,000.00
174,000.00
$1,251,092.00
Award
$ 970,792.42
102,372.00
125,000.00
170,000.00
$1,368,164.42
Based on the bid results, additional funding is required: $50,000 in funding will come
from existing street lighting funds (CIPs 3001549, 3501608) to help cover the cost of
lighting cabinets installed as part of this project; $27,072.42 in funds (CIP 2501816) will
be used from the Traffic Signal Vehicle Detection CIP to help cover the cost of new
detection installed at 22 and 32 Street; and $40,000 (CIP 1021609) will be used from
existing fiber optic CIPs to help cover the cost of new fiber conduit.
CIP Funding Source Amount
Iowa Energy Efficiency and Conservation Block Grant $ 500,000.00
3001266 Traffic Signal Interconnect (FY 2010) 74,000.00
3001266 Traffic Signal Interconnect (FY 2011) 100,000.00
3001133 Mastarm (FY 2010) 50,000.00
3001133 Mastarm (FY 2011) 105,000.00
1001818 Rockdale Road Corridor Study 100,000.00
3002256 Pennsylvania at Radford Road Intersection Signal 60,000.00
3002083 Derby Grange Intersection 262.092.00
3001549 Street Light Replacement and New Installation 25,000.00
3501608 Downtown Street Light Replacement Schedule 25,000.00
1021609 Fiber Optic In Private and Misc 40,000.00
2501816 Traffic Signal Vehicle Detection Conversion 27,072.42
Total Project Funding $1,368,164.42
The City was awarded a State Energy Efficiency and Conservation Block Grant in the
amount of $500,000. This grant funds projects that show improved energy efficiency by
coordination of the traffic signals and making them run more efficiently to minimize
motorist fuel consumption. This grant has a 50% match that will be funded by utilizing
existing transportation - related CIPs.
ACTION TO BE TAKEN
I recommend that the City Council adopt the attached resolution awarding the US 52
Traffic Flow Enhancement Project to Portzen Construction, Inc. in the amount of
$970,792.42.
Prepared by David Ness, Civil Engineer II
cc: Jenny Larson, Budget Director
RESOLUTION NO. 282-10
AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE US 52 TRAFFIC FLOW
ENHANCEMENT PROJECT
Whereas, sealed proposals have been submitted by contractors for the US 52
Traffic Flow Enhancement Project (the Project) pursuant to Resolution No. 236 -10 and
Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on
the 9 day of July, 2010.
Whereas, said sealed proposals were opened and read on the 27 day of July,
2010 and it has been determined that Portzen Construction, Inc. of Dubuque, Iowa, with
a bid in the amount of $970,792.42, is the lowest responsive, responsible bidder for the
Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That a Public Improvement Contract for the Project is hereby awarded to Portzen
Construction, Inc. and the City Manager is hereby directed to execute a Public
Improvement Contract on behalf of the City of Dubuque for the Project.
Attest:
Passed, approved and adopted this 2nd day of August , 2010.
eanne F. Schneider, CMC, City Clerk
Roy D. Buol, Mayor
CITY OF DUBUQUE
US 52 TRAFFIC FLOW ENHANCEMETN PROJECT
IIW Project No.: 09064 -03
Page 1
BID TAB
NO. DESCRIPTION
1 MOBILIZATION & MISCELLANEOUS
2 REMOVE PAVEMENT OR DRIVEWAY
3 REMOVAL OF SIDEWALK
4 REMOVAL OF CURB AND GUTTER
5 REMOVE PCC WALL AND STEPS, 17TH ST. SW CORNER
6 REMOVE PCC STEPS, 17TH STREET NW CORNER
7 REMOVE PCC STEPS, 22ND STREET SE CORNER
8 REMOVE EXISTING HANDHOLE
9 BASE STONE
10 SIDEWALK, P.C. CONCRETE, 4IN.
11 SIDEWALK, P.C. CONCRETE, 6 IN.
12 CURB & GUTTER, P.C. CONCRETE, 2.5 FEET
13 DETECTABLE WARNING - CURB RAMP
14 RediMat SURFACE APPLIED DETECTABLE WARNING, 17TH ST.
15 ARMOR -TILE SURFACE APPLIED DETECTABLE WARNING, 22ND ST.
16 PCC PATCHES, FULL -DEPTH FINISH, BY AREA
17 PCC PATCHES, FULL -DEPTH FINISH
18 PCC STEPS
19 PCC BARRIER CURB
20 PCC WALL
21 RAILING, 17TH STREET
22 FLOWABLE MORTAR
QUANTITY UNIT PRICE
$53,000.00
$15.00
1 LS
451.6 SY
633.3 SY
26 LF
1 LS
1 LS
1 LS
9 EA
542 TON
482.8 SY
150.5 SY
25.6 LF
168 SF
16 SF
16 SF
1221 SF
4 EA
39 LF
20.3 LF
11.5 LF
1 LS
20 CY
Portzen Construction
$11.00
$5.00
$750.00
$900.00
$600.00
$350.00
$17.00
$40.50
$54.00
$24.00
$40.00
$50.00
$50.00
$10.50
$500.00
$50.00
$70.00
$110.00
$850.00
$150.00
TOTAL PRICE
$53,000.00
$6,774.00
$6,966.30
$130.00
$750.00
$900.00
$600.00
$3,150.00
$9,214.00
$19,553.40
$8,127.00
$614.40
$6,720.00
$800.00
$800.00
$12,820.50
$2,000.00
$1,950.00
$1,421.00
$1,265.00
$850.00
$3,000.00
Price Industrial Electric
UNIT PRICE
$8,000.00
$17.25
$8.62
$11.50
$4,050.00
$3,795.00
$3,105.00
$224.25
$16.10
$43.70
$57.50
$33.93
$52.90
$103.50
$103.50
$32.20
$402.50
$179.40
$142.60
$382.95
$3,200.00
$184.00
TOTAL PRICE
$8,000.00
$7,790.10
$5,459.05
$299.00
$4,050.00
$3,795.00
$3,105.00
$2,018.25
$8,726.20
$21,098.36
$8,653.75
$868.61
$8,887.20
$1,656.00
$1,656.00
$39,316.20
$1,610.00
$6,996.60
$2,894.78
$4,403.93
$3,200.00
$3,680.00
CITY OF DUBUQUE
US 52 TRAFFIC FLOW ENHANCEMETN PROJECT
Page 2
NO. DESCRIPTION
23 8" PCC PAVEMENT WITH INTEGRAL CURB AND GUTTER
24 HMA 300k SURFACE COURSE, 1/2" (PG64 -22) PAVEMENT
25 PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT -BASE(
26 TRAFFIC CONTROL
27 FOUNDATION FOR TRAFFIC SIGNAL CONTROL CABINET & INSTALL
CABINET
28 FIBER OPTIC HUB CABINET AND FOUNDATION 3 EA
29 FOUNDATION FOR TESCO BATTERY BACKUP & INSTALL TESCO 5 EA
30
31
32
33
34
35
39
40
41
42
43
44
45
CONDUIT, HDPE, 2 ", PUSHED
CONDUIT, HDPE, 4 ", PUSHED
CONDUIT, HDPE, 4" WITH 4 - 1" INNERDUCT CONDUITS, PUSHED
CONDUIT, RIGID HDPE, 2 ", TRENCHED
CONDUIT, RIGID HDPE, 4 ", TRENCHED
CONDUIT, RIGID HDPE, 4" WITH 4 - 1" INNERDUCT CONDUITS,
TRENCHED
CLASS 12 EXCAVATION
TOTAL OF BID
QUANTITY
316 SY
62 TON
40.3
1
5
FIBER VAULT, 48" ROUND 1 EA
FIBER VAULT, SQUARE 17 EA
24" ROUND HANDHOLES 12 EA
PRECAST HANDHOLE with NEENAH R6689 lid marked "Traffic Signals" 5 EA
REMOVAL OF TRAFFIC SIGNALIZATION 1 LS
REMOVAL OF TRAFFIC SIGNALIZATION; 15TH STREET 1 LS
36 TRAFFIC SIGNALIZATION 1 LS
37 CORE DRILL FIBER VAULT OR HANDHOLE 129 EA
38 FIBER OPTIC CABLE; 48 SINGLE MODE AND 24 MULTIPLE MODE 23153 LF
632
739
5315
677
49
4048
100
STA
LS
EA
LF
LF
LF
LF
LF
LF
CY
Portzen Construction
UNIT PRICE
$46.00
$132.00
$60.50
$15,250.00
$2,528.45
$6,465.05
$2,053.65
$3,507.60
$3,303.75
$863.80
$2,031.80
$13,000.00
$3,000.00
$395,494.50
$130.00
$2.00
$20.36
$26.80
$18.59
$7.00
$13.00
$11.50
$85.00
TOTAL PRICE
$14,536.00
$8,184.00
$2,438.15
$15,250.00
$12,642.25
$19,395.15
$10,268.25
$3,507.60
$56,163.75
$10,365.60
$10,159.00
$13,000.00
$3,000.00
$395,494.50
$16,770.00
$46,306.00
$12,867.52
$19,805.20
$98,805.85
$4,739.00
$637.00
$46,552.00
$8,500.00
I $970,792.421
Price Industrial Electric
UNIT PRICE
$82.80
$210.00
$482.00
$19,400.00
$4,200.00
$7,200.00
$1,800.00
$3,800.00
$3,200.00
$650.00
$750.00
$23,600.00
$3,400.00
$617,688.24
$160.00
$3.20
$13.25
$18.00
$26.00
$6.50
$8.50
$23.00
$95.00
TOTAL PRICE
$26,164.80
$13,020.00
$19,424.60
$19,400.00
$21,000.00
$21,600.00
$9,000.00
$3,800.00
$54,400.00
$7,800.00
$3,750.00
$23,600.00
$3,400.00
$617,688.24
$20,640.00
$74,089.60
$8,374.00
$13,302.00
$138,190.00
$4,400.50
$416.50
$93,104.00
$9,500.00
1 $1,354,228.261