Loading...
Re-Lighting Fifth Street Ramp and Locust Street RampMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Re- Lighting 5th Street Ramp and Locust Street Ramp DATE: September 22, 2010 MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Tim Horsfield, Parking System Supervisor Michael C. Van Milligen Dubuque hell All- AmedcaCity 1111 r 2007 Parking System Supervisor Tim Horsfield recommends City Council approval of two contracts with TwistHDM /Limelight for replacement lighting in the 5 Street Ramp for $93,260, and replacement lighting in the Locust Street Ramp for $78,672, for a total of $171,932 for both ramps. Greater control of when the lighting is activated in the ramps has a payback estimated at 4.5 years. Of the three different lighting systems considered by our lighting engineers, KJWW Engineers, TwistHDM /Limelight System was the only one that is web -based and does not require any re- wiring of the current ramps. This is based on the fact that it uses radio frequencies for communication rather than the more common timers on circuits. I concur with the recommendation and respectfully request Mayor and City Council approval. Parking Division 830 Bluff Street Dubuque, IA 52001 Phone: 563 - 589 -4267 Fax: 563- 690 -6675 September 21, 2010 To: Michael C. Van Milligen, City Manager From: Tim Horsfield, Parking System Supervisor Subject: Re- Lighting 1 IF 2007 5 Street Ramp and Locust Street Ramp Dubuque THE CITY OF Waal DUB E All-Amelica CUT Last October and December I sent you information and memos regarding the replacement of the lighting in the 5 Street Ramp. Two things happened as a result of those memos. The system we were considering at that time was Twist HDM/LimeLight, which is a completely computerized web based system with each light being individually controlled by either motion sensors, daylight harvesting or a combination of both and then further controlled by the software operating system. Calculations that have been done estimate a payback on the system considering energy usage to be about 4.5 years. First of all, we went through a bidding process for a new lighting system to be installed in the ramp currently being built. There were three different lighting systems considered and specified by the lighting engineers, KJVWV Engineers. The lighting system selected to be installed in the new parking ramp is the TwistHDM /Limelight System. This system has a great advantage in that it is web -based and also does not require any re- wiring of the current ramps and all other systems would. This is based on the fact that it uses radio frequencies for communication rather than the more common timers on circuits. This is a system that we now really need to carry to all the ramps as we retro fit them so that we control all the facilities with the same software, have the same replacement equipment on hand and service equipment that is similar in design. Having said this, we would consider this a sole source system, approved by Barry Lindahl City Attorney, and through the budget process have two CIP's in place to replace the lighting in the 5 Street Ramp (730 -2230 for $100,000.00) and also the Locust Street Ramp (730 -2229 for $85,000.00). If you would agree on the sole source provider concept, I would like approval to go forward with install on these other two ramps. This would basically be the same as our parking equipment provider. September 21, 2010 Page II I have received bids from TwistHDM /Limelight for equipment, install and complete programming for both facilities. Prior to them submitting the bids to me, they solicited bids from both Paulson Electric and Westphal Electric here in Dubuque. In their bids, they indicate that Westphal Electric would be doing the install in the two additional ramps. The bids for the ramps are as follows: 5 Street Ramp $ 93,260.00 (CIP Amount $ 100,000.00) Locust Street Ramp $ 78,672.00 (CIP Amount $ 85,000.00) This is really a great system and has been evaluated several times during the bidding process for the new ramp. I am presenting this to you as two separate contracts due to the fact they are two separate ramps, with two separate Capital Improvement Project Numbers. However, for purposes of approval, being both contracts are to the same vendor totaling $171,932.00 I am attaching a resolution for City Council approval pending your approval and subsequent submission to the Council. I think we should be able to get both ramps done yet this fall. If you have any questions or concerns please let me know. I am also sending City Attorney Lindahl a copy of this information for his review regarding the sole source approval. Cc: Barry Lindahl, City Attorney Dave Heiar, Economic Development Director Preparer: Tim Horsfield Address: 830 Bluff Street Dubuque, IA 52001 Telephone: 563 - 589 -4267 RESOLUTION NO. 388 -10 Re- Lighting of the 5 Street Ramp and Locust Street Ramp Whereas, Twist!HDM has submitted a proposal in response to the City of Dubuque's request to re -light the 5 Street and Locust Street Parking Ramps Whereas, they were selected as the vendor through the bidding process for the new ramp at 10 and Central and now through that process considered a sole source provider for like equipment due to the operating system required for each ramp NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. To award the two contracts to TwistIHDM in the amount of $171,932.00 to relight the 5 Street and Locust Street Parking Ramps. Passed, approved and adopted this 4 day of October, 2010. Attest: Jeanne F. Schneider, CMC City Clerk F:IUSERSI K la A. Braig, Mayor g, ro -Tem