Fiber Optic Con Pt of Dbq finalMEMORANDUM October 14, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Fiber Optic Connection Between City Network and Port of Dubuque Public Works Director Mike Koch is recommending acceptance of the Fiber Optics Connection Project between the City Network and Port of Dubuque, as completed by Volkens Excavating, in the final contract amount of $11,625. This project allowed for the extension of the City's fiber optic system to the Grand Harbor Resort, the Grand River Center and the National Mississippi River Museum and Aquarium. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director MEMORANDUM October 13, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director /~' Fiber Optic Connection between City Network and Port of Dubuque INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Fiber Optics Connection Project between the City Network and Port of Dubuque. DISCUSSION Work has been completed by Volkens Excavating of Dyersville, Iowa, ~n the final contract amount of $11,625. The project provided for the installation of four-inch fiber optics conduit with one-inch interducts from a manhole at Fourth and Iowa Streets to the Port of Dubuque. This conduit allowed for the extension of the City's fiber optic system to the Grand Harbor Resort, the Grand River Center, and the National Mississippi River Museum and Aquarium. RECOMMENDATION I recommend that the City Council accept the improvements and the final contract be established at $11,625. BUDGET IMPACT The summary of the project costs is as follows: Bid Final Construction Contract $12,332.00 $11,625.00 Contingency 2,430.20 0 Engineering 1,336.61 1,743.75 Total Project Cost $16,098.81 $13,368.75 The project will be funded with the Utility Relocation funds budgeted from the Port of Dubuque Fiscal Year 2003 appropriation. ACTION REQUESTED The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Michael Felderman, Civil Engineer cc: Pauline Joyce, Administrative Services Manager Michael Felderman, Civil Engineer David Ness, Civil Engineer Chris Kohlmann, Information Services Merrill Crawford, Cable Franchise Administrator Jim Kolf, Durrant RESOLUTION NO. 394-03 ACCEPTING IMPROVEMENT Whereas, the contract for the Fiber Optic Connection Project between City Network and Port of Dubuque has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Port of Dubuque Utility Relocation Funds in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 20th day of October, 2003. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 395-03 FINAL ESTIMATE Whereas, the contract for the Fiber Optic Connection Project between City Network and Port of Dubuque has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $13,368.75 and the said amount shall be paid from the Port of Dubuque Utility Relocation Funds of the City of Dubuque, Iowa. Passed, approved and adopted this 20th __ day of October ,2003. e F. Schneider, CMC, City Clerk City of Dubuque PARTIAL PAYMENT: FINAL PRO~ECT NAME: Fiber Optic Cormection Froject (City Network and Po~t of Dubuque) CONTRACTOR: Volken~ ~. CODE ITEM DATE: June 6, 2003 CONTRACT AMOUNT: $12,332.00 QTY. UNIT COST TO DATE COST E-I I205.020o Bedding Stone, (1" Clean) 1301.o925 ACC Full Depth Repair Patches 1301.1400 ACC Hand Patching, Temporary I302.225o Storm Sewer, Manhole, Cone Section, Ring & Cove~ 1901.0100 Boring, 1~5" PVC duct containing 4 ~ I' PVC innerduct 1910.0000 Pull Box 2OOO.OOOO Traffic Conm)l EXTRA WORK Core Bore existing manhole Ton $10.00 5 $50.00 SY $35.00 13 $455~00 SY $20.00 0 $0.00 Each $500.00 0 $0.00 LF $12.00 860 $10,320.00 Each $400.00 1 $400.00 LS $250.00 1 $250.00 Ea $150.00 I $150.00 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST $11,625.00 $I,743.75 $13,368.75 I hereby cec'fify that the above statement shows jn detail the correct amount of all.wgrk req~ii'~d (o e~mplete t[~ above improvement. Michael Van Mffilgen, C~y Manager Ciiy of Dubuque,Iowa improvement, does hereby accept the above "Total Due Contractor", as tull settlement for all claims for said improvement. co cToR: . / Michael A~ Koch Public Works