Loading...
Montrose Terrace Stairs Reconstruction Project AcceptanceTHE CITY OF DuT Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Montrose Terrace Stairs Reconstruction Project DATE: September 10, 2010 Dubuque kerd Ith-AmmicaCIty 2007 Civil Engineer II Jon Dienst is recommending acceptance of the Montrose Terrace Stairs Reconstruction Project, as completed by Max Smith Construction, in the final contract amount of $46,880.80, which is a 6.9% increase from the original contract amount of $43,871.00. This increase was due to slope stability concerns, the concrete walk was installed at a 6 -inch depth versus the originally planned 4 -inch depth. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Michael C. Van ' igen TO: FROM: SUBJECT: DISCUSSION Masterpiece on the Mississippi INTRODUCTION RECOMMENDATION BUDGET IMPACT Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II t Montrose Terrace Stairs Reconstruction Project CIPs 2501620, 3501432, 3501425 DATE: September 9, 2010 The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. Award Construction Contract $43,871.00 Contingency 4,387.10 Construction Engineering & Inspection 7,238.72 Total Project Cost $55,496.82 Dubuque bietra AN-America City ' MIIi , 2007 The enclosed resolution provides for the acceptance of the construction contract for the Montrose Terrace Stairs Reconstruction Project. The Montrose Terrace Stairs Reconstruction Project was completed by Max Smith Construction of Dubuque, Iowa, in the final contract amount of $46,880.80, which is a 6.9% increase from the original contract amount of $43,871.00. Due to slope stability concerns, the concrete walk was installed at a 6 -inch depth versus the originally planned 4 -inch depth. I recommend that the City Council accept the improvements and authorize payment of the contract amount of $46,880.80 to Max Smith Construction, Inc. for the Montrose Terrace Stairs Reconstruction Project. The cost summary for the Montrose Terrace Stairs Reconstruction Project is as follows: Final $46,880.80 0 10,112.60 $56,993.40 The project funding summary is as follows: CIP Fund Description Fund Amount 2501620 Montrose Steps Reconstruction $30,000.00 3501432 Steps, Railings, Fencing 26,993.40 Total Project Funding $56,993.40 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $46,880.80 to Max Smith Construction, Inc. for the Montrose Terrace Stairs Reconstruction Project. cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Robert Schiesl, Assistant City Engineer RESOLUTION NO. 361-10 ACCEPTING THE MONTROSE TERRACE STAIRS RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Montrose Terrace Stairs Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Montrose Steps Reconstruction Project, Steps, Railing, Fencing, and Sidewalk Program, City -Owned appropriations for the contract amount of $46,880.80 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 20 day of September, 2010. Atte t: eanne F. Schneider, CMC, City Clerk mAt Karla A. Braig, Mayor -Tem CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE MONTROSE TERRACE STAIRS RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Montrose Terrace Stairs Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $56,993.40. Dated this L % y `l day of , 2010. Filed in the office of the City Clerk on the / City Engineer anne F. Schneider, CMC, City Clerk Masterpiece on the Mississippi PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: Montrose Terrace Stairs Reconstruction CONTRACTOR: Max Smith Construction, Inc. BID ITEM DESCRIPTION DEMOLITION & REMOVAL 1 Removal of Existing Steps, Sidewalk, & Runoff Swale 2 Remove & Reconstruct Stone Walls/Terraces 3 Remove Existing Storm Intake EXCAVATION & STONE 4 Excavation (Unclassified) 5 Graded Stone Base (4" Thick) 6 Backfill Topsoil 7 Washed Decorative Stone MISCELLANEOUS 16 Install New Stair Railing 17 Seeding, Mulching, & Watering 18 Erosion Control Plan - Operating Procedures 19 Traffic Control and Safety Control 20 Mobilization & Miscellaneous CHANGE ORDER - EXTRA WORK ITEMS C1 Additional Concrete Charge C2 Limestone Blocks C3 Re -bar City of Dubuque - Engineering Division Council Final Payment Form UNIT CY LS LS CONTRACT AMOUNT: $43,871.00 CONTRACT UNIT COST LF $60.00 SY $18.00 LS $400.00 LS $500.00 LS $5,000.00 72.00 $ 95.30 $ 1.00 $ 1.00 $ 1.00 $ $100.00 $200.00 $75.00 QUANTITY TO DATE TOTAL AMOUNT EARNED TO DATE: DATE: September 9, 2010 14.00 1.00 1.00 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL AMOUNT EARNED TO DATE: TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: AMOUNT EARNED TO DATE LS $3,000.00 1.00 $ 3,000.00 LF $90.00 30.00 $ 2,700.00 LS $500.00 1.00 $ 500.00 CY $100.00 30.00 $ 3,000.00 Ton $20.00 87.88 $ 1,757.60 SY $12.00 95.30 $ 1,143.60 SY $50.00 21.30 $ 1,065.00 SIDEWALKS & STEPS 8 PCC Steps, Treads (Includes Footing & Reinforcement Ste LF $68.00 145.00 $ 9,860.00 9 PC Concrete Curb and Gutter, 2.5, Construct LF $25.00 6.20 $ 155.00 10 PC Concrete Sidewalk, 6" Construct SF $7.00 791.60 $ 5,541.20 11 PC Concrete Sidewalk, 4" Construct SF $5.50 $ STORM SEWER 12 PC Concrete Runoff Trench, Construct SF $15.00 114.40 $ 1,716.00 13 Furnish & Install Trench Drain LF $80.00 30.00 $ 2,400.00 14 6" Dia. Drain Tile (Connect to Downspouts and Curb Drain LF $6.00 72.00 $ 432.00 15 Trench Drain Curb Opening Each $100.00 0.00 $ 4,320.00 1,715.40 400.00 500.00 5,000.00 $ 46,206.80I $ 1,400.00 200.00 75.00 $ 1,675.001 $ 46,880.801 $ 46,880.80 $ 10,112.60 I $ 66,993.40 I APPROVED: APPROVED: CERTIFICATE OF THE CITY MANAGER: hereby certify that the above statement shows in detail the correct amount of all work required to comple)e he above improvement. Michael Van Milligen, City Manager 2_ City of Dub a owa1 Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR he undersigned, Max Smith Construction, inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: � / � ,i- I1 � i / aYvl J /- BY: MLP �CrjYv TITLE: OC A -e, - DATE: ( Z /