Loading...
Tentative Time Schedule_10.25.1976T H E C I T Y O E DUBUQUE F pCET w S O f C m COMMUNITY �`� GILeERT D. CHA y E N EL LE 0 CITY MANAG EH C I T Y H A L L • D U 8 0 0 0 E 1 O W A 5 2 0 0 1 October 29, 1976 Five Flags Center Building Committee Dear Friends: Chairperson Jacqueline Merritt has called a meeting of the Committee for 4:15 p.m. on Thursday, November 4 at City Hall to discuss among other items the following subjects with Mr. Ron Bowen. Approval of special consultants and their fees Tentative budget Tentative time schedule Mrs. Merritt urges that every member be present for this meeting. Sincerely, Gent M. Wittenberg J/ Acting Assistant City Manager GMW/jr FIVE FLAGS CIVIC CENTER Ronald Gene Sowon aia Henry K. KanazZimmermann aia aia DUBUQUE, IOWA Frederick E. Zimmermann Rolland H. Williamson TENTATIVE TIME SCHEDULE CONVENTIONAL DESIGN - BID October 25, 1976 City of Dubuque award Architectural - Engineering contract for Civic Center Analyze Schematic Design to verify potential and intended use_ and operation thru assistance of a management con- sultant Review Schematic Design analysis With Commission November 25, 1976 Evaluate construction systems and relative costs thru comprehensive value engineering Develop Design Development Documents including sketches, models, plans, details and outline specifications Preparation of a Quantity Cost Estimate. Submit Design Development Documents and Cost Estimate to Commission for review and approval January 13, 1977 Preparation of Contract Documents including plans, details, specifications and alternatives Completion of documents and reviews by appropriate City of Dubuque agencies May 12, 1977 Documents out for bid to contractors June 1977 Take bids, evaluation and awardof contracts September 1978 Completion of construction October 1978 Owner occupancy Eloven Nnrlh Arun Madison, Wisconsin use 53705 E00.23k-7: Ronald Gene Bowen aia Henry K. Kanazawa aia Frederick E. Zimmermann aia Rolland H. Williamson FIVE FLAGS CIVIC CENTER DUBUQUE, IOWA TENTATIVE TIME SCHEDULE SCHEMATIC DESIGN ANALYSIS October 25 - 29 Architect to review schematic design with structural and heating, ventilating, and air conditioning consultants and consider structural and mechanical concepts. Architect to review schematic design with electrical consultant and consider electrical and lighting concepts Oct.28 Approval of selection of special con- sultants by Five Flags Center Committee November 1 - 5 Architect to review schematic design with acoustical, theatre, and ice rink consultants Architect and representatives of Five Flags Center Committee to visit arenas in Twin Cities area. Acoustical, theatre, and ice rink con- sultants to submit concept recommenda- tions to Architect November 8 - 10 Architect to review schematic design and recommendations of special consultants with management consultant Nov. 11 Progress report by Architect to Five Flags Center Committee, and review of user group requirements November 15 - 25 Architect and consultants prepare analysis of schematic design Nov. 25 Presentation of Schematic Design Analysis by Architect and management consultant Eleven NIh Allen Madison, Wisconsin use 53705 608.238.7626