Chavenelle Drive 2010 PC Concrete Pavement Repair Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Chavenelle Drive - 2010 PCC Concrete Pavement Repair Project CIP 3601481 DATE: September 20, 2010 MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Dubuque ibittd AII•AmedcaCity ' 1 1 1 ' 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project, as completed by Horsfield Construction, Inc., in the final contract amount of $37,986.10, which is a 58.2% increase from the original contract in the amount of $24,018.00. During the project a storm sewer failure was found; therefore, the project increase was to cover the cost of the repair and the associated pavement. I concur with the recommendation and respectfully request Mayor and City Council approval. Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Man FROM: Gus Psihoyos, City Engineer SUBJECT: Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project CIP 3601481 DATE: September 20, 2010 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project. BACKGROUND Dubuque bitil AMamataCity 1111r 2007 The Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project involved the replacement of the existing concrete pavement located just to the west of the intersection of Chavenelle Drive and Synergy Court. The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, §384.103 and §364.12(3)(c). DISCUSSION The Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project was completed by Horsfield Construction, Inc. of Epworth, Iowa, in the final contract amount of $37,986.10, which is a 58.2% increase from the original contract amount of $24,018.00. During the project, a storm sewer failure was found; therefore, the project increase was to cover the cost of the repair and the associated pavement. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $37,986.10 to Horsfield Construction, Inc. for the Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project. BUDGET IMPACT The project cost summary for the Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project is as follows: Construction Contract Construction Engineering & Inspection Total Project Cost The project funding summary is as follows: CIP No. Fund Description 3601481 Site B Industrial Park 7201066 General Storm Repairs Total Project Funding ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $37,986.10 to Horsfield Construction, Inc. for the Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project. cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Greg Doeden, Civil Engineer Award Final $ 24, 018.00 $ 37, 986.10 4,611.42 1,956.46 $ 28,629.42 $ 39,942.56 Fund Amount $ 27,019.56 12,923.00 $ 39,942.56 RESOLUTION NO. 383 -10 ACCEPTING THE CHAVENELLE DRIVE — 2010 PCC CONCRETE PAVEMENT REPAIR PROJECT AND AUTHORIZING THE .PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Site B Industrial Park and General Storm Repair appropriations for the contract amount $37,986.10 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Jeanne F. Schneider, CMC City Clerk Passed, approved and adopted this 4 day of October, 2010. (o ALL:e4 Karla A. Braig, Mayor Prfj -Tem CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CHAVENELLE DRIVE — 2010 PCC CONCRETE PAVEMENT REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Chavenelle Drive — 2010 PCC Concrete Pavement Repair Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $39,942.56. Dated this day 010. City Engineer Filed in the office of the City Clerk on thejday �.r! %/ / ' 10. anne F. Schneider, CMC, City Clerk PAYMENT NO: COUNCIL FINAL City of Dubuque - Engineering Division Final Payment Form PROJECT NAME: CHAVENELLE DRIVE - 2010 PCC CONCRETE PAVEMENT REPAIR PROJECT CONTRACTOR: HORSFIELD CONSTRUCTION, INC. BID ITEM DESCRIPTION 0010 Concrete, Full -Deph Sawcut 0020 Pavement Removal 0030 Excavation, Unclassified 0040 3" Crushed Stone Base 0050 Graded Stone Base 0060 PC Concrete Pavement, (12 ") wMtegral Curb, Class "C ", Continuously Reinforced 0070 Traffic Control & Safety Control CHANGE ORDER (ITEM DESCRIPTION) C1 Storm Sewer Repair LS $8,415.00 C1 8" PCC Pavement SY $49.00 C1 Hydro-Seeding LS $450.00 APPROVED: APPROVED: UNIT LF SY CY TON TON SY UNIT COST $4.00 $8.00 $10.00 $15.00 $15.00 $63.00 LS $2,500.00 CONTRACT AMOUNT: $24,018.00 TOTAL AMOUNT EARNED TO DATE - BASE BID: TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY MANAGER: CERTIFICATE OF THE CONTRACTOR: $ 37,986.101 $1,956.46 1 accept the above 'Total Due Contractor", as full settlement for all claims for s�p rovem ent. CONTRACTOR: BY: Mc % /'; SX TITLE: / 15e7 , - /A GFi� DATE: / L`d 1 $39,942.56 1 Michael Van M' I gen, City Manager City of Du owa Gus Psihoyos, City Engineer City of Dubuque, Iowa DATE: September 14, 2010 QUANTITY TO DATE AMOUNT EARNED TO DATE $ 472.00 $ 2,712.00 $ 1,920.00 118 339 192 0 96.54 $ 1,448.10 247.0 $ 15,561.00 1 $ 2,500.00 $ 24,613.10 1 $ 8,415.00 92.0 $ 4,508.00 1 $ 450.00 1 $ 13,373.00 $ 37,986.101 I hereby certify that the above statement shows in detail the correct ajffotfit of all work required to complete the above improvement. The undersigned, contractor for the above improvement, does hereby