Civil Engineer II Jon Dienst is recommending acceptance of the Montrose Terrace
Stairs Reconstruction Project, as completed by Max Smith Construction, in the final
contract amount of $46,880.80, which is a 6.9% increase from the original contract
amount of $43,871.00. This increase was due to slope stability concerns, the concrete
walk was installed at a 6 -inch depth versus the originally planned 4 -inch depth.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
Jon Dienst, Civil Engineer II
Michael C. Van ' igen
TO:
FROM:
SUBJECT:
DISCUSSION
Masterpiece on the Mississippi
INTRODUCTION
RECOMMENDATION
BUDGET IMPACT
Michael C. Van Milligen, City Manager
Gus Psihoyos, City Engineer
Jon Dienst, Civil Engineer II
t
Montrose Terrace Stairs Reconstruction Project
CIPs 2501620, 3501432, 3501425
DATE: September 9, 2010
The project was awarded based on a competitive quotation process for public
improvements in accordance with Iowa Code, Section 26.14.
Award
Construction Contract $43,871.00
Contingency 4,387.10
Construction Engineering & Inspection 7,238.72
Total Project Cost $55,496.82
Dubuque
bietra
AN-America City
' MIIi ,
2007
The enclosed resolution provides for the acceptance of the construction contract for the
Montrose Terrace Stairs Reconstruction Project.
The Montrose Terrace Stairs Reconstruction Project was completed by Max Smith
Construction of Dubuque, Iowa, in the final contract amount of $46,880.80, which is a
6.9% increase from the original contract amount of $43,871.00. Due to slope stability
concerns, the concrete walk was installed at a 6 -inch depth versus the originally
planned 4 -inch depth.
I recommend that the City Council accept the improvements and authorize payment of
the contract amount of $46,880.80 to Max Smith Construction, Inc. for the Montrose
Terrace Stairs Reconstruction Project.
The cost summary for the Montrose Terrace Stairs Reconstruction Project is as follows:
Final
$46,880.80
0
10,112.60
$56,993.40
The project funding summary is as follows:
CIP Fund Description Fund Amount
2501620 Montrose Steps Reconstruction $30,000.00
3501432 Steps, Railings, Fencing 26,993.40
Total Project Funding $56,993.40
ACTION TO BE TAKEN
I respectfully request that the City Council adopt the attached resolution accepting the
improvements and authorizing payment of the contract amount of $46,880.80 to Max
Smith Construction, Inc. for the Montrose Terrace Stairs Reconstruction Project.
cc: Jenny Larson, Budget Director
Don Vogt, Public Works Director
John Klostermann, Street & Sewer Maintenance Supervisor
Robert Schiesl, Assistant City Engineer
RESOLUTION NO. 361-10
ACCEPTING THE MONTROSE TERRACE STAIRS RECONSTRUCTION PROJECT
AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Public Improvement Contract for the Montrose Terrace Stairs
Reconstruction Project (the Project) has been completed and the City Engineer has
examined the work and filed a certificate stating that the Project has been completed
according to the terms of the Public Improvement Contract and that the City Engineer
recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Montrose Steps Reconstruction Project, Steps, Railing, Fencing, and Sidewalk
Program, City -Owned appropriations for the contract amount of $46,880.80 less any
retained percentage provided for therein as provided in Iowa Code chapter 573, and to
pay such retainage only in accordance with the provisions of Iowa Code chapter 573.
Passed, approved and adopted this 20 day of September, 2010.
Atte t:
eanne F. Schneider, CMC, City Clerk
mAt
Karla A. Braig, Mayor -Tem
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE MONTROSE
TERRACE STAIRS RECONSTRUCTION PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Montrose Terrace Stairs Reconstruction Project, that the Project
has been performed in compliance with the terms of the Public Improvement Contract,
and that the total cost of the completed work is $56,993.40.
Dated this L % y `l day of , 2010.
Filed in the office of the City Clerk on the /
City Engineer
anne F. Schneider, CMC, City Clerk
Masterpiece on the Mississippi
PARTIAL PAYMENT NO: COUNCIL FINAL
PROJECT NAME: Montrose Terrace Stairs Reconstruction
CONTRACTOR: Max Smith Construction, Inc.
BID ITEM DESCRIPTION
DEMOLITION & REMOVAL
1 Removal of Existing Steps, Sidewalk, & Runoff Swale
2 Remove & Reconstruct Stone Walls/Terraces
3 Remove Existing Storm Intake
EXCAVATION & STONE
4 Excavation (Unclassified)
5 Graded Stone Base (4" Thick)
6 Backfill Topsoil
7 Washed Decorative Stone
MISCELLANEOUS
16 Install New Stair Railing
17 Seeding, Mulching, & Watering
18 Erosion Control Plan - Operating Procedures
19 Traffic Control and Safety Control
20 Mobilization & Miscellaneous
CHANGE ORDER - EXTRA WORK ITEMS
C1 Additional Concrete Charge
C2 Limestone Blocks
C3 Re -bar
City of Dubuque - Engineering Division
Council Final Payment Form
UNIT
CY
LS
LS
CONTRACT AMOUNT: $43,871.00
CONTRACT
UNIT COST
LF $60.00
SY $18.00
LS $400.00
LS $500.00
LS $5,000.00
72.00 $
95.30 $
1.00 $
1.00 $
1.00 $
$100.00
$200.00
$75.00
QUANTITY
TO DATE
TOTAL AMOUNT EARNED TO DATE:
DATE: September 9, 2010
14.00
1.00
1.00
TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS:
TOTAL AMOUNT EARNED TO DATE:
TOTAL DUE CONTRACTOR:
ENGINEERING:
TOTAL CONSTRUCTION COST:
AMOUNT EARNED
TO DATE
LS $3,000.00 1.00 $ 3,000.00
LF $90.00 30.00 $ 2,700.00
LS $500.00 1.00 $ 500.00
CY $100.00 30.00 $ 3,000.00
Ton $20.00 87.88 $ 1,757.60
SY $12.00 95.30 $ 1,143.60
SY $50.00 21.30 $ 1,065.00
SIDEWALKS & STEPS
8 PCC Steps, Treads (Includes Footing & Reinforcement Ste LF $68.00 145.00 $ 9,860.00
9 PC Concrete Curb and Gutter, 2.5, Construct LF $25.00 6.20 $ 155.00
10 PC Concrete Sidewalk, 6" Construct SF $7.00 791.60 $ 5,541.20
11 PC Concrete Sidewalk, 4" Construct SF $5.50 $
STORM SEWER
12 PC Concrete Runoff Trench, Construct SF $15.00 114.40 $ 1,716.00
13 Furnish & Install Trench Drain LF $80.00 30.00 $ 2,400.00
14 6" Dia. Drain Tile (Connect to Downspouts and Curb Drain LF $6.00 72.00 $ 432.00
15 Trench Drain Curb Opening Each $100.00 0.00 $
4,320.00
1,715.40
400.00
500.00
5,000.00
$ 46,206.80I
$
1,400.00
200.00
75.00
$ 1,675.001
$ 46,880.801
$ 46,880.80
$ 10,112.60 I
$ 66,993.40 I
APPROVED:
APPROVED:
CERTIFICATE OF THE CITY MANAGER:
hereby certify that the above statement shows in detail the correct amount of all work required
to comple)e he above improvement.
Michael Van Milligen, City Manager
2_
City of Dub a owa1
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR
he undersigned, Max Smith Construction, inc. contractor for the above improvement, does
hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement.
CONTRACTOR: � / � ,i- I1 � i / aYvl J /-
BY: MLP �CrjYv
TITLE: OC A -e, -
DATE: ( Z /