Cost Estimates for the Five Flags Civic CenterCOST ESTIMATE FIVE FLAGS CIVIC CENTER A EXTERIOR South Elevation I. Tuckpointing Tuckpointing 2. Remove existing doors and replace with, $ 8,100.00 new doors, pines, hardware, etc. -? 3. Check structural integrity 2,400.00 of fire escapes, esca sand -blast and paint 11500.00 East Emotion 1. Tuckpointing 2. Remove all glass, doors, glassblock windows and restore to original 7,600.00 ,00.00 condition 3. Remove existing sign.vtiy,� 4. Install 500.00 new marquees, matching original shape 5. Repaint metal and wood 3,000.00 6. Remove and replace metal cornice 7. Patch and repair mansarde 800.00 2,200.00 3,100.00 North Elevation 1. Remove one course of brick on exposed areas and replace with new brick , 2. Cut down wall at lower roof to match south elevation. 3. Install new stone coping to match south original elevation 4. Paint any paintable surfaces West Emotion 1. Tuckpoint above new addition line 2. Reface below new addition line with masonry 3. Extend eave line across existing theater wall 4. Paint any paintable surface swi 1. Re -roof 2. New flashings 3. Remove and replace ventilators 4. Tuckpoint vertical surfaces adjacent to Total Exterior Cost 12,360.00 750.00 1,800.00 300.00 2,457.00 5,040.00 1,500.00 300.00 14,200.00 11500.00 1,100.00 low roof 1_ 500,00 $76,507.00 I Cost Estimate Five Flags Civic Center Page 2 SITE COST V, 11�E '��� z ° "J A B 1. Blacktop with black base parking lot 2. Concrete curb 1)-?_) L �: 3.S $13,860.00 $13,860.00 3. Landscaping 7,595.00 7,595.00 4. Grading , s �� Q��. P 4,000.00 1,000.00 5. Lighting — 1,500.00 1,500.00 6. Sidewalks ,�a ti��f���y�s 15,000.00 12,000.00 8,208.00 6,000 00 $50,163.00 INTERIOR WORK House .Ceiling I. Replaster, repair and restore to original $12,000.00 condition 2. Install stage lights, catwalk 3,000.00 3. Paint to restore to period, including walls 30,000.00 nw�s Balcony Face c 1. Remove existing plaster, replaster, including 2,000.00 decorative plaster Repaint ' Install curtains in balcony boxes to match 3,500._00 original Walls \ I. Repair plaster 2. Decorative painting to restore original color 4,000.00 . scheme and murals 3. Repair walls of lobby, snack bar, toilets, and 3,400.00 pairtt 4. Repair ceiling of accessory spaces and paint 1,600.00 Floor p , C _," I. Carpet aisles, lobby, accessory spaces) icl 7200.00 2. Seal remaining concrete ' 600.00 3. Remove existing seats, and install new seats 31,500.00 7", on lower level and balcony _ 2 4. Re -upholster gallery seats 3,000.00 Mechanical Work - Theater Ol G C) i I. Heating and air conditioning 2. Electrical, including house lights, control $6325,,500.00 000.00 /S 09 0 conduits, etc. 85,500.00 Cost Estimate Five Flags Civic Center Page 3 Stage Basement I. Demolish -.and remove all existing .partitions 2. Build new dressing room partitions 3. New ceiling and lights 4. New vinyl asbestos tile floor 5. Two new toilets with 2 W.C.'s; 2 Lay.; 1 Urn. 1 D.F. 6. Paint and repair walls 7. General requirements 8. Overhead and profit 9. Contingency Main Stage and Fly Space A $ 500.00- 1,000.00 3,500.00 1,120.00 1,800.00 440.00 250.00 1,291.00 495.00 $10,396.00 1. Remove existing wood partition around screen $ 250.00 and re -use materials. 2. Sand and seal stage floor, sand and paint floor around stage 1,837.50 3. Recondition fire curtain 4. Refit movie sc een for "flying"�w9-tfi neuw 2,000.00 aluminum frame -I'r)., ,, '.. . 5. Redo ladder on rear wail with safety cage 150.00 6. Speaker storage 7. Counter -weight system for curtains, etc. 51000.00 B. All stage lighting controls, etc. - see 45,488.00 separate breakdown sheet 9. Build 7 foot stage (portable) extension and stage risers (portable) 2,300.00 10. Rebuild existing orchestra pit to original 450.00 configuration 11. Remove two rows of existing seats and patch floor 300.00 12. General requirements 1,733.00 13. Overhead and profit 8,926.00 14. Contingency 3,421.00 $71,856.00 Cost estimate Five Flags Civic Center Page 4 Promenade Addition Adapting new with existing I. Connect future lobby 2. Provide 4 double door promenade, including match floors. Promenade basement 1. 2. 3. 4. 5. 6. 7. B. 9. 10. 11. 12. 13. 14. 15. 16. 17. I:1 of theater with promenade $ 1,150.00 access to 15t floor of 2,800.00 steps as required to Excavating and backfilling Foundation walls Floor - concrete Precast concrete floor with topping Two stairs with enclosure in basement Elevator - (basement cost only) Basement floor finish Ceiling Wall finish Toilet fixtures - 1,000 people Partition walls for toilets, including Screen toilet partitions $ 5,000.00 6,500.00 3,600.00 7,200.00 level only 6,000.00 doors Air conditioning and heating for basement Electrical in basement General requirements Overhead and profit i,) Contingencies Promenade - 1st floor 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 6,000.00 3,000.00 3,600.00 3,250.00 16,500.00 4,800.00 2,125.00 8,164.00 6,000.00 2,570.00 13,238.00 5,074.00 $106,571.00� S ' 7,600.00 1,170.00 2,000.00 8,000.00 4,000.00 4,000.00 2,880.00 6,000.00 6,000.00 7,484.00 7,200.00 Sidewalk cafe built-in equipment, partitions, 12,500.00 counters, etc. 14. General requirements 15. Overhead and profit 16. Contingencies Columns, beams, floor system Walls - North, West & East Glass - East side Rear entrance West and East canopy Floor cover Ceiling finish South wall Two stairs - 1st floor Elevator - 1st floor Heating and air conditioning Electrical 2,813.00 14,486.00 5,553.00 $116,616.00 3��0 0 Cost Estimate Five Flags Civic Center Page 5 Promenade - 2nd Floor 1. Column beams, roof system 2. Walls, North, East and West 3. Built-up roof and flashing 4. Floor Cover 5. Ceiling finish 6. South wall 7. Two stairs - (2nd floor only) 8. Elevators 9. Heating and air conditioning 10. Electrical 11. General requirements 12. Overhead and profit 13. Contingencies 1- Guo�l�� at�� �f �77 A B $12,600.00 8,000.00 3,600.00 4,000.00 4,000.00 2,680.00 6,000.00 6,000.00 7,484.00 7,200.00 1,846.00 9,512.00 3,646.00 76,567.00 = Z ),2 3Sd��fi1 76, s�7 29, 2- 7s 832- 2-%