DICW North Siegert Farm Phase III PCC Paving, Utilities AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dubuque Industrial Center West - North Siegert Farm Phase III - PCC Paving & Utilities CIP 3601943 DATE: October 8, 2010 MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Micha I C. Van Milligen Dubuque kietri All- America city 1 I i 1 2007 City Engineer Gus Psihoyos is recommending acceptance of the Dubuque Industrial Center West -North Siegert Farm Phase III — PCC Paving & Utilities Project, as completed by Horsfield Construction, Inc. in the final contract amount of $693,058.70, which is a 1.0% decrease from the original contract in the amount of $700,167.69. I concur with the recommendation and respectfully request Mayor and City Council approval. Masterpiece on the Mississippi TO: FROM: Gus Psihoyos, City Engineer SUBJECT: Dubuque Industrial Center West — North Siegert Farm Phase III — PCC Paving & Utilities CIP 3601943 DATE: October 8, 2010 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Dubuque Industrial Center West — North Siegert Farm, Phase III — PCC Paving & Utilities. BACKGROUND The Dubuque Industrial Center West — North Siegert Farm, Phase III — PCC Paving & Utilities included the following: — Construction of a 1,449 -foot long, 37 -foot back -to -back roadway north of Chavenelle Road, with a right- and left -turn lane at Chavenelle Drive intersection. This improvement provides access to approximately 100 usable acres of industrial property of the Dubuque Industrial West (DICW), with four industrial sites ranging from 8.5 acres to 50.5 acres. — Installation of watermain, storm sewer, sanitary sewer, fiber optic conduit and junction boxes, street lighting, and landscaping. — Sidewalk installation on the west side of Chavenelle Road. — Grading of a sidewalk berm to accommodate future sidewalk on both sides. DISCUSSION Michael C. Van Milligen, City Manager .C Dubuque AN- America city '111 il 2007 The Dubuque Industrial Center West — North Siegert Farm, Phase III — PCC Paving & Utilities was completed by Horsfield Construction, Inc. of Epworth, Iowa, in the final contract amount of $693,058.70, which is a 1.0% decrease from the original contract in the amount of $700,167.69. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $693,058.70. BUDGET IMPACT The project cost summary for the Dubuque Industrial Center West — North Siegert Farm, Phase III — PCC Paving & Utilities is as follows: Bid Award Final Construction Contract $700,167.69 $693,058.70 Contingency 70,016.77 0.00 Engineering 134,825.00 134,825.00 Total Project Cost The project funding summary is as follows: CIP No. Fund Description 3601943 Revitalize Iowa's Sound Economy (RISE) Program G.O. Bond Proceeds (TIF- Abated) ACTION TO BE TAKEN Total Project Funding $827,883.70 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $693,058.70 to Horsfield Construction, Inc. for the Dubuque Industrial Center West — North Siegert Farm, Phase III — PCC Paving & Utilities. Prepared by Steve Sampson Brown, Project Manager cc: Jenny Larson, Budget Director David Heiar, Economic Development Director Don Vogt, Public Works Director Bob Green, Water Plant Manager Jonathan Brown, Water Pollution Control Manager Rich Russell, Building Services Manager Dan Brown, Fire Chief Laura Carstens, Planning Services Manager $905,009.46 $827,883.70 Fund Amount $187,899.66 639,984.04 RESOLUTION NO. 398 -10 ACCEPTING THE DUBUQUE INDUSTRIAL CENTER WEST — NORTH SIEGERT FARM, PHASE III — PCC PAVING AND UTILITIES AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Dubuque Industrial Center West — North Siegert Farm, Phase III — PCC Paving and Utilities (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Revitalize Iowa's Sound Economy Rise (RISE) Program and General Obligation Bonds Proceeds (TIF- Abated) appropriations for the contract amount of $693,058.70 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 18th day of October A st: Jeanne F. Schneider, CMC, City Clerk 010. Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DUBUQUE INDUSTRIAL CENTER WEST — NORTH SIEGERT FARM, PHASE III — PCC PAVING AND UTILITIES The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Dubuque Industrial Center West — North Siegert Farm, Phase III — PCC Paving and Utilities, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $827,883.70. Dated this 13 day of OeTOBCQ , 2010. � 2010. Filed in the office of the City Clerk on the Pe of[�,� City Engineer eanne F. Schneider, CMC, City Clerk ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS TOTAL TRTS PER TOTAL TO DATE PERCENT QTY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 Mobilization & Miscellaneous 1 1.5 5,000.00 1 56, 000.00 0 30.00 1 38 000.00 100% 2 Excavator. Class 10 Roadway and Borrow 5277 CY 2.80 5277 314,77880 0 50.00 5277 114,775.60 100% 3 Excavation Removal of -, • . ,.: : 500 CY 1.00 250 5250.00 0 50.00 250 5250.00 50% 4 Sawcut Pavement 296 LF 2.00 303 5506.00 0 50.00 303 5806.00 102% 5 Removal of PCC Curb & Gutter & Pavement 250 SY 3.00 134 5402.00 0 50.00 134 $402.00 54% 6 Removal d PCC Curb & Gutter & HMA Pavement & walk 210 SY 3.00 213 5639.00 0 50.00 213 5839.00 101% 7 Topsot Spread, 6" 1186 CY 2.80 1188 33.320.80 0 $0.00 1186 $3,320.80 100% 8 12" Crushed Stone Base 5218 TON 10.50 4779.01 550,179.61 0 $0.00 4779.01 550,179.61 92% 9 Subgrade Slabilim8on - 3" Modified Macadam 2270 TON 11.00 1396.23 $15,358.53 0 50.00 1398.23 515,358.53 62% 10 9' PCC Paving wl Integral Curb & CD Baskets 6259 5Y 30.00 6260 5187,800.00 0 50.00 6280 5187,900.00 100% 11 7" PCC Driveway wlnt curb & putter 142 SY 36.00 152 55,472.00 0 50.00 152 $5,472.00 107% 12 4" Lorgiludnal Drain The 3130 LF 5.85 3140 516,369.00 0 50.00 3140 $18,369.00 100% 13 7" PCC Paving wl Int Curb & Gutter (cul -de -sac) 1057 SY 25.00 1000 525.000.00 0 I0.00 1000 $25,000.00 95% 14 Subdraln Outlet (connect to catch beam) 10 EA 100.00 12 31.200.00 0 30.00 12 51,200.00 120% 15 Inlet Protection 7 EA 100.00 7 5700.00 0 50.00 7 5700.00 100% 16 Seed & Fertilize, Urban (ROW) 1.47 4.29 AC AC 1.000.00 385.00 1.47 4.88 31,470.00 51,601.80 0 0 50.00 50.00 1.47 4.66 31 51,801.80 100% 109% 17 Seed & Fertilize, Rural (seed mix) 18 Temporary Seeding 5.78 AC 10.00 0 50.00 0 50.00 0 50.00 0% 19 Curb BacldS 1 LS 3,000.00 1 53,000.00 D $0.00 1 53,000.00 100% 20 Mulch 5.76 AC 325.00 9.15 52,973.75 0 50.00 9,15 $2,973.75 159% 21 PavementMarkimg 33.4 STA 55.00 13.56 3745.80 0 50.00 13.58 5745.80 41% 22 Traffic Control 1 LS 650 1 5650.00 0 $0.00 1 $650.00 100% 23 6" PCC Reinforced Ramps 13 SY 45 13 5585.00 0 30.00 13 $585.00 100% 24 Detectable Wamkgs for Curb Ramp 16 SF 30 16 5480.00 0 50.00 _ 18 $480.00 100% 25 Painted Symbols 1 Lags 6 EA 75 6 . 5450.00 0 50.00 6 5450.00 100% CONTRACTOR'S PAYMENT FORM CONTRACT PAYMENT NO. PROJECT COMPLETION DATE Odginel November 3, 2009 Revised December 15, 2009 7 OWNER City of Dubuque PROJECT: DICW North Siegert Farm Paving & U61ibes Phase lit IIW PROJECT NO: 07147 -01 DETAILED ESTIMATE OF CONTRACT WORK COMPLETED TO DATE FINAL AMOUNT OF CONTRACT Original: Revised: 5700,167.69 $706,660.24 PREPARED BY: IIW ENGINEERS & SURVEYORS, P.C. PAGE 115 CONTRACTOR: Harsfield Construction ADDRESS: DATES OF PAYMENT From: Commencement To: Completion 50.00 $342,226.69 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS TOTAL THIS PERIOD TOTAL TO DATE PERCENT QTY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 26 15" RCP, 20000, wl Claw C Bedding • 149.4 LF 325.00 150 $3.750.00 0 woo 150 53,750.00 10016 27 18" RCP. 2000D, wl Class C Bedding 371 LF $26.00 371 59,646.00 0 $0.00 371 59,646.00 100% 28 18" Concrete Apron wfTrash Guard 1 EA 1800.00 1 1800.00 0 50.00 1 5800.00 100% 29 RIprap 19 TON 640.00 15.29 6611.60 0 30.00 15.29 5611.60 8014 30 Engineering Fabric 9 SY 310.00 0 30.00 0 50.00 0 10.00 0% 31 Type 101 -B Catch Basin 2 EA 51,800.00 2 63,200.00 0 $0.00 2 33,200.00 100% 32 Type 101 -B Catch Basin, out over pipe 2 EA 51,800.00 2 53,600.00 0 50.00 2 53,600.00 100% 33 Select Badd6, Storm Seer, RCP 78.3 LF 513.00 78 51,014.00 0 10.00 78 61,014.00 100% 34 Type 104.8 Catch Basin 2 EA 52,400.00 2 34,800.00 0 50.00 2 14,800.00 10016 35 Street Light, Pole and Fixture 9 EA 52,373.00 9 521,357.00 0 50.00 9 521,357.00 100% 36 Street Light. Foundation. Complete 9 EA 5847.00 9 57,623.00 0 50.00 9 $7,82200 100% 37 2" Conduit, Schedule 40 PVC 1,760 LF 13.65 1530 55,584.50 0 50.00 1530 55,584.50 8616 38 Ckuhdudor, IMO. XHHW orTHWN 1,936 LF $0.43 0 50.00 0 50.00 0 50.00 0% 39 Conductor, 06XHHWor THWNN 1,335 LF 10.70 1320 5924.00 0 50.00 1320 3924.00 89% 40 Conductor, 38 XHHW Cr TH1NN 1,242 LF 50.43 3282 51,411.26 0 10.00 3282 31,411.26 264% 41 In-Line Fuseholder With Fuse 18 EA 128.00 18 544500 0 10.00 16 1448.00 89% 42 Conned to Existing City Pedestal 1 EA 6750.00 1 5750.00 0 30.00 1 5750.00 100% 43 5" Conduit, Schedule 40 PVC 1,416 15 17.00 1432 510,024.00 0 30.00 1432 510,024.00 10111 44 4" HDPE Trenched (with 4-1" HOPE inside) 1.884 LF 39.65 2005 119,348.25 0 50.00 2005 319,348.25 106% 45 Fiber Vault Installed 8 EA 11,97200 8 115,776.00 0 50.00 8 315,776.00 + 100% 46 4" Drain Line 180 LF _ 510.00 0 50.00 0 50.00 o 50.00 0% 47 Select Bad8ll 1,480 LF 51.50 1540 12,310.00 0 30.00 1540 12,310.00 104% 48 Tree, Emerald Queen Maple, 1.75 -Inch Caber 7 EA 5234.00 7 31,638.00 0 30.00 7 51,838.00 100% 49 Tree, Red Sunset Maple, 1.75 -Inch Caliper 13 EA 5210.00 13 $2,730.00 0 10.00 13 32,730.00 100% 50 Tree, Autumn Blaze Red x Silver Maple Cross, 1.75-inch Caipt 12 EA 1205.00 12 12,480.00 0 10.00 12 $2,460.00 10016 51 Tree, Homestead Eke, 1.75-inch Carper 10 EA 1255.00 10 12,550.00 0 10.00 10 52,550.00 100% 52 4" Sidewalk 278 SY 325.00 253 16,325.00 0 50.00 253 18,325.00 91% 53 Turf Rekdoroement Mat (Prow( Land Lok CS2) 264 SY 51.50 0 50.00 0 10.00 0 50.00 0% CONTRACT PAYMENT NO. CONTRACT WORK COMPLETED - CONTINUED 7 10.00 PAGE 2/5 5128,680.61 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS TOTAL THIS PERIOD TOTAL TO DATE QTY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT PERCENT 54 16" DIP Water Man, CI.51 1,461 LF 352.00 1501 578,052.00 0 50.00 1501 578,052.00 103% 55 12" DIP Water Main, CI. 52 165 LF 545.00 170 57,650.00 0 50.00 170 57,650.00 103% 56 6" DIP Hydrant Lead, CI. 62 40 LF 535.00 33 51,155.00 0 50.00 23 51,155.00 83% 57 5' Gate Valve w/Box and Adapter 3 EA 5800.00 3 32,400.00 0 50.00 3 $2,400.00 100% 58 Fittings, Compact DI 2,861 LOS 53.50 3177 511,119.50 D 50.00 3177 511,119.50 111% 59 Conner tion to Existing Mier Main 1 EA 51,750.00 1 31,750.00 0 $0.00 1 51,750.00 100% 80 18" Butterfly Valvew/8uttedly Vale and Adapter 2 • EA 52,400.00 2 54,800.00 0 50.00 2 34.800.00 100% 61 12" Gate Valve w /Adaptor 8 3 EA 51,700.00 3 55,100.00 0 10.00 3 $5, 100.00 100% 62 6" Fns Hydrant 8 EA 51,900.00 6 511,400,00 0 50.00 6 111,400.00 100% 63 Tracer Wire 1,700 LF 50.12 1740 5208.80 0 30.00 1740 5208.80 102% 84 Tracer liVre Access Box 5 EA 525.00 4 5100.00 0 90.00 4 3100.00 80% 85 Sabel Bac1d81, Water 475 LF 514.00 506 57.084.00 0 30.00 506 57,084.00 107% 66 Mechanical Joint Restraint for 6" DIP (MagaLug series 1106) 18 EA 550.00 12 5600.00 0 30.00 12 5600.00 67% 67 Mecha,k J Joie Resraint for 12' DIP (MegaLug amiss 1112) 12 EA 590.00 12 31,080.00 0 60.00 12 51,080.00 100% 88 Mechanical Jail Restaitl far 16" DIP (htegaLug series 1116) 19 FA 3150.00 24 53,600.00 0 10.00 24 53,600.00 128% 69 Push on Joint Restrain far 12' DIP (Flom Lok 350) 9 EA 5150.00 B 5900.00 0 50.00 6 5900.00 67% 70 Push an Joint Rostraird for 16" DIP (Field Lok 350) 6 EA 5310.00 6 11,860.00 0 30.00 6 31,880.00 100% 71 Abandon Existing 16" - Reinstall 16' Valve, Reducer & Hydran 1 EA 52000.00 1 52000.00 0 50.00 1 52,000.00 100% 72 8' DIP Class 51 2249 LF 529.00 40 51,160.00 0 50.00 40 51,160.00 296 A72 8' PVC SOR 26 Sanitary Sewer 2213 LF 518.50 2192 140.552.00 0 50.00 2192 340,552.00 99% 73 12" DIP Class 51 78 LF 343.00 82 $3,528.00 0 50.00 82 33,526.00 105% 74 IT PVC SDR 26 w/ 3 ceps 102.1 LF 320.00 104 52,080.00 0 30.00 104 12,080.00 102% 75 48" ID Manhole Base 11 EA 5750.00 11 38.250.00 0 30.00 11 58,250.00 100% 76 48" ID Manhole Sideman 104 W 595.00 81.33 57,728.35 0 30.00 81.33 37,726.35 78% 77 Manhole Frame & Cover 11 EA 1250.00 11 52,750.00 0 50.00 11 $2,750.00 10034 78 Connection to Exising Sewer Manhole 2 EA 3750.00 2 31,500.00 0 50.00 2 31,500.00 100% 79 Select Badtfill 12" DIP Pipe 70 LF 325.00 75 51,875.00 0 50.00 75 51,875.00 10756 80 Select Baelfill 8" PVC Pipe 42 LF $15.00 48 5720.00 0 50,00 48 5720.00 114% 81 Stream Crossing iRrprap and Stone 30 TON 340.00 29 51,160.00 D 50.00 29 11,180.00 97% 62 Trench Stabil Stone 50 TON 520.00 44.9 1898.00 0 $0.00 44.9 3898.00 90% 83 .16" x 8" SEB Reducer 1 EA 1600.00 1 $800.00 0 30.00 1 5800.00 10096 CONTRACT PAYMENT NO. CONTRACT WORK COMPLETED - CONTINUED 7 50.00 1 10.00 I PAGE 3/5 3213,658.65 5684,566.15 1 CH. ORD. NO. CHANGE ORDER ITEM DESCRIPTION - CHANGE ORDER ITEM PREVIOUS TOTAL THIS PERIOD TOTAL TO DATE PERCErrr QTY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 Install Mazes, boxes at the base of light poles 7 =I4 3525.00 7 53,675.00 0 30.00 7 $3,875.00 100% 1 Additional water mein labor to connect at AT &T easerner 1 3750.00 1 5750.00 0 $0.00 1 5750.00 100% 2 Supply and place badkRl material In eMdrieal trench 142.48 510.05 142.48 51,431.92 0 50.00 142.48 51,431.92 100% 3 Engineering Fettle under Subyrade 722.5 SY $2.25 722.5 50.00 0 50.00 722.5 51,625.83 100% 3 Remove Briefing Cone and Put on Seal 1 LS $240.00 1 50.00 0 $0.00 1 5240.00 100% 3 Sat Fence 200 LF 52.00 200 50.00 0 50.00 200 3400.00 100% 3 DIP -PVC Connection at East Sanitary Sewer Line 2 EA 3185.00 2 50.00 0 $0.00 2 5370.00 100% CONTRACT PAYMENT NO. TOTAL CHANGE ORDER WORK 7 [DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLETED TO DATE TOTAL CONTRACT AND CHANGE ORDER WORK PERFORMED TO DATE Less: Amount Retained Per Contract 5% Value of Stored Materials (See Attached List) Less: Stored Materials Amount Retained Per Contract 5% Net Amount Earned to Date Less: Precious Amount Earned BALANCE DUE TO CONTRACTOR THIS PAYMENT PAGE 415 58,492.55 3833,058.70 10.00 30.00 30.00 3693.056.70 5858,568.68 134,490.02 CONTRACT PAYMENT NO. Dennis Waugh, P.E. CERTIFICATION OF CONTRACTOR The undersigned contractor cantles that to the best of Ns knowledge, information and belief the work covered by this Contract Payment has been completed in accordwice with the Contract Documents for this project, that This Contract Payment is a true and correct statement of the amount of the work completed to the date of this Contract Payment and that the amounts paid lo the contractor yid' be utilized by him to pay for labor, materials, equipment and subcontracts involved in the performance of this contract. TITLE: Project Manager RECOMMENDATION OF ENGINEER: In accordance with the Contract Documents for ells project, the undersigned Engineer recommends payment to the Conhactor of the balance due this payment as shown. IIYV ENGINFdi EU , P.C. 8l' , / y t /// DATE: /�0 /,a AMOUNT PAID # 3 ` J 7 0. O 2- TITLE: _ Jt' (71- 6 /t 7 DATE f � — 9 '/c9 PAGE 51b