Chestnut Street ReconstructionMEMORANDUM TO: FROM: SUBJECT: September 30, 2003 The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Chestnut Street (Highland to Cox) Reconstruction Project Public Works Director Mike Koch recommends City Council approval of the plans and specifications, the Schedule of Special Assessments, and the Resolution with Respect to the Adoption of the Resolution of Necessity for the Chestnut Street (Highland to Cox) Reconstruction Project. To try and lessen additional parking congestion in this area caused by the concurrent construction of Chestnut Street and University Avenue, the City has adjusted the completion date for the Chestnut Street Reconstruction Project to June 30, 2004. This will limit the time ovedap between the two projects. The University Avenue Reconstruction Project is anticipated to extend from April through September 2004. In terms of parking needs for residents, the City will work with the contractors on both projects to limit the times that Chestnut Street and University Avenue, from Alta Vista to Spruce Street, would have simultaneous "No Parking" as a result of the stages of construction. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM October 1, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ~"~'/~'~-~/ Chestnut Street (Highland to Cox) Reconstruction Project INTRODUCTION The enclosed resolutions are in reference to the public hearing on the Chestnut Street (Highland to Cox) Reconstruction Project. DISCUSSION Chestnut Street from Highland to Walnut was built in 1898 with macadam stone; and in 1918, brick was placed over the stone. Chestnut Street from Walnut Street to Cox was built in 1915 with macadam stone and replaced in 1935 with concrete. The Chestnut Street project involves a complete reconstruction of the existing base and pavement surface that is 31 foot in width, from back-of-curb to back-of- curb from Highland to Walnut and 20 foot in width from Walnut to Cox. The pavement will be concrete, with new curb and gutter and sidewalks from Highland to Walnut. The section from Walnut to Cox will be concrete with curb and sidewalk on the north side. Since there is one property which does not have a sidewalk, a new sidewalk will be installed at the property owner's expense. The project will include: storm sewer improvements; sanitary manhole replacement; sanitary sewer main repairs; water valve replacement; replacement of 15 lead water services; and 21 sanitary sewer lateral replacements. To try and lessen additional parking congestion in this area caused by the concurrent construction of Chestnut Street and University Avenue, we have adjusted the completion date for the Chestnut Street Reconstruction Project to June 30, 2004. This will limit the time overlap between the two projects. The University Avenue Reconstruction Project is anticipated to extend from April through September, 2004. In terms of parking needs for residents, the City will work with the contractors on both projects to limit the times that Chestnut Street and University Avenue, from Alta Vista to Spruce Street, would have simultaneous "No Parking" as a result of the stages of construction. RECOMMENDATION I recommend that the City Council approve the plans and specifications, the Resolution of Necessity, the Resolution with Respect to the Adoption of the Resolution of Necessity, and Ordering Bids for the Chestnut Street (Highland to Cox) Reconstruction Project. ACTION TO BE TAKEN The City is requested to approve the plans and specifications, the Resolution of Necessity, the Resolution with Respect to the Adoption of the Resolution of Necessity, and Ordering Bids for the Chestnut Street (Highland to Cox) Reconstruction Project through the adoption of the enclosed resolutions. MAK/vjd Prepared by Michael Felderman, Civil Engineer cc: Bob Green, Water Plant Manager Gus Psihoyos, Assistant City Engineer Michael Felderman, Civil Engineer MEMORANDUM September 9, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Miiligen, City Manager Chestnut Street (Highland to Cox) Reconstruction Project Public Works Director Mike Koch recommends initiation of the bidding process for the Chestnut Street (Highland to Cox) Reconstruction Project, and further recommends that a public hearing be set for October 6, 2003. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barw Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director UNIVERSITY AVE. PATCHING PROJECT ( ALTA VISTA TO SPRUCE) CHESTNUT STREET RECONSTRUCTION PROJECT KELLY'S BLF VICINITY MAP [CITY OF DUBUQUE[ CITY OF DUBUQUE, IOWA MEMORANDUM September 8, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ~ ~ Chestnut Street (Highland to Cox) Reconstruction Project INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Chestnut Street (Highland to Cox) Reconstruction Project. DISCUSSION Chestnut Street from Highland to Walnut was built in 1898 with macadam stone; and in 1918, bdck was placed over the stone. Chestnut Street from Walnut Street to Cox was built in 1915 with macadam stone and replaced in 1935 with concrete. The Chestnut Street project involves a complete reconstruction of the existing base and pavement surface that is 31 foot in width, from back-of-curb to back-of- curb from Highland to Walnut and 20 foot in width from Walnut to Cox. The pavement will be concrete, with new curb and gutter and sidewalks from Highland to Walnut. The section from Walnut to Cox will be concrete with curb and sidewalk on the north side. Since there is one property which does not have a sidewalk, a new sidewalk will be installed at the property owner's expense. The project will include: storm sewer improvements; sanitary manhole replacement; sanitary sewer main repairs; water valve replacement; replacement of 15 lead water services; and 21 sanitary sewer lateral replacements. The schedule for the project will be as follows: Advertisement for Bids Notice of Headng on Plans & Specifications Mail Notice to Property Owners Published Notices to Property Owners Receipt of Bids Public Hearing Award of Contract Completion September 19, 2003 September 19, 2003 September 19, 2003 September 23, 2003 October 3, 2003 October 9, 2003 October 6, 2003 October 20, 2003 June 30, 2004 · RECOMMENDATION I would recommend that the City Council give preliminary approval to the Resolution of Necessity and establish October 6, 2003 as the date of the public hearing. BUDGET IMPACT The estimate for the project is as follows: Construction Contract Contingency Engineedng $482,611.70 48,261.17 79,630.93 Total Estimated Cost $610,503.80 The project will be funded as follows: Street Construction Fund Local Option Sales Tax Fund Special Assessment to Private Properties Special Assessment to Water Services Special Assessment for Sewer Laterals Special Assessment for Sidewalk City Paid Deficiency Watermain Depreciation Fund Sanitary Sewer Construction Fund $ 91,559.84 231,907.78 77,302.59 16,343.80 45,820.83 2,201.10 0 88,128.51 57,239.35 Total Project Funding $610,503.80 The project will be funded through the Fiscal Year 2004 CIP appropriation of City funds in the amount of $600,000. The project, as outlined, will require Special Assessments of $141,668.32, Local Option Sales Tax Fund of $231,907.28, and Road Use Funds of $91,559.84. Low- to moderate-income property owners subject to street assessment will be eligible for financial assistance ranging from 20 to 100 percent of the street assessment for the owner-occupied resident property depending on family size and income level. This financial assistance program is made available through the One Percent Local Option Sales Tax. ACTION TO BE TAKEN The City Council ~s requested to give preliminary approval to the Resolution of Necessity, approve the preliminary assessment schedule, and to establish the date of the public hearing. MAK/vjd Prepared by Michael Felderman, Civil Engineer cc: Bob Green, Water Plant Manager Gus Psihoyos, Assistant City Engineer Michael Felderman, Civil Engineer '- , -0 ,--' , ~',~ ..' ~ ....... ' .'~ SITE LOCATION MAP NOT T0 SCALE NORTH PURPOSE: RECONSTRUCTION OF CHESTNUT STREET RESOLUTION NO. 378-03 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 10th day of September, 2003, plans, specifications, form of contract and estimated cost were filet with the City Clerk of Dubuque, Iowa for the Chestnut Street (Highland to Cox) Reconstruction Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this 6th day of October, 2003. day of October ,2003. Terrance M. Duggan, Mayor Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 379-03 RESOLUTION WITH RESPECT TO THE ADOPTION OF THE RESOLUTION OF NECESSITY PROPOSED FOR THE CHESTNUT STREET (HIGHLAND TO COX) RECONSTRUCTION PROJECT Whereas, the City Council has proposed a Resolution of Necessity for the Chestnut Street (Highland to Cox) Reconstruction Project, has given notice of the public headng thereon as required'by law; and Whereas, the public headng has been held, all persons offedng objections have been heard and consideration given to all objections and is pending before this Councit; and Whereas, this is the time and place set as provided for the taking of action on the proposed Resolution of Necessity. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed Resolution of Necessity described above is hereby: Adopted, without amendment, and all objections filed or made having been duly considered are overruled. Adopted as amended by the Schedule of Assessments attached hereto as Exhibit A, and made a part hereof by reference. All objections filed or made having been duly considered are overruled. Deferred for later consideration to a City Council meeting to be held on the day of ,2003, next at 6:30 p.m. in the Public Library Auditorium, with jurisdiction retained for further consideration and action at the adjourned meeting. Abandoned. 2003. Passed, adopted and approved this 6th day of October, 2003. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 335-03 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Chestnut Street (Highland to Cox) Reconstruction Project in the estimated amount $610,503.80 are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 15th day of September 2003. Attest: ~eanne F. Schneider, CMC, City Clerk RESOLUTION NO. 336-03 FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the Chestnut Street (Highland to Cox) Reconstruction Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a public hearing will be held on the 6th day of October, 2003, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this 15th day of September ,~2003 T~fTaEce M. Dug~an,~ // Attest: (../'Jeanne, F. Schneider, CMC, City Clerk RESOLUTION NO. 337-03 RESOLUTION OF NECESSITY Whereas, proposed plans have been duly prepared and approved by the City Council of the City of Dubuque and are now on file in the office of City Clerk showing among other things the plans, specifications, form of contract, estimated cost and preliminary plat and schedule showing the amount proposed to be assessed against each lot and the valuation of each lot as filed by the City Council, for the Chestnut Street (Highland to Cox) Reconstruction Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements, and unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity, they shall be deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed and done in accordance with the plans and specifications which have been approved by the City Council and now on file with the City Clerk. That the cost and expense of making such improvement will be assessed partially or totally against privately owned property lying with the assessment limits, and in an amount not to exceed that provided by law, and in proportion to the special benefits conferred. The portion of the cost which shall be borne by the City will be paid from the: Street Construction Fund, Local Option Sales Tax Fund, Watermain Depreciation Fund, Sanitary Sewer Construction Fund and special assessment bonds may be issued in anticipation of deferred payments of assessments when a contract has been performed and accepted, and the proceeds thereof used to pay the contractor. The above resolution was introduced, approved and ordered placed on file with the City Clerk this 15th day of Sept. ember'2003. Approved and placed on file for final action. ~/,d'eanne F. Schneider, CMC, City Clerk RESOLUTION NO. 338-03 FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY Whereas, the City Council of the City of Dubuque, iowa, has given its preliminary approval on the proposed plans, specifications and form of contract and placed same on file in the office of the City Clerk for public inspection for the Chestnut Street (Highland to Cox) Reconstruction Project; and Whereas, the proposed Resolution of Necessity for said improvement has been introduced and is now on file in the City Clerk's office for public inspection. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 6th day of October, 2003, a public hearing will be held at 6:30 p.m. in the Public Library Auditorium in the City of Dubuque at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a Resolution of Necessity and the City Clerk be and is hereby authorized and directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity they shall be deemed to have waived all objections thereto. Passed, adopted and approved this 15th day of September, 2003. Terrance M. Dug~-an~r e F. Schneider, CMC, City Clerk RESOLUTION NO. 339-03 RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets, 1 to 1 inclusive, are hereby determined to be the schedule of proposed assessments for the Chestnut Street (Highland to Cox) Reconstruction Project and the valuations set out herein are hereby approved. Passed, approved and adopted this 15th day of September, 2_003..~ Ter(ance M. Dug~a~ayor Attest¢. ~xfeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 340-03 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the Chestnut Street (Highland to Cox) Reconstruction Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 9th day of October, 2003. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 20t~ day of October, 2003. Passed, adopted and approved this __ 15thday of September, 2003. Terratnce M. Du§ga~, Attest: e F. Schneider, CMG~Ci~y Clerk SiTE LOCATION MAP ~ NOT TO SCALE NORTH PURPOSE: RECONSTRUCT~0N CHESTNUT STREET WC~ CITY OF DUBUQUE, IOWA CHESTNUT STREET (HIGHLAND TO COX STREET) PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS PUBLIC PARCEL ~VALUATIONwlNETPAVINO SIDEWALK SEWER WATERMAIN DEFICIENCy IMPROVEMENTS WATERSERVICESEWERLAffERALTOTALNET OWNER Lot Description NO, IMPROVEMENT ASSESSMENT ASSESSMENT ASSESSMENTA$SESSMEblT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT $778.46 S633.55 $1,290.30 SI,290,30 $1,290.30 SI,290.30 $1,290.30 S834.90 NOTICE TO BIDDERS OF THE RECEIPT OF BIDS FOR THE CHESTNUT STREET (HIGHLAND TO COX) RECONSTRUCTION PROJECT Sealed proposals will be received by the City Clerk of the City of Dubuque, Iowa, at the Office of City Clerk in City Hall no later than 2:00 o'clock p.m. on the 9th day of October, 2003, for the construction of Chestnut Street (Highland to Cox) Reconstruction Project. Copies of the plans and specifications may be obtained in the City Engineer's office at City Hall. No plan deposit is required. Payment to the contractor will be made from funds as may be legally used for such purposes. All work herein provided for shall be commenced within ten (10) days after the Notice To Proceed has been issued, and shall be fully completed by the 30~h day of June, 2004. All bids must be submitted on the Bid Form bound in the specifications. Each bid shall be accompanied by a satisfactory Bid Bond executed by the Bidder and an acceptable surety; or a cashier's or certified check payable to the City Treasurer, City of Dubuque, drawn on a bank in Iowa or a bank chartered under the laws of the United States, in the amount of ten percent (10%) of the bids submitted as security that the bidder will enter into a contract for doing the work and will give bond with proper securities for the faithful performance of the contract in the form attached to the specifications. The successful bidder will be required to furnish a performance bond in an amount equal to one hundred percent (100%) of the contract price. Said bond is to be issued by a responsible surety company approved and acceptable to the City Council, and shall guarantee the faithful performance of the contract and terms and conditions therein contained, and shall guarantee the prompt payment of ail materials and labor and protect and save harmless the City of Dubuque, Iowa, from claims and damages of any kind caused by the operations of the Contractor. Said Bond shall also guarantee the material and the maintenance of the improvement(s) constructed for a minimum period of two (2) years from and after its completion and acceptance by the City Council. No bid submitted by any Contractor which contains a condition or qualification shall be recognized or accepted by the City Council and any letter or communication accompanying the bid which contains a condition or qualification upon the bid which has the effect of qualifying or modifying any provision of the specifications in any manner will be construed as a non-qualifying bid and will be rejected by the City Council as not responsive. All proposals must be made on blanks furnished by the City Engineer and each bidder will be required to state his prices for doing all the items in each section on which he makes a bid and for all things necessary to make a complete job. The Bidder's attention is directed to the City of Dubuque's Affirmative Action Program which is included in the Contract Specifications and the provisions thereof and hereby made a part of the Contract Documents by reference and incorporated therein. The Contractor, when requested by the City of Dubuque, will furnish a statement of his financial and practical qualifications as provided for in the General Requirements of the Specifications. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa Domestic Labor. The City Council reserves the right to reject any and all bids or to waive any technical ties and irregularities. All bids will be publicly opened and read by the City Clerk at 2:00 o'clock p.m. on the 9~h day of October, 2003, and will be submitted to the City Council for final action at a meeting to be held in the Public Library Auditorium, 360 West 11th Street, at said City at 6:30 p.m. on the 20th day of October, 2003. A contract will be awarded at that time or such subsequent time as the City may determine. Published by order of the City Council of the City of Dubuque, Iowa and dated this of ,2003. Jeanne F. Schneider, CMC, City Clerk CONSTRUCTION SCHEDULE AND LIQUIDATED DAMAGES Work herein provided for shall be commenced within the (10) days after notice to proceed has been issued and shall be fully completed by June 30, 2004. For each calendar day that any work shall remain uncompleted beyond the completion schedule, $500.00 per calendar day will be assessed, not as a penalty but as predetermined and agreed liquidated damages. The contractor will be separately invoiced for this amount, and final payment will be withheld until payment has been made of this invoice. The assessment of liquidated damages shall not constitute a waiver of the City's right to collect any additional damages which the City may sustain by failure of the contractor to carry out the terms of his contract. An extension of the contract period may be granted by the City for any of the following reasons: 1. Additional work resulting from a modification of the plans. 2. Delays caused by the City. Other reasons beyond the control of the Contractor, which in the City's opinion, would justify such extension. MEMORANDUM September 9, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Chestnut Street (Highland to Cox) Reconstruction Project Public Works Director Mike Koch recommends initiation of the bidding process for the Chestnut Street (Highland to Cox) Reconstruction Project, and further recommends that a public hearing be set for October 6, 2003. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM September 8, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ~[~. Chestnut Street (Highland to Cox) Reconstruction Project INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Chestnut Street (Highland to Cox) Reconstruction Project. DISCUSSION Chestnut Street from Highland to Walnut was built in 1898 with macadam stone; and in 1918, brick was placed over the stone. Chestnut Street from Walnut Street to Cox was built in 1915 with macadam stone and replaced in 1935 with concrete. The Chestnut Street project involves a complete reconstruction of the existing base and pavement surface that is 31 foot in width, from back-of-curb to back-of- curb from Highland to Walnut and 20 foot in width from Walnut to Cox. The pavement will be concrete, with new curb and gutter and sidewalks from Highland to Walnut. The section from Walnut to Cox will be concrete with curb and sidewalk on the north side. Since there is one property which does not have a sidewalk, a new sidewalk will be installed at the property owner's expense. The project will include: storm sewer improvements; sanitary manhole replacement; sanitary sewer main repairs; water valve replacement; replacement of 15 lead water services; and 21 sanitary sewer lateral replacements. The schedule for the project will be as follows: Advertisement for Bids Notice of Hearing on Plans & Specifications Mail Notice to Property Owners Published Notices to Property Owners Receipt of Bids Public Hearing Award of Contract Completion September 19, 2003 September 26, 2003 September 26, 2003 September 26, 2003 October 3, 2003 October 9, 2003 October 6, 2003 October 20, 2003 June 30, 2004 RECOMMENDATION I would recommend that the City Council give preliminary approval to the Resolution of Necessity and establish October 6, 2003 as the date of the public hearing. BUDGET IMPACT The estimate for the project is as follows: Construction Contract Contingency Engineering $482,611.70 48,261.17 79,630.93 Total Estimated Cost $610,503.80 The project will be funded as follows: Street Construction Fund Local Option Sales Tax Fund Special Assessment to Private Properties Special Assessment to Water Services Special Assessment for Sewer Laterals Special Assessment for Sidewalk City Paid Deficiency Watermain Depreciation Fund Sanitary Sewer Construction Fund $ 91,559.84 231,907.78 77,302.59 16,343.80 45,820.83 2,201.10 0 88,128.51 57,239.35 Total Project Funding $610,503.80 The project will be funded through the Fiscal Year 2004 CIP appropriation of City funds in the amount of $600,000. The project, as outlined, will require Special Assessments of $141,668.32, Local Option Sales Tax Fund of $231,907.28, and Road Use Funds of $91,559.84. Low- to moderate-income property owners subject to street assessment will be eligible for financial assistance ranging from 20 to 100 percent of the street assessment for the owner-occupied resident property depending on family size and income level. This financial assistance program is made available through the One Percent Local Option Sales Tax. ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, approve the preliminary assessment schedule, and to establish the date of the public hearing. MAK/vjd Prepared by Michael Felderman, Civil Engineer cc: Bob Green, Water Plant Manager Gus Psihoyos, Assistant City Engineer Michael Felderman, Civil Engineer City Clerk's Office 50 West 13th Street Dubuque, Iowa 520014864 (563) 5894120 Office (563) 589-0890 Fax (563) 690-6678 7DD September 19, 2003 NOTICE TO PROPERTY OWNERS Notice is given that there is now on file for public inspection in the office of the City Clerk of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost, and a plat and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of Dubuque, Iowa, for an improvement of the type(s) and in the location(s) as follows: Chestnut Street (Highland to Cox) Reconstruction Project The project involves a complete reconstruction of the existing base and pavement surface that is 31 foot in width, from back-of-curb to back-of-curb from Highland to Walnut and 20 feet in width from Walnut to Cox. The project will include: storm sewer improvements; sanitary manhole replacement; sanitary sewer main repairs; water valve replacement; replacement of 15 lead water services; and 21 sanitary sewer lateral replacements. That the proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: Chestnut Street (Highland to Cox) All property included within the areas described so as to include one-half of the privately- owned property between each such street to be improved and the next street, whether such privately-owned property abuts upon the street to be improved or not. In no case shall property situation more than 300 feet from the street to be improved be assessed. The City Council will meet at 6:30 p.m. on the 6th day of October, 2003, at the Public Library Auditorium, 360 West 11th Street, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a Resolution of Necessity. A property owner will be deemed to have waived all objections unless at the time of headng he has filed objections with the City Clerk. Any visual- or hearing-impaired persons needing special assistance or persons with special accessibility needs shOuld contact the City Clerk's office at (563) 589-4120 or TDD (563) 690-6678 at least 48 hours prior to the meeting. City Clerk Service People Integrity Responsibility Imlovation Teamwork B]~)FORI~, P~LA E & MU~LLER DONALD. '1245 HIGI-I_LA~qD PLACE DUBUQUE, IA 52001 sleqe'l ssmppv ®AU3AV ~ O'DONNELL, JOSEPH L & KELLY K 38529 HWY 52 BELLEVUE, IA 52031 O'DONNELL, JOSEPH L & KELLY K 38529 HWY 52 BELLEVUE, IA 52031 HESS, OWEN C & SUSAN K 506 N BLUFF ST, PO BOX 277 GUTTENBERG, IA 52052 HESS, OWEN & SUSAN 506 N BLUFF ST, PO BOX 277 GUTTENBERG, IA 52052 SHELDON, THOMAS L & JANA R 56[ GHESTNUT DUBUQUE, IA 52001 WHALEN MD, JOHN E & NORBY, ANTHONY f'i' O'5~IdHLAND PLACE DUBUQUE, IA 52001 I~A~t~ STEVEN ALgJq 643 CHESTNUT DUBUQUE, IA 52001 KENNET JOHN 803 GRANT MAQUOKETA, IA 52060 YUNK, GAlL A 559 CHESTNUT DUBUQUE, IA 52001 WHALEN MD, JOHN E & NORBY, ANTHONY 1105 HIGHLAND PLACE DUBUQUE, IA 52001 SHEETS, JEFFREY & CAROL 973 RICHARDS ROAD DUBUQUE, IA 52003 CINGILLI, MUSTAFA & MESUDE 647 CHESTNUT DUBUQUE, IA 52001 MOORE, KENNETH JOHN 8O3 GRANT MAQUOKETA, IA 52060 CIAPALO, ROMAN P & NANCY B 1209.t-ItGHLAND PL DUBUQUE, IA 52001 HAUGEN, BRUCE P & LINDA J 22390 GREAT RIVER ROAD LE CLAIRE,IA 52753 HAUGEN, BRUCE P & LINDA J 22390 GREAT RIVER ROAD LE CLAIRE,IA 52753 RICHARDSON, JOHN F. & SHIHATA, MIRIAM A. 1163 HIGHLAND PL DUBUQUE, IA 52001 LAMPE, LYNN A/K/A LYNN E LAMPE 116 W 13TH STREET DUBUQUE, IA 52001 DEMELLO,MAKOVEC PARTNERSHIP 552 CHESTNUT DUBUQUE, IA 52001 FREEDOM PROPERTIES LLC 973 RICHARDS ROAD DUBUQUE, IA 52001 ALT, CYNTHIA L 632 CHESTNUT ST DUBUQUE, IA 52001 PETERSON, CHARLES E. 648 CHESTNUT STREET DUBUQUE, IA 52001 ALT, L PETER & CYNTHIA LINDLE 632 CHESTNUT DUBUQUE, IA 52001 JOHNSON, ROBERT L & GOLOMBESKI 1295 PRAIRIE DUBUQUE, IA 52001 BONIFAZI, ARTHUR W ETAL 1293 WALNUT DUBUQUE, IA 52001 STEFFEN, DANIEL T & TAMMY L. 1283 WALNUT DUBUQUE, IA 52001 WHITE, RONALD R. 3197 HIGHLAND PARK DR DUBUQUE, IA 52001 AMERICAN HOUSING TRUST I PO BOX 277 GUTTENBERG, IA 52052 COMBS, JOHN E & NETTIE I. 765 CHESTNUT DUBUQUE, IA 52001 sl~qe'~ ss~ppv SCHIESL, JOHN R & MARY ANN 604 CHESTNUT DUBUQUE, IA 52001 JURISIC; JAMES A & SARA L. 642 CHESTNUT DUBUQUE, IA 52001 LYONS, JYMIE M. 658 CHESTNUT DUBUQUE, IA 52001 ALT, L PETER & CYNTHIA LINDLE 632 CHESTNUT ST DUBUQUE, IA 52001 BREITBACH, ROBERT L & CATHERINE 1209 PRAIRIE DUBUQUE, IA 52001 CONNOLLY, JOHN M & JUDY M. 1289 WALNUT DUBUQUE, IA 52001 HESS, RICHARD J & NANCY M. 1015 ROCKDALE ROAD DUBUQUE, IA 52003 SCHUBERT, KELLI A 755 CHESTNUT DUBUQUE, IA 52001 COMBS, JOHN E & NETTLE I. 765 CHESTNUT DUBUQUE, IA 52001 At)EL, PATRICK D. 789 CHESTNUT DUBUQUE, IA 52001 w~LgL~ JOJ ~,~ldw,~, *sll }v~s~,**q$ P**:I q~,ooms "/89 CHESTNUT DUBUQUE, IA 52001 sl~q~'l sse~ppv CLINE, RYAN M. 1243 WALNUT DUBUQUE, IA 52001 WEINER, JAMES F & PATRICIA A. 7t5 ROSE DUBUQUE, IA 52001 DATA, CORY L. 721 ROSE DUBUQUE, IA 52001 BANWARTH, HAROLD A & VIRGiNIA 2781 BALKE DUBUQUE, IA 52001 FIELD, JAMES JR & ROSALYN 751 ROSE DUBUQUE, IA 52001 HUSEMANN, SHERRY L. 761 ROSE DUBUQUE, IA 52001 CONNOLLY, PATRICK W & JANANN L. 775 ROSE DUBUQUE, IA 52001 BECK, JOHN J. 785 ROSE DUBUQUE, IA 52001 ROPER, ARNOLD L. & MALONE, PATRICK I. 110 E. MAPLE ST LANCASTER, WI 53813 w~l,9~S ~o~ aleldrue~, asfl w~S~,eaqS pea:! q3oorus CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: BRADFORD, PAMELA K & MUELLER 1245 HIGHLAND PL 1245 HIGHLAND PLACE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.378.022 Valuation with Improvement: $234,435.29 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 784 & 2-786 A MCDANIEL'S SUB $2,995.29 (-) Gross Assessment: $2,995.29 9-5-03 DONALD P. Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1 ~493.71 $1,493.71 $4,489.00 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: O'DONNELL, JOSEPH L & KELLY K 5O7 CHESTNUT 38529 HWY 52 BELLEVUE, IA 52031 Legal Description: Parcel Number: 10~24.378.020 Valuation with improvement: $43,938.46 Public Improvements Assessment Paving Assessment: $778.46 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 1 W 14'3 OF 786 AND ALL OF LOT 787 Gross Assessment: $778.46 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,493.71 $1,493.71 $2,272.17 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: O'DONNELL, JOSEPH L & KELLY K 509 CHESTNUT 38529 HWY 52 BELLEVUE, IA 52031 Legal Description: Parcel Number: 10.24.378.019 Valuation with Improvement: $44,759.17 Public Improvements Assessment Paving Assessment: $849.17 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 2 W 14'3 OF 786 AND ALL OF 787 Gross Assessment: $849.17 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,493.71 $1,493.71 $2,342.88 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: HESS, OWEN C & SUSAN K 533 CHESTNUT 506 N BLUFF ST, PO BOX 277 GUTTENBERG, IA 52052 Legal Description: Parcel Number: 10.24.378.018 Valuation with Improvement: $26,910.93 Public Improvements Assessment Paving Assessment: $710.93 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 2-788 iN A. MCDANIEL'S SUB Gross Assessment: $710.93 9-5-03 Private Improvements Assessment water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,290.30 $1 ;493.71 $2,784.01 $3,494.94 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: HESS, OWEN & SUSAN 535 CHESTNUT 506 N BLUFF ST, PO BOX 277 GUTTENBERG, IA 52052 Legal Description: Parcel Number: 10.24.378.017 Valuation with Improvement: $34,643.55 Public Improvements Assessment Paving Assessment: $633.55 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 1-788 A. MCDANIELS SUB Gross Assessment: $633.55 9-5~03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,290.30 $1,493.71 $2,784.01 $3,417.56 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: YUNK, GAlL A 559 CHESTNUT 559 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.378.016 Valuation with Improvement: $43,181.51 Public Improvements Assessment Paving Assessment: $691.51 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 2 - E 50' - 789 A MCDANIELS SUB Gross Assessment: $691.51 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Pdvate Improvement: TOTAL NET ASSESSMENT $1,290.30 $1,493.71 $2,784.01 $3,475.52 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: SHELDON, THOMASL&JANA R 561CHESTNUT 561CHESTNUT DUBUQUE, IA52001 Legal Description: Parcel Number: 10.24.378.015 Valuation with Improvement: $30,937.90 Public Improvements Assessment Paving Assessment: $597.90 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) S 87'6 OF LOT 1 OF E 50' OF LOT 789 Gross Assessment: $597.90 9-5-03 Private ImprOvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,290.30 $1,493.71 $2,784.01 $3,381.91 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: WHALEN MD, JOHN E & NORBY, ANTHONY VACANT 1105 HIGHLAND PLACE DUBUQUE, IA 52001 Legal Description: Parcel N umber: 10.24.378.014 Valuation with Improvement: $7,577.20 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: A. MCDANIELS SUB S 87' OF W 3'6 789 $1,557.20 (-) Gross Assessment: $1,557.20 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,557.20 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: WHALEN MD, JOHN E & NORBY, ANTHONY 609 CHESTNUT 1105 HIGHLAND PLACE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.378.013 Valuation with Improvement: $65,716.34 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: A. MCDANIEL'S SUB. S.92'6 OF LOT 791 $1,496.34 (-) Gross Assessment: $1,496.34 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,493.71 $1,493.71 $2,990,05 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: SHEETS, JEFFREY & CAROL 631 CHESTNUT 973 RICHARDS ROAD DUBUQUE, IA 52003 Legal Description: Parcel Number: 10.24.378.012 Valuation with Improvement: $58,698.66 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 2 OF 792 & LOT 2 OF 793 $2,688.66 (-) Gross Assessment: $2,688.66 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,493.71 $1,493.71 $4,182.37 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: DAVIS, STEVEN ALAN 643 CHESTNUT 643 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.378.011 Valuation with Improvement: $61,772.74 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: A.MC DANIELS SUB LOTS 794 & 795 $2,512.74 (-) Gross Assessment: $2,512.74 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,290.30 $1,493.71 $2,784.01 $5,296.75 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: CINGILLI, MUSTAFA & MESUDE 647 CHESTNUT 647 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.378.010 Valuation with Improvement: $44,546.09 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: E.45'-S.1/2-796 A. MC DANIELS SUB $1,136.09 (-) Gross Assessment: $1,136.09 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,290.30 $1,493.71 $2,784.01 $3,920.11 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: MOORE, KENNETH JOHN 653 CHESTNUT 803 GRANT MAQUOKETA, IA 52060 Legal Description: Parcel Number: 10.24.378.009 Valuation with Improvement: $52,554.49 Public Improvements Assessment Paving Assessment: $784.49 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) A MCDANIELS SUB W 15' Sl/2 LOT 796 Gross Assessment: $784.49 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,290.30 $1,493.71 $2,784.01 $3,568.51 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Add ress: Mailing Address: MOORE, KENNETH JOHN 655 CHESTNUT 803 GRANT MAQUOKETA, IA 52060 Legal Description: Parcel Number: 10.24.378.008 Valuation with Improvement: $45,750.88 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: A MCDANIELS SUB W45' S1/2 LOT 797 $1,130.88 (-) Gross Assessment: $1,130.88 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,493.71 $1,493.71 $2,624.59 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: CIAPALO, ROMAN P & NANCY B 1209 HIGHLAND PL 1209 HIGHLAND PL DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.382.001 Valuation with Improvement: $112,489.77 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 830 A MCDANIELS SUB $3,838.67 $2,201.10 (-) Gross Assessment: $6,039.77 9-5-03 Private improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $834.90 $2,089.78 $2,924.68 $8,964.45 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: HAUGEN, BRUCE P & LINDA J 1193 HIGHLAND PL 22390 GREAT RIVER ROAD LE CLAIRE,IA 52753 Legal Description: Parcel Number: 10.24.382.002 Valuation with Improvement: $41,833.83 Public Improvements Assessment Paving Assessment: $713.83 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) N 1/2 OF LOT 829 A MCDANIELS SUB Gross Assessment: $713.83 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $713.83 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: HAUGEN, BRUCE P & LINDA J 1175 HIGHLAND PL 22390 GREAT RIVER ROAD LE CLAIRE,IA 52753 Legal Description: Parcel Number: 10.24.382.003 Valuation with Improvement: $43,316.90 Public Improvements Assessment Paving Assessment: $446.90 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) S 1/2 OF LOT 829 A MCDANIELS SUB Gross Assessment: $446.90 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $446.90 CHESTNUT STREET PAVING PROJECT 9-5-03 Property Owner: Assessed Address: Mailing Address: RICHARDSON, JOHN F. & SHIHATA, MIRIAM A. 1163 HIGHLAND PL 1163 HIGHLAND PL DUBUQUE, IA 52001 Legal Description: Pamel Number: 10.24.382.004 Valuation with Improvement: $74,589.95 Public Improvements Assessment Paving Assessment: $399.95 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) Lot 828 A. MCDANIELS SUB Gross Assessment: $399.95 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $399.95 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: LAMPE, LYNN NWA LYNN E LAMPE 508 CHESTNUT 116 W 13TH STREET DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.008 Valuation with Improvement: $79,783.32 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 1 M A MCDANIELS SUB $1,033.32 (-) Gross Assessment: $1 033.32 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,033.32 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: DEMELLO-MAKOVEC PARTNERSHIP 552 CHESTNUT 552 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.007 Valuation with Improvement: $52,826.35 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOTS 2 & 3 A MCDANIELS SUB $2,066.35 Gross Assessment: $2,066.35 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $860.20 $2,O89.78 $2,949.98 $5,016.33 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: FREEDOM PROPERTIES LLC 574 CHESTNUT 973 RICHARDS ROAD DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.006 Valuation with Improvement: $76,472.92 Public Improvements Assessment Paving Assessment: $992.92 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 4 M A MCDANIELS SUB Gross Assessment: $992.92 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $885.50 $2,089.78 $2,975.28 $3,968.20 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Add ress: Mailing Address: SCHIESL, JOHN R & MARY ANN 604 CHESTNUT 604 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.005 Valuation with Improvement: $77,232.92 Public Improvements Assessment Paving Assessment: $992.92 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 5 M A MCDANIELS SUB Gross Assessment: $992.92 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $885.50 $2,089.78 $2,975.28 $3,968.20 9-5-03 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: ALT, CYNTHIA L 632 CHESTNUT 632 CHESTNUT ST DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.004 Valuation with Improvement: $178,543.03 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOTS 1, 2 & 3 OF PT OF 823 & 824 A. MCDANIELS SUB $8,503.03 (-) Gross Assessment: $8,503.03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $2,089.78 $2,O89.78 $10,592.81 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: JURISIC, JAMES A & SARA L. 642 CHESTNUT 642 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.003 Valuation with Improvement: $54,204.37 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Waterrnain Assessment: Deficiency Assessment: LOT 4 H M KINGMAN SUB $1,014:37 Gross Assessment: $1,014.37 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $885.50 $2,O89.78 $2,975.28 $3,989.65 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: PETERSON, CHARLES E. 648CHESTNUT 648CHESTNUTSTREET DUBUQUE, IA52001 Legal Description: Parcel Number: 10.24.381.002 Valuation with Improvement: $45,824.37 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: E 8 1/2' LOTS 1 & 2 H M KINGMAN SUB $1,014.37 (-) Gross Assessment: $1,014.37 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $834.90 $2,089.78 $2,924.68 $3,939.05 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: LYONS, JYMIE M. 658CHESTNUT 658CHESTNUT DUBUQUE, IA52001 Legal Description: Parcel Number: 10.24.381.001 Valuation with Improvement: $46,747.06 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: W 43.5' LOT 1 H M KINGMANS SUB $1,507.06 (-) Gross Assessment: $1,507.06 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $2,089.78 $2,O89.78 $3,598.84 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Add ress: Mailing Address: ALT, L PETER & CYNTHIA LINDLE 1206 PRAIRIE 632 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.014 Valuation with Improvement: $69,782.56 Public Improvements Assessment Paving Assessment: $362.56 Sidewalk Assessment: Sanitary SeWer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 5 H M KINGMANS SUB Gross Assessment: $362.56 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $362.56 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: ALT, L PETER & CYNTHIA LINDLE VACANT 632 CHESTNUT ST DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.381.015 Valuation with Improvement: $6,461.14 Public Improvements Assessment Paving Assessment: $181.14 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 6 H M KINGMANS SUB Gross Assessment: $181.14 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $181.14 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: JOHNSON, ROBERT L & GOLOMBESKI 1295 PRAIRIE 1295 PRAIRIE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.376.006 Valuation with Improvement: $205,691.78 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 780 & 781 A MCDANIELS SUB $6,841.78 (-) Gross Assessment: $6,841.78 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,290.30 $1,290.30 $8,132.08 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: BREITBACH, ROBERT L & CATHERINE 1209 PRAIRIE 1209 PRAIRIE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.380.001 Valuation with Improvement: $267,683.03 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOTS 778 & 779 A MCDANIELS SUB $8,503.03 (-) Gross Assessment: $8,503.03 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $834.90 $834.90 $9,337.93 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: BONIFAZI, ARTHUR W ETAL 1293 WALN UT 1293 WALNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.016 Valuation with Improvement: $43,416.08 Public Improvements Assessment Paving Assessment: $46.08 Sidewalk Assessment: Sanitary Sewer Assessment: Watsrmain Assessment: Deficiency Assessment: (-) Nl/2 - 14 & LOT 15 BISSELLS DUBUQUE Gross Assessment: $46.08 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $46,08 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: CONNOLLY, JOHN M & JUDY M. 1289 WALNUT 1289 WALNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.017 Valuation with Improvement: $49,633.14 Public Improvements Assessment Paving Assessment: $363.14 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) BISSELLS DUB LOT 13 BISSELLS DUB S1/2 Gross Assessment: $363.14 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $363.14 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: STEFFEN, DANIEL T & TAMMY L. 1283 WALN UT 1283 WALNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.018 Valuation with Improvement: $49,773.95 Public Improvements Assessment Paving Assessment: $883.95 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) LOT 11 & 12 BISSELLS DUBUQUE Gross Assessment: $883.95 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $883.95 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: HESS, RICHARD J & NANCY M. 1267 WALNUT 1015 ROCKDALE ROAD DUBUQUE, IA 52003 Legal Description: Parcel Number: 10.24.354.019 Valuation with Improvement: $32,094.27 Public Improvements Assessment Paving Assessment: $664.27 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) BISSELL DUBUQUE LOT 10 Gross Assessment: $664.27 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $664.27 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: WHITE, RONALD R. 1251 WALNUT 3197 HIGHLAND PARK DR DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.020 Valuation with Improvement: $66,431.79 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOTS 8 & 9 BISSELLS DUBUQUE $3,151.79 (-) Gross Assessment: $3,151.79 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $3,151.79 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: SCHUBERT, KELLI A 755 CHESTNUT 755 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.013 Valuation with Improvement: $61,142.83 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 6 AND LOT 7 BISSELLS DUBUQUE $1,772.83 (-) Gross Assessment: $1,772.83 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,772.83 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: AMERICAN HOUSING TRUST I 763 CHESTNUT PO BOX 277 GUTTENBERG, IA 52052 BISSELLS DUBUQUE 5 Legal Description: Parcel Number: 10.24.354.012 Valuation with Improvement: $58,416.56 Public Improvements Assessment Paving Assessment: $886.56 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) Gross Assessment: $886.56 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $886.56 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: COMBS, JOHN E&NETTIEI. 765CHESTNUT 765CHESTNUT DUBUQUE, IA52001 Legal Description: Parcel Number: 10.24.354.011 Valuation with Improvement: $50,986.98 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: BISSELL'S DUBUQUE 4 $1,016.98 (-) Gross Assessment: $1,016,98 9-5-03 Private .Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private improvement: TOTAL NET ASSESSMENT $1,016.98 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: COMBS, JOHN E & NETTLE I. 773 CHESTNUT 765 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.010 Valuation with ImproVement: $11,846.98 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 3 BISSELLS DUB $1,016.98 (-) Gross Assessment: $1,016.98 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,016.98 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: APEL, PATRICK D. VACANT 789 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.009 Valuation with Improvement: $4,686.56 Public Improvements Assessment Paving Assessment: $886.56 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) BISSELLS DUBUQUE 2 Gross Assessment: $886.56 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $886.56 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: APEL, PATRICK D. 789 CHESTNUT 789 CHESTNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.354.008 Valuation with Improvement:. $52,053.80 Public Improvements Assessment Paving Assessment: $913.80 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) BISSELLS DUBUQUE 1 Gross Assessment: $913.80 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $913.80 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: CLINE, RYAN M. 1243 WALN UT 1243 WALNUT DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.355.008 Valuation with Improvement: $54,192.76 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: N 1/2 LOT 7 CUMMINS SUB $1,142.76 (-) Gross Assessment; $1,142.76 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,142.76 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: WEINER, JAMES F & PATRICIA A. 715 ROSE 715 ROSE DUBUQUE, IA 52001 Legal Description: Pamel Number: 10.24.355.007 Valuation with Improvement: $47,922.33 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT6 CUMMINS SUB $1,132.33 (-) Gross Assessment: $1,132.33 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,132.33 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: DATA, CORY L. 721 ROSE 721 ROSE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.355.006 Valuation with Improvemen[: $97,018.40 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 5 CUMMINS SUB $1,178.40 (-) Gross Assessment: $1,178.40 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,178.40 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: BANWARTH, HAROLD A & VIRGINIA 733 ROSE 2781 BALKE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.355.005 Valuation with Improvement: $103,972.22 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: E 6'9-3 AND LOT 4 CUMMINS SUB $1,332.22 (-) Gross Assessment: $1,332.22 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,332.22 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: FIELD, JAMES JR & ROSALYN 751 ROSE 751 ROSE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.355.004 Valuation with Improvement: $67,464.81 Public Improvements Assessment Paving Assessment: $984.81 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) W45' LOT3 CUMMINS SUB Gross Assessment: $984.81 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $984.81 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: HUSEMANN, SHERRY L. 761 ROSE 761 ROSE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.355.003 Valuation with Improvement: $48,856.31 Public Improvements Assessment Paving Assessment: $566.31 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) E 1/2 LOT 2 CUMMINS SUB Gross Assessment: $566.31 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $566.31 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: CONNOLLY, PATRICK W & JANANN L. 775 ROSE 775 ROSE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.355.002 Valuation with Improvement: $45,526.31 Public Improvements Assessment Paving Assessment: $566.31 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) W 1/2 LOT 2 CUMMINS SUB Gross Assessment: $566.31 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $566.31 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Add ress: Mailing Address: BECK, JOHN J. 785 ROSE 785 ROSE DUBUQUE, IA 52001 Legal Description: Parcel Number: 10.24.355.001 Valuation with Improvement: $60,862.33 Public Improvements Assessment Paving Assessment: Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: LOT 1 CUMMINS SUB $1,132.33 (-) Gross Assessment: $1,132.33 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $1,132.33 CHESTNUT STREET PAVING PROJECT Property Owner: Assessed Address: Mailing Address: ROPER, ARNOLD L. & MALONE, PATRICK I. 815 ROSE 110 E. MAPLE ST LANCASTER, WI 53813 LOT 5 BLK 1 HAMBLIN SUB Legal Description: Pamel Number: 10.24.353.037 Valuation with Improvement! $181,586.44 Public Improvements Assessment Paving Assessment: $656.44 Sidewalk Assessment: Sanitary Sewer Assessment: Watermain Assessment: Deficiency Assessment: (-) Gross Assessment: $656.44 9-5-03 Private Improvements Assessment Water Service Lateral: Sanitary Sewer Service Lateral: Total Private Improvement: TOTAL NET ASSESSMENT $656.44 EngineerLng Division City Hall 50 West 13th Street Dubuque, IA 520014864 (563) 5894270 office (563) 5894205 fax September 19, 2003 CHESTNUT STREET RECONSTRUCTION PROJECT (Highland to Cox) PUBLIC MEETING When: October l, 2003 Times: 4:45 PM - 6:00 PM Location: Lincoln School - Gymnasium 555 Nevada Street N°tes: a) No-Smoking Facility b) Access For Persons with Disabilities: - Use front entrance at 555 Nevada Street. c) Directions: - Enter the playground off of Nevada Street. - May park on playground lot. - Use single-door entrance with rust.colored railings. The City is conducting an open forum discussion to acquaint the residents and business owners along the project with the proposed improvements and project schedule. Representatives of the City staff will be available to discuss the scope of the project, construction phasing, timing, special assessment procedures, availability of financial assistance, as well as to answer any other questions relating to the project. Feel free to stop in at any time during the above hours for an informal discussion. This meeting should offer mutual benefit in that it gives the City the opportunity to explain the design of the project, and also allows the public to express their concerns and opinions regarding the proposed design. Consideration will be given to all comments and suggestions. Chestnut Street (Highland to Cox) Chestnut Street from Highland to Walnut was built in 1898 with macadam stone; and in 1918, brick was placed over the stone. Chestnut Street from Walnut Street to Cox was built in 1915 with macadam stone and replaced in 1935 with concrete. 1 Service People Inte~[ty Responsibility Innoyation Teamwork The Chestnut Street project involves a complete reconstruction of the existing base and pavement surface that is 31 foot in width, from back-of-curb to back-of-curb from Highland to Walnut and 20 foot in width from Walnut to Cox. The pavement will be concrete, with new curb and gutter and sidewalks from Highland to Walnut. The section from Walnut to Cox will be concrete with curb and sidewalk on the north side. Since there is one property which does not have a sidewalk, a new sidewalk will be installed at the property owner's expense. The project will include: storm sewer improvements; sanitary manhole replacement; sanitary sewer main repairs; water valve replacement; replacement of 15 lead water services; and 21 sanitary sewer lateral replacements. The construction project will include: Length (Footage) Highland to Walnut: Walnut to Cox: 1,060 48O Street Width Highland to Walnut: 31 Feet Walnut to Cox: 20 Feet Pavement 7" Portland Cement Concrete Pavement Base 4" Granular Base Longitudinal Drain Tile Subdrains are to be installed on both sides of the street along the project. Storm Sewer New storm sewer system at Highland. Water Services Replacement of 15 lead water services from back-of-curb with copper service. The cost of installing water services is a direct benefit only to the affected property, and this cost is assessed to each respective lot. The City's 1% Local Option Sales Tax funding does not apply to this assessment. Sanitary Sewer Laterals Replacement of 21 sanitary sewer laterals from back of sidewalk to sewer main. The cost of installing sanitary sewer laterals is a direct benefit only to the affected property, and this cost is assessed to each respective lot. The City's 1% Local Option Sales Tax funding does not apply to this assessment. New Sidewalk A new sidewalk will be installed at the corner of Highland and Chestnut. The property owner will be assessed at 100% of the cost. Existing Sidewalk Traffic Control Watermain Project Estimated Cost Project Funding Sidewalk along Highland to Walnut and the north side of Chestnut from Walnut to Cox will be replaced. Curb ramps will be installed at the intersection. The project will require a closure for all through traffic. New watermain valves will be replaced. This work will require the interruption of water during the construction period. Construction Contingency Engineering $482,611.70 48,261.17 79,630.93 Total EstimatedCost $610,503.80 Street Construction Fund Local Options Sales Tax Special Assessment to Private Properties Special Assessment for Water Services Special Assessment for Sewer Laterals Special Assessment for Sidewalk City Paid Deficiency Watermain Construction Fund Sanitary Sewer Construction Fund $ 91,559.84 231,907.78 77,302.59 16,343.80 45,82O.83 2,201.10 0 88,128.51 57,239.35 Total Project Funding $610,503.80 Project Schedule Advertisement for Bids Notice of Hearing on Plans & Specifications Mail Notice to Property Owners Published Notices to Property Owners Receipt of Bids Public Hearing Award of Contract Completion September 19, 2003 September 19, 2003 September 19, 2003 September 23, 2003 October 3, 2003 October 9, 2003 October 6, 2003 October 20, 2003 June 30, 2004 NOTICE: Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City ClerMs office at (563) 589-4120 or TDD at (563) 589-4193 in the Human Rights Department at least 48 hours prior to the meeting. 3 PROJECT ASSESSMENTINFORMATION Based upon the City's street assessment policy, 19.3 percent of the total $400,770.21 street- related costs will be assessed to private property. The full cost for the water service lines, sidewalk, and sanitary sewer laterals are assessable to each respective lot. Final assessments will be calculated after the completion of the project, and after a final cost has been developed. The final assessment may be no greater than the estimated assessment you have already received but could be less than the estimated amount. Assessments may be paid in full or over a ten-year period with interest, currently at the rate of nine percent. STREET ASSESSMENT POLICY (ADOPTED APRIL 18, 1983) Local Option Sales Tax Funds will be utilized to reduce the amount of the proposed assessments by 75%: All property included within the area described so as to include one-half of the privately- owned property between each street to be improved and the next street, whether such privately-owned property abuts upon the street to be improved or not shall be assessed, tn no case shall property situated more than 300 feet from the street being improved be assessed. FINANCIAL ASSISTANCE AVAILABLE Financial assistance is available for a portion or the entire street paving, water services, and sanitary sewer lateral assessments. Low- and moderate-income property owners subject to the assessments will be eligible for financial assistance ranging from 20% to 100% of the assessment for owner-occupied residential properties, depending on family size and income level. This financial assistance is funded through 1% Local Option Sales Tax Funds. After final assessments are mailed upon completion of the project (June 30, 2004), property owners may apply for this financial assistance. Information required to be submitted with the application would be a copy of your latest Federal Income Tax return, and supporting W-2's. Information regarding the level of financial assistance as compared to family size and income level will be available at the meeting. Financial assistance is not available for any portion of the water services to individual properties. If you should have questions please contact Mike Felderman, City Engineering at (563) 589- 4270.