Loading...
Letter on Suggested Changes and Clarification to Standard Form of Agreement_10.05.1976October 5, 1976 Mrs. Jacque Merritt 2315 Simpson Street Dubuque, Iowa 52001 Re: Five Flags Civic Center Contract Dubuque, Iowa Dear Jacque: Ronald Gene Bowen aia Henry K. Kanazawa aia Frederick E. Zimmermann aia Rolland H. Williamson In response to our telephone conversation, I propose the following changes and clarification of the Standard Form of Agreement Between Owner and Architect, dated October 4, 1976. FIXED FEE II. The Owner Item B 2. Page 2 Change to Rea . Employees' time at a multiple of Two and One -Half (2.5) Item B 3. Page 2 Clarify: Multiple of One and One -Tenth (1. 1) applies to additional services and not Special Consultants listed under Article 14 TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT Article 1 Architects Services Construction Phase -- Administration of the Construction Contract Item 1. 1. 22 Page 4 Add: The Architect intends to retain a local Architect to assist him in the administration of the Construction Contract Additional Services Item 1.3. 1 Page 4 Delete: Sentence Item 1. 3. 7 Page 4 Delete: Sentence Add: Provide detailed estimates of Construction Cost or detailed Quantity Surveys or Inventories of materials, equipment and labor in excess of those budgeted or approved under Special Consultants - Quantity Survey Cost Estimating $6000 Cleven North Allen Madison, Wisconsin as., 53705 608.232.762L Mrs. Jacque Merritt -2- October 5, 1976 Item 1.3. 11 Pa e 4 Delete: entence Item 1. 3. 14 Page 5 Clarify: Should a Bonding Company be required to complete a Project in default due to Contractor lack of performance or major construction defect caused by the Contractor, additional services could be required in the administration of the Con- struction Contract. Item 1. 3.16 Page 5 Clarify: This service is normally provided by the Contractors pro- viding equipment covering all items listed under this Item. The Architect will coordinate and collect such data for Owner use. Item 1.3. 19 Page 5 'larify: The Architect shall provide professional services covering structural (excluding soil borings & analysis), plumbing, heating, ventilating and air conditioning, ice rink engineering, and electrical engineering for the Project. Other Special Consultants anticipated at this time are listed under Article 14. Their services do not constitute additional services. I hope I have been responsive to your questions. You had also asked my definition of "if not extensive in reference to tours to other cities. This is somewhat more difficult to define since I feel it could be beneficial for all of us. Perhaps 2 - 3 trips of 1 - 2 days duration would be a guide. I am less concerned with the exact time than with the spirit of trust and good will we all share in the bringing of a new Civic Center to the City of Dubuque. Be assured of our genuine dedication to working with you to assure this end. Please call if there are any additional questions. Sincerel, BOWEN 7 Ronald Gene Bowen AIA sjs Enclosures cc: Gent Wittenberg ✓