Chestnut Street ReconstructionMEMORANDUM
TO:
FROM:
SUBJECT:
September 30, 2003
The Honorable Mayor and City Council Members
Michael C. Van Milligen, City Manager
Chestnut Street (Highland to Cox) Reconstruction Project
Public Works Director Mike Koch recommends City Council approval of the plans and
specifications, the Schedule of Special Assessments, and the Resolution with Respect
to the Adoption of the Resolution of Necessity for the Chestnut Street (Highland to Cox)
Reconstruction Project.
To try and lessen additional parking congestion in this area caused by the concurrent
construction of Chestnut Street and University Avenue, the City has adjusted the
completion date for the Chestnut Street Reconstruction Project to June 30, 2004. This
will limit the time ovedap between the two projects. The University Avenue
Reconstruction Project is anticipated to extend from April through September 2004.
In terms of parking needs for residents, the City will work with the contractors on both
projects to limit the times that Chestnut Street and University Avenue, from Alta Vista to
Spruce Street, would have simultaneous "No Parking" as a result of the stages of
construction.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Michael A. Koch, Public Works Director
CITY OF DUBUQUE, IOWA
MEMORANDUM
October 1, 2003
TO:
FROM:
SUBJECT:
Michael C. Van Milligen, City Manager
Michael A. Koch, Public Works Director ~"~'/~'~-~/
Chestnut Street (Highland to Cox) Reconstruction Project
INTRODUCTION
The enclosed resolutions are in reference to the public hearing on the Chestnut
Street (Highland to Cox) Reconstruction Project.
DISCUSSION
Chestnut Street from Highland to Walnut was built in 1898 with macadam stone;
and in 1918, brick was placed over the stone. Chestnut Street from Walnut
Street to Cox was built in 1915 with macadam stone and replaced in 1935 with
concrete.
The Chestnut Street project involves a complete reconstruction of the existing
base and pavement surface that is 31 foot in width, from back-of-curb to back-of-
curb from Highland to Walnut and 20 foot in width from Walnut to Cox.
The pavement will be concrete, with new curb and gutter and sidewalks from
Highland to Walnut. The section from Walnut to Cox will be concrete with curb
and sidewalk on the north side. Since there is one property which does not have
a sidewalk, a new sidewalk will be installed at the property owner's expense.
The project will include: storm sewer improvements; sanitary manhole
replacement; sanitary sewer main repairs; water valve replacement; replacement
of 15 lead water services; and 21 sanitary sewer lateral replacements.
To try and lessen additional parking congestion in this area caused by the
concurrent construction of Chestnut Street and University Avenue, we have
adjusted the completion date for the Chestnut Street Reconstruction Project to
June 30, 2004. This will limit the time overlap between the two projects. The
University Avenue Reconstruction Project is anticipated to extend from April
through September, 2004.
In terms of parking needs for residents, the City will work with the contractors on
both projects to limit the times that Chestnut Street and University Avenue, from
Alta Vista to Spruce Street, would have simultaneous "No Parking" as a result of
the stages of construction.
RECOMMENDATION
I recommend that the City Council approve the plans and specifications, the
Resolution of Necessity, the Resolution with Respect to the Adoption of the
Resolution of Necessity, and Ordering Bids for the Chestnut Street (Highland to
Cox) Reconstruction Project.
ACTION TO BE TAKEN
The City is requested to approve the plans and specifications, the Resolution of
Necessity, the Resolution with Respect to the Adoption of the Resolution of
Necessity, and Ordering Bids for the Chestnut Street (Highland to Cox)
Reconstruction Project through the adoption of the enclosed resolutions.
MAK/vjd
Prepared by Michael Felderman, Civil Engineer
cc: Bob Green, Water Plant Manager
Gus Psihoyos, Assistant City Engineer
Michael Felderman, Civil Engineer
MEMORANDUM
September 9, 2003
TO:
FROM:
SUBJECT:
The Honorable Mayor and City Council Members
Michael C. Van Miiligen, City Manager
Chestnut Street (Highland to Cox) Reconstruction Project
Public Works Director Mike Koch recommends initiation of the bidding process for the
Chestnut Street (Highland to Cox) Reconstruction Project, and further recommends that
a public hearing be set for October 6, 2003.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barw Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Michael A. Koch, Public Works Director
UNIVERSITY AVE. PATCHING PROJECT ( ALTA VISTA TO SPRUCE)
CHESTNUT STREET RECONSTRUCTION PROJECT
KELLY'S BLF
VICINITY MAP
[CITY OF DUBUQUE[
CITY OF DUBUQUE, IOWA
MEMORANDUM
September 8, 2003
TO:
FROM:
SUBJECT:
Michael C. Van Milligen, City Manager
Michael A. Koch, Public Works Director ~ ~
Chestnut Street (Highland to Cox) Reconstruction Project
INTRODUCTION
The enclosed resolutions authorize the public bidding procedure for the Chestnut
Street (Highland to Cox) Reconstruction Project.
DISCUSSION
Chestnut Street from Highland to Walnut was built in 1898 with macadam stone;
and in 1918, bdck was placed over the stone. Chestnut Street from Walnut
Street to Cox was built in 1915 with macadam stone and replaced in 1935 with
concrete.
The Chestnut Street project involves a complete reconstruction of the existing
base and pavement surface that is 31 foot in width, from back-of-curb to back-of-
curb from Highland to Walnut and 20 foot in width from Walnut to Cox.
The pavement will be concrete, with new curb and gutter and sidewalks from
Highland to Walnut. The section from Walnut to Cox will be concrete with curb
and sidewalk on the north side. Since there is one property which does not have
a sidewalk, a new sidewalk will be installed at the property owner's expense.
The project will include: storm sewer improvements; sanitary manhole
replacement; sanitary sewer main repairs; water valve replacement; replacement
of 15 lead water services; and 21 sanitary sewer lateral replacements.
The schedule for the project will be as follows:
Advertisement for Bids
Notice of Headng on Plans & Specifications
Mail Notice to Property Owners
Published Notices to Property Owners
Receipt of Bids
Public Hearing
Award of Contract
Completion
September 19, 2003
September 19, 2003
September 19, 2003
September 23, 2003
October 3, 2003
October 9, 2003
October 6, 2003
October 20, 2003
June 30, 2004
· RECOMMENDATION
I would recommend that the City Council give preliminary approval to the
Resolution of Necessity and establish October 6, 2003 as the date of the public
hearing.
BUDGET IMPACT
The estimate for the project is as follows:
Construction Contract
Contingency
Engineedng
$482,611.70
48,261.17
79,630.93
Total Estimated Cost
$610,503.80
The project will be funded as follows:
Street Construction Fund
Local Option Sales Tax Fund
Special Assessment to Private Properties
Special Assessment to Water Services
Special Assessment for Sewer Laterals
Special Assessment for Sidewalk
City Paid Deficiency
Watermain Depreciation Fund
Sanitary Sewer Construction Fund
$ 91,559.84
231,907.78
77,302.59
16,343.80
45,820.83
2,201.10
0
88,128.51
57,239.35
Total Project Funding
$610,503.80
The project will be funded through the Fiscal Year 2004 CIP appropriation of City
funds in the amount of $600,000. The project, as outlined, will require Special
Assessments of $141,668.32, Local Option Sales Tax Fund of $231,907.28, and
Road Use Funds of $91,559.84.
Low- to moderate-income property owners subject to street assessment will be
eligible for financial assistance ranging from 20 to 100 percent of the street
assessment for the owner-occupied resident property depending on family size
and income level. This financial assistance program is made available through
the One Percent Local Option Sales Tax.
ACTION TO BE TAKEN
The City Council ~s requested to give preliminary approval to the Resolution of
Necessity, approve the preliminary assessment schedule, and to establish the
date of the public hearing.
MAK/vjd
Prepared by Michael Felderman, Civil Engineer
cc: Bob Green, Water Plant Manager
Gus Psihoyos, Assistant City Engineer
Michael Felderman, Civil Engineer
'- , -0 ,--' , ~',~ ..' ~ ....... ' .'~
SITE LOCATION MAP
NOT T0 SCALE NORTH
PURPOSE:
RECONSTRUCTION
OF
CHESTNUT STREET
RESOLUTION NO. 378-03
RESOLUTION ADOPTING PLANS AND SPECIFICATIONS
Whereas, on the 10th day of September, 2003, plans, specifications, form
of contract and estimated cost were filet with the City Clerk of Dubuque, Iowa for
the Chestnut Street (Highland to Cox) Reconstruction Project.
Whereas, notice of hearing on plans, specifications, form of contract, and
estimated cost was published as required by law.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the said plans, specifications form of contract and estimated cost are
hereby approved as the plans, specifications, form of contract and estimated cost
for said improvements for said project.
Passed, adopted and approved this 6th day of October, 2003.
day of October ,2003.
Terrance M. Duggan, Mayor
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 379-03
RESOLUTION WITH RESPECT TO THE ADOPTION OF THE
RESOLUTION OF NECESSITY PROPOSED FOR THE
CHESTNUT STREET (HIGHLAND TO COX) RECONSTRUCTION
PROJECT
Whereas, the City Council has proposed a Resolution of Necessity for the
Chestnut Street (Highland to Cox) Reconstruction Project, has given notice of the
public headng thereon as required'by law; and
Whereas, the public headng has been held, all persons offedng objections
have been heard and consideration given to all objections and is pending before
this Councit; and
Whereas, this is the time and place set as provided for the taking of action
on the proposed Resolution of Necessity.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the proposed Resolution of Necessity described above is hereby:
Adopted, without amendment, and all objections filed or made having
been duly considered are overruled.
Adopted as amended by the Schedule of Assessments attached hereto as
Exhibit A, and made a part hereof by reference. All objections filed or
made having been duly considered are overruled.
Deferred for later consideration to a City Council meeting to be held on the
day of ,2003, next at 6:30 p.m. in the Public Library
Auditorium, with jurisdiction retained for further consideration and action at
the adjourned meeting.
Abandoned.
2003.
Passed, adopted and approved this 6th day of October, 2003.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 335-03
PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the proposed plans, specifications, form of contract and estimated
cost for the Chestnut Street (Highland to Cox) Reconstruction Project in the
estimated amount $610,503.80 are hereby approved and ordered filed in the
office of the City Clerk for public inspection.
Passed, adopted and approved this 15th day of September 2003.
Attest:
~eanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 336-03
FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS
Whereas, the City Council of the City of Dubuque, Iowa has given its
preliminary approval on the proposed plans, specifications, and form of contract
and placed same on file in the office of the City Clerk for public inspection of the
Chestnut Street (Highland to Cox) Reconstruction Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That a public hearing will be held on the 6th day of October, 2003, at 6:30
p.m. in the Public Library Auditorium at which time interested persons may
appear and be heard for or against the proposed plans and specifications, form
of contract and cost of said improvement, and the City Clerk be and is hereby
directed to cause a notice of time and place of such hearing to be published in a
newspaper having general circulation in the City of Dubuque, Iowa, which notice
shall be not less than four days nor more than twenty days prior to the day fixed
for its consideration. At the hearing, any interested person may appear and file
objections to the proposed plans, specifications, contract, or estimated cost of
the improvement.
Passed, adopted and approved this
15th day of September ,~2003
T~fTaEce M. Dug~an,~
//
Attest:
(../'Jeanne, F. Schneider, CMC, City Clerk
RESOLUTION NO. 337-03
RESOLUTION OF NECESSITY
Whereas, proposed plans have been duly prepared and approved by the
City Council of the City of Dubuque and are now on file in the office of City Clerk
showing among other things the plans, specifications, form of contract, estimated
cost and preliminary plat and schedule showing the amount proposed to be
assessed against each lot and the valuation of each lot as filed by the City
Council, for the Chestnut Street (Highland to Cox) Reconstruction Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the City Council deems it advisable and necessary for the public
welfare to make the herein mentioned improvements, and unless property
owners at the time of the final consideration of this proposed resolution have on
file with the City Clerk objections to the Resolution of Necessity, they shall be
deemed to have waived all objections pertaining to the regularity of the
proceeding and the legality of using the special assessment procedure.
Said improvements shall be constructed and done in accordance with the
plans and specifications which have been approved by the City Council and now
on file with the City Clerk. That the cost and expense of making such
improvement will be assessed partially or totally against privately owned property
lying with the assessment limits, and in an amount not to exceed that provided by
law, and in proportion to the special benefits conferred.
The portion of the cost which shall be borne by the City will be paid from
the: Street Construction Fund, Local Option Sales Tax Fund, Watermain
Depreciation Fund, Sanitary Sewer Construction Fund and special assessment
bonds may be issued in anticipation of deferred payments of assessments when
a contract has been performed and accepted, and the proceeds thereof used to
pay the contractor.
The above resolution was introduced, approved and ordered placed on file
with the City Clerk this 15th day of Sept. ember'2003.
Approved and placed on file for final action.
~/,d'eanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 338-03
FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY
Whereas, the City Council of the City of Dubuque, iowa, has given its
preliminary approval on the proposed plans, specifications and form of contract
and placed same on file in the office of the City Clerk for public inspection for the
Chestnut Street (Highland to Cox) Reconstruction Project; and
Whereas, the proposed Resolution of Necessity for said improvement has
been introduced and is now on file in the City Clerk's office for public inspection.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That on the 6th day of October, 2003, a public hearing will be held at 6:30
p.m. in the Public Library Auditorium in the City of Dubuque at which time the
owners of property subject to assessment for the proposed improvement or any
other person having an interest in the matter may appear and be heard for or
against the making of the improvement, the boundaries of the district, the cost,
the assessment against any lot, or the final adoption of a Resolution of Necessity
and the City Clerk be and is hereby authorized and directed to cause a notice of
time and place of such hearing to be published in a newspaper having general
circulation in the City of Dubuque, Iowa, which notice shall be published once
each week for two consecutive weeks, the first publication of which shall be not
less than ten days prior to the day fixed for its consideration. Unless property
owners at the time of the final consideration of this proposed resolution have on
file with the City Clerk objections to the Resolution of Necessity they shall be
deemed to have waived all objections thereto.
Passed, adopted and approved this 15th
day of September, 2003.
Terrance M. Dug~-an~r
e F. Schneider, CMC, City Clerk
RESOLUTION NO. 339-03
RESOLUTION APPROVING PRELIMINARY SCHEDULE OF
ASSESSMENTS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the attached sheets, 1 to 1 inclusive, are hereby determined to be the
schedule of proposed assessments for the Chestnut Street (Highland to Cox)
Reconstruction Project and the valuations set out herein are hereby approved.
Passed, approved and adopted this 15th
day of September, 2_003..~
Ter(ance M. Dug~a~ayor
Attest¢.
~xfeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 340-03
ORDERING BIDS
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the Chestnut Street (Highland to Cox) Reconstruction Project is
hereby ordered to be advertised for bids for construction.
BE IT FURTHER RESOLVED, that the amount of the security to
accompany each bid shall be in an amount which shall conform to the provisions
of the Notice to Bidders hereby approved as a part of the plans and
specifications heretofore adopted.
That the City Clerk is hereby directed to advertise for bids for the
construction of the improvements herein provided, to be published in a
newspaper having general circulation in the City of Dubuque, Iowa, which notice
shall not be less than four days nor more than forty-five days prior to the receipt
of said bids at 2:00 p.m. on the 9th day of October, 2003. Bids shall be opened
and read by the City Clerk at said time and will be submitted to the Council for
final action at 6:30 p.m. on the 20t~ day of October, 2003.
Passed, adopted and approved this __
15thday of September, 2003.
Terratnce M. Du§ga~,
Attest:
e F. Schneider, CMG~Ci~y Clerk
SiTE LOCATION MAP ~
NOT TO SCALE NORTH
PURPOSE:
RECONSTRUCT~0N
CHESTNUT STREET
WC~
CITY OF DUBUQUE, IOWA
CHESTNUT STREET (HIGHLAND TO COX STREET)
PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS
PUBLIC
PARCEL ~VALUATIONwlNETPAVINO SIDEWALK SEWER WATERMAIN DEFICIENCy IMPROVEMENTS WATERSERVICESEWERLAffERALTOTALNET
OWNER Lot Description NO, IMPROVEMENT ASSESSMENT ASSESSMENT ASSESSMENTA$SESSMEblT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT
$778.46
S633.55
$1,290.30
SI,290,30
$1,290.30
SI,290.30
$1,290.30
S834.90
NOTICE TO BIDDERS OF THE RECEIPT OF BIDS
FOR THE CHESTNUT STREET (HIGHLAND TO COX)
RECONSTRUCTION PROJECT
Sealed proposals will be received by the City Clerk of the City of Dubuque,
Iowa, at the Office of City Clerk in City Hall no later than 2:00 o'clock p.m. on the
9th day of October, 2003, for the construction of Chestnut Street (Highland to
Cox) Reconstruction Project.
Copies of the plans and specifications may be obtained in the City
Engineer's office at City Hall. No plan deposit is required.
Payment to the contractor will be made from funds as may be legally used
for such purposes.
All work herein provided for shall be commenced within ten (10) days after
the Notice To Proceed has been issued, and shall be fully completed by the 30~h
day of June, 2004.
All bids must be submitted on the Bid Form bound in the specifications.
Each bid shall be accompanied by a satisfactory Bid Bond executed by the
Bidder and an acceptable surety; or a cashier's or certified check payable to the
City Treasurer, City of Dubuque, drawn on a bank in Iowa or a bank chartered
under the laws of the United States, in the amount of ten percent (10%) of the
bids submitted as security that the bidder will enter into a contract for doing the
work and will give bond with proper securities for the faithful performance of the
contract in the form attached to the specifications.
The successful bidder will be required to furnish a performance bond in an
amount equal to one hundred percent (100%) of the contract price. Said bond is
to be issued by a responsible surety company approved and acceptable to the
City Council, and shall guarantee the faithful performance of the contract and
terms and conditions therein contained, and shall guarantee the prompt payment
of ail materials and labor and protect and save harmless the City of Dubuque,
Iowa, from claims and damages of any kind caused by the operations of the
Contractor. Said Bond shall also guarantee the material and the maintenance of
the improvement(s) constructed for a minimum period of two (2) years from and
after its completion and acceptance by the City Council.
No bid submitted by any Contractor which contains a condition or
qualification shall be recognized or accepted by the City Council and any letter or
communication accompanying the bid which contains a condition or qualification
upon the bid which has the effect of qualifying or modifying any provision of the
specifications in any manner will be construed as a non-qualifying bid and will be
rejected by the City Council as not responsive.
All proposals must be made on blanks furnished by the City Engineer and
each bidder will be required to state his prices for doing all the items in each
section on which he makes a bid and for all things necessary to make a complete
job.
The Bidder's attention is directed to the City of Dubuque's Affirmative
Action Program which is included in the Contract Specifications and the
provisions thereof and hereby made a part of the Contract Documents by
reference and incorporated therein.
The Contractor, when requested by the City of Dubuque, will furnish a
statement of his financial and practical qualifications as provided for in the
General Requirements of the Specifications.
By virtue of statutory authority, a preference will be given to products and
provisions grown and coal produced within the State of Iowa and to Iowa
Domestic Labor.
The City Council reserves the right to reject any and all bids or to waive
any technical ties and irregularities.
All bids will be publicly opened and read by the City Clerk at 2:00 o'clock
p.m. on the 9~h day of October, 2003, and will be submitted to the City Council for
final action at a meeting to be held in the Public Library Auditorium, 360 West
11th Street, at said City at 6:30 p.m. on the 20th day of October, 2003. A contract
will be awarded at that time or such subsequent time as the City may determine.
Published by order of the City Council of the City of Dubuque, Iowa and
dated this of ,2003.
Jeanne F. Schneider, CMC, City Clerk
CONSTRUCTION SCHEDULE AND LIQUIDATED DAMAGES
Work herein provided for shall be commenced within the (10) days after notice to
proceed has been issued and shall be fully completed by June 30, 2004.
For each calendar day that any work shall remain uncompleted beyond the
completion schedule, $500.00 per calendar day will be assessed, not as a
penalty but as predetermined and agreed liquidated damages. The contractor
will be separately invoiced for this amount, and final payment will be withheld
until payment has been made of this invoice.
The assessment of liquidated damages shall not constitute a waiver of the City's
right to collect any additional damages which the City may sustain by failure of
the contractor to carry out the terms of his contract.
An extension of the contract period may be granted by the City for any of the
following reasons:
1. Additional work resulting from a modification of the plans.
2. Delays caused by the City.
Other reasons beyond the control of the Contractor, which in the City's
opinion, would justify such extension.
MEMORANDUM
September 9, 2003
TO:
FROM:
SUBJECT:
The Honorable Mayor and City Council Members
Michael C. Van Milligen, City Manager
Chestnut Street (Highland to Cox) Reconstruction Project
Public Works Director Mike Koch recommends initiation of the bidding process for the
Chestnut Street (Highland to Cox) Reconstruction Project, and further recommends that
a public hearing be set for October 6, 2003.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Michael A. Koch, Public Works Director
CITY OF DUBUQUE, IOWA
MEMORANDUM
September 8, 2003
TO:
FROM:
SUBJECT:
Michael C. Van Milligen, City Manager
Michael A. Koch, Public Works Director ~[~.
Chestnut Street (Highland to Cox) Reconstruction Project
INTRODUCTION
The enclosed resolutions authorize the public bidding procedure for the Chestnut
Street (Highland to Cox) Reconstruction Project.
DISCUSSION
Chestnut Street from Highland to Walnut was built in 1898 with macadam stone;
and in 1918, brick was placed over the stone. Chestnut Street from Walnut
Street to Cox was built in 1915 with macadam stone and replaced in 1935 with
concrete.
The Chestnut Street project involves a complete reconstruction of the existing
base and pavement surface that is 31 foot in width, from back-of-curb to back-of-
curb from Highland to Walnut and 20 foot in width from Walnut to Cox.
The pavement will be concrete, with new curb and gutter and sidewalks from
Highland to Walnut. The section from Walnut to Cox will be concrete with curb
and sidewalk on the north side. Since there is one property which does not have
a sidewalk, a new sidewalk will be installed at the property owner's expense.
The project will include: storm sewer improvements; sanitary manhole
replacement; sanitary sewer main repairs; water valve replacement; replacement
of 15 lead water services; and 21 sanitary sewer lateral replacements.
The schedule for the project will be as follows:
Advertisement for Bids
Notice of Hearing on Plans & Specifications
Mail Notice to Property Owners
Published Notices to Property Owners
Receipt of Bids
Public Hearing
Award of Contract
Completion
September 19, 2003
September 26, 2003
September 26, 2003
September 26, 2003
October 3, 2003
October 9, 2003
October 6, 2003
October 20, 2003
June 30, 2004
RECOMMENDATION
I would recommend that the City Council give preliminary approval to the
Resolution of Necessity and establish October 6, 2003 as the date of the public
hearing.
BUDGET IMPACT
The estimate for the project is as follows:
Construction Contract
Contingency
Engineering
$482,611.70
48,261.17
79,630.93
Total Estimated Cost
$610,503.80
The project will be funded as follows:
Street Construction Fund
Local Option Sales Tax Fund
Special Assessment to Private Properties
Special Assessment to Water Services
Special Assessment for Sewer Laterals
Special Assessment for Sidewalk
City Paid Deficiency
Watermain Depreciation Fund
Sanitary Sewer Construction Fund
$ 91,559.84
231,907.78
77,302.59
16,343.80
45,820.83
2,201.10
0
88,128.51
57,239.35
Total Project Funding
$610,503.80
The project will be funded through the Fiscal Year 2004 CIP appropriation of City
funds in the amount of $600,000. The project, as outlined, will require Special
Assessments of $141,668.32, Local Option Sales Tax Fund of $231,907.28, and
Road Use Funds of $91,559.84.
Low- to moderate-income property owners subject to street assessment will be
eligible for financial assistance ranging from 20 to 100 percent of the street
assessment for the owner-occupied resident property depending on family size
and income level. This financial assistance program is made available through
the One Percent Local Option Sales Tax.
ACTION TO BE TAKEN
The City Council is requested to give preliminary approval to the Resolution of
Necessity, approve the preliminary assessment schedule, and to establish the
date of the public hearing.
MAK/vjd
Prepared by Michael Felderman, Civil Engineer
cc: Bob Green, Water Plant Manager
Gus Psihoyos, Assistant City Engineer
Michael Felderman, Civil Engineer
City Clerk's Office
50 West 13th Street
Dubuque, Iowa 520014864
(563) 5894120 Office
(563) 589-0890 Fax
(563) 690-6678 7DD
September 19, 2003
NOTICE TO PROPERTY OWNERS
Notice is given that there is now on file for public inspection in the office of the City Clerk of
Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost, and a plat and schedule
showing the amounts proposed to be assessed against each lot and the valuation of each lot within
a district approved by the City Council of Dubuque, Iowa, for an improvement of the type(s) and in
the location(s) as follows:
Chestnut Street (Highland to Cox) Reconstruction Project
The project involves a complete reconstruction of the existing base and pavement surface
that is 31 foot in width, from back-of-curb to back-of-curb from Highland to Walnut and 20 feet in
width from Walnut to Cox. The project will include: storm sewer improvements; sanitary manhole
replacement; sanitary sewer main repairs; water valve replacement; replacement of 15 lead water
services; and 21 sanitary sewer lateral replacements.
That the proposed district to be benefited and subject to assessment for the cost of such
improvements is described as follows:
Chestnut Street (Highland to Cox)
All property included within the areas described so as to include one-half of the privately-
owned property between each such street to be improved and the next street, whether such
privately-owned property abuts upon the street to be improved or not. In no case shall property
situation more than 300 feet from the street to be improved be assessed.
The City Council will meet at 6:30 p.m. on the 6th day of October, 2003, at the Public Library
Auditorium, 360 West 11th Street, at which time the owners of property subject to assessment for
the proposed improvement or any other person having an interest in the matter may appear and be
heard for or against the making of the improvement, the boundaries of the district, the cost, the
assessment against any lot, or the final adoption of a Resolution of Necessity. A property owner
will be deemed to have waived all objections unless at the time of headng he has filed objections
with the City Clerk.
Any visual- or hearing-impaired persons needing special assistance or persons with special
accessibility needs shOuld contact the City Clerk's office at (563) 589-4120 or TDD (563) 690-6678
at least 48 hours prior to the meeting.
City Clerk
Service People Integrity Responsibility Imlovation Teamwork
B]~)FORI~, P~LA E & MU~LLER DONALD.
'1245 HIGI-I_LA~qD PLACE
DUBUQUE, IA 52001
sleqe'l ssmppv ®AU3AV ~
O'DONNELL, JOSEPH L & KELLY K
38529 HWY 52
BELLEVUE, IA 52031
O'DONNELL, JOSEPH L & KELLY K
38529 HWY 52
BELLEVUE, IA 52031
HESS, OWEN C & SUSAN K
506 N BLUFF ST, PO BOX 277
GUTTENBERG, IA 52052
HESS, OWEN & SUSAN
506 N BLUFF ST, PO BOX 277
GUTTENBERG, IA 52052
SHELDON, THOMAS L & JANA R
56[ GHESTNUT
DUBUQUE, IA 52001
WHALEN MD, JOHN E & NORBY, ANTHONY
f'i' O'5~IdHLAND PLACE
DUBUQUE, IA 52001
I~A~t~ STEVEN ALgJq
643 CHESTNUT
DUBUQUE, IA 52001
KENNET JOHN
803 GRANT
MAQUOKETA, IA 52060
YUNK, GAlL A
559 CHESTNUT
DUBUQUE, IA 52001
WHALEN MD, JOHN E & NORBY, ANTHONY
1105 HIGHLAND PLACE
DUBUQUE, IA 52001
SHEETS, JEFFREY & CAROL
973 RICHARDS ROAD
DUBUQUE, IA 52003
CINGILLI, MUSTAFA & MESUDE
647 CHESTNUT
DUBUQUE, IA 52001
MOORE, KENNETH JOHN
8O3 GRANT
MAQUOKETA, IA 52060
CIAPALO, ROMAN P & NANCY B
1209.t-ItGHLAND PL
DUBUQUE, IA 52001
HAUGEN, BRUCE P & LINDA J
22390 GREAT RIVER ROAD
LE CLAIRE,IA 52753
HAUGEN, BRUCE P & LINDA J
22390 GREAT RIVER ROAD
LE CLAIRE,IA 52753
RICHARDSON, JOHN F. & SHIHATA, MIRIAM A.
1163 HIGHLAND PL
DUBUQUE, IA 52001
LAMPE, LYNN A/K/A LYNN E LAMPE
116 W 13TH STREET
DUBUQUE, IA 52001
DEMELLO,MAKOVEC PARTNERSHIP
552 CHESTNUT
DUBUQUE, IA 52001
FREEDOM PROPERTIES LLC
973 RICHARDS ROAD
DUBUQUE, IA 52001
ALT, CYNTHIA L
632 CHESTNUT ST
DUBUQUE, IA 52001
PETERSON, CHARLES E.
648 CHESTNUT STREET
DUBUQUE, IA 52001
ALT, L PETER & CYNTHIA LINDLE
632 CHESTNUT
DUBUQUE, IA 52001
JOHNSON, ROBERT L & GOLOMBESKI
1295 PRAIRIE
DUBUQUE, IA 52001
BONIFAZI, ARTHUR W ETAL
1293 WALNUT
DUBUQUE, IA 52001
STEFFEN, DANIEL T & TAMMY L.
1283 WALNUT
DUBUQUE, IA 52001
WHITE, RONALD R.
3197 HIGHLAND PARK DR
DUBUQUE, IA 52001
AMERICAN HOUSING TRUST I
PO BOX 277
GUTTENBERG, IA 52052
COMBS, JOHN E & NETTIE I.
765 CHESTNUT
DUBUQUE, IA 52001
sl~qe'~ ss~ppv
SCHIESL, JOHN R & MARY ANN
604 CHESTNUT
DUBUQUE, IA 52001
JURISIC; JAMES A & SARA L.
642 CHESTNUT
DUBUQUE, IA 52001
LYONS, JYMIE M.
658 CHESTNUT
DUBUQUE, IA 52001
ALT, L PETER & CYNTHIA LINDLE
632 CHESTNUT ST
DUBUQUE, IA 52001
BREITBACH, ROBERT L & CATHERINE
1209 PRAIRIE
DUBUQUE, IA 52001
CONNOLLY, JOHN M & JUDY M.
1289 WALNUT
DUBUQUE, IA 52001
HESS, RICHARD J & NANCY M.
1015 ROCKDALE ROAD
DUBUQUE, IA 52003
SCHUBERT, KELLI A
755 CHESTNUT
DUBUQUE, IA 52001
COMBS, JOHN E & NETTLE I.
765 CHESTNUT
DUBUQUE, IA 52001
At)EL, PATRICK D.
789 CHESTNUT
DUBUQUE, IA 52001
w~LgL~ JOJ ~,~ldw,~, *sll }v~s~,**q$ P**:I q~,ooms
"/89 CHESTNUT
DUBUQUE, IA 52001
sl~q~'l sse~ppv
CLINE, RYAN M.
1243 WALNUT
DUBUQUE, IA 52001
WEINER, JAMES F & PATRICIA A.
7t5 ROSE
DUBUQUE, IA 52001
DATA, CORY L.
721 ROSE
DUBUQUE, IA 52001
BANWARTH, HAROLD A & VIRGiNIA
2781 BALKE
DUBUQUE, IA 52001
FIELD, JAMES JR & ROSALYN
751 ROSE
DUBUQUE, IA 52001
HUSEMANN, SHERRY L.
761 ROSE
DUBUQUE, IA 52001
CONNOLLY, PATRICK W & JANANN L.
775 ROSE
DUBUQUE, IA 52001
BECK, JOHN J.
785 ROSE
DUBUQUE, IA 52001
ROPER, ARNOLD L. & MALONE, PATRICK I.
110 E. MAPLE ST
LANCASTER, WI 53813
w~l,9~S ~o~ aleldrue~, asfl w~S~,eaqS pea:! q3oorus
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
BRADFORD, PAMELA K & MUELLER
1245 HIGHLAND PL
1245 HIGHLAND PLACE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.378.022
Valuation with Improvement: $234,435.29
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 784 & 2-786 A MCDANIEL'S SUB
$2,995.29
(-)
Gross Assessment:
$2,995.29
9-5-03
DONALD P.
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1 ~493.71
$1,493.71
$4,489.00
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
O'DONNELL, JOSEPH L & KELLY K
5O7 CHESTNUT
38529 HWY 52
BELLEVUE, IA 52031
Legal Description:
Parcel Number: 10~24.378.020
Valuation with improvement: $43,938.46
Public Improvements Assessment
Paving Assessment: $778.46
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 1 W 14'3 OF 786 AND ALL OF LOT 787
Gross Assessment: $778.46
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,493.71
$1,493.71
$2,272.17
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
O'DONNELL, JOSEPH L & KELLY K
509 CHESTNUT
38529 HWY 52
BELLEVUE, IA 52031
Legal Description:
Parcel Number: 10.24.378.019
Valuation with Improvement: $44,759.17
Public Improvements Assessment
Paving Assessment: $849.17
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 2 W 14'3 OF 786 AND ALL OF 787
Gross Assessment: $849.17
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,493.71
$1,493.71
$2,342.88
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
HESS, OWEN C & SUSAN K
533 CHESTNUT
506 N BLUFF ST, PO BOX 277
GUTTENBERG, IA 52052
Legal Description:
Parcel Number: 10.24.378.018
Valuation with Improvement: $26,910.93
Public Improvements Assessment
Paving Assessment: $710.93
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 2-788 iN A. MCDANIEL'S SUB
Gross Assessment: $710.93
9-5-03
Private Improvements Assessment
water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1 ;493.71
$2,784.01
$3,494.94
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
HESS, OWEN & SUSAN
535 CHESTNUT
506 N BLUFF ST, PO BOX 277
GUTTENBERG, IA 52052
Legal Description:
Parcel Number: 10.24.378.017
Valuation with Improvement: $34,643.55
Public Improvements Assessment
Paving Assessment: $633.55
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 1-788 A. MCDANIELS SUB
Gross Assessment: $633.55
9-5~03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1,493.71
$2,784.01
$3,417.56
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
YUNK, GAlL A
559 CHESTNUT
559 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.378.016
Valuation with Improvement: $43,181.51
Public Improvements Assessment
Paving Assessment: $691.51
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 2 - E 50' - 789 A MCDANIELS SUB
Gross Assessment: $691.51
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Pdvate Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1,493.71
$2,784.01
$3,475.52
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
SHELDON, THOMASL&JANA R
561CHESTNUT
561CHESTNUT
DUBUQUE, IA52001
Legal Description:
Parcel Number: 10.24.378.015
Valuation with Improvement: $30,937.90
Public Improvements Assessment
Paving Assessment: $597.90
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
S 87'6 OF LOT 1 OF E 50' OF LOT 789
Gross Assessment: $597.90
9-5-03
Private ImprOvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1,493.71
$2,784.01
$3,381.91
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
WHALEN MD, JOHN E & NORBY, ANTHONY
VACANT
1105 HIGHLAND PLACE
DUBUQUE, IA 52001
Legal Description:
Parcel N umber: 10.24.378.014
Valuation with Improvement: $7,577.20
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
A. MCDANIELS SUB S 87' OF W 3'6 789
$1,557.20
(-)
Gross Assessment:
$1,557.20
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,557.20
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
WHALEN MD, JOHN E & NORBY, ANTHONY
609 CHESTNUT
1105 HIGHLAND PLACE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.378.013
Valuation with Improvement: $65,716.34
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
A. MCDANIEL'S SUB. S.92'6 OF LOT 791
$1,496.34
(-)
Gross Assessment:
$1,496.34
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,493.71
$1,493.71
$2,990,05
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
SHEETS, JEFFREY & CAROL
631 CHESTNUT
973 RICHARDS ROAD
DUBUQUE, IA 52003
Legal Description:
Parcel Number: 10.24.378.012
Valuation with Improvement: $58,698.66
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 2 OF 792 & LOT 2 OF 793
$2,688.66
(-)
Gross Assessment:
$2,688.66
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,493.71
$1,493.71
$4,182.37
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
DAVIS, STEVEN ALAN
643 CHESTNUT
643 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.378.011
Valuation with Improvement: $61,772.74
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
A.MC DANIELS SUB LOTS 794 & 795
$2,512.74
(-)
Gross Assessment:
$2,512.74
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1,493.71
$2,784.01
$5,296.75
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
CINGILLI, MUSTAFA & MESUDE
647 CHESTNUT
647 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.378.010
Valuation with Improvement: $44,546.09
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
E.45'-S.1/2-796 A. MC DANIELS SUB
$1,136.09
(-)
Gross Assessment:
$1,136.09
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1,493.71
$2,784.01
$3,920.11
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
MOORE, KENNETH JOHN
653 CHESTNUT
803 GRANT
MAQUOKETA, IA 52060
Legal Description:
Parcel Number: 10.24.378.009
Valuation with Improvement: $52,554.49
Public Improvements Assessment
Paving Assessment: $784.49
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
A MCDANIELS SUB W 15' Sl/2 LOT 796
Gross Assessment: $784.49
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1,493.71
$2,784.01
$3,568.51
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Add ress:
Mailing Address:
MOORE, KENNETH JOHN
655 CHESTNUT
803 GRANT
MAQUOKETA, IA 52060
Legal Description:
Parcel Number: 10.24.378.008
Valuation with Improvement: $45,750.88
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
A MCDANIELS SUB W45' S1/2 LOT 797
$1,130.88
(-)
Gross Assessment:
$1,130.88
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,493.71
$1,493.71
$2,624.59
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
CIAPALO, ROMAN P & NANCY B
1209 HIGHLAND PL
1209 HIGHLAND PL
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.382.001
Valuation with Improvement: $112,489.77
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 830 A MCDANIELS SUB
$3,838.67
$2,201.10
(-)
Gross Assessment:
$6,039.77
9-5-03
Private improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$834.90
$2,089.78
$2,924.68
$8,964.45
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
HAUGEN, BRUCE P & LINDA J
1193 HIGHLAND PL
22390 GREAT RIVER ROAD
LE CLAIRE,IA 52753
Legal Description:
Parcel Number: 10.24.382.002
Valuation with Improvement: $41,833.83
Public Improvements Assessment
Paving Assessment: $713.83
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
N 1/2 OF LOT 829 A MCDANIELS SUB
Gross Assessment: $713.83
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$713.83
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
HAUGEN, BRUCE P & LINDA J
1175 HIGHLAND PL
22390 GREAT RIVER ROAD
LE CLAIRE,IA 52753
Legal Description:
Parcel Number: 10.24.382.003
Valuation with Improvement: $43,316.90
Public Improvements Assessment
Paving Assessment: $446.90
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
S 1/2 OF LOT 829 A MCDANIELS SUB
Gross Assessment: $446.90
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$446.90
CHESTNUT STREET PAVING PROJECT
9-5-03
Property Owner:
Assessed Address:
Mailing Address:
RICHARDSON, JOHN F. & SHIHATA, MIRIAM A.
1163 HIGHLAND PL
1163 HIGHLAND PL
DUBUQUE, IA 52001
Legal Description:
Pamel Number: 10.24.382.004
Valuation with Improvement: $74,589.95
Public Improvements Assessment
Paving Assessment: $399.95
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
Lot 828 A. MCDANIELS SUB
Gross Assessment: $399.95
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$399.95
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
LAMPE, LYNN NWA LYNN E LAMPE
508 CHESTNUT
116 W 13TH STREET
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.008
Valuation with Improvement: $79,783.32
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 1 M A MCDANIELS SUB
$1,033.32
(-)
Gross Assessment:
$1 033.32
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,033.32
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
DEMELLO-MAKOVEC PARTNERSHIP
552 CHESTNUT
552 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.007
Valuation with Improvement: $52,826.35
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOTS 2 & 3 A MCDANIELS SUB
$2,066.35
Gross Assessment:
$2,066.35
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$860.20
$2,O89.78
$2,949.98
$5,016.33
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
FREEDOM PROPERTIES LLC
574 CHESTNUT
973 RICHARDS ROAD
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.006
Valuation with Improvement: $76,472.92
Public Improvements Assessment
Paving Assessment: $992.92
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 4 M A MCDANIELS SUB
Gross Assessment: $992.92
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$885.50
$2,089.78
$2,975.28
$3,968.20
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Add ress:
Mailing Address:
SCHIESL, JOHN R & MARY ANN
604 CHESTNUT
604 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.005
Valuation with Improvement: $77,232.92
Public Improvements Assessment
Paving Assessment: $992.92
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 5 M A MCDANIELS SUB
Gross Assessment: $992.92
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$885.50
$2,089.78
$2,975.28
$3,968.20
9-5-03
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
ALT, CYNTHIA L
632 CHESTNUT
632 CHESTNUT ST
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.004
Valuation with Improvement: $178,543.03
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOTS 1, 2 & 3 OF PT OF 823 & 824 A. MCDANIELS SUB
$8,503.03
(-)
Gross Assessment:
$8,503.03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$2,089.78
$2,O89.78
$10,592.81
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
JURISIC, JAMES A & SARA L.
642 CHESTNUT
642 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.003
Valuation with Improvement: $54,204.37
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Waterrnain Assessment:
Deficiency Assessment:
LOT 4 H M KINGMAN SUB
$1,014:37
Gross Assessment:
$1,014.37
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$885.50
$2,O89.78
$2,975.28
$3,989.65
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
PETERSON, CHARLES E.
648CHESTNUT
648CHESTNUTSTREET
DUBUQUE, IA52001
Legal Description:
Parcel Number: 10.24.381.002
Valuation with Improvement: $45,824.37
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
E 8 1/2' LOTS 1 & 2 H M KINGMAN SUB
$1,014.37
(-)
Gross Assessment:
$1,014.37
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$834.90
$2,089.78
$2,924.68
$3,939.05
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
LYONS, JYMIE M.
658CHESTNUT
658CHESTNUT
DUBUQUE, IA52001
Legal Description:
Parcel Number: 10.24.381.001
Valuation with Improvement: $46,747.06
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
W 43.5' LOT 1 H M KINGMANS SUB
$1,507.06
(-)
Gross Assessment:
$1,507.06
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$2,089.78
$2,O89.78
$3,598.84
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Add ress:
Mailing Address:
ALT, L PETER & CYNTHIA LINDLE
1206 PRAIRIE
632 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.014
Valuation with Improvement: $69,782.56
Public Improvements Assessment
Paving Assessment: $362.56
Sidewalk Assessment:
Sanitary SeWer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 5 H M KINGMANS SUB
Gross Assessment: $362.56
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$362.56
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
ALT, L PETER & CYNTHIA LINDLE
VACANT
632 CHESTNUT ST
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.381.015
Valuation with Improvement: $6,461.14
Public Improvements Assessment
Paving Assessment: $181.14
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 6 H M KINGMANS SUB
Gross Assessment: $181.14
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$181.14
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
JOHNSON, ROBERT L & GOLOMBESKI
1295 PRAIRIE
1295 PRAIRIE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.376.006
Valuation with Improvement: $205,691.78
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 780 & 781 A MCDANIELS SUB
$6,841.78
(-)
Gross Assessment:
$6,841.78
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,290.30
$1,290.30
$8,132.08
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
BREITBACH, ROBERT L & CATHERINE
1209 PRAIRIE
1209 PRAIRIE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.380.001
Valuation with Improvement: $267,683.03
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOTS 778 & 779 A MCDANIELS SUB
$8,503.03
(-)
Gross Assessment:
$8,503.03
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$834.90
$834.90
$9,337.93
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
BONIFAZI, ARTHUR W ETAL
1293 WALN UT
1293 WALNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.016
Valuation with Improvement: $43,416.08
Public Improvements Assessment
Paving Assessment: $46.08
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watsrmain Assessment:
Deficiency Assessment: (-)
Nl/2 - 14 & LOT 15 BISSELLS DUBUQUE
Gross Assessment: $46.08
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$46,08
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
CONNOLLY, JOHN M & JUDY M.
1289 WALNUT
1289 WALNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.017
Valuation with Improvement: $49,633.14
Public Improvements Assessment
Paving Assessment: $363.14
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
BISSELLS DUB LOT 13 BISSELLS DUB S1/2
Gross Assessment: $363.14
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$363.14
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
STEFFEN, DANIEL T & TAMMY L.
1283 WALN UT
1283 WALNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.018
Valuation with Improvement: $49,773.95
Public Improvements Assessment
Paving Assessment: $883.95
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
LOT 11 & 12 BISSELLS DUBUQUE
Gross Assessment: $883.95
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$883.95
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
HESS, RICHARD J & NANCY M.
1267 WALNUT
1015 ROCKDALE ROAD
DUBUQUE, IA 52003
Legal Description:
Parcel Number: 10.24.354.019
Valuation with Improvement: $32,094.27
Public Improvements Assessment
Paving Assessment: $664.27
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
BISSELL DUBUQUE LOT 10
Gross Assessment: $664.27
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$664.27
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
WHITE, RONALD R.
1251 WALNUT
3197 HIGHLAND PARK DR
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.020
Valuation with Improvement: $66,431.79
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOTS 8 & 9 BISSELLS DUBUQUE
$3,151.79
(-)
Gross Assessment:
$3,151.79
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$3,151.79
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
SCHUBERT, KELLI A
755 CHESTNUT
755 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.013
Valuation with Improvement: $61,142.83
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 6 AND LOT 7 BISSELLS DUBUQUE
$1,772.83
(-)
Gross Assessment:
$1,772.83
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,772.83
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
AMERICAN HOUSING TRUST I
763 CHESTNUT
PO BOX 277
GUTTENBERG, IA 52052
BISSELLS DUBUQUE 5
Legal Description:
Parcel Number: 10.24.354.012
Valuation with Improvement: $58,416.56
Public Improvements Assessment
Paving Assessment: $886.56
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
Gross Assessment: $886.56
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$886.56
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
COMBS, JOHN E&NETTIEI.
765CHESTNUT
765CHESTNUT
DUBUQUE, IA52001
Legal Description:
Parcel Number: 10.24.354.011
Valuation with Improvement: $50,986.98
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
BISSELL'S DUBUQUE 4
$1,016.98
(-)
Gross Assessment:
$1,016,98
9-5-03
Private .Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private improvement:
TOTAL NET ASSESSMENT
$1,016.98
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
COMBS, JOHN E & NETTLE I.
773 CHESTNUT
765 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.010
Valuation with ImproVement: $11,846.98
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 3 BISSELLS DUB
$1,016.98
(-)
Gross Assessment: $1,016.98
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,016.98
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
APEL, PATRICK D.
VACANT
789 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.009
Valuation with Improvement: $4,686.56
Public Improvements Assessment
Paving Assessment: $886.56
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
BISSELLS DUBUQUE 2
Gross Assessment: $886.56
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$886.56
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
APEL, PATRICK D.
789 CHESTNUT
789 CHESTNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.354.008
Valuation with Improvement:. $52,053.80
Public Improvements Assessment
Paving Assessment: $913.80
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
BISSELLS DUBUQUE 1
Gross Assessment: $913.80
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$913.80
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
CLINE, RYAN M.
1243 WALN UT
1243 WALNUT
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.355.008
Valuation with Improvement: $54,192.76
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
N 1/2 LOT 7 CUMMINS SUB
$1,142.76
(-)
Gross Assessment;
$1,142.76
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,142.76
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
WEINER, JAMES F & PATRICIA A.
715 ROSE
715 ROSE
DUBUQUE, IA 52001
Legal Description:
Pamel Number: 10.24.355.007
Valuation with Improvement: $47,922.33
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT6 CUMMINS SUB
$1,132.33
(-)
Gross Assessment:
$1,132.33
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,132.33
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
DATA, CORY L.
721 ROSE
721 ROSE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.355.006
Valuation with Improvemen[: $97,018.40
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 5 CUMMINS SUB
$1,178.40
(-)
Gross Assessment:
$1,178.40
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,178.40
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
BANWARTH, HAROLD A & VIRGINIA
733 ROSE
2781 BALKE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.355.005
Valuation with Improvement: $103,972.22
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
E 6'9-3 AND LOT 4 CUMMINS SUB
$1,332.22
(-)
Gross Assessment:
$1,332.22
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,332.22
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
FIELD, JAMES JR & ROSALYN
751 ROSE
751 ROSE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.355.004
Valuation with Improvement: $67,464.81
Public Improvements Assessment
Paving Assessment: $984.81
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
W45' LOT3 CUMMINS SUB
Gross Assessment: $984.81
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$984.81
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
HUSEMANN, SHERRY L.
761 ROSE
761 ROSE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.355.003
Valuation with Improvement: $48,856.31
Public Improvements Assessment
Paving Assessment: $566.31
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
E 1/2 LOT 2 CUMMINS SUB
Gross Assessment: $566.31
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$566.31
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
CONNOLLY, PATRICK W & JANANN L.
775 ROSE
775 ROSE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.355.002
Valuation with Improvement: $45,526.31
Public Improvements Assessment
Paving Assessment: $566.31
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
W 1/2 LOT 2 CUMMINS SUB
Gross Assessment: $566.31
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$566.31
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Add ress:
Mailing Address:
BECK, JOHN J.
785 ROSE
785 ROSE
DUBUQUE, IA 52001
Legal Description:
Parcel Number: 10.24.355.001
Valuation with Improvement: $60,862.33
Public Improvements Assessment
Paving Assessment:
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment:
LOT 1 CUMMINS SUB
$1,132.33
(-)
Gross Assessment:
$1,132.33
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$1,132.33
CHESTNUT STREET PAVING PROJECT
Property Owner:
Assessed Address:
Mailing Address:
ROPER, ARNOLD L. & MALONE, PATRICK I.
815 ROSE
110 E. MAPLE ST
LANCASTER, WI 53813
LOT 5 BLK 1 HAMBLIN SUB
Legal Description:
Pamel Number: 10.24.353.037
Valuation with Improvement! $181,586.44
Public Improvements Assessment
Paving Assessment: $656.44
Sidewalk Assessment:
Sanitary Sewer Assessment:
Watermain Assessment:
Deficiency Assessment: (-)
Gross Assessment: $656.44
9-5-03
Private Improvements Assessment
Water Service Lateral:
Sanitary Sewer Service Lateral:
Total Private Improvement:
TOTAL NET ASSESSMENT
$656.44
EngineerLng Division
City Hall
50 West 13th Street
Dubuque, IA 520014864
(563) 5894270 office
(563) 5894205 fax
September 19, 2003
CHESTNUT STREET RECONSTRUCTION PROJECT
(Highland to Cox)
PUBLIC MEETING
When:
October l, 2003
Times:
4:45 PM - 6:00 PM
Location:
Lincoln School - Gymnasium
555 Nevada Street
N°tes:
a) No-Smoking Facility
b) Access For Persons with Disabilities:
- Use front entrance at 555 Nevada Street.
c) Directions:
- Enter the playground off of Nevada Street.
- May park on playground lot.
- Use single-door entrance with rust.colored
railings.
The City is conducting an open forum discussion to acquaint the residents and business
owners along the project with the proposed improvements and project schedule.
Representatives of the City staff will be available to discuss the scope of the project,
construction phasing, timing, special assessment procedures, availability of financial
assistance, as well as to answer any other questions relating to the project. Feel free to stop
in at any time during the above hours for an informal discussion. This meeting should offer
mutual benefit in that it gives the City the opportunity to explain the design of the project, and
also allows the public to express their concerns and opinions regarding the proposed design.
Consideration will be given to all comments and suggestions.
Chestnut Street (Highland to Cox)
Chestnut Street from Highland to Walnut was built in 1898 with macadam stone; and in 1918,
brick was placed over the stone. Chestnut Street from Walnut Street to Cox was built in
1915 with macadam stone and replaced in 1935 with concrete.
1
Service People Inte~[ty Responsibility Innoyation Teamwork
The Chestnut Street project involves a complete reconstruction of the existing base and
pavement surface that is 31 foot in width, from back-of-curb to back-of-curb from Highland to
Walnut and 20 foot in width from Walnut to Cox.
The pavement will be concrete, with new curb and gutter and sidewalks from Highland to
Walnut. The section from Walnut to Cox will be concrete with curb and sidewalk on the north
side. Since there is one property which does not have a sidewalk, a new sidewalk will be
installed at the property owner's expense. The project will include: storm sewer
improvements; sanitary manhole replacement; sanitary sewer main repairs; water valve
replacement; replacement of 15 lead water services; and 21 sanitary sewer lateral
replacements.
The construction project will include:
Length (Footage)
Highland to Walnut:
Walnut to Cox:
1,060
48O
Street Width Highland to Walnut: 31 Feet
Walnut to Cox: 20 Feet
Pavement
7" Portland Cement Concrete
Pavement Base
4" Granular Base
Longitudinal Drain Tile
Subdrains are to be installed on both sides of the street along the
project.
Storm Sewer
New storm sewer system at Highland.
Water Services
Replacement of 15 lead water services from back-of-curb with
copper service.
The cost of installing water services is a direct benefit only to the
affected property, and this cost is assessed to each respective lot.
The City's 1% Local Option Sales Tax funding does not apply to
this assessment.
Sanitary Sewer Laterals
Replacement of 21 sanitary sewer laterals from back of sidewalk
to sewer main. The cost of installing sanitary sewer laterals is a
direct benefit only to the affected property, and this cost is
assessed to each respective lot. The City's 1% Local Option
Sales Tax funding does not apply to this assessment.
New Sidewalk
A new sidewalk will be installed at the corner of Highland and
Chestnut. The property owner will be assessed at 100% of the
cost.
Existing Sidewalk
Traffic Control
Watermain
Project Estimated Cost
Project Funding
Sidewalk along Highland to Walnut and the north side of Chestnut
from Walnut to Cox will be replaced.
Curb ramps will be installed at the intersection.
The project will require a closure for all through traffic.
New watermain valves will be replaced. This work will require the
interruption of water during the construction period.
Construction
Contingency
Engineering
$482,611.70
48,261.17
79,630.93
Total EstimatedCost
$610,503.80
Street Construction Fund
Local Options Sales Tax
Special Assessment to Private Properties
Special Assessment for Water Services
Special Assessment for Sewer Laterals
Special Assessment for Sidewalk
City Paid Deficiency
Watermain Construction Fund
Sanitary Sewer Construction Fund
$ 91,559.84
231,907.78
77,302.59
16,343.80
45,82O.83
2,201.10
0
88,128.51
57,239.35
Total Project Funding
$610,503.80
Project Schedule
Advertisement for Bids
Notice of Hearing on Plans & Specifications
Mail Notice to Property Owners
Published Notices to Property Owners
Receipt of Bids
Public Hearing
Award of Contract
Completion
September 19, 2003
September 19, 2003
September 19, 2003
September 23, 2003
October 3, 2003
October 9, 2003
October 6, 2003
October 20, 2003
June 30, 2004
NOTICE: Any visual or hearing-impaired persons needing special assistance or persons
with special accessibility needs should contact the City ClerMs office at (563) 589-4120 or
TDD at (563) 589-4193 in the Human Rights Department at least 48 hours prior to the
meeting.
3
PROJECT ASSESSMENTINFORMATION
Based upon the City's street assessment policy, 19.3 percent of the total $400,770.21 street-
related costs will be assessed to private property. The full cost for the water service lines,
sidewalk, and sanitary sewer laterals are assessable to each respective lot.
Final assessments will be calculated after the completion of the project, and after a final cost
has been developed. The final assessment may be no greater than the estimated
assessment you have already received but could be less than the estimated amount.
Assessments may be paid in full or over a ten-year period with interest, currently at the rate
of nine percent.
STREET ASSESSMENT POLICY (ADOPTED APRIL 18, 1983)
Local Option Sales Tax Funds will be utilized to reduce the amount of the proposed
assessments by 75%:
All property included within the area described so as to include one-half of the privately-
owned property between each street to be improved and the next street, whether such
privately-owned property abuts upon the street to be improved or not shall be assessed, tn
no case shall property situated more than 300 feet from the street being improved be
assessed.
FINANCIAL ASSISTANCE AVAILABLE
Financial assistance is available for a portion or the entire street paving, water services, and
sanitary sewer lateral assessments. Low- and moderate-income property owners subject to
the assessments will be eligible for financial assistance ranging from 20% to 100% of the
assessment for owner-occupied residential properties, depending on family size and income
level. This financial assistance is funded through 1% Local Option Sales Tax Funds. After
final assessments are mailed upon completion of the project (June 30, 2004), property
owners may apply for this financial assistance. Information required to be submitted with the
application would be a copy of your latest Federal Income Tax return, and supporting W-2's.
Information regarding the level of financial assistance as compared to family size and income
level will be available at the meeting. Financial assistance is not available for any portion of
the water services to individual properties.
If you should have questions please contact Mike Felderman, City Engineering at (563) 589-