North Fork Catfish Creek Stormwater, Sanitary Sewer Phase II AcceptanceMasterpiece on the Mississippi Dubuque Will AA- America City 1111 ! 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project - Phase 11 DATE: October 25, 2010 City Engineer Gus Psihoyos is recommending acceptance of the public improvements project and the construction contract for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project – Phase II, as completed by Portzen Construction, Inc., in the final contract amount of $1,052,308.47, which is a 5.5% increase from the original contract amount of $997,168.00. The main reason for the increase was due to soil conditions that required a wider trench resulting in more backfill and pavement restoration. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer 4 //—---- Michael C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: North Fork Caffish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II DATE: October 22, 2010 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvements project and the construction contract for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II. BACKGROUND The North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II involved the replacement of 1,595 feet of 12 -inch diameter clay sanitary sewer with 24 -inch diameter ductile iron sewer from Kensington Place, through the Pennsylvania /John F. Kennedy intersection, north to Keystone Drive. DISCUSSION The North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $1,052,308.47, which is a 5.5% increase from the original contract amount of $997,168.00. The main reason for the increase was due to soil conditions that required a wider trench resulting in more backfill and pavement restoration. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $1,052,308.47 to Portzen Construction, Inc. for the North Fork Caffish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II. BUDGET IMPACT The summary of costs for the North Fork Caffish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II is as follows: Award Construction Contract $ 997,168.00 $1,052,308.47 Contingency 91,901.46 Engineering 111,091.61 157,864.94 Property Acquisitions 5,000.00 5,643.83 Total Project Cost $1,205,161.07 $1,215,817.24 Final Dubuque NI- AmedcaCl4 11 11 1' 2007 The sanitary sewer portion of the project will be funded from the Fiscal Year 2007, 2008, and 2009 appropriations for the North Fork Catfish Creek Interceptor Upgrade — University Avenue to the Northwest Arterial (CIP #7101802) in the amount of $1,904,250. The stormwater improvements will be funded from the Fiscal Year 2005 appropriation for the Pennsylvania /John F. Kennedy Culvert Improvement (CIP #7201658) in the amount of $169,125. Sanitary sewer improvements associated with all three phases of the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project are eligible for the FEMA Hazard Mitigation Grant Program funds. The City borrowed the balance of funds through the State Revolving Loan Fund (SRF) program and was awarded ARRA stimulus funds through the SRF program in the form of a forgivable loan. The funding source breakdown for all three phases of North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project is outlined below: Phase I Phase II Phase III TOTAL PROJECT COST $ 3,960,327.84 Sanitary Sewer Construction Funds Stormwater Utility Funds FEMA HMGP Funds ARRA Funds TOTAL PROJECT FUNDING $ 3,960,327.84 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $1,052,308.47 to Portzen Construction, Inc. for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II. Prepared by Deron Muehring cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Ken TeKippe, Finance Director Deron Muehring, Civil Engineer II Project Cost $ 896, 932.65 $ 1,215,817.24 $ 1,847,577.95 $ 1,102, 959.13 $ 875,945.88 $ 1,627,112.50 $ 354, 310.33 THE CITY OF DUB Masterpiece on the Mississippi n EMBASSY CT CHAVENELLE RD EC ee O z s . v _ g is b m z re 1 SHORT ST C 1 AURORA ST I cp cm -1 o u. cm -1 KEYSTONE DR X n To 0 F KEYMONT DR ! e.. Z 0°G1 Z. to so tC 0 Wo DR to rn DANIELS ST IDEAL LN 4. r A 41% STONEMAN RD 4, 41, 0 70 DISCLAIMER: Informal., was compiled ususing Dubuque o. area . I bn System (OASIS), S), which which Includes day data created by both by both the CID of Dubuque O. DDubuque County. ft 4 understood that, while the any of t Dubuque and .MDdp.rq agencies marred the »d xcurete Mforneu» ayMbe1, DADIS one htf motio ha not w ntar d *. M oCcun»c y of tlw Mf� tbn or data c» n 1 11. here,,. Me any »d , Incidental, m shag not be e o en Ogle eo tlrM, indeed, ,see u is Oats r M e M edl out of e t authorized dauthorized zed out unauthorized of any eac use of this data o Me „abgty to use this or a,n f any breach of w«r»er wnameyer. WE Interceptor Sewer Improvements s North Fork Catfish Creek Phase I Phase II Phase III re G F z W re 0 W re 0 01(0 4 Gi 1 inch = 1,000 feet 500 250 0 500 Feet UNIVERSITY AV CONN DODGE ST Dubuque an- 8menca cm 2007 Map Prepaired by City of Dubuque Engineering Department 50 West 13th Street Dubuque, Iowa 52001 Phone: (563) 589 -0270 Fax: (563) 589 -4205 RESOLUTION NO. 418 -10 ACCEPTING THE NORTH FORK CATFISH CREEK STORMWATER AND SANITARY SEWER IMPROVEMENTS PROJECT — PHASE II AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase II (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Catfish Interceptor Reconstruction, North Fork Sanitary Sewer Improvements, and the Pennsylvania /John F. Kennedy Culvert Improvement appropriations for the contract amount $1,052,308.47 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attes Passed, approved and adopted this 1s t day of November, 2010. y,69,U Roy D. Buol, Mayor eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE NORTH FORK CATFISH CREEK STORMWATER AND SANITARY SEWER IMPROVEMENTS PROJECT — PHASE II The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase 11, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,215,817.24. Dated this d1.• day of (k.ros , 2010. Filed in the office of the City Clerk on thec ay o I 2010. City ngineer eanne F. Schneider, CMC, City Clerk ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE FINAL QUANTITY TOTAL PERCENT COMPLETE FEMA Eligible Ductile Iron Sanitary Sewer (24 -Inch) 1 Mobilization 1.00 LS $ 15,000.00 1.00 $ 15,000.00 100.00% 2 Clearing and Grubbing 1.00 LS $ 5,000.00 1.00 $ 5,000.00 100.00% 3 24" DIP Class 51 Sanitary Sewer, Depth less than 14' 1365.00 LF $ 98.00 1298.44 $ 127,247.12 95.12% 4 24" DIP Class 51 Sanitary Sewer, Depth greater than 14' 935.00 LF $ 235.00 1000.11 $ 235,025.85 106.96% 5 6" PVC SDR 26 Sanitary Sewer Lateral 10.00 LF $ 75.00 17.00 $ 1,275.00 170.00% 6 24" x 12" Reducer and Connection to Existing Sewer 1.00 EA $ 2,500.00 1.00 $ 2,500.00 100.00% 7 Select Sanitary Sewer Trench Backfill 855.00 LF $ 175.00 870.75 $ 152,381.25 101.84% 8 Tapping Saddle 1.00 EA $ 300.00 1.00 $ 300.00 100.00% 9 Rock Excavation 500.00 CY $ 150.00 500.00 $ 75,000.00 100.00% 10 PCC Pipe Encasement -24" DIP 96.00 LF $ 120.00 116.00 $ 13,920.00 120.83% 11 By -Pass Pumping 1.00 LS $11,200.00 1.00 $ 11,200.00 100.00% 12 Remove and replace storm sewer 80.00 LF $ 70.00 75.00 $ . 5,250.00 93.75% 13 Remove and Replace Water Main 60.00 LF $ 120.00 60.00 $ 7,200.00 100.00% 14 Erosion Control (SWPPP - inspections, maintainence, misc. 1.00 LS $ 2,000.00 1.00 $ 2,000.00 100.00% 15 Silt Fence or Filter Sock - install and remove 550.00 LF $ 2.50 291.00 $ 727.50 52.91% 16 Inlet Protection - install, maintain and remove 6.00 EA $ 100.00 3.00 $ 300.00 50.00% 17 Temporary Construction Entrance - install and remove 2.00 EA $ 1,000.00 2.00 $ 2,000.00 100.00% 18 Temporary Stream Crossing - install and remove 3.00 EA $ 1,500.00 3.00 $ 4,500.00 100.00% 19 Traffic Control 1.00 LS $ 35,000.00 1.00 $ 35,000.00 100.00% 20 Offsite Disposal of Soil (non - contaminated) 4800.00 CY $ 5.50 4800.00 $ 26,400.00 100.00% 21 FEMA Eligible Sanitary Sewer Manhole Manhole Base for 60" Diameter Manhole 12.00 EA $ 1,200.00 12.00 $ 14,400.00 100.00% 22 Manhole Base for 108" Diameter Manhole 1.00 EA $ 2,500.00 1.00 $ 2,500.00 100.00% 23 48" ID Manhole Sidewall 9.00 LF $ 110.00 9.00 $ 990.00 100.00% 24 60" ID Manhole Sidewall 208.00 LF $ 185.00 195.00 $ 36,075.00 93.75% 25 108" ID Manhole Sidewall 6.00 LF $ 550.00 6.00 $ 3,300.00 100.00% 26 Keyed Top Slab for 108" Manhole w/24" Opening 1.00 EA $ 1,900.00 1.00 $ 1,900.00 100.00% 27 Manhole Cover and Frame 13.00 EA $ 450.00 13.00 $ 5,850.00 100.00% 28 Internal Manhole Chimney Seal 13.00 EA $ 400.00 11.00 $ 4,400.00 84.62% 29 Outside Manhole Drop 2.00 EA $ 3,000.00 2.00 $ 6,000.00 100.00% 30 Temporary Concrete Washout - install and remove 1.00 EA $ 1,000.00 1.00 $ 1,000.00 100.00% 32 FEMA Eligible Restoration of ROW HMA Pavement 700.00 TON $ 80.00 700.00 . $ 56,000.00 100.00% 33 PCC Curb and Gutter, 30" Width 300.00 LF $ 22.00 300.00 $ 6,600.00 100.00% 34 Engineering Fabric 300.00 SY $ 3.00 507.66 $ 1,522.98 169.22% 35 Pavement Markings 1.00 LS $ 2,648.00 1.00 $ 2,648.00 100.00% 36 PCC Pavement, Class C, T = 8" w/ Intergral Curb 910.00 SY $ 44.00 909.46 $ 40,016.24 99.94% 37 Stone Base for Pavement 1200.00 TONS $ 14.40 1332.06 $ 19,181.66 111.01% 38 PCC Sidwalk, T = 4" 360.00 SY $ 50.00 314.86 $ 15,743.00 87.46% 39 PCC Pavement, Class C, T = 6" (Driveway) 60.00 SY $ 54.00 70.80 $ 3,823.20 118.00% THE CRY OF DUB Masterpiece on the Mississippi Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: North Fork Catfish Creek Stormwater & Sanitary Sewer Improvements - Phase!! 7101802, 7201662, & 7102178 997,168.00 20- Nov -09 Portzen Construction Co. 205 Stone Valley Drive Dubuque, IA 52003 563 -557 -7642 TOTAL CONTRACT WORK Sub Total 1 $ 722,226.72 City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 Sub Total 1 $ 76,415.00 Sub Total 1 $ 145,535.08 Sub Total $ 20,731.07 I $ 964,907.87 NON -FEMA Eligible Items 31 Riprap 300.00 TONS $ 20.20 357.33 $ 7,218.07 119.11% 40 Seeding (Turf Grass) 2.00 AC $ 1,500.00 1.55 $ 2,325.00 77.50% 41 Structural Concrete (Headwall Collar) 15.00 CY $ 500.00 0.00 $ - 0.00% 42 Offsite Disposal of Soil (petroleum contaminated) 4800.00 CY $ 8.00 336.00 $ 2,688.00 7.00% 43 Catch Basin, Type 104 -B 2.00 EA $ 2,500.00 2.00 $ 5,000.00 100.00% 44 Catch Basin, Type 105 -B 1.00 EA $ 3,000.00 1.00 $ 3,000.00 100.00% 45 Reinforcing Steel 815.00 LBS $ 1.00 500.00 $ 500.00 61.35% THE CRY OF DUB Masterpiece on the Mississippi Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: PROJECT CLOSE OUT FORM Project Name: CIP Number: Project Contract Amount: Project Completion Date: North Fork Catfish Creek Stormwater & Sanitary Sewer Improvements - Phase!! 7101802, 7201662, & 7102178 997,168.00 20- Nov -09 Portzen Construction Co. 205 Stone Valley Drive Dubuque, IA 52003 563 -557 -7642 TOTAL CONTRACT WORK Sub Total 1 $ 722,226.72 City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 Sub Total 1 $ 76,415.00 Sub Total 1 $ 145,535.08 Sub Total $ 20,731.07 I $ 964,907.87 NO. DATE TOTAL CHANGE ORDER CHANGE ORDER DESCRIPTION TOTAL CHANGE ORDER AMOUNT 1.00 10- Aug -09 Offsite Disposal of Soil (non - contaminated), 4,464 CY @ $5.50 $ 24,552.00 1.00 10- Aug -09 Offsite Disposal of Soil (petroleum contaminated), Change from 4800CY to 325CY 2.00 10- Aug-09 Reconnect 4" lateral (3280 Pennsylvania) $ 2,910.00 3.00 12- Aug-09 Reconnect 12" lateral (1690 Kennedy Road) $ 5,040.00 4.00 23- Sep -09 Add C -D Baskets & additional 1/2" depth of concrete for PCC Pavement $ 5,311.25 5.00 23-Sep-09 Additonal cost to convert Catch Basin, 105 -B to Catch Basin, Type 105 -B Special $ 600.00 6.00 22- Oct -09 Sawcutting & Asphalt Removal Associated with Sidewalk Replacement, NW Corner of JFK/Penn $ 446.64 7.00 22- Oct -09 Re- adjustment of MH222 due to modifed grade $ 628.00 8.00 22- Oct -09 Tie in additional sewer service (Arby's from JFK) $ 728.00 9.00 22- Oct -09 Sod & Seeding associated with restoring temporary business access on JFK $ 1,788.50 10.00 22- Oct -09 Detectable warning for curb ramps (8 EA @ $125.00) $ 1,000.00 11.00 22- Oct -09 Adjustment of water main fixtures added during construction & MH adjustments due to grade change $ 1,575.00 12.00 22- Oct -09 Additional asphalt (402.81 Tons) required on Sherwin Williams parking lot $ 32,224.80 13.00 22- Oct-09 Additional PCC Curb & Gutter (154.41 LF) required on Sherwin Williams parking lot $ 3,397.02 14.00 22- Oct -09 Additional PCC Pavement (60.04 SY) required for Sherwin Williams JFK driveway $ 3,242.16 15.00 14- Apr -10 Repair Slope & rip -rap drop -down at rear of Sherwin Williams $ 3,957.23 Total Contract Work Performed to Date: Total Change Order Work Performed to Date: Total Due Contractor: $ 1,052,308.47 Total miscellaneous Project Costs: $ Total Engineering Work Performed: $ 157,864.94 Total Land Acquisition and /or Easement Costs: $ 5,643.83 TOTAL PROJECT COST: $ 1,215,817.24 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City of Dubuque, to Gus Psihoyos, City Engineer City of Dubuque, Iowa Total Change Order Work Performed to Date: PROJECT COST SUMMARY The Undersigned, Portzen Construction, Inc., contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: BY: 964,907.87 87,400.60 $ 87,400.60 Pr y