TO: Michael C. Van Milligen, City Manager
FROM: Marie L. Ware, Leisure Services Manage
SUBJECT: Bergfeld Trail Phase 2 Change for Moving Driveway and
Completing Parking Lot, Plus Budget Overage
DATE: July 30, 2010
Dubuque
hitd
11 111.!
'
e
2007
have prepared the attached spreadsheet outlining all costs related to the Bergfeld Trail
Phase 2 project. These costs were separated to get a handle on total cost of the project
versus the budget. The original project budget was $475,000 to be paid for by North
Siegert farm savings on grading. To date expenditures total $472,759. There is
approximately $60,750 remaining in expenses to complete the project. Change orders
have resulted in over expenditure of the budget. This will result in $58,508.60 over
budget. This would include purchase and installation of emergency lights and complete
the project totally.
The attached change order revises the bid for the parking lot and drive due to the
moving of the driveway off Pennsylvania further to the west. According to Ron Turner
this saves about $8,100 from Drew's original bid for that specific work.
have spoken with Jenny and she says funds are available for this overage in the
Dubuque Industrial Center West North Siegert farm account. I request your approval to
revise the budget so that the work may be completed on this project. With your
approval we will authorize Drew Cook Construction to finish the parking lot and drive.
will coordinate ordering and installing the emergency lights.
This memo does not address the drainage issue at McGraw -Hill.
Bergfeld Trail l YP
City of Dubuque `=
07147 -02
NO. DESCRIPTION
Cost for Paving. Revised Parking Entrance at Bergfeld Trail
15- Jul -10
1 Remove Existing PCC Curb
2 Excavation
3 PCC Curb and Gutter
4 Topsoil, Stockpile, Spread
5 Graded Stone Base
6 HMA Parking Paving, 4 -inch
7 Shoulder Shaping
8 15" HDPE Pipe
9 Erosion Stone Outlet Protection
10 15" CMP
11 Storm Manhole 48" die
12 Fence Removal, Additional
13 Seed, Fertilize & Mulch (urban mix)
14 Engineering Fabric
15 Traffic Control - Flaggers
16 30" RCP Inlet w/ Beehive
CONSTRUCTION COST
UNIT
QUANTITY PRICE
133 LF
1,033 CY
107 LF
125 CY
260 Ton
16 Ton
3 Sta
91 LF
12 Ton
20 LF
1 LS
1 LS
0.2 AC
13 SY
3 Days
2 EA
l= ` IIW Engineers & Surveyors, P.C.
4155 Pennsylvania Avenue
Dubuque, IA 52002 -2628
563 -556 -2464 Voice / 563 - 556 -781 1 Fax
c \„ wwJiw k.g com
(
TOTAL
PRICE
1 r 11."
I i
1 : 5 6 6
0c7).
3 "t='
39 °0
Preparation of bid plans and
IIW
PO 42019
Additional charges
Invoices from 6/09 -8/09
Construction services - testing and inspection, change orders and pay requests
IIW 3601686 62716
PO 50131
Construction of Trail
Drew Cook & Sons
PO 49861
Change order #1
Change order #2
Change order #3
Invoices 8/09 -7/10
Bergfeld Trail Phase 2
includes parking lot off Pennsylvania
Actual
specs, sending to contractors
3601686 62716
$10,000
$8,050
$30,000
and Parking Lot
($256.35)
$513.00
$416,869.35
7/30/2010
$5,505.75 FY 09
$2,388.00 FY 09
$10,156.25 FY 10
$18,050.00
$3,138.75 FY 10
$16,705.25 FY 10
$5,845.50 FY 10
$6,226.50 FY 10
$417.50 FY 10
$5,505.75 FY 10
$37,839.25
3601943 73211
Deleted item
Add photo sensor to control light fixture
$114,404.20 FY 10
$85,813.29 FY 10
$156,826.46 FY 10
$5,175.54 FY 10
$21,813.42 FY 10
$4,468.56 FY 11
$388,501.47
Paid to date
Estimate for additional engineering work by IIW
Estimate for additional work by Drew Cook
for moving drive & pkg lot
Emergency Lights -est not include ship & install
Original budget for Bergeld Trail Phase 2 and Parking Lot accding to Jenny
Committed
$392,087.70
$24,525.00 Addtl. base stone to stabilize trail, serve as French drain
$18,050.00
$37,839.25
$416,869.35
$472,758.60
$5,300.00
$ 28,450.00
$27,000.00
$533,508.60
Budget
$10,000
$30,000
$392,088
$432,088
$475,000
Over budget - $58,508.60