Loading...
Letter on consultation for cost of project_10.22.1976i October 22. 1976 Mr. Edward J. Gingrass 3446 N. Frederick Avenue Milwaukee, WI 53211 Re: Five Flags Civic Center Dubuque, Iowa Dear Ed: A bond referendum was recently passed for the construction of the proposed Civic Center in Dubuque. We have talked about this project with you from time to time over the last three years. There have, of course, been items added and deleted over the life of the concept design. We are now in the process of reviewing the schematic design before beginning the design development documents and finally the contract documents. The Owner has agreed to retaining a special cost esti- mating quantity survey estimator -to assist us in monitoring the cost of the project to assure its being on the target budget at bid time. Could you work within an up set maximum fee frame work of $4000 - $5000 for the following consultation. This would include all construc- tion including mechanical and electrical. 1. Assist in evaluation of the budget developed based on the schematic design to date. 2. Advise on relative costs of systems considered for inclusion in the design development documents. 3. Prepare a detailed quantity cost estimate at the completion of the design development documents. 4. Prepare an updated detailed quantity cost estimate at approximately 75% completion of the contract documents. 5. Assist in evaluation of the bids that are received from public bidding. Could I hear from you as soon as possible. The Owner must approve our selection and the fee prior to our proceeding. I have enclosed a COPY of some pertinent background information for your reference. Very truly yours, BGWEN KANAZAWA PARTNERSHIP Ronald Gene Bowen AIA sjs Enclosures