Loading...
Signed Contracts, Agreements_FSS Staff Office Release of Federal FundingTHE CITY OF DUBE f) c Masterpiece on the Mississippi Dubuque Jr M 1101' 2007 TO: Michael Vanligen, City Manager FROM: David rris, Housing and Community Development Department SUBJECT: FSS staff office at Federal Building DATE: 20 August 10 The purpose of this memorandum is to request release of Federal Building funding for conversion of space in the Housing Department offices for the new Family Self - Sufficiency (FSS) Program coordinator, Erica Haugen. Engineering has developed aplan for conversion of the mail /copier room into two areas: one for the copiers and work spaces presently in use in this room, and the other for the new FSS office. The schematic (attached) shows this is accomplished with the addition only of a dividing wall and entry door. The down -side is loss of the existing hallway door, which must remain closed due to the positioning of one multi- function copier machine. No other functionality of the existing work area is lost due to the conversion, other than 'shrinking' the space into less generously -sized dimensions. Steve Brown had Randy Klauer bid the work, as Tricon Construction is presently heavily scheduled. Klauer's bid is $17 036. Steve suggested adding a $2000 contingency and $3000 for the employee workstation (we have a computer), bringing the total cost to $22 000. Steve obtained CIP budget numbers from Jenny, showing a current balance in the Federal Building capital account of $143 000. Of this amount, $95 000 is set aside for tuck pointing in FY2011, leaving approximately $48 000 available for this purpose. Alternatively, we could situate the new FSS staff in the office located in the rear hallway. I would recommend against that option, as it would operationally isolate Erica Haugen from the rest of the Section 8 team. She also could continue sharing an office with Carroll Clark, but this makes confidential interviewing of clients by both FSS staff impossible. Thank you for your consideration. cc: Steve Brown /Gus Psihoyos Jenny Larson PROJECT PROJECT NUMBER DATE OF PLANS BID DUE DATE Federal Building 3rd Floor Office Remodel KCC #2010034.00 N/A 8/10/2010 WE PROPOSE TO: TOTAL FURNISH ALL NECESSARY LABOR, MATERIAL AND EQUIPMENT TO COMPLETE THE FOLLOWING AREAS OF CONSTRUCTION AS SPECIFIED. BASE BID: Provide labor, material and equipment to provide floor protection, dust protection, demolition of selected areas, transportation and disposal of debris, construction of new wall, sheetrock finishes, painting of affected areas, re- laminating existing cabinet ends and existing countertops, cut in new 1/2 lite into existing door, fabricate and install re- claimed door jamb and door (from owner stock), install re- claimed base and casing from owner stock, strip & re- finish door, door jamb, casing & wood base from owner stock, patch and repair ceiling, patch and repair carpet at new opening only (see note #6). Price includes data, electrical and HVAC revisions, please see below for specifics & options. DATA REVISIONS: Labor to relocate existing (3) port data and voice location from west wall to new partition wall between the office and work room. Note: If additional cables are needed they can be installed on T &M basis. ELECTRICAL REVISIONS: Remove & relocate (2) duplex receptacles, supply & install (1) new duplex receptacle, remove (3) light switches, supply and install new occupancy sensor, remove and relocate (1) ceiling light fixture, remove (1) under cabinet light, remove and relocate fire alarm strobe into copy area, supply and install blank plates for all abandon locations. HVAC REVISIONS: Use existing VAV box and thermostat to control office. Add (1) supply diffuser in the office and (1) return grille in the copy room. 17,036.00 This proposal may be withdrawn if not accepted within 30 days. TOTAL ACCEPTANCE OF PROPOSAL, Sign & Date AUTHORIZED SIGNATURE /721 a V d '' V7 ardWar KLA>tIER '.:COMPANY 1015 Century Circle Dubuque, IA 52002 Phone: 563 -588 -0247 Fax: 563 -588 -0370 NAME / ADDRESS City of Dubuque City Hall 50 W 13th Street Dubuque, IA 52001 age 1 PROPOSAL DATE 8/10/2010 PROPOSAL # 2252 PROJECT PROJECT NUMBER DATE OF PLANS BID DUE DATE Federal Building 3rd Floor Office Remodel KCC #2010034.00 N/A 8/10/2010 WE PROPOSE TO: TOTAL ALTERNATE #1: Separate the HVAC for each room. Additional ceiling tile & grid removal and replacement. Use existing VAV box and thermostat to control the office. Add a new VAV box, reheat coil, hot water piping, thermostat and ductwork to control the copy room. Controls by Woodman Controls. Add (1) supply diffuser in the office and (1) return grille in the copy room. Add to the base bid $7,651.00 NOTES: 1) All wood trim, base, casing, door, door jamb, and door hardware is to be supplied by owner. 2) All office furnishings are to be supplied and installed by others. 3) No sales tax is included. It is assumed this is a tax exempt project. 4) All work is to be done during normal business hours. Monday thru Friday 7:00 am thru 3:30 pm 5) Removal and relocation of existing office equipment prior to commencement is to be done by others as well as re- installation at completion 6) We assume the carpet is underneath the existing cabinets. If this is not the case, additional charges will apply. This proposal may be withdrawn if not accepted within 30 days. TOTAL $17,036.00 ACCEPTANCE OF PROPOSAL, Sign & Date AUTHORIZED SIGNATURE WOW RLApaR (lQAT_STRUCTIO114 COMPANY 1015 Century Circle Dubuque, IA 52002 Phone: 563 -588 -0247 Fax: 563 -588 -0370 NAME / ADDRESS City of Dubuque City Hall 50 W 13th Street Dubuque, IA 52001 PROPOSAL DATE 8/10/2010 PROPOSAL # 2252 age