Port of Dbq Parking Lot RenovatMEMORANDUM TO: FROM: SUBJECT: September 30, 2003 The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Port of Dubuque Parking Lot Renovation & Resuffacing The Port of Dubuque Parking Lot Renovation and Resurfacing project includes resurfacing the entrance of Parking Lot 3 (located under the Third Street Bridge and in front of the museum). The project will also include the renovation of the old Welcome Center parking and a new bus stop/pick-up area. Sealed bids were received for the Port of Dubuque Parking Lot Renovation and Resurfacing Project. Public Works Director Mike Koch recommends award of the contract to the Iow bidder, Portzen Construction, Inc., in the amount of $476,492.35, which is 12.3% over the engineer's estimate. The project will be funded from the Fiscal Years 2003 and 2004 appropriations for existing parking lot renovation of $384,422, $173,903 from the balance of funds for new parking lot construction, and $45,000 budgeted amount for the landscaping and amenities. The landscaping and amenities portion of this project will be bid as a separate project at a later date. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM September 29, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Port of Dubuque Parking Lot Renovation & Resurfacing INTRODUCTION The enclosed resolution provides for the award of the Port of Dubuque Parking Lot Renovation & Resurfacing Project. DISCUSSION This resurfacing project includes resurfacing the entrance of Parking Lot 3 (located under the Third Street Bridge and in the front of the museum). The project will also include the renovation of the old Welcome Center parking and a new bus stop/pick-up area. The proposed landscaping for these lots will be planted in the spring, 2004. Sealed bids were received on September 25, 2003. Portzen Construction, Inc. of Dubuque, Iowa submitted the Iow bid in the amount of $476,492.35. This amount is 12.3% over the engineer's estimate. A summary of the bids received is as follows: Portzen Construction, Inc. Drew Cook & Sons Excavating, Inc. Tschiggfrie Excavating Co. WC Stewart Construction Co., Inc. $476,492.35 $493,618.85 $494,101.25 $546,391.91 RECOMMENDATION The summary of the project costs is as follows: Construction Contract Landscaping & Amenities Contingency Engineering Estimate 8424-,268.00 4-5,000.00 42,426.80 46,669.48 Bid Award 9476,492.35 45,000.00 35,163.17 46,669.48 Total Project Estimate 9558,364.28 9603,325.00 The project will be funded from the Fiscal Years 2003 and 2004 appropriations for existing parking lot renovation of $384,422, $173,903 from the balance of funds for new parking lot construction, and $45,000 budgeted amount for the landscaping and amenities. The landscaping and amenities portion of this project will be bid as a separate project at a later date. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution awarding the Port of Dubuque Parking Lot Renovation & Resurfacing Project to Portzen Construction, Inc. MAK/vjd Prepared by Michael Felderman cc: Michael Felderman, Civil Engineer Pauline Joyce, Administrative Services Jim Kolf, Durrant RESOLUTION NO. 382-03 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 27th day of August, 2003, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the Port of Dubuque Parking Lot Renovation & Resurfacing Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this 6th dayof October ,2003. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 383-03 AWARDING CONTRACT Whereas, sealed proposals have been submitted by contractors for the Port of Dubuque Parking Lot Renovation & Resurfacing Project pursuant to Resolution No. 307-03 and notice to bidders published in a newspaper published in the City of Dubuque, Iowa on the 5th day of September, 2003. Whereas, said sealed proposals were opened and read on the 25th day of September, 2003, and it has been determined that the bid of Portzen Construction, Inc. of Dubuque, Iowa, in the amount of $476,492.35 was the lowest bid for the furnishings of all labor and materials and performing the work as provided for in the plans and specifications. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Portzen Construction, Inc. and the Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to return the bid deposits of the unsuccessful bidders. Passed, approved and adopted this 6th Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk day of October ,2003. T~rrance M. Dug~g~yor Port of Dubuque Parking Lot Renovation (Lots 2 A-B, Old Welcotne Center) and Resurfacing (Lot 3) Drew Cook Tschiggfiie Ex Stewald Const $476,492,3 Total Bid ~ $ $493,618.85 Total Bid = $ $494,101.25 $546,391.91 UNIT COST TOTAL COST UNIT COST TOTAL COST ITEM [INITQUANTITY UNITCOST TOTALCOST UNITCOST TOTALCOST UNITCOST TOTALCOST i Backfill Topsoll SY 1340 $5.00 $6,700,00 $1.75 $2,345.00 $I7.00 $22,780.00 $5.40 $7,236.00 $2.74 $3,671.60 2 Graded StoneBas¢ Ton 3570 $13.00 $46,410.00 $13,37 $47,730.90 $12.50 $44,625.00 $9.80 $34,986.00 $12.27 $43.803.90 3 Removal of Asphalt Pavement SY 9291 $3.00 $27,873.00 $1.75 $16,259.25 $1,85 $17.188.35 $2.85 $26.479.35 $4.75 $44,132.25 4 ACC Binder Course Toil 2100 $42.00 $88,200,00 $46.09 $96,789.00 $50.00 $105,000.00 $50.20 $105,420.00 $55.00 $115,500.00 5 ACC Sur f:ace Course Ton ]400 $48.00 $67~200.00 $46.09 $64,526.00 $50.00 $70,000.00 $46.10 $64.540.00 $55.00 $77,000,00 6 ACC Hand Patchillg Ton 60 $130.00 $7,800.00 $69.00 $4,140.00 $70.00 $4,200,00 $69.00 $4,140.00 $80.00 $4,800.00 7 pc Concrete Curb &Guiler Placement LF 2800 $14.00 $39,200.00 $15.00 $42~000.00 $12.00 $33,600.00 $16,00 $~A,800.00 $12.90 $36,120.00 8 Removal ofCurb & Gutter LF 2400 $3.00 $7,200,00 $1.75 $4,200.00 $1.50 $3.600.00 $2.35 $5.640.00 $2.25 $5.400.00 9 PCC Sidewalk, 4" SF 4600 $4.00 $18A00.O0 $4.95 $22,770.00 $4.00 $18,400.00 $3.55 $16,330.00 $3.65 $16,790.00 10 RCPStormSewel 15" LF 28 $34.00 $952.00 $26.00 $728.00 $25.00 $700.00 $36.15 $1,012.20 $30.97 $867.16 ]1 StomlSewcr, ConvertInlak¢101-Btol01 Each 2 $1,000.00 $2,000.00 $[.150.00 $2,300.00 $1,400.00 $2,800,00 $1,[80.20 $2,360.40 $1,350.00 $2,700.00 12 Stoml Sewer. Intake 101-B Each I $1,500.00 $1,500.00 $1,350.00 $1,350.00 $1.450,00 $1,450.00 $1.480.75 $1.480.75 $1,200.00 $1,200.00 13 Stonn Sewer. Intake 101-C Each I $1,500.00 $1,500.00 $1.750.00 $I,750.00 $1,650.00 $1,650.00 $1.967.50 $1,967.50 $1,450.00 $1,450.00 14 Stom~ 8ewer. Intake 101 -C - Top Each I $400.00 $400.00 $400.00 $400.00 $200.00 $200.00 $413.20 $413.20 $245.00 $245.00 15 Color Mulchiltg SY 600 $11.00 $6+600.00 $5.50 $3,300.00 $6.00 $3,600.00 $5.50 $3,300.00 $6.85 $4,110.00 16 Sodding SY 900 $7.00 $6,300.00 $4.00 $3,600.00 $4.00 $3,600.00 $4.00 $3,600.00 $4.85 $4,365.00 17 Sawcut Concrete LF 250 $2.00 $500.00 $3.00 $750.00 $1.75 $437.50 $4.20 $1,050.00 $2.50 $625.00 18 Aspltalt Sawcut LF 1878 $3.00 $5,634,00 $1.90 $3,568.20 $1.00 $1,878.00 $2.60 $4,882.80 $1.00 $1.878.00 19 Pavenlcnt Marking LS I $500.00 $500.00 $2,275.00 $2,275.00 $2,275.00 $2,275.00 $2,275.00 $2,275.00 $2,616.25 $2~616.25 20 Parking Lot Lights LS I $55,000.00 $55,000.00 $102,311.00 $t02,311.00 $121,]60.00 $121.160.00 $125,000.00 $125,000.00 $141,634.00 $141,634.00 21 Removal of Lights and Bases Each 9 $600,00 $5,400.00 $325.00 $2,925.00 $200.00 $1,800.00 $371.25 $3,341.25 $230.00 $2,070.00 22 Relnoval of Rail Road Tracks DS I $1.000.00 $1.000.00 $750.00 $750.00 $1.900.00 $1,900.00 $4,121.80 $4, I21.80 $],230.00 $1,230.00 23 Irrigation System LS I $20,000.00 $20,000.00 $26,925.00 $26,925.00 $26,975.00 $26,975.00 $26,925.00 $26,925.00 $30,963.75 $30,963.75 24 Traffic Conlro] LS I $8,000,00 $8.000.00 $22,800.00 $22,800.00 $3,800.00 $3,800.00 $2,800.00 $2,800.00 $3,220.00 $3,220.00 $0.00 $0.00 $0.00 $0.00 $0.00 RESOLUTION NO. 305-03 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Port of Dubuque Parking Lot Renovation & Resurfacing Project, in the estimated amount $558,364.28 are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 2nd Attest: day of September2003. T~rrance M. DuggCayor ne F. Schneider, CMC, Ci~-Clerk RESOLUTION NO. 306-03 FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the Port of Dubuque Parking Lot Renovation & Resurfacing Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a public hearing will be held on the 6th day of October, 2003, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this 2nd day of September,,---x2003.I RESOLUTION NO. 307-03 ORDERING BIDS NOW THEREFORE, BE iT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the Port of Dubuque Parking Lot Renovation & Resurfacing Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders. hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 25th day of September, 2003. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 6th day of October, 2003. Passed, adopted and approved this 2nd Attest: l-errance M. Du,~/ayor NOTICE TO BIDDERS OFTHE RECEIPT OF BIDS FORTHEPORTOFDUBUQUE PARKING LOT RENOVATION & RESURFACING PROJECT Sealed proposals will be received by the City Clerk of the City of Dubuque, Iowa, at the Office of City Clerk in City Hall no later than 2:00 o'clock p.m. on the 25TM day of September, 2003, for the construction of the Port of Dubuque Parking Lot Renovation & Resurfacing Project. Copies of the plans and specifications may be obtained in the City Engineer's office at City Hall. No plan deposit is required. Payment to the contractor will be made from funds as may be legally used for such purposes. All work herein provided for shall be commenced within ten (10) days after the Notice To Proceed has been issued, and shall be fully completed by the 21st day of November, 2003. All bids must be submitted on the Bid Form bound in the specifications. Each bid shall be accompanied by a satisfactory Bid Bond executed by the Bidder and an acceptable surety; or a cashier's or certified check payable to the City Treasurer, City of Dubuque, drawn on a bank in Iowa or a bank chartered under the laws of the United States, in the amount of ten percent (10%) of the bids submitted as security that the bidder will enter into a contract for doing the work and will give bond with proper securities for the faithful performance of the contract in the form attached to the specifications. The successful bidder will be required to furnish a performance bond in an amount equal to one hundred percent (100%) of the contract price. Said bond is to be issued by a responsible surety company approved and acceptable to the City Council, and shall guarantee the faithful performance of the contract and terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City of Dubuque, Iowa, from claims and damages of any kind caused by the operations of the Contractor. Said Bond shall also guarantee the material and the maintenance of the improvement(s) constructed for a minimum period of two (2) years from and after its completion and acceptance by the City Council. No bid submitted by any Contractor which contains a condition or qualification shall be recognized or accepted by the City Council and any letter or communication accompanying the bid which contains a condition or qualification upon the bid which has the effect of qualifying or modifying any provision of the specifications in any manner will be construed as a non-qualifying bid and will be rejected by the City Council as not responsive. All proposals must be made on blanks furnished by the City Engineer and each bidder will be required to state his prices for doing all the items in each section on which he makes a bid and for all things necessary to make a complete job. The Bidder's attention is directed to the City of Dubuque's Affirmative Action Program which is included in the Contract Specifications and the provisions thereof and hereby made a part of the Contract Documents by reference and incorporated therein. The Contractor, when requested by the City of Dubuque, will furnish a statement of his financial and practical qualifications as provided for in the General Requirements of the Specifications. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa Domestic Labor. The City Council reserves the right to reject any and all bids or to waive any technical ties and irregularities. All bids will be publicly opened and read by the City Clerk at 2:00 o'clock p.m. on the 25® day of September, 2003, and will be submitted to the City Council for final action at a meeting to be held in the Public Library Auditorium, 360 West 11th Street, at said City at 6:30 p.m. on the 6th day of October, 2003. A contract will be awarded at that time or such subsequent time as the City may determine. Published by order of the City Council of the City of Dubuque, Iowa and dated this of ,2003. Jeanne F. Schneider, CMC, City Clerk CONSTRUCTION SCHEDULE AND LIQUIDATED DAMAGES Work herein provided for shall be commenced within the (10) days after notice to proceed has been issued and shall be fully completed by November 21,2003. For each calendar day that any work shall remain uncompleted beyond the completion schedule, $500.00 per calendar day will be assessed, not as a penalty but as predetermined and agreed liquidated damages. The contractor will be separately invoiced for this amount, and final payment will be withheld until payment has been made of this invoice. The assessment of liquidated damages shall not constitute a waiver of the City's right to collect any additional damages which the City may sustain by failure of the contractor to carry out the terms of his contract. An extension of the contract period may be granted by the City for any of the following reasons: 1. Additional work resulting from a modification of the plans. 2. Delays caused by the City. Other reasons beyond the control of the Contractor, which in the City's opinion, would justify such extension. UBLJQ'UE MEMORANDUM August 20, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Port of Dubuque Parking Lot Renovation & Resurfacing Public Works Director Mike Koch recommends initiation of the bidding process for the Port of Dubuque Parking Lot Renovation & Resurfacing Project, and further recommends that a public hearing be set for October 6, 2003. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM August 21,2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Port of Dubuque Parking Lot Renovation & Resurfacing INTRODUCTION The enclosed resolutions authorize the bidding procedure for the Port of Dubuque Parking Lot Renovation & Resurfacing Project. DISCUSSION The City of Dubuque is required to renovate some of the existing parking lots in the Port of Dubuque area to meet the new design criteria. The design requires a planting island be placed every 12th stall, new lighting to meet the minimum average of three candle-wafts using the standard 25-foot poles and parking lot standard luminaries with metal halogen fixtures, sodding, and mulch. The City has worked with the property owners in this area in regard to the renovation of Parking Lot 2A (in front of the Museum) and Lot 2B (between the Museum and the Diamond Jo). The northern portions of Parking Lots 2A and 2B were resurfaced as part of the utility relocate project at the Port of Dubuque. This resurfacing project includes resurfacing the entrance of Parking Lot 3 (located under the Third Street Bridge and in the front of the museum). The project will also include the renovation of the old Welcome Center parking and a new bus stop/pick-up area. The proposed landscaping for these lots will be planted in the spdng, 2004. The City has been working with the property owners to schedule the project during "slower" business periods to minimize interruption of parking. The schedule for the project is as follows: Advertisement for Bids Notice of Public Headng Receipt of Bids Public Hearing Award of Contract Completion September 5, 2003 September 19, 2003 September 25, 2003 October 6, 2003 October 6, 2003 November 21,2003 RECOMMENDATION recommend that the City Council establish the date of the public hearing and authorize the City Clerk to advertise for proposals. BUDGET IMPACT The estimate for the project is: Construction Contract Landscaping & Amenities Contingency Engineering $424,268.00 45,000.00 42,426.80 46,669.48 Total Project Cost $558,364.28 The project will be funded from the Fiscal Years 2003 and 2004 appropriations for existing parking lot renovation of $384,422 and $173,903 from the balance of funds for new parking lot construction. ACTION REQUESTED The City Council is requested to establish the date of the public hearing and to authorize the City Clerk to advertise for proposals through the adoption of the enclosed resolutions. MAK/vjd Prepared by Michael A. Felderman, PE cc: Michael A. Felderman, PE