Signed Contracts_Bergfeld Trail Phase 2 Project_Change OrderMasterpiece on the Mississippi MLW:et attachments copy Jenny Larson Gus Psihoyos Ron Turner TO: Michael C. Van Milligen, City Manager FROM: Marie L. Ware, Leisure Services Manage SUBJECT: Bergfeld Trail Phase 2 Change for Moving Driveway and Completing Parking Lot, Plus Budget Overage DATE: July 30, 2010 Dubuque hitd 11 111.! ' e 2007 have prepared the attached spreadsheet outlining all costs related to the Bergfeld Trail Phase 2 project. These costs were separated to get a handle on total cost of the project versus the budget. The original project budget was $475,000 to be paid for by North Siegert farm savings on grading. To date expenditures total $472,759. There is approximately $60,750 remaining in expenses to complete the project. Change orders have resulted in over expenditure of the budget. This will result in $58,508.60 over budget. This would include purchase and installation of emergency lights and complete the project totally. The attached change order revises the bid for the parking lot and drive due to the moving of the driveway off Pennsylvania further to the west. According to Ron Turner this saves about $8,100 from Drew's original bid for that specific work. have spoken with Jenny and she says funds are available for this overage in the Dubuque Industrial Center West North Siegert farm account. I request your approval to revise the budget so that the work may be completed on this project. With your approval we will authorize Drew Cook Construction to finish the parking lot and drive. will coordinate ordering and installing the emergency lights. This memo does not address the drainage issue at McGraw -Hill. Bergfeld Trail l YP City of Dubuque `= 07147 -02 NO. DESCRIPTION Cost for Paving. Revised Parking Entrance at Bergfeld Trail 15- Jul -10 1 Remove Existing PCC Curb 2 Excavation 3 PCC Curb and Gutter 4 Topsoil, Stockpile, Spread 5 Graded Stone Base 6 HMA Parking Paving, 4 -inch 7 Shoulder Shaping 8 15" HDPE Pipe 9 Erosion Stone Outlet Protection 10 15" CMP 11 Storm Manhole 48" die 12 Fence Removal, Additional 13 Seed, Fertilize & Mulch (urban mix) 14 Engineering Fabric 15 Traffic Control - Flaggers 16 30" RCP Inlet w/ Beehive CONSTRUCTION COST UNIT QUANTITY PRICE 133 LF 1,033 CY 107 LF 125 CY 260 Ton 16 Ton 3 Sta 91 LF 12 Ton 20 LF 1 LS 1 LS 0.2 AC 13 SY 3 Days 2 EA l= ` IIW Engineers & Surveyors, P.C. 4155 Pennsylvania Avenue Dubuque, IA 52002 -2628 563 -556 -2464 Voice / 563 - 556 -781 1 Fax c \„ wwJiw k.g com ( TOTAL PRICE 1 r 11." I i 1 : 5 6 6 0c7). 3 "t=' 39 °0 Preparation of bid plans and IIW PO 42019 Additional charges Invoices from 6/09 -8/09 Construction services - testing and inspection, change orders and pay requests IIW 3601686 62716 PO 50131 Construction of Trail Drew Cook & Sons PO 49861 Change order #1 Change order #2 Change order #3 Invoices 8/09 -7/10 Bergfeld Trail Phase 2 includes parking lot off Pennsylvania Actual specs, sending to contractors 3601686 62716 $10,000 $8,050 $30,000 and Parking Lot ($256.35) $513.00 $416,869.35 7/30/2010 $5,505.75 FY 09 $2,388.00 FY 09 $10,156.25 FY 10 $18,050.00 $3,138.75 FY 10 $16,705.25 FY 10 $5,845.50 FY 10 $6,226.50 FY 10 $417.50 FY 10 $5,505.75 FY 10 $37,839.25 3601943 73211 Deleted item Add photo sensor to control light fixture $114,404.20 FY 10 $85,813.29 FY 10 $156,826.46 FY 10 $5,175.54 FY 10 $21,813.42 FY 10 $4,468.56 FY 11 $388,501.47 Paid to date Estimate for additional engineering work by IIW Estimate for additional work by Drew Cook for moving drive & pkg lot Emergency Lights -est not include ship & install Original budget for Bergeld Trail Phase 2 and Parking Lot accding to Jenny Committed $392,087.70 $24,525.00 Addtl. base stone to stabilize trail, serve as French drain $18,050.00 $37,839.25 $416,869.35 $472,758.60 $5,300.00 $ 28,450.00 $27,000.00 $533,508.60 Budget $10,000 $30,000 $392,088 $432,088 $475,000 Over budget - $58,508.60