University Ave ReconstructionMEMORANDUM September 30, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager University Avenue Reconstruction Project from Delhi to Alta Vista University Avenue Patching Project from Alta Vista to Spruce Street Sealed bids were received for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. Public Works Director Mike Koch recommends award of the contract to the Iow bidder, Horsfield Construction, Inc., in the amount of $1,007,996.36, which is 20.1% under the engineer's estimate, subject to concurrence by the Iowa Department of Transportation. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C Van Milligen~ MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM September 30, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ~// University Avenue Reconstruction Project from Delhi to Alta Vista University Avenue Patching Project from Alta Vista to Spruce Street INTRODUCTION The enclosed resolution provides for the award of the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. BACKGROUND University Avenue from Delhi to Alta Vista involves the complete reconstruction of the existing base and pavement surface that is 41 feet in width, from back-of-curb to back- of-curb from Delhi to Alta Vista Street. The pavement will be portland cement concrete, with new curb and gutter, sidewalks, a reconstructed sanitary sewer, sewer lateral replacements, and replacement of all lead water services. University Avenue from Alta Vista to Spruce will be reconstructed in the middle 26 feet with new concrete. The balance of the pavement is in good durable condition and will not be reconstructed since it is in the parking lane, and will only consist of section repair. Aisc included will be the watermain replacement; sanitary sewer manhole replacement; and replacement of all lead water services from back-of-curb with copper service. The replacement of the lead water service lines will be the only portion of this project which is assessable. DISCUSSION The Iowa Department of Transportation (IDOT) received the following bids for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street on September 16, 2003: Horsfield Construction, Inc. Portzen Construction, Inc. Tschiggfrie Excavating Co. WC Stewart Construction, Inc. $1,007,996.35 $1,195,178.15 $1,197,499.50 $1,383,033.63 Horsfield Construction, Inc. of Epworth, Iowa, submitted the Iow bid of $1,007,996.36. This amount is 20.1% under the engineer's estimate. RECOMMENDATION I recommend that the contract be awarded to Horsfield Construction, Inc. in the amount of $1,007,996.35. BUDGET IMPACT The summary of the project costs is as follows: Estimate Bid Award Construction Contract Contingency Engineering $1,274,900.55 127,490.06 210,358.59 $1,007,996.36 127,490.06 210,358.59 Total Project Estimate $1,612,749.20 $1,345,845.01 The project will be funded as follows: Estimate Bid Award City Cost STP Funds Special Assessment to Private Properties Special Assessment to Water Services Special Assessment to Sewer Laterals City Paid Deficiency Watermain Construction Fund Sanitary Sewer Construction Fund 61,791.48 $ 80,698.45 874,000.00 712,152.49 119,966.94 97,339.67 52,320.40 45,458.60 93,427.33 71,785.29 60.61 49.13 181,340.23 156,419.39 229,842.21 181,941.99 Total Project Funding $1,612,749.20 $1,345,845.01 The project will be funded through a Fiscal Year 2003 CIP appropriation of $1,250,000. The project, as outlined, will require Special Assessments of $214,583.56, Federal Aid Surface Transportation Program (STP) funds of $712,512.49 and the 1% Local Option Sales Tax Fund in the amount of $80,698.45. Low- to moderate-income property owners subject to street, water service, and sanitary lateral assessments will be eligible for financial assistance ranging from 20 to 100 percent of the assessments for the owner-occupied resident property depending on family size and income level. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution awarding the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street to Horsfield Construction, Inc., subject to the concurrence by the Iowa Department of Transportation. MAK/vjd Prepared by Michael Felderman cc: Pauline Joyce, Administrative Services Bob Green, Water Plant Manager Gus Psihoyos, Assistant City Engineer Michael Felderman, Civil Engineer RESOLUTION NO. 386-03 AWARDING CONTRACT Whereas, sealed proposals have been submitted by contractors for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street pursuant to Resolution No.286-03 and notice to bidders published in a newspaper published in the City of Dubuque, Iowa on the 22"d day of August, 2003. Whereas, said sealed proposals were opened and read on the 16th of September, 2003, by the Iowa Department of Transportation (IDOT), and it has been determined that the bid of Horsfield Construction, Inc. of Epworth, Iowa, in the amount of $1,007,996.35 was the lowest bid for the furnishings of all labor and materials and performing the work as provided for in the plans and specifications. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Horsfield Construction, Inc., subject to the concurrence by the Iowa Department of Transportation, and the Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to return the bid deposits of the unsuccessful bidders. Passed, approved and adopted this 6th Attest: dayof October ., 2003. Terrance M. Duggan, Mayor Jeanne F. Schneider, CMC, City Clerk Bid Order: Letting Date: Letting Status: Contract Period: Project: Work Type: County: Route: Location: IOWA DEPARTMENT OF TRANSPORTATION VENDOR RANKING 101 Contract ID: 31-2100-621 09/16703 10:00 A.M. AWARD RECOMMENDED to HORSFIELD CONSTR, INC. 120 WORK DAYS Late Start Date: 04/05/04 STP-U-2100(621)--70-31 PCC PAVEMENT - REPLACE DUBUQUE PrJ Awd Amt: $t,007,996.35 UNIVERSITY AVENUE UNIVERSITY AVE. FROM SPRUCE ST. TO DELHI ST. IN DUBUQUE Run Date: 09/17/03 Page: t01 1 Primary County: DUBUQUE No Established DBE Goal TOTAL % OVER RANK VENDOR NO./NANE BID LOW BID I H0640 HORSFIELD CONSTRUCTION, [NC. $ 1,007,996.35 t00.0000% 2 P0085 PORTZEN CONSTRUCT[ON, INC. $ 1,195,t78.t5 118.5696% S TS020 TSCHIGGFRIE EXCAVATING CO. $ 1,197,499.50 118.7999% 4 ST580 W.C. STEWART CONSTRUCTION, INC. $ 1,383,033.83 137.2062% IOWA DEPARTMENT OF TRANSPORTATION TABULATION OF CONSTRUCTION AND MATERIAL BIDS Bid Order: 101 Contract ID: 31-2100-621 Primary County: DUBUQUE Letting Date: 09/16/03 10:00 A.M. Run Date: 09/17/03 Page: t01 2 (1) H0640 (2) P0085 I(3) TS020 HORSFIELD CONSTR, INC. PORTZEN CONSTRUCTION, INC.'iTSCHIGGFRIE EXCAV. CO. LINE NO / ITEM CODE / ALT I UNIT PRICE AMOUNT! UNIT PRICE AMOUNT!' UNIT PRICE AMOUNT ITEM DESCRIPTION QUANTITY i .......................................... + ............................ + ............................ + ............................... SECTION 0001 ROADWAY ITEMS 0010 2t02-0425070 13200.000 TON SPECIAL BACKFILL 0020 2102-2710070 2653.000 CY EXCAVATION, CLASS 10, ROADWAY AND BORROW 0030 2105-8425005 246.000 CY TOPSOIL, FURNISH AND SPREAD 0040 2111-8174100 16675.000 SY GRANULAR SUBBASE 0050 2123-7450020 28.300 STA SHOULDER FINISHING, EARTH 0060 2301-t032080 9308.000 SY STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 2 DURABILITY, 8 IN. 0070 2303-0000100 134.500 TON HOT MIX ASPHALT MIXTURE, COMMERCIAL MIX (INCLUDES ASPHALT BINDER), AS PER PLAN 0080 2502-8212016 6050.000 LF SUBDRAIN, LONGITUDINAL, 6 IN. DIA. 0090 2502-8220193 5.000 EACH SUBDRAIN OUTLET (RF-19C) 0100 2503-4480500 3.000 EACH STORM SEWER UTILITY ACCESS, RA-50 0110 2503-72750t5 278.000 LF SEWER PIPE, 1500D STORM, 15 IN. DIA. 0120 2503-7275036 368.000 LF SEWER PIPE, 1500D STORM, 36 IN. DIA. 0130 2504-7055008 2088.t50 LF SEWER PIPE, DUCTILE IRON SANITARY, B IN. DIA. 0140 2504-7398104 1057.000 LF SEWER SERVICE, SANITARY, CAST IRON, 4 IN. DIA. 0150 2504-7398106 434.000 LF SEWER SERVICE, SANITARY, CAST IRON, B IN. DIA. 0160 2504-8462510 13.000 EACH SANITARY SEWER UTILITY ACCESS (PRECAST) (RA-51) 0170 2510-6745850 13241.000 SY REMDVAL OF PAVEMENT 7.00000 42350.00 80.00000 400.00 1140.00000 8420.00 22.70000 6310.60 48.80000 17774.40 25.00000 50958.75 17.50000 18497,50 21.50000 9331.00 1428.00000 18564.00 2.80000 37074.80 6.15000 81180.00 3.90000 10346.70 15.00000 3690.00 8.20000 53360.00 250,00000 7075,00 25.70000 239215.60 75.00000 10087.50 30.00000 31710.00 33,75000 14647.50 1795.00000 23335.00 4.75000 62894.75 4J80000 63360.00 6.15000 16315,95 9.00000 2214.00 2.70000 45022.50 65.00000 8742.50 7.95000 48097.50 136.00000 680.00 1128.00000 3384.00 28.75000 6602.50 51.15000 18823.20 34.60000 70519.99 29.20000 30864.40 32.10000 13931.40 1253.00000 16289.00 2.90000 38398.90 Btd Order: 101 Letttng Date: 09/16/03 10:00 A.M. IOWA DEPARTMENT OF TRANSPORTATION TABULATION OF CONSTRUCTION AND MATERIAL BIDS Contract ID: 3t-2100-62t Run Date: 09/17/03 Page: 101 3 Primary County: DUBUQUE (1) H0640 (2) Poe85 (3) TS020 HORSFIELD CONSTR, INC. PORTZEN CONSTRUCTION, INC. TSCHIGGFRIE EXCAV. CB. LINE NO / ITEM CODE / ALT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 0180 2511-6745900 2364.000 SY 2.80000 6619.20 3.50000 8274.00 2.70000 6382.80 REMOVAL OF SIDEWALK 0190 2511-7528004 2864.000 SY SIDEWALK, P.C. CONCRETE, 4 IN. 0200 2512-1725356 240.000 LF CURB AND GUTTER, P.C. CONCRETE, 3.5 FT. 0210 2512-1725558 368.000 LF CURB AND GUTTER, P.C. CONCRETE, 5.5 FT. 0220 2512-1750006 2989.000 LF CURB AND GUTTER, P.C. CONCRETE, AS PER PLAN 0230 25t5'2475006 335.000 SY DRIVEWAY, P.C. CONCRETE, 8 IN. 0240 25t5-6745600 335.000 SY REMOVAL OF PAVED DRIVEWAY 0250 25t8-6910000 25.000 EACH SAFETY CLOSURE 0260 2525-0000100 LUMP TRAFFIC SIGNALIZATION 0270 2527-9263110 29.900 STA PAINTED PAVEMENT MARKING 0280 2528-8445110 LUMP TRAFFIC CONTROL 0290 2538-4980005 LUMP MOBILIZATION 0300 2598-3778006 18.000 EACH GATE VALVE AND VALVE BOX, 6 IN. 0310 2598-3778008 23,000 EACH GATE VALVE AND VALVE BOX, 8 IN. 0320 2598-4254900 5.000 EACH HYDRANTS 0330 2598-880§606 196.000 LF WATER MAIN, DUCTILE IRON, 6 IN. 0340 2598-8805608 1775.000 LF WATER MAIN, DUCTILE IRON, 8 IN. 0350 2598-8810200 3216.000 LB WATER MAIN FITTINGS 0360 2598-88210i0 46.000 EACH NEW WATER SERVICE 0370 2598-882i034 1243.000 LF WATER SERVICE PIPE, COPPER, 8/4 INCH 0380 2598-8821302 20.000 EACH ADUUST WATER SERVICE STOP BOXES 19.50000 46098.00 17.00000 4080.00 21.00000 7728.00 22.20000 65245.80 24.00000 8040.00 2.80000 938.00 40.00000 1000.00 57500.00000 57500.00 60.00000 1794.00 17500.00000 17500.00 32700.00000 32700.00 545.00000 8175.00 706.00000 16238.00 t361,00000 6805.00 20.50000 4018,00 23.00000 40825.00 2,g0000 9326.40 375.00000 17250.00 18.15000 18831.4§ 60.00000 1200.00 32.00000 10720.00 3.50000 1172.50 40.00000 1000.00 28.90000 68319.60 22.80000 5352.00 27.65000 10175.20 33.85000 99485.15 IOWA DEPARTMENT OF TRANSPORTATION TABULATION OF CONSTRUCTION AND MATERIAL BIDS Bid Order: 101 Contract ID: 31-2100-621 Primary County: DUBUQUE Letttng Date: 09/16/G3 10:00 Run Date: 09/17/03 Page: 101 4 0390 2599-9999005 12.000 EACH ('EACH' ITEM) PULL BOX (SIDEWALK) 0400 2599-9999005 49.G00 EACH ('EACH' ITEM) SEWER, SANITARY 8X4 Md TEE 0410 2599-9999005 14.000 EACH ('EACH' ITEM) SEWER, SANITARY 8X6 Md TEE 0420 2599-9999005 9.000 EACH ('EACH' ITEM) STORM SEWER, INTAKE 101-B 0430 2599-9999005 1.000 EACH ('EACH' ITEM) STORM SEWER, INTAKE tO1-B SPECIAL 0440 2599-9999005 5.000 EACH ('EACH' ITEM) STORM WATER CURB OPENING 0450 2599-9999009 2675.000 LF ('LINEAR FEET' ITEM) FURNISH AND INSTALL t@5 IN. PVC DUCT (W/ 4@1 IN. pvc) 0460 260t-2639010 106.000 SQ SODDING 0470 2601-2643110 63,600 MGAL WATERING FDR SOD, SPECIAL DITCH CONTROL,~ OR SLOPE PROTECT[ON SECTION TOTALS (1) H0640 (2) P0085 (3) TS020 HORSFIELD CONSTR, INC. PORTZEN CONSTRUCTION, INC. TSCHIGGFRIE EXCAV. CO. LINE NO / ITEM CODE / ALT ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 335.00000 4020.00 350.00000 4200.00 450.00000 5400.00 305.00000 14945.00 175.00000 8575.00 223.00000 10927.00 325,00000 4550,00 180.00000 2520,00 225,00000 3150.00 IOWA DEPARTMENT OF TRANSPORTATION TABULATION OF CONSTRUCTION AND MATERIAL BIDS Bid Order: 101 Contract ID: 31-2100-621 Primary County: DUBUQUE Letting Date: 09/t6/03 10:00 Run Date: 09/17/03 PaRe: 101 5 (4) STSBO i STEWART, W.C. CONSTRUCTION, I I LINE NO / ITEM CODE / ALT ITEM DESCRIPTION QUANTITY I UNIT PRICE AMOUNTI UNIT PRICE AMOUNTI UNIT PRICE AMOUNT SECTION 0001 ROADWAY ITEMS 0010 2102-0425070 13200.000 TON SPECIAL BACKFILL 0020 2102-27t0070 2653.000 CY EXCAVATION, CLASS 10, ROADWAY AND BORROW 0030 2t05-8425005 248.000 CY TOPSOIL, FURNISH AND SPREAD 0040 2111-8174100 16675.000 SY GRANULAR SUBBASE 0050 2t23-7450020 28.300 STA SHOULDER FINISHING, EARTH 0060 2301-1032080 9308.000 SY STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 2 DURABILITY, 8 IN. 0070 2303-0000100 134.500 TON HOT MIX ASPHALT MIXTURE, COMMERCIAL MIX (INCLUDES ASPHALT BINDER), AS PER PLAN 0080 2502-8212016 6050,000 LF SUBDRAIN, LONGITUDINAL, B IN. DIA. 0090 2502-8220193 5.000 EACH SUBDRAIN OUTLET (RF-19C) 0100 2503-4480500 3.000 EACH STORM SEWER UTILITY ACCESS, RA-50 0110 2503-7275015 278.000 LF SEWER PIPE, 1500D STORM, 15 IN. DIA. 0t20 2503-7275038 388.000 LF SEWER PIPE, 1500D STORM, 38 IN. DIA. 0130 2504-7055008 2038.t50 LF SEWER PIPE, DUCTILE IRON SANITARY, 8 IN. DIA. 0140 2504-7398104 1057.000 LF SEWER SERVICE, SANITARY, CAST IRON, 4 IN. DIA, 0150 2504-7398106 434.000 LF SEWER SERVICE, SANITARY, CAST IRON, 8 IN. DIA. 0180 2504-8482510 13.000 EACH SANITARY SEWER UTILITY ACCESS (PRECAST) (RA-51) 0170 2510-8745850 13241.000 SY REMOVAL OF PAVEMENT 8.00000 105600.00 2.50000 6632.50 13.00000 3198.00 9.15000 152576.25 125.00000 3537.50[ 26.50000 246662.00 ?5.00000 10087.50 29.50000 32.80000 1650.00000 4.50000 3i1BI.50 14235.20J 21450,00 59584.50 Bid Order: 101 Letting Date: 09/t6/03 10:00 A.M. IOWA DEPARTMENT OF TRANSPORTATION TABULATION OF CONSTRUCTION AND MATERIAL BIDS CoNtract ID: 31-2100-621 Run Date: 09/17/03 Page: 101 6 Primary County: DUBUQUE (4) ST58O STEWART, W.C. CONSTRUCTION, LINE NO / ITEN COBE / ALT ITEM DESCRIPTION QUANTITY ! UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT .......................................... + .......................................................................................... 0i80 25il-6745900 2364.000 SY 1.25000 2955.00 REMOVAL DF SIDEWALK 0190 2511-7526004 2364.000 SY SIDEWALK, P.C. CONCRETE, 4 IN. 0200 2512-t725356 240.000 LF CURB AND GUTTER, P.C. CONCRETE, 8.5 FT. 02t0 25t2-1725556 368.000 LF CURB AND GUTTER, P.C. CONCRETE, 5.5 FT. 0220 25t2-1750006 2939.000 LF CURB AND GUTTER, P.C. CONCRETE, AS PER PLAN 0230 25i5-2475006 335.000 SY DRIVEWAY, P.C. CONCRETE, 6 IN. 0240 25i5-6745600 335.000 SY REMOVAL OF PAVED DRIVEWAY 0250 25i8-6910000 25.000 EACH SAFETY CLOSURE 0260 2525-0000100 LUMP TRAFFIC SIGNALIZATION 0270 2527-9263110 29.900 STA PAINTED PAVEMENT MARKING 0280 2528-8445110 LUMP TRAFFIC CONTROL 0290 2533-4980005 LUmP MOBILIZATION 0300 2598-3778006 15.000 EACH GATE VALVE AND VALVE BOX, 6 IN. 0310 2598-3778008 23.000 EACH GATE VALVE AND VALVE BOX, 8 IN. 0320 2598-4254900 5.000 EACH HYDRANTS 0330 2598-8805606 t96.000 LF WATER MAIN, DUCTILE IRON, 6 IN. 0340 2598-8805608 1775.000 LF WATER MAIN, DUCTILE IRON, 8 IN. 0350 2598-8810200 3216.000 LB WATER NAIN FITTINGS 0360 2598-8821010 46.000 EACH NEW WATER SERVICE 0370 2598-8821034 1243.000 LF WATER SERVICE PIPE, COPPER, 3/4 INCH 0380 2598-8821302 20.000 EACH ADdUST WATER SERVICE STOP BOXES 32.25000 76239.00 22.50000 5400.00 33.50000 12328.00 15.00000 44085.00 34.00000 11390.00 4,50000 1507.50 40.00000 t000.00 78460,00000 78460.00 60.00000 1794.00 23982.00000 23982.00 29000.00000 29000.00 518.00000 9228.00 800.00000 18400.00 1305.00000 6525.00 37.16000 7283~30 40.17000 71301.75 3.16000 10162.56 431.40000 19844.40 29.50000 36668.50 100.00000 2000.00 IOWA DEPARTMENT OF TRANSPORTATION TABULATION OF CONSTRUCTION AND MATERIAL BIOS Run Date: 09/17/03 Page: lei 7 Bid Order: t~t Contract ID: 81-2100-021 Primary County: DUBUQUE Lettfng Date: 09/16/03 t0:~ A.M. ~STEWART, W.C. CONSTRUCTION, I I LINE NO / ITEM CODE / ALT ITEM DESCRIPTION QUANTITY ! UNIT PRICE AMOUNTI UNIT PRICE AMOUNT UNIT PRICE AMOUNT ('EACH' ITEM) PULL BOX (SIDEWALK) 205.4e000 1~064.60 ('EACH' ITEM) SEWER, SANITARY 8X4 Md TEEI' ('EACH' ITEM) SEWER, SANITARY 8X6 Md TEEI (rEACH' ITEM) STORM SEWER, INTAKE t~t-B 04B~ 2599-9999005 t.~00 EACH 1950.00~00 1950.00 ('EACH' ITEM) STORM SEWER, INTAKE 1~1-B SPECIAL 0440 2599-9999~05 5.00~ EACH 95.00000 475.~0 ('EACH' ITEM) STORM WATER CURB OPENING ~450 2599-9999009 2675.000 LF 15.850~0 B7~48.75 ('LINEAR FEET' ITEM) FURNISH AND INSTALL 1@5 IN. PVC DUCT (W/ 4@1 IN. PVC) 047~ 2601-2643tt0 WATERING FOR SOD, SPECIAL DITCH CONTROL, OR SLOPE PROTECTION I $ 1,383,~33 63! SECTION TOTALS CONTRACT TOTALS I $ 1,383,~B$.BB RESOLUTION NO. 341-03 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 13~ day of August, 2003, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this 15th ~J/eanne F. Schneider, CMC, City C e day of September , 2003. T/errance M. D~'~g~or RESOLUTION NO. 342-03 RESOLUTION WITH RESPECT TO THE ADOPTION OF THE RESOLUTION OF NECESSITY PROPOSED FOR THE UNIVERSITY AVENUE RECONSTRUCTION PROJECT FROM DELHI TO ALTA VISTA AND THE UNIVERSITY AVENUE PATCHING PROJECT FROM ALTA VISTA TO SPRUCE STREET Whereas, the City Council has proposed a Resolution of Necessity for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street, has given notice of the public hearing thereon as required by law; and Whereas, the public hearing has been held, all persons offering objections have been heard and consideration given to all objections and is pending before this Council; and Whereas, this is the time and place set as provided for the taking of action on the proposed Resolution of Necessity. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed Resolution of Necessity described above is hereby: Adopted, without amendment, and all objections filed or made having been duly considered are overruled. Adopted as amended by the Schedule of Assessments attached hereto as Exhibit A, and made a part hereof by reference. All objections filed or made having been duly considered are overruled. Deferred for later consideration to a City Council meeting to be held on the __ day of ~, 2003, next at 6:30 p.m. in the Public Library Auditorium, with jurisdiction retained for further consideration and action at the adjourned meeting. Abandoned. Passed, adop~d and approvedthis. 2003. Atte¢: , ~J'~anne F. Schneider, CMC, City Clerk 15th dayof September Ter~ance M. D~gg~ayor NOTICE TO PROPERTY OWNERS Notice is g~ven that there is now on file for public inspection in the office of the City Clerk of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost, and a plat and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of Dubuque, Iowa, for an improvement of the type(s) and ~n the location(s) as follows: University Avenue Reconstruction Project from Delhi to Alta Vista The project involves the complete reconstruction of the existing base and pavement surface that is 41 feet in width, from back-of-curb to back-of-curb from Delhi to Alta Vista Street. The pavement will be Portland cement concrete, with new curb and gutter and sidewalks. The section from Delhi to Alta Vista Street will also include: storm sewer improvements; sanitary manhole replacement; sanitary sewer main repairs; sanitary sewer lateral replacement; watermain valve replacement; replacement of all lead water services from back-of-curb with copper service; replacement of sidewalk along University Avenue from Delhi to Alta Vista; and new curb ramps at intersections. All property included within the areas described so as to include one-half of the privately-owned property between each such street to be improved and the next street, whether such privately-owned property abuts upon the street to be improved or not. In no case shall property situation more than 300 feet from the street to be improved be assessed. University Avenue Patching Project from Alta Vista to Spruce Street The project replaces the middle 26 feet with new concrete that will be tied together. Also included will be the watermain replacement; sanitary sewer manhole replacement; and replacement of all lead water services from back-of- curb with copper service. That [he proposed district to be benefited and subject to assessment for the cost of such water lateral improvements is described as follows: Lot 2-1-15 Kelly Sub N. 100' Lot 14 Kelly's Sub Lots 38, 39 & 40 & E. 21' of Lot 41 Farley's S. Bal. Of Lot 37 Fadey's Sub Lot 2-1-1-11 Kelly's Sub Lot 2-8 of Kelly's Sub Lot 7 Kelly's Sub W. 30' of Lot 6 of City Lot 738 Lot 4 Kelly's Sub Lot 7 of City Lot 738 Lot 3 Kelly's Sub W. 3' of Lot 8 & Lot 9 of City Lot 738 Lot 2-1 Kelly's Sub & Lot 2 Kelly's Sub Lot 10 of City Lot 738 Lot 2-1 Collins Sub Lot 1-1 Kelly's Sub & Lot 2 W. 7.5' Lot 3-2-3 & Lot 4-2-3 & Lot 11 all in City Lot 1 Cains Sub Lot 1 McKay Place Lot 2 Oxford Hei§ ~ts Lot 3 & E. 5' of Lot 4 Oxford Heights W. 45' Lot 4 Oxford Heights Lot 5 Oxford Heights Lot 6 & E. 1/5 of Lot 7 Oxford Heights Sisters of Presentation The City Council will meet at 6:30 p.m. on the 15th day of September, 2003, at the Public Library Auditorium, 360 West 11th Street, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost. the assessment against any lot, or the final adoption of a Resolution of Necessity. A property owner will be deemed to have waived all objections unless at the ti rne of hearing he has filed objections with the City Clerk. Any visual- or hearing-~mpaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council g~ven on the ,2003. day of Jeanne F, Schneider, CMC City Clerk RESOLUTION NO. RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets 1 to 3 inclusive, are hereby determined to be the schedule of proposed assessments for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street and the valuations set out herein are hereby approved. Passed, approved and adopted this day of ,2003. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY OF DUBUQHE. [OW^ UNIVERSITY AVE DELHI STREET TO SPRUCE STREET, PRELIMINARY SCHEDULE OF VALUATION kND PROPOSED ASSESSMENTS PUBLIC EARCEL VALUATION w PAVING DEFICIENCY IMPROVEMENTS WATER SERVICE SEWER LATERAl. rOTAL NET OWNER Lot Des¢fipuon No IMPROVEMEN ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT I'esler. LaVemo M Lot I - 1-46 Oxford Heights 10-25-106-004 $65,746.15 $1.076.15 S0.00 $1,876.15 $0.00 $2.19 I. 13 $4.067.28 Sitzmann, Dawd & l'l~omas Lot 1-47 Oxford Heights 10-25-106-003 $94.148.00 $2.468.00 $0.00 $2,46§.00 $1.442.10 $2.312.88 $6.222.97 Neume~sler, Tom& Janet 1~ 64'-N. 100'Lol 1 Mar6ns Dubuque 10-25-106~002 $96.867.39 $2,197.39 $0.00 $2 197.39 $0.00 S2.373.75 $4 571.13 Mare. Gerald & lanelda W. 50' - N. 100' - N. 150' Lot I Martins Dubtlqu~ 10-25-106-001 $I00.441,11 $1.701.1 $0.00 $1.701.11 $0.00 $2.495.49 $4.196.60 Lochner Donald 1.012-1-46 & 2~47 Oxford Heights 10-25-106-015 $76.044.51 $254.51 $0.00 S254.51 $0,00 S0.00 $254.51 llammel Daniel & Kmen Lot 48 Oxford lieights 10-25-106~016 $88,690A 7 $140.17 $0.00 $140.17 $0.00 :S0.00 $140.17 CITY OF DUBUQUE. IOWA L~qlVERSITY AVE DELIII STREEJ TO SPRUCE 5TREET~ ?RELIMFNARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS PUBLIC PARCEL VAMJATION w/ PAVING DEFICIENCY IMPROVEMENI'S WATER SERVICE SEWER LATERA£ TOTAL NET OWNER Lot DeSCnl~OOn No, IMPROVEMEN ASSESSMENT $SSESSMENT ASSESSMENT ASSF. SSMENT ASSESSMENT ASSESSMENT Eisba¢[ Wilhm~A& EelenM N. lO'Lot 5 & Lot6Marsh'sDubuquett2 0-26-229-004 $126.170,78 $130.78 $0.00 $130,78 $0~00 $0.00 $130.78 $112.00 $0.00 $112,00 $0.00 $0.00 $112.00 $ 1.199.71 $0.00 $1,199.71 $1.442.10 $2.373.75 $5.015.56 $1.442.85 $0.00 $1.442.85 $0.00 $2373.75 $3.816.60 $1.097.98 $0.00 $1.097.98 $0.00 $2.373.75 $3.471.72 $2.080.78 $0.00 $2.080.78 $0,00 $2.373.75 $4.454.53 $1.957.29 $0.00 $1.957.29 $0.00 $2.373.75 $4.331.04 $1.031.8£ $000 $1,031.80 $0.00 $2.373.75 $3,405.54 $718.94 $0.00 $718.94 $0.00 $2.373.75 $3,092.68 $L359,41 $0.00 $1.359.41 $1.442.10 $2.373.75 $5.1 75.26 $ L359.41 $0.00 $L359.41 $1.442.10 $2.373.75 $5 75.26 $1.359.41 $0.00 $1359.41 $1.442.10 $2.373.75 $5.175.26 $1.359.41 $0.00 $1.359.41 $1,442.10 $2.373.75 $5 75.26 $1 359.41 $0~00 $1.359.41 $1.442.10 $2,373.75 $5 75.26 $L356 06 $0.00 $1.356.06 $1.442.10 $2.373.75 $5.1 71.90 $969.76 $0.00 $969.76 $0.00 $2.373.75 $3,343.51 $179.40 $&O0 $179.40 $0.00 $0.00 $179.40 $3.199,23 $000 $3.199.23 $860.20 $1.765.03 $5.824.46 $3.199.23 $0.00 $3.199.23 $000 $1.765.O3 $4.964.26 $502.99 $0.00 $502.99 $0,00 $0.00 $502.99 $138,82 $0.00 $138.82 $0.00 $0.00 $138.82 $95.90 $0.00 $95.90 $0.00 $0,00 $95.90 $135 81 $0.00 $135.81 $0.00 $0.00 $135.81 $107.30 $0.00 $107.30 $0.00 $0.00 $107.30 $2.643.71 $0.00 g2.643.71 $0.00 $1.765.03 $4.408.74 $1.590.78 $0.00 $1,590.78 $860.20 $1.765.03 $4.216.01 $321.91 $0.00 $321.91 $0.00 $0.00 $321.91 ~ t64.64 $0.00 $1 ~4.64 $0.00 $0.00 $164.64 5 t48.21 $0.00 $148.21 $0.00 $0.00 $148.21 $1.38322 $0.00 $1,383.22 $860.20 $1.765.03 $4,008.45 $1.415.41 $0.00 $1.415,41 $0.00 $1,765.03 $3.180.44 $1.374.83 $0,00 $1.374.83 $860.20 $1.765.03 $4.000.06 $618.34 $000 $618.34 $000 $0.00 $618.34 $250.15 $0.00 $250.15 $0.0£ $0.00 $250.15 $177.05 $0.00 $177.05 $0.00 $000 $177.05 $129.77 $0.00 $129~77 $0.00 $0.00 $129.77 $1.89761 gO O0 $1 897.61 $860.20 $1,765.03 $4 522.84 $3.200.01 $0.00 $3.200.01 ~860.20 $L765.03 $5.825.24 $392.00 $0.00 $392.00 $0.00 ~o.uu ~392 00 $160.96 $0.00 $160.96 $0.00 $0.00 $160 96 $ 179.06 $0.00 $179~06 $0 00 $0.00 $179.06 $136.8[ $0.00 $136.81 $0.00 gO.O0 $136.81 $20 20 $60~61 $80.81 $0 0( $0.00 $20.20 CITY OF DUBUQI E. IOWA UNIVERSITY AVE iDELHI STREET TO SPRUCE STREET, PRELIMINARY SCIIEDULE OF VALUATION AND PROPOSED ASSESSMENTS PUBLIC PARCEL VALUA'IION w/ PAVING DEFICIENCY IMPROVEMENTS WATER SERVICE SEWER LATERAL TOTAL NET OWNER Lot Description NO. IMPROVEMEN ASSESSMENT ASSESSMENT ASSESSMEW[ ASSESSMENT ASSESSMENT ASSESSMENT Water Laterals Only Snyder, David & Mao~ J Lot 2- I -I 5 Kelly Su0 10-25-130-005 29.580,00 20.00 $ I 265.00 20.00 21 265.00 SIor~. David & Mary N. 100' Lot 14 Kelly's Sub. 10-25-130-027 253.420.00 $0.00 21.265.00 20.00 $1,265.00 City of Dubuque ~ts 38.39 & 40 & E. 21' of Lot 41 Farley's 10-25-126-002 $5.300.00 $0.00 $1 012,00 20.00 $1.012.00 Ransdali, Markg. S BaI, Of Lot 37 Farley's Sub. 10-25-126-003 262.440.00 $0.00 $1,012.00 20.00 $1,£ ~.00 Birch. Ken & Jeffrey Lot 2- I *l-I I Kelly's Snb 0-25-129-020 $19.330.00 TO.O{ $0,00 $0.00 20.00 Mafinko Edward & C~ol Lot 2-8 Kelly s Sub. 10-25-129-012 254.820.00 20.00 21,265.00 $0.00 Sl.265,00 Malmko Edward & Carol Lot 7 Kelly's Sub. t0-25-129-011 256,870.00 $0.00 $1.265.00 $0.00 $1.265.00 Lynch, Kelly Ann W 30' of Lot 6 of Ci[y Lot 738 10-25-104-018 $28.350.00 $0.00 $1.( g.O0 $0.00 $1.012.00 Heakel. Richard A & 3~rl~t h A Lot 4 Kelly's Sub. 10-25-129-008 $55.000.00 $0.00 21.265.00 $0.00 $1.265.00 Lynch. Ketly Ann Lot 7 of City Lot 738 10-25-104-017 226,830.00 $0.00 $1.012.00 20.00 $1.012.00 Silver. Commie {I{enkel) Lot 3 Kelly's Stlb. 10-25-120-007 S60.260.00 $0.00 $1.265.00 $0.00 $1.265.00 B&WProueriies W YofLot 8 & Lot~ofCitj Lot738 10-25-104-016 245.490.00 $0.00 $1.012.00 $0.00 $1,012.00 Gukelsen. Michael & Kalhy Lot 2-1 Kelly's Snb. & Lot 2 Kelly s Sub. 10-25-129-000 ~132.500.00 $0.00 $1.265.00 $0.00 $1,265.00 Voeib~l~ Dirk & Pmnela Lot lO of City Lot 738 10-25-104-015 $56.570.00 $0.00 $1.012,00 $0.00 $1,012.00 Moffat. vtrgmla Lot 2-1 Collins Sub.. Lot I-I Kelly's Sub. & Lot 2-7 Mo I0-25~129-005 261.390.00 $0.00 21.265.00 2000 $1.265.00 Furies, Gm~ J W. 7.5. Lot 3_2_3 & Lot 4_2-3 & LOt I 1 all in Ciw Lat 7 10-25-104-014 268,070.00 $0.00 21,012.00 20.00 21.012.00 119966.945 60.61 120027.555 52320.4 93427,334 265714.679 MEMORANDUM September 10, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager University Avenue Reconstruction Project from Delhi to Alta Vista University Avenue Patching Project from Alta Vista to Spruce Street Public Works Director Mike Koch is recommending approval of the plans and specs for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. The bids are due September 16, with bid award at the October 6 City Council meeting. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director MEMORANDUM August14,2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager University Avenue Reconstruction Project from Delhi to Alta Vista University Avenue Patching Project from Alta Vista to Spruce Street Public Works Director Mike Koch recommends initiation of the bidding process for the University Avenue Reconstruction Project from Delhi to Alta Vista and University Avenue Patching Project from Alta Vista to Spruce Street, and further recommends that a public hearing be set for September 15, 2003. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C.~/an Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM August 13, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ¢¢'~ University Avenue Reconstruction Project from Delhi to Alta Vista University Avenue Patching Project from Alta Vista to Spruce Street INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. DISCUSSION University Avenue from Delhi to Alta Vista was built in 1955, with an asphalt surface being placed in 1982. The project involves the complete reconstruction of the existing base and pavement surface that is 41 feet in width, from back-of- curb to back-of-curb from Delhi to Alta Vista Street. The pavement will be Portland cement concrete, with new curb and gutter and sidewalks. The section from Delhi [o Alta Vista Street will also include: storm sewer '~mprovements; sanitary manhole replacement; sanitary sewer main repairs; sanitary sewer lateral replacement; watermain valve replacement; replacement of all lead water services from back-of-curb with copper service; replacement of sidewalk along University Avenue from Delhi to Alta Vista: and new curb ramps at intersections. The section of University Avenue from Alta Vista to Spruce was constructed with Portland cement concrete pavement in 1962. The concrete sections were not tied together and thus there has been considerable movement between slabs, making for an extremely rough ride. The staff is proposing to replace the middle 26 feet with new concrete that will be tied together. University Avenue will not be improved since it is in the parking lane, and is considered concrete section repair. Therefore, this segment of the project is nonassessable. Also included will be the watermain replacement; sanitary sewer manhole replacement; and replacement of all lead water services from back-of-curb with copper service. The replacement of the water service lines will be assessable to the properly owner. The schedule for the project will be as follows: Advertisement for Bids Notice of Hearing on Plans & Specifications Mail Notice to Property Owners Published Notices to Property Owners Public Hearing Receipt of Bids Award of Contract Project Start Date Completion August 22, 2003 August 29, 2003 August 29, 2003 August 29, 2003 September 5, 2003 September 15, 2003 September 16, 2003 October 6, 2003 April 20, 2004 120 Working Days RECOMMENDATION I recommend that the City Council give preliminary approval to the Resolution of Necessity and establish Seote tuber 15, 2003 as the date of the public hearing. BUDGET IMPACT The estimate for the project is as follows: Construction Contract Contingency Engineering $1,274,900.55 127,490.06 210,358.59 Total Estimated Cost $1,612,749.20 The project will be funded as follows: City Cost STP Funds Special Assessment to Private Properties Special Assessment to Water Services Special Assessment for Sewer Laterals City Paid Deficiency Watermain Construction Fund Sanitary Sewer Construction Fund $ 61,791.48 874,000.00 119,966.94 52,320.40 93,427.33 60.61 181,340.23 229,842.21 Total Project Funding $1,612,749,20 The project will be funded through a Fiscal Year 2003 CIP appropriation of $1,274,900.55. The project, as outlined, will require Special Assessments of $265,714.67, STP funds of $874,000 and Franchise Fees in the amount 'of $61,791.48. Low- to moderate-income property owners subject to street, water service, and sanitary lateral assessments will be eligible for financial assistance ranging from 20 to 100 percent of the assessments for the owner-occupied resident property depending on family size and income level. ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, approve the preliminary assessment schedule, and to establish the date of the public headng. CC: Bob Green, Water Plant Manager Gus Psihoyos, Assistant City Engineer Michael Fe derman, Civil Engineer City Clerk's Office 50 West i3th Street Dubuque, Iowa 52001-4864 (563) 5894120 Office (563) 589-0890 Fax (563) 690-6678 TDD August 22, 2003 TO: Eric Stierman Dubuque County Treasurer Attached is a certified copy of Resolution No. 28%03 "Resolution Approving Preliminary Schedule of Assessments" for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street Project. City Clerk Service People Integl~ty Responsibility Ira~ova~ion Teamwork RESOLUTION NO. 281-03 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street in the estimated amount $1,612,749.20 are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 18th day of August 2003. Patricia Ao Cline, Mayor Pro-Tem Attest: 3eanne F. Schneider, CMC, City Clerk CITY OF DIJBIJQUE. IOWA UNIVERSITY AVE (DELHI STREET TO SPRUCE S FKEET) PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS PUtsLIC PARCEL VALUATION w/ PAVING DEFICIENCY IMPROVEMENTS WATER SERVICE SEWER LATERAL TOTALNET Lot Description No. IMPROVEMEN ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT Fesler, LaVeme M Lot 1 - 1-46 Oxford Helghts 10-25-106-004 $65,746.15 $1,876.15 $0.00 $1,876.15 $0.00 $2,191.13 $4,067.28 Sitzmann, David & Thomas Lot 1-47 Oxford Heights 10-25-106-003 $94,148.00 $2,468.00 $0.00 $2,468.00 $1,442.10 $2,312.88 $6,222.97 Neumelster. Tom & Janet E. 64' - N. 100' Lot 1 Marthls Dubuque 10~25-106-002 $96,867.39 $2,197.39 $0.00 $2,197.39 $0.00 $2,373.75 $4,571.13 Moro, Gerald & lanelda W. 50' - N. 10fi - N. 150' Lot 1 Martins Dubuque 10-25-106-00I $100,441.11 $1,701. I 1 $0.00 $1,701.11 $0.00 $2,495.49 $4,196.60 Lochner, Donald Lot 2-1-46 & 2-47 Oxford Heights 10-25-I06-015 $76,044.51 $254.51 $0.00 $254.51 $0.00 $0.00 $254.51 Hummel, Daniel & Kmen Lot 48 Oxford Heights 10-25-106~016 $88,690.17 $140.17 $0.00 $140.17 $0.00 $0.00 $140.17 Oiunta, Francis, Ill & JoAnn E. 102.5' of LOt 49 Oxford Heights 10-25-106-017 $74,556.51 $86.51 $0.00 $86.51 $0.00 $0.00 $86,5 I Speeht, Joseph & Debra S. 50' - N. 150' LOt 1 Martins Dubuque 10-25-106-005 $70,697.47 $527.47 $0.00 $527.47 $0.00 $0.00 $527.47 Davis, B~Tce S. & (~nthia J S. 50' Lot 1 Mardns Dubuque 10-25-106-006 $70,108.20 $258.20 $0.00 $258.20 $0.00 $0.00 $258.20 Stayer, C86stopher T Lot 2 Martins Dubuque 10-25-106-007 $86,557.54 $147.54 $0.00 $147.54 $0.00 $0.00 $147.54 Torres, John & Linda Lot 3 Martins Dubuque & W. Iff of Lot 49 Oxford Heig 10-25-106~008 $67,529.10 $129.10 $0.00 $129.10 $0.00 $0.00 $129.10 Gross, lamesE &JutieA 1.o1 1-1-2-1 MineralLot 80 10-25405-006 $47,165.91 $1,035.91 $0.00 $I,035.91 $0.00 $2,373.75 $3,409.66 C~s, J0mes E & lube ^. Lot 2-1-2-1 Mineral Lot 80 10-25-105-005 $33,456.21 $806.21 $0.00 $806.21 $0.00 $2,373.75 $3,179.95 Gtx)ss, James E. & Sulie A Lot 1-2-2~1 Mineral Lot 80 10-25-105-004 $77,905.97 $2,115.97 $0.00 $2,I 15.97 $0.00 $2,373.75 $4,489.72 Gross, James E & JulieA. Lot 2-2~2-1 Mineral Lot 80 10-25-105-003 $47,451.25 $1,131.25 $0.00 $1,131.25 $1,442.10 $2,373.75 $4,947.10 Gross, lames 18. & JuSe A. Lot 1-1 Mineral Lot 80 10~25-105-020 $21,442.31 $1,062.31 $0.00 $1,062.31 $0.00 $0.00 $1,062.31 Bauerly, James W & M Kath~¥ne Lot 2-2 Mineral Lot 80 10-25-105~021 $129,436.08 $686.08 $0.00 $686.08 $0.00 $0.00 $686.08 Bliggs, Shirley Trustee Lot 1-1-2 Mineral Lot 80 10-25-105-022 $124,043.33 $223.33 $0.00 $223.33 $0.00 $0.00 $223.33 Klinge, Kenneth E & Tummy Lot 2-1-2 Mineral Lot 80 10-25-105-023 $73,852.83 $82.83 $0.00 $82.83 $0.00 $0.00 $82.83 Cook. Kenneth & Barbara Lot 12 Bmdstreet Dubuque 10-25405-024 $127,602.67 $112.67 $0.00 $112.67 $0.00 $0.00 $112.67 Geisler, Joan & Bfiggs, Joan Lol 2-4 MJnexal Lot 80 10-25-105-002 $79,076.82 $3,256.82 $0.00 $3,256.82 $1,442.10 $2,373.75 $7,072.67 Geisler, Jom~ & Brlggs, Joan Lot 3-4 Mineral Lo! 80 10-25-105~001 $60,346.82 $3,256.82 $0.00 $3,256.82 $1,442.10 $2,373.75 $7,072.67 Cigrand, Ralph & Ma~ Jean Lot 1-4 Mineral Lot 80 10-25405-007 $78,488.21 $708.21 $0.00 $708.21 $0.00 $0.00 $708.21 Bteile, Randy J & Cmla K. N. 1/2 of Lot 3 of Mineral Lot 80 10-25-105-008 $82,564.10 $354.10 $0.00 $354.10 $0.00 $0.00 $354.10 Nelson, Roberi A & gemadine S. 1/2 of LOt 3 of Mineral Lot 80 10-25-105 009 $68,113.76 $183.76 $0.00 $183.76 $0.00 $0.00 $183.76 Davis, John J Lm etta S [~)t 2-13 Bradslxeet & Lot 2A Mineral Lot 80 [ 0-25-105-010 $53,053.22 $93.22 $0.00 $93.22 $0.00 $0.00 $93.22 Cullen, William J & MeClain Theresa Lot 1-13 Bradst/e~t Dubuque 10~25-105-011 $87,293.83 $83.83 $0.00 $83.83 $0.00 $0.00 $83.83 Wolff, Julie A. Lo145 & 46 bodt in SM Lmtgwor tby's Add. 10-26-233-007 $142,447.14 $3,567.14 $0.00 $3,567.14 $0.00 $2,373.75 $5,940.89 Wheelock, Paul A & Wendy S Lot 47 in SM Langwortby's Add. 10-26-233-004 $55,056.97 $1,296.97 $0.00 $1,296.97 $1,442. I0 $2,373.75 $5,112.82 Boelk, Robert D & Mable L Lot 48 in SM Langwortby's Add. 10-26-233-003 $76,246.97 $1,296.97 $0.00 $1,296.97 $0.00 $2,373.75 $3,670.72 Steve, JO^nh M. Lots 49, 50 & 51 SM Lm~gwortby's Add. 10-26-233-002 $176,490.91 $3,890.91 $0.00 $3,890.91 $0.00 $2,373.75 $6,264.65 JG Properties Lots 52 & 53 in SM Langworthy's Add. 10-26-233-001 $122,245.03 $2,695.03 $0.00 $2,695.03 $1,442.10 $2,373.75 $6,510.88 Church of Nativity, cio Alfl~ed Hughes Cbureb of Nativity & Lot 1-1 - 1-1-1-1 SlaEery*s Sub 10-25-10]-001 $3,785,612.53 $16,472.53 $0.00 $16,472.53 $0.00 $0.00 $16,472.53 Chm~zh of Natlvity, ¢/o Al fred Hughes Lot 2-DI and Lot 2-1 Slattery's Sub. 10-25-101-002 $103,128.68 $5,518.68 $0.00 $5,518.68 $860.20 $1,765.03 $8,143.91 Perfection Oil Company Lot 2-2 Slattery's Sub. 10-26-229-018 $77,148.62 $5,758.62 $0.00 $5~758.62 $0.00 $1,765.03 $7,523.65 Heitz Distributing Company Lot 2-1 ~2 SlaOery's Sub. 10-26-229-017 $107,129.31 $2,879.31 $0.00 $2,879.31 $0.00 $1,765.03 $4,644.34 Matheos, James P & Debble S Lot 1 Marsh's Dubuque/12 10~26-229-016 $105,449.23 $3,199.23 $0.00 $3,199.23 $0.00 $1,765.03 $4,964.26 SchreS~r, John D & Rosemary F I.ot 2 Marsh's Dubuque #2 10-26-229-015 $115,539.23 $3,199.23 $0.00 $3,199.23 $860.20 $1,765.03 $5,824.46 Buehheit, Dennis J & Ma~3~ K Lot 3 Mamh's Dubuque #2 10-26-229-007 $77,892.99 $502.99 $0.00 $502.99 $0.00 $0.00 $502.99 Hefel, Dale R. & LuAnn M Lot 1 Schlitz Sub. 10 26-229-014 $59,746.75 $686.75 $0.00 $686.75 $0.00 $0.00 $686.75 Saeugl]ng, Julie M. S. 45' Lot 4 Marsb's Dubuque #2 10-26~229-006 $64,958.97 $218.97 $0.00 $218.97 $0.00 $0.00 $218.97 Willey Joke & Buehhelt. Dennis Col 2 Schlitz Sub 10-26-229~013 $98,83057 $320.57 $0 00 $320.57 $0.00 $0.00 $320.57 Slatte, Peter J & Georgia L N. 5' l-or 4 & S. 40' Lot 5 Marsh's Dubuque//2 10-26-229-005 $62,818.09 $128.09 $000 $128.09 $0.00 $000 $128.09 Delive, Stephol P & Janet M Lot 3 Seldltz Sub. 10-26-229-012 $94,315. I 0 $185. I 0 $0.00 $185. I 0 $0.00 $0.00 $185. I 0 CITY OF DUBUQUE, IOWA UNIVERSITY AVE (DELHI STREET TO SPRUCE STREET) PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS Lot 4 Sehiltz Sub. 10-26-229-011 $85.412.00 $112.00 $0.00 $112.00 $0.00 $0.00 $112.00 Lot 54 SM Lm~gwor thy's Add. 10-26~232-007 $69.049.71 $1,199.71 $0.00 $1,199.71 $1,442.10 $2.373.75 $5,015.56 Lot 55 & 1-56 SM Laugworthy's Add. 10~26~232-006 $49.852.85 $1,442.85 $0.00 $1,442.85 $0.00 $2,373.75 $3,816.60 Lot A-2-56 SM Lm~gworthy's Add. 10-26-232-005 $33,997.98 $1,097.98 $0.00 $1,097.98 $0.00 $2,373.75 $3,471.72 Lot B-2-56 & Lot 57 SM Langworlhy's Add. 10-26-232-004 $72,220.78 $2,080.78 $0.00 $2,080.78 $0.00 $2,373.75 $4,454.53 Lot 1-58 SM Langworthy's Add. 10-26-232.003 $67,297.29 $1,957.29 $0.00 $1,957.29 $0.00 $2,373.75 $4,331.04 Lot 59, 1-60, 2-58 SM Langworthy's Add. 10-26-232-002 $73,501.80 $1,031.80 $0.00 $1,03 LB0 $0.00 $2,373.75 $3,405.54 Lot 4 Cleminson Sub. & Lot 2-60 SM Langwo~thy's Ad 10-26-232-001 $56,108.94 $718.94 $0.00 $718.94 $0.00 $2,373.75 $3,092.68 Lot 1-2 Clemlnson Sub. 10-26~231-008 $89,920.41 $1,359.41 $0.00 $1,359.41 $1,442.10 $2,373.75 $5,175.26 Lot 6 Sunmlltt Add. 10-26-231-007 $67,959.41 $1,359A1 $0.00 $1,359.41 $1,442.10 $2,373.75 $5,175.26 Lot5 Smnmitt Add. 10-26-231-006 $92,569.41 $1,359.41 $0.00 $1,359.41 $1.442.10 $2,373.75 $5,175.26 Lot 4 Sunmlitt Add. 10-26-231-005 $65,099.41 $1,359.41 $0.00 $1,359.4I $1,442.10 $2,373.75 $5,175.26 Lot3 Sunmlltt Add. 10-26~231-004 $127,589.41 $1,359.41 $0.00 $1,359.41 $1,442.10 $2,373.75 $5,175.26 Lot I-2 Smmnilt Add. 10-26-231-003 $93,306.06 $1,356.06 $0.00 $1,356.06 $1,442.10 $2,373.75 $5,171.90 E. 50' Lot 1 & Lot 2-2 Summltt Add. 10-26-231-002 $189,569.76 $969.76 $0.00 $969.76 $0.00 $2,373.75 $3,343.51 LotB Sun~nltt Add. 10-26-231-010 $8,169.40 $179.40 $0.00 $I79.40 $0.00 $0.00 $179.40 Lot 16 Marsh's Dubuque #2 10-26-228-020 $141,939.23 $3,199.23 $0.00 $3,199.23 $860.20 $L765.03 $5;824.46 Lot 17 Marsh's Dubuque//2 10-26-228-019 $92,279.23 $3,199.23 $0.00 $3,199.23 $0.00 $1,765.03 $4,964.26 Lot 15 Marsh's Dubuque #2 10-26-228-016 $43,582.99 $502.99 $0.00 $502.99 $0.00 $0.00 $502.99 S. 1/2 Lot 14 Marsh's Dubuque #2 10-26-228-015 $46,238.82 $138.82 $0.00 $138.82 $0.00 $0.00 $138.82 N. 1/2 Lot 14 Marsh's Dubuque #2 10-26-228-014 $45,935.90 $95.90 $0.00 $95.90 $0.00 $0.00 $95.90 Lot 13 Marsh's Dubuque #2 10-26-228-013 $66,065.81 $135.81 $0.00 $135.81 $0.00 $0.00 $135.81 Lot 12 Marsh's Dubuque #2 10-26-228-012 $65.027.30 $107.30 $0.00 $107.30 $0.00 $0.00 $107.30 Lot 13 Marsh's Dubuque #2 10~26-228-018 $97,103.71 $2,643.71 $0.00 $2,643.71 $0.00 $1,765.03 $4,408.74 Lot I-11 Lawrence Dubuque 10-26:228-017 $56,030.78 $1,590.78 $0.00 $1,590.78 $860.20 $1,765.03 $4,216.01 Lot 1-10 Lawrence Dubuque 10-26-228-007 $85,541.91 $321.91 $0.00 $321.91 $0.00 $0.00 $321.91 Lot 1-9 Lawrence Dubuque 10-26-228-006 $89,644.64 $164.64 $0.00 $164.64 $0.00 $0.00 $164.64 Lot I-7 & 1-8 Lawrence Dubuque 10-26-228-005 $128,108.21 $148.21 $0.00 $148.21 $0.00 $0.00 $148.21 Lot 1-6 Lawrence Dubuque 10-26-227-025 $72,723.22 $1,383.22 $0.00 $1,383.22 $860.20 SI ,765.03 $4.008.45 Lot 5 Lawrence Dubuque 10-26-227-027 $89,865.41 $1,415.41 $0.00 $1,415.41 $0.00 $I,765.03 $3,180.44 Lot 4 Lawrence Dnbnque 10~26-227-026 $68,654.83 $1,374.83 $0.00 $1.374.83 $860.20 $1,765.03 $4,000.06 Lawrence Dubuque W. 2/3 Lot3. E. 1/3 Lot 3 Sub. 6 10-26-227-022 $67,368.34 $618.34 $0.00 $618.34 $0.00 $0.00 $618.34 Lot 2 Lawrence Dubuque 10-26~227-021 $87,660.15 $250.15 $0.00 $250.15 $0.00 $0.00 $250.15 Lot l Lawrence Dubuque, a strip hi front of Lot I to sim 10-26-227-020 $90,767.05 $~77.05 $0.00 $177.05 $0.00 $0.00 $177.05 Lot 1-31 Mt. Pleasm~t Addition 10-26-227-019 $[28,939.77 $129.77 $0.00 $129.77 $0.00 $0.00 $129.77 S. 134.30' Lo~ 2~5 Riley's Sub 10-26-227-023 $73,017.61 $1,897.61 $0.00 $1,897.61 $860.20 $1,765.03 $4,522.84 Lot 1 Riley's Sub. (Except N. 14') 10~26~227-013 $92,230.01 $3~200.01 $0.00 $3,200.01 $860.20 $1,765.03 $5,825.24 Und. 1/2 of Lot 2 Riley's Sub. 10-26-227-028 $95,752.00 $392.00 $0.00 $392.00 $0.00 $0.00 $392.00 N. 14' of Lot I Riley's Sub. 10-26-227-010 $3,040.96 $160.96 $0.00 $160.96 $0.00 $0.00 $160.96 Lot 2-2 & Lot 1-3 & Lot 1~4 Rilcy's Sub. 10-26-227-009 $51,629.06 $179.06 $0.00 $179.06 $0.00 $0.00 $179.06 Lot 3 Sub. 2 & 1-3 & I-4 of Riley's Sub. 10-26-227-014 $16,776.81 $136.81 $0.00 $136.81 $0.00 $0.00 $136.81 Ix)l I-5 & N I4' Lot 2-5 of Riley's Sub 10-26-227-015 $80.81 $20.20 $60 61 $80.81 $0.00 $0.00 $20.20 Sub. Or2 & I o f Riley's Sub., Lot I Und. I/2 Int. 10~26-227-007 $43,232.00 $112.00 $0.00 $112.00 $0.00 $0.00 $112.00 Sub. O$ 2 & I of 3 & I Riley's Sub 10 26~227 008 $39,126.12 $76,12 $0.00 $76.12 $0.00 $0.00 $76.12 CITY OF DUBUQUE. IOWA UNIVERSITY AVE (DELHi STREET TO SPRUCE STREE3~) PP.~LIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS Water Laterals Only Snyder, David & Mary J Lot 2-1-15 Kelly Sub I 0-25-130-005 $9.580.00 $0.00 $1,265.00 $0.00 $1,265.00 Stot3,, David & Mm~y N. 100' Lot 14 Kelly's Sub. 10-25-150-027 $53,420.00 $0.00 $1~265.00 $0.00 $1,265.00 City of Dubuque LOIS 38, 39 & 40 & E. 21' of Lot 41 Farley's 10-25-126-002 $5,300.00 $0.00 $1,012.00 $0.00 $1,012.00 RansdeS, Mink [i. S. Bal. Of Lot 37 Farley's Sub. 10-25-126-003 $62,440.00 $0.00 $1,012.00 $0.00 $1,012.00 Bimh, Ken& Jeffi~y Lot2-l-l-ll Kelly's Sub. 10-25-129~020 $19,330.00 · $0.00 $0.00 $0.00 $0.00 Marinko, ~dward & Carol Lot 2-8 Kelly's Sub. I 0-25-129-012 $54,820.00 $0.00 $1,265.00 $0.00 $1.265.00 Marinko, l~dward & Carol Lot 7 Kelly's Sub. 10-25-129-011 $56,870.00 $0.00 $1,265.00 $0.00 $1,265.00 Lynch, Kelly Ann W. 30' of Lot 6 of City Lot 738 10-25-104-018 $28,350.00 $0.00 $1,012.00 $0.00 $1.012.00 Henkel, Richard A & Judith A Lot 4 Kelly's Sub. 10-25-129-008 $55,000.00 $0.00 $1,265.00 $0.00 $1,265.00 Lynch, Kelly Ann Lot 7 of City Lot 738 10-25-104-017 $26,830.00 $0.00 $1,012.00 $0.00 $1,012.00 Silver, Corinne (Henkel) Lot 3 Kelly's Sub. 10-25-129-007 $60,260.00 $0.00 $1,265.00 $0.00 $1,265.00 B & W Properiies W. 3' of Lot 8 & Lot 9 of City LOt 738 I 0~25-104-016 $45,490.00 $0.00 $1,012.00 $0.00 $1,012.00 Gukeisen, Michael & Kathy Lot 2-1 Kelly's Sub. & Lot 2 Kelly's Sub. 10-25-129-006 $132,500.00 $0.00 $1,265.00 $0.00 $1,265.00 Voetbe~g, Dirk & Pamela Lot 10 of City Lot 738 ] 0-25-104-015 $56,570.00 $0.00 $1,012.00 $0.00 $1,012.00 Moffat, Virginia Lot 2-1 Collins Sub., Lot I-I Kelly's Sub. & Lot 2-7 Mo 10-25~129-005 $61,390.00 $0.00 $1,265.00 $0.00 $1,265.00 Furrer, Oat3' J W. 7.5'Lot3-2-3 &Lot4-2-3 &Lot ll all in City Lot 7 10-25-104-014 $68,070.00 $0.00 $1,012.00 $0.00 $1,012.00 8 & S Investments Lot 1 Cains Sub. 10-25~104-009 $47,870.00 $0.00 $1,012.00 $0.00 $1,012.00 Ebeling, Timofl~y & Swift, Susan M Lot 1 McKay Place 10~25-103-005 $134,890.00 $0.00 $1.138.50 $0.00 $1,I38.50 Jaeger, John & Daniel Lot 2 Oxford Heights 10-25-109-008 $56,690.00 $0.00 $1.265.00 $0.00 $1,265,00 Roeder, Corey & Penny Lot 3 & E. 5' of Lot 4 Oxford Heights 10-25-109-007 $70,370.00 $0.00 $1,265.00 $0.00 $1,265.00 McWalter, William & Donna W. 45' Lot 4 Oxford Heights 10-25-I09-006 $80,910,00 $0.00 $1,265.00 $0.00 $1,265.00 Munmn, Carl E. & Lubben, Datda Lot 5 Oxford Heights 10-25-109-005 $78,240.00 $0.00 $1,265.00 $0.00 $1,265,00 Swift, Thom~ & Carol J Lot 6 & E. 1/5 of Lot 7 Oxford Heights 10-25-109-004 $83,130.00 $0.00 $1,265.00 $0.00 $1,265.00 Loras Sisters of Presentation 10-25-102-001 $1,088,220.00 $0.00 $1,012.00 $0.00 $1,012.00 119966.945 60.61 120027.555 52320.4 93427.334 265714.679 RESOLUTION NO. 282-03 FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a public hearing will be held on the 15th day of September, 2003, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this 18th day of August, 2003. Patricia A. Cline, Mayor Pro-Tem -- ~J~anne, F. Schneider, CMC, City Clerk RESOLUTION NO, 283-03 RESOLUTION OF NECESSITY Whereas, proposed plans have been duly prepared and approved by the City Council of the City of Dubuque and are now on file in the office of City Clerk showing among other things the plans, specifications, form of contract, estimated cost and preliminary plat and schedule showing the amount proposed to be assessed against each lot and the valuation of each lot as filed by the City Council, for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements, and unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity, they shall be deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed and done in accordance with the plans and specifications which have been approved by the City Council and now on file with the City Clerk. That the cost and expense of making such improvement will be assessed partially or totally against privately owned property lying with the assessment limits, and in an amount not to exceed that provided by law, and in proportion to the special benefits conferred. The portion of the cost which shall be borne by the City will be paid from: STP Funds, Watermain Construction Fund, Sanitary Sewer Construction Fund, Franchise Fees, and special assessment bonds may be issued in anticipation of deferred payments of assessments when a contract has been performed and acceptad, and the proceeds thereof used to pay the contractor. The above resolution was introduced, approved and ordered placed on file with the City Clerk this 18th day of August, ,2003. Approved and placed on file for final actio~ , ~ Patricia A. Cline, Mayor Pro-Tom ~Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 284-03 FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary approval on the proposed plans, specifications and form of contract and placed same on file in the office of the City Clerk for public inspection for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street; and Whereas, the proposed Resolution of Necessity for said improvement has been introduced and is now on file in the City Clerk's office for public inspection. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 15th day of September, 2003, a public hearing will be held at 6:30 p.m. in the Public Library Auditorium in the City of Dubuque at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a Resolution of Necessity and the City Clerk be and is hereby authorized and directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity they shall be deemed to have waived all objections thereto. Passed, adopted and approved this 18th dayof Auqust ,2003. ' Patricia A. Cline, Mayor Pro-Tern AttestS. ~ ~J~eanne F. Schneider, CMC, City C e RESOLUTION NO. 285-03 RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE. IOWA: That the attached sheets, 1 to 3 inclusive, are hereby determined to be the schedule of proposed assessments for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street and the valuations set out herein are hereby approved. Passed, approved and adopted this 18th day of August , 2003. Patricia A. Cline, Mayor Pro-Tern Atte~/,t.~ ~ ~-~ ) ~J~anne F. Schneider, CMC, City Clerk RESOLUTION NO. 286-03 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the proposal guaranty shall be no less than the amount as set forth in the proposal form and shall be filed with each proposal. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than twenty-one days nor more than forty-five days prior to the receipt of said bids at 10:00 a.m. Central Time on the 16th day of September, 2003 at the Iowa Department of Transportation. Bids shall be opened and read by the Iowa Department of Transportation in Ames, Iowa, after 10:30 a.m. Central Time on the same date such as the bids are scheduled to be received. Bids shall be submitted to the Council for final action at 6:30 p.m. on the 6th day of October, 2003, subject to the concurrence of the Federal Highway Administration. Passed, adopted and approved thislSth day of August ,2003. Patricia A. Cline, Mayor Pro-Tern Attest: ~/'~eanne F. Schneider, CMC, City~CTe71~- MEMORANDUM August14,2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager University Avenue Reconstruction Project from Delhi to Alta Vista University Avenue Patching Project from Alta Vista to Spruce Street Public Works Director Mike Koch recommends initiation of the bidding process for the University Avenue Reconstruction Project from Delhi to Alta Vista and University Avenue Patching Project from Alta Vista to Spruce Street, and further recommends that a public hearing be set for September 15, 2003. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM August 13, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ¢-~ University Avenue Reconstruction Project from Delhi to Alta Vista University Avenue Patching Project from Alta Vista to Spruce Street INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the University Avenue Reconstruction Project from Delhi to Alta Vista and the University Avenue Patching Project from Alta Vista to Spruce Street. DISCUSSION University Avenue from Delhi to Alta Vista was built in 1955, with an asphalt surface being placed in 1982. The project involves the complete reconstruction of the existing base and pavement surface that is 41 feet in width, from back-of- curb to back-of-curb from Delhi to Alta Vista Street. The pavement will be Portland cement concrete, with new curb and gutter and sidewalks. The section from Delhi to Alta Vista Street will also include: storm sewer improvements; sanitary manhole replacement; sanitary sewer main repairs; sanitary sewer lateral replacement; watermain valve replacement; replacement of all lead water services from back-of-curb with copper service; replacement of sidewalk along University Avenue from Delhi to Alta Vista; and new curb ramps at intersections. The section of University Avenue from Alta Vista to Spruce was constructed with Portland cement concrete pavement in 1962. The concrete sections were not tied together and thus there has been considerable movement between slabs, making for an extremely rough ride. The staff is proposing to replace the middle 26 feet with new concrete that will be tied together. University Avenue will not be improved since it is in the parking lane, and is considered concrete section repair. Therefore, this segment of the project is nonassessable. Also included will be the watermain replacement; sanitary sewer manhole replacement; and replacement of all lead water services from back-of-curb with copper service. The replacement of the water service lines will be assessable to the property owner. The schedule for the project will be as follows: Advertisement for Bids Notice of Hearing on Plans & Specifications Mail Notice to Property Owners Published Notices to Property Owners Public Hearing Receipt of Bids Award of Contract Project Start Date Completion August 22, 2003 August 29, 2003 August 29, 2003 August 29, 2003 September 5, 2003 September 15, 2003 September 16, 2003 October 6, 2003 April 20, 2004 120 Working Days RECOMMENDATION I recommend that the City Council give preliminary approval to the Resolution of Necessity and establish September 15, 2003 as the date of the public hearing. BUDGET IMPACT The estimate for the project is as follows: Construction Contract Contingency Engineering $1,274,900.55 127,490.06 210,358.59 Total Estimated Cost $1,612,749.20 The project will be funded as follows: City Cost STP Funds Special Assessment to Private Properties Special Assessment to Water Services Special Assessment for Sewer Laterals City Paid Deficiency Watermain Construction Fund Sanitary Sewer Construction Fund $ 61,791.48 874,000.00 119,966.94 52,320.40 93,427.33 60.61 181,340.23 229,842.21 Total Project Funding $1,612,749.20 The project will be funded through a Fiscal Year 2003 ClP appropriation of $1,274,900.55. The project, as outlined, will require Special Assessments of $265,714.67, STP funds of $874,000 and the 1% Local Option Sales Tax Fund in the amount of $61,791.48. Low- to moderate-income property owners subject to street, water service, and sanitary lateral assessments will be eligible for financial assistance ranging from 20 to 100 percent of the assessments for the owner- occupied resident property depending on family size and income level. ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, approve the preliminary assessment schedule, and to establish the date of the public hearing. CC: Bob Green, Water Plant Manager Gus Psihoyos, Assistant City Engineer Michael Felderman, Civil Engineer