Letter from Architects on Fee Computation_09.14.1976Ronald Gene Bowen aia Henry K. Kanazawa aia Frederick E. Zimmermann aia Rolland H. Williamson September 14, 1976 Mr. Randy Nig Vice Chairman Five Flags Civic Center Commission City Hall Dubuque, Iowa 52001 Re: Five Flags Civic Center Dear Mr. Nig: Pursuant to the Five Flags Civic Center Commission's request, I have enclosed a copy of our Fee Computation discussed with the Commission September 13. There have been some revisions based on our discussions at that meeting. They include the following: 1. We have attempted to reflect the differences in the complexity of the project by breaking down the various parts. For instance, we have indicated a normal 6% Fee for the more open and con- ventional parts of the project, while reflecting the more complex areas necessitating greater work at a higher fee (incidently, this follows a normal procedure for additions to existing buildings). 2. We have drawn a distinction between what I will call attached building equipment and moveable equipment. I have not applied a fee on the moveable equipment, i, e. ice surfacer, bleachers, removeable basket floor and removeable ice floor cover, and miscellaneous equipment. The rationale being that management or the City of Dubuque would purchase these direct. 3. I have identified the special consultants and reimbursable expenses separately. These could be contracted for separately if in the interest of the City, but I would recommend they be under our control so we can oversee their work and coordinate it. 4. Our discussion Monday led me to believe the Commission is interested in proceeding essentially with the Schematic Design as presented to the voters. I chatted with Al Lundh on Tuesday, and he confirmed my impression. If that is the case, I believe it would be fair to apply an additional credit for the work all ready executed. I had earlier suggested that the $12, 000 Feasibility Fee be applied, and would further suggest an additional $8, 000 be credited (or a total of $20, 000) toward the total A/E Fee. I have reflected that credit in my computation. Eleven North Allen Madison, Wisconsin usa 53705 608-238-7626 i -2- September 14, 1976 Mr. Randy Nig i Taking our discussions and the scope of the work into consideration, I feel a 6.1% Average Fee on the f construction thenCitytsis a nterestanot to nd peti- tive figure. I would propose, but rather fix the fee at a lump sum proceed on a percentage basis, amount. This sometimes avoids any concern about our choose to we will want, of course, to negotiate being a function of what we design or specify. If you choose to putt e special consultants under our fee, the fees those before firming up on that portion (I believe, however, as outlined are very close). lease I hope the enclosed is responsive to the questions raised. If not, p feel free to call. I sincerely believe our continued involvement along f this success 0 swith you uccess will assure the move forward most interesting project. Much to all B&W N K,4NAZAWA Ronald Gene Bowen AIA sjs Enclosure September 14, 1976 FIVE FLAGS CIVICCENTER DUBUQUE, I BOWEN �WISCONSINARTNERSHIP MADISON, FEE COMPUTATION Construction $1, riu 099, 600 Below Grade Mechanicalm 222, 640 and Support Spaces Attached Building Equipment &Score Board 30,000 Dasher Board 105,000 Auditorium Seats 50,000 Special Lighting 190,000 Moving Walls $ 70,000 Utilities 75,000 Site Work 130, 000 ice Sheet Fixed Seating & Support 110,000 40,000 Existing Theatre Exits 738,850 Community Space Fee Credit for Work Coll m leted Durin Schematic Design A/E Fee Construction Cost $1, 697, 240 @ 610 _ $101, 834 A/E Fee to Coll m lete Construction 74' 942 A/�e _—=6.11% n Cost $2, 861, 090 Total Constructio onsuan Additional S eciae Cxpensests an . elm ursa $1 1% 850 @ 8_ Management and Ice $ 10,000 Consultation and Sound 5,000 Acoustical Consultation Theatrical & Rigging 5,006 Consultation Quantity Survey Cost 6,000 Estimate Consultation Reimbursable Expenses & specifi- mileage, plan cation printing, mist.— 61000 $2, 861, 090 108 $ 9_-3'-- $194, 942 - 20,000 $174, 942 $ 32,000 Total A/E, Special Consultant and $206, 942 Reimbursable Expenses