TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements
Project - Phase III
DATE: October 25, 2010
City Engineer Gus Psihoyos is recommending acceptance of the public improvements
project and the construction contract for the North Fork Catfish Creek Stormwater and
Sanitary Sewer Improvements Project — Phase III, as completed by Portzen
Construction, Inc., in the final contract amount of $1,626,471.56, which is a 2.5%
increase from the original contract amount of $1,587,080.25. The main reason for the
increase was due to the rock/soil conditions found under the box culvert constructed at
Key Way Drive. Conditions required the placement of concrete to fill the void between
rock and the bottom of the culvert.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
Mis;hael C. Van Milligen
Masterpiece on the Mississippi
Dubuque
All- America city
11 11 1'
2007
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements
Project — Phase III
DATE: October 22, 2010
INTRODUCTION
The enclosed resolution provides for the acceptance of the public improvements project
and the construction contract for the North Fork Catfish Creek Stormwater and Sanitary
Sewer Improvements Project — Phase III.
BACKGROUND
The North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project —
Phase III involved the replacement of just over 4,700 feet of 12 -inch diameter clay sanitary
sewer from Keystone Drive to the Northwest Arterial (IA32) with a combination of 24 -inch
and 18 -inch diameter ductile iron sanitary sewer.
Phase III also included stormwater management improvements outlined in the Drainage
Basin Master Plan: replacement of the Key Way culverts (CIP 7201662); an additional
culvert at Rosemont Street (CIP 7201911); and creek improvements to improve flow and
stabilize the creek banks from Key Way to the Northwest Arterial (CIP 7201807 & CIP
7202018).
DISCUSSION
The North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project —
Phase III was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final
contract amount of $1,626,471.56, which is a 2.5% increase from the original contract
amount of $1,587,080.25. The main reason for the increase was due to the rock/soil
conditions found under the box culvert constructed at Key Way Drive. Conditions required
the placement of concrete to fill the void between rock and the bottom of the culvert.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment of
the contract amount of $1,626,471.56 to Portzen Construction, Inc. for the North Fork
Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III.
BUDGET IMPACT
The summary of costs for the North Fork Catfish Creek Stormwater and Sanitary Sewer
Improvements Project — Phase III is as follows:
Phase I
Phase II
Phase III
TOTAL PROJECT COST $ 3,960,327.84
Construction Contract $1,587,080.25
Contingency 167,756.93
Engineering 237,100.00
Property Acquisitions 20,000.00
Sanitary Sewer Construction Funds
Stormwater Utility Funds
FEMA HMGP Funds
ARRA Funds
Award
Project Cost
$ 896,932.65
$ 1,215,817.24
$ 1,847, 577.95
Final
$ 1,102, 959.13
$ 875,945.88
$ 1,627,112.50
$ 354,310.33
TOTAL PROJECT FUNDING $ 3,960,327.84
$1,626,471.56
204,167.39
16, 939.00
$1,991,937.18 $1,847,577.95
The sanitary sewer portion of the project will be funded from the Fiscal Year 2007, 2008,
and 2009 appropriations for the North Fork Catfish Creek Interceptor Upgrade — University
Avenue to the Northwest Arterial (CIP #7101802) in the amount of $1,904,250. The
stormwater improvements will be funded from Fiscal Year 2006 and 2007 appropriations
for Key Way Channel and Culvert Improvements (CIP# 7201662), the Fiscal Year 2007
and 2008 appropriations for Key Way to Rosemont Channel Improvements
(CIP #7201807), the Fiscal Year 2008 appropriation for Rosemont Culvert Improvements
(CIP #7201911); and the Fiscal Year 2009 appropriation for Rosemont to NW Arterial
Channel Improvements (CIP #7202018).
Sanitary sewer improvements associated with all three phases of the North Fork Catfish
Creek Stormwater and Sanitary Sewer Improvements Project are eligible for the FEMA
Hazard Mitigation Grant Program funds. The City borrowed the balance of funds through
the State Revolving Loan Fund (SRF) program and was awarded ARRA stimulus funds
through the SRF program in the form of a forgivable loan. The funding source breakdown
for all three phases of North Fork Catfish Creek Stormwater and Sanitary Sewer
Improvements Project is outlined below:
ACTION TO BE TAKEN
I respectfully request that the City Council adopt the attached resolutions accepting the
improvements and authorizing the payment of the contract amount of $1,626,471.56 to
Portzen Construction, Inc. for the North Fork Catfish Creek Stormwater and Sanitary
Sewer Improvements Project — Phase III.
Prepared by Deron Muehring
cc: Barry Lindahl, City Attorney
Jenny Larson, Budget Director
Ken TeKippe, Finance Director
Deron Muehring, Civil Engineer II
Masterpiece on the Mississippi
Z A 10
I C o P
HILLCREST R m W Z 0
w C
t7 p. R Q O J
3 �! A p Z O == m
SHORT ST 91 m m O 111 JO S p OC Z l7
91 P
I p O Z '1 Ip X O HILLCREST RD 0
-1 AURORA ST j C • i A
a
u .
n
W W
- I KEYSTONE DR m CRESTON ST 131 X
V = 0 n = s fA ffl
0 F KEYMONT DR ! c..
Z sy ANNE DR
co 10
F1 I-
co
4 i
7 cu
~0 _
m D ANIELS ST a IDEAL LN / NOS
C
n W E LD p R m BOG A� 4 v 4
X co P
CHAVENELLE RD C STONEMAN RD 4y gt, ,�O
F
C,'
D6Gan,» v., compiled
using the Du ' .�rai inl
fDAGIS., wh4A b .A.. data cleated by bal he City of
Db ,a bug and Dubudue County. It is understood that, while
City of Iwwgoa and participating agencies uullzed the
Most and act, Informal. eventide, DAGIS and
,ppli actin. actin. an not warrant the accuracy or currency of the
Mfarmatbn or data contai. herein. The sty and participate°
agencies shat) pl M held liable for any area indirect, direct, guid s!,
u onseq entW punitive, hive, or special damages, whether eaeeable or
nforeseeable, arising om of me authorized or unaumndzed ,de of
Ms data Or the Noddy to use this date or out of any beach of
warranty whatsoever.
North Fork Catfish Creek
Interceptor Sewer Improvements s
Phase I
Phase II
Phase III
N
W +E
ogoosc
1 inch = 1,000 feet
UNIVERSITY A CONN
DODGE ST
Dubuque
An- AmerkaCity
" 'II I ►
200
Map Prepaired by
City of Dubuque
Engineering Department
50 West 13th Street
Dubuque, Iowa 52001
Phone: (563) 589 -4270
Fax: (563) 589 -4205
RESOLUTION NO. 419 -10
ACCEPTING THE NORTH FORK CATFISH CREEK STORMWATER AND SANITARY
SEWER IMPROVEMENTS PROJECT — PHASE III AND AUTHORIZING THE
PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR
Whereas, the Public Improvement Contract for the North Fork Catfish Creek
Stormwater and Sanitary Sewer Improvements Project — Phase III (the Project) has
been completed and the City Engineer has examined the work and filed a certificate
stating that the Project has been completed according to the terms of the Public
Improvement Contract and that the City Engineer recommends that the Project be
accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Catfish Interceptor Reconstruction, North Fork Sanitary Sewer Improvements, Key
Way Channel and Culvert Improvements, Key Way to Rosemont Channel
Improvements, Rosemont Culvert Improvements, Rosemont to NW Arterial Channel
Improvements appropriations for the contract amount $1,626,471.56 less any retained
percentage provided for therein as provided in Iowa Code chapter 573, and to pay such
retainage only in accordance with the provisions of Iowa Code chapter 573.
Att
Passed, approved and adopted this 1St day of November X 10.
-644/ I Ii _ LIO
eanne F. Schneider, CMC, City Clerk
Roy D. Buol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE NORTH FORK
CATFISH CREEK STORMWATER AND SANITARY SEWER IMPROVEMENTS
PROJECT — PHASE III
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the North Fork Catfish Creek Stormwater and Sanitary Sewer
Improvements Project — Phase III, that the Project has been performed in compliance
with the terms of the Public Improvement Contract, and that the total cost of the
completed work is $1,847,577.95.
Dated this ,219 day of Cie.. , 2010.
Filed in the office of the City Clerk on th
City Engineer
2010.
eanne F. Schneider, CMC, City Clerk
15
NON -FEMA Eligible Items (Sanitary)
0.1 LS
$95,000.00
0.10
$ 9,500.00
100.00%
24
Seeding - Urban Mix
3.00 AC
$ 2,500.00
0.00
$ -
0.00%
25
SWPPP - inspections, maintainence, misc.
0.50 LS
$ 5,000.00
0.00
$ -
0.00%
26
PVC SDR 26 Drain Pipe w /connection to existing, 6" dia or is
100.00 LF
$ 20.00
0.00
$ -
0.00%
27
CPE Drain Pipe w /connection to existing, 6" dia or less
100.00 LF
$ 15.00
608.00
$ 9,120.00
608.00%
28
HMA Pavement
75.00 TON
$ 74.00
72.66
$ 5,376.84
96.88%
29
Base Stone
150.00 TON
$ 12.00
150.00
$ 1,800.00
100.00%
30
8 DIP Class 51 Sanitary Sewer w /push -on joint
100.00 LF
$ 85.00
115.41
$ 9,809.85
115.41%
31
8" DIP Class 51 Sanitary Sewer w /restralned gasket joint
20.00 LF
$ 120.00
20.00
$ 2,400.00
100.00%
32
10" DIP Class 51 Sanitary Sewer w /push -on joint
20.00 LF
$ 150.00
0.00
$ -
0.00%
33
PCC Pipe Encasement - 8" DIP
20.00 LF
$ 95.00
20.00
$ 1,900.00
100.00%
34
Silt Fence or Filter Sock - Install and remove
5000.00 EA
$ 1.75
0.00
$ -
0.00%
35
Temporary Construction Entrance - Install and remove
3.00 EA
$ 1,500.00
0.00
$ -
0.00%
36
Temporary Stream Crossing - Install and remove
4.00 EA
$ 1,500.00
4.00
$ 6,000.00
100.00%
37
Temporary Safety Fencing, remove & replace
3500.00 LF
$ 1.25
425.00
$ 531.25
12.14%
38
Deciduous Tree, 2 -1/2" Caliper, B &B
50.00 EA
$ 310.00
50.00
$ 15,500.00
100.00%
39
Shrubs, 18" - 24" height, container
20.00 EA
$ 40.00
0.00
$ -
,0.00%
40
Fence, Chain Link, 48" Height (remove exist.,install new)
2200.00 LF
$ 16.85
300.00
$ 5,055.00
13.64%
41
Fence, Wood Stockade, 48" Height (remove exist., install ne
220.00 LF
$ 21.00
0.00
$ -
0.00%
A1.1
Increase pipe size: 18" DIP to 24" DIP
1140.00 LF
$ 16.00
1133.66
$ 18,138.56
99.44%
A1.2
Increase restrained gasket joint pipe size: 18" DIP to 24" DIF
117.00 LF
$ 32.00
108.00
$ 3,456.00
92.31%
A1.3
Increase manhole sidewall: 48" ID to 60" ID
39.00 LF
$ 65.00
35.26
$ 2,291.90
90.41%
A1.4
Increase manhole base size: 48" MH to 60" MH
4.00 EA
$ 150.00
4.00
$ 600.00
100.00%
A1.5
Increase PCC pipe encasement for 18" DIP to 24" DIP
117.00 LF
$ 20.00
119.00
$ 2,380.00
101.71%
15
FEMA Eligible Sanitary Sewer Manhole
Mobilization and Miscellaneous
0.1 LS
$95,000.00
0.10
$ 9,500.00
100.00%
16
Manhole Base for 60" Diameter Manhole
2.00 EA
$ 900.00
2.00
$ 1,800.00
100.00%
17
Manhole Base for 48" Diameter Manhole
19.00 EA
$ 750.00
19.00
$ 14,250.00
100.00%
18
Manhole Base for 84" Diameter Manhole
1.00 EA
$ 1,500.00
1.00
$ 1;500.00
100.00%
19
48" ID Manhole Sidewall
158.00 LF
$ 150.00
128.02
$ 19,203.00
81.03%
20
60" ID Manhole Sidewall
28.00 LF
$ 180.00
25.97
$ 4,674.60
92.75%
21
84" ID Manhole Sidewall
11.00 LF
$ 350.00
9.50
$ 3,325.00
86.36%
22
Manhole Cover and Frame
22.00 EA
$ 450.00
22.00
$ 9,900.00
100.00%
23
Internal Manhole Chimney Seal
22.00 EA
$ 415.00
11.00
$ 4,565.00
50.00%
7
FEMA Eligible Ductile Iron Sanitary Sewer (18 -Inch)
Mobilization and Miscellaneous
0.30 LS
$ 95 000.00
0.30
$ 28,500.00
100.00%
8
Clearing and Grubbing
0.25 LS
$ 25,000.00
0.25
$ 6,250.00
100.00%
9
Rock Excavation
666.00 CY
$ 50.00
463.14
$ 23,157.00
69.54%
10
By -Pass Pumping
1.00 LS
$ 20,000.00
1.00
$ 20,000.00
100.00%
11
Select Sanitary Sewer Trench Backfill
800.00 TON
$ 9.00
590.70
$ 5,316.30
73.84%
12
PCC Pipe Encasement - 18" DIP
263.00 LF
$ 105.00
265.00
$ 27,825.00
100.76%
13
18" DIP Class 51 Sanitary Sewerw /push- onjoirit
3853.00 LF
$ 94.00
3910.51
$ 367,587.94
101.49%
14
18" DIP Class 51 Sanitary Sewer w /restrained gasket joint
263.00 LF
$ 138.00
252.00
$ 34,776.00
95.82%
ITEM
NO.
CONTRACT ITEM
DESCRIPTION
CONTRACT ITEM
QUANTITY UNIT UNIT PRICE
FINAL
QUANTITY TOTAL
PERCENT
COMPLETE
FEMA Eligible Ductile Iron Sanitary Sewer (24 -Inch)
1 Mobilization and Miscellaneous
0.10 LS $ 95,000.00
0.10 $ 9,500.00
100.00%
2 Clearing and Grubbing
0.25 LS $ 25,000.00
0.25 $ 6,250.00
100.00%
3 Rock Excavation
334.00 CY $ 50.00
301.24 $ 15,062.00
90.19%
4 PCC Pipe Encasement -24" DIP
56.00 LF $ 125.00
58.50 $ 7,312.50
104.46%
5 24" DIP Class 51 Sanitary Sewer w /push -on joint
450.00 LF $ 110.00
451.88 $ 49,706.80
100.42 %
6 24" DIP Class 51 Sanitary Sewerw /restrained gasket joint
120.00 LF $ 166.00
142.00 $ 23,572.00
118.33%
Masterpiece on the Mississippi
Project Name:
CIP Number:
Project Contract Amount:
Project Completion Date:
North Fork Catfish Creek Slormwater &
Sanitary Sewer Improvements - Phase!!!
7101802, 7102178, 7201662 & 7201807
1,587,080.25
30- Sep -10
Contractor Name:
Contractor Address:
City, State, Zip:
Contractor Te lephone:
PROJECT CLOSE OUT FORM
Portzen Construction Co.
205 Stone Valley Drive
Dubuque, IA 52003
563 - 557 -7642
Sub Total
Sub Total 1 $
Sub Total 1 $
111,403.30
513,412.24
City of Dubuque
Engineering
50. W. 13th Street
Dubuque, IA 52001
(563) 589-4270
68,717.60
Sub Total
$ 84,359.40
TOTAL CONTRACT WORK
Sub Total I $ 771,614.80
$ 1,649,507.34
i
NON -FEMA Eligible Items (STORMWATER)
42
Mobilization and Miscellaneous
0.50 LS
$95,000.00
0.50
$ 47,500.00
100.00%
43
Traffic Control
1.00 LS
$ 6,600.00
0.75
$ 4,950.00
75.00%
44
Clearing and Grubbing
0.50 LS
$25,000.00
0.50
$ 12,500.00
100.00%
45
SWPPP - inspections, maintainence, misc.
0.50 LS
$ 5,000.00
1.00
$ 5,000.00
200.00%
46
Riprap
900.00 TONS
$ 21.00
670.58
$ 14,082.18
74.51%
47
Seeding - Native Grasses
4.00 AC
$ 1,300.00
5.16
$ 6,708.00
129.00%
48
Seeding - Urban Mix
3.00 AC
$ 2,500.00
1.79
$ 4,480.00
59.73%
49
Seeding - Rural Mix
2.00 AC
$ 1,700.00
0.00
$ -
0.00%
50
Turf Reinforcement Mat - Permanent (TRM)
6575.00 SY
$ 8.65
6650.00
$ 57,522.50
101.14%
51
Erosion Control Blanket - Extended Term
7885.00 SY
$ 1.10
8500.00
$ 9,350.00
107.80%
52
Erosion Control Blanket - Short Term
7200.00 SY
$ 0.92
18250.00
$ 16,790.00
253.47%
53
Excavation (Streambank Enhancement)
9120.00 CY
$ 8.00
9120.00
$ 72,960.00
100.00%
54
PCC Pavement, T = 6"
60.00 SY
$ 45.00
23.11
$ 1,039.95
38.52%
55
HMA Pavement
250.00 TON
$ 74.00
350.22
$ 25,916.28
140.09%
56
Base Stone
350.00 TON
$ 12.00
935.67
$ 11,228.04
267.33%
57
Engineering Fabric (Under Riprap)
650.00 SY
$ 2.50
543.75
$ 1,359.38
83.65%
58
6" DIP Cl. 52 Water Main, w/ poly wrap and tracer wire
135.00 LF
$ 55.00
48.50
$ 2,667.50
35.93%
59
8" DIP Cl. 52 Water Main, w/ poly wrap and tracer wire
125.00 LF
$ 65.00
89.75
$ 5,833.75
71.80%
60
16" ID Steel Casing Pipe (1/4 ") w/End Seals
45.00 LF
$ 80.00
36.00
$ 2,880.00
80.00%
61
8 "Gale Valve with Box
2.00 EA
$ 1,250.00
2.00
$ 2,500.00
100.00%
62
Water Main Fittings (Compact MJ DI)
500.00 LBS
$ 7.50
522.00
$ 3,915.00
104.40%
63
Select Water Main Trench Backfill
1100.00 TON
$ 9.00
596.58
$ 5,369.22
54.23%
64
Select Storm Sewer Trench Backfill
110.00 TON
$ 9.00
68.01
$ 612.09
61.83%
65
Select Backfill - Key Way Box Culvert
660.00 TON
$ 9.00
660.00
$ 5,940.00
100.00%
66
Select Backfill - Rosemont 72" Culvert
450.00 TON
$ 9.00
308.29
$ 2,774.61
68.51%
67
Catch Basin, Type 104 -B
2.00 EA
$ 2,400.00
2.00
$ 4,800.00
100.00%
68
Catch Basin, Type 104 -8 Special
2.00 EA
$ 3,000.00
2.00
$ 6,000.00
100.00%
69
72" RCP, Class III
78.00 LF
$ 225.00
78.00
$ 17,550.00
100.00%
70
72" Cone Pipe Apron
2.00 EA
$ 1,650.00
2.00
$ 3,300.00
100.00%
71
Pipe Apron Guard, 72"
4.00 EA
$ 1,450.00
4.00
$ 5,800.00
100.00%
72
Structural Concrete (Box Culvert)
631.00 CY
$ 300.00
670.20
$ 201,060.00
106.21%
73
Reinforcing Steel
97272.00 LBS
$ 0.75
98788.51
$ 74,091.38
101.56%
74
Excavation, CI. 23 - Key Way Culvert
2740.00 CY
$ 7.00
6077.00
$ 42,539.00
221.79%
75
Excavation, CI. 23 - Rosemont Culvert
660.00 CY
$ 7.00
693.00
$ 4,851.00
105.00%
76
Remove Culvert, 78" RCP
80.00 LF
$ 35.00
156.00
$ 5,460.00
195.00%
77
Storm Sewer Manhole - 48" dia (complete)
1.00 EA
$ 3,800.00
1.00
$ 3,800.00
100.00%
78
Storm Sewer Manhole - 60" dia (complete)
1.00 EA
$ 4,300.00
1.00
$ 4,300.00
100.00%
79
Storm Sewer Manhole - 72" dia (complete)
1.00 EA
$ 5,800.00
1.00
$ 5,800.00
100.00%
80
PCC Curb and Gutter, 30"
550.00 LF
$ 19.00
575.00
$ 10,925.00
104.55%
81
PCC Sidewalk, T = 4"
165.00 SY
$ 45.00
248.44
$ 11,179.80
150.57%
82
Silt Fence or Filter Sock - install and remove
5000.00 LF
$ 1.75
0.00
$ -
0.00
83
Temporary Concrete Washout - Install and remove
1.00 EA
$ 1,000.00
1.00
$ 1,000.00
100.00%
84
Temporary Construction Entrance - install and remove
2.00 EA
$ 1,500.00
5.00
$ 7,500.00
250.00%
85
Temporary Safety Fencing, remove & replace
1000.00 LF
$ 1.25
1646.50
$ 2,058.13
164.65%
86
Fence, Chain Link, 48" Height (installed on culvert wall)
280.00 LF
$ 18.00
280.00
$ 5,040.00
100.00%
87
12" RCP, Class III
12.00 LF
$ 40.00
0.00
$ -
0.00%
88
15" RCP, Class III
18.00 LF
$ 50.00
32.00
$ 1,600.00
177.78%
89
18" RCP, Class III
100.00 LF
$ 47.00
60.00
$ 2,820.00
60.00%
90
24" RCP, Class III
110.00 LF
$ 46.00
88.00
$ 4,048.00
80.00%
91
30" RCP, Class III
30.00 LF
$ 65.00
54.00
$ 3,510.00
180.00%
92
48" RCP, Class III
35.00 LF
$ 90.00
32.00
$ 2,880.00
91.43%
93
12" Cone Pipe Apron
1.00 EA
$ 550.00
1.00
$ 550.00
100.00%
94
18" Conc Pipe Apron
6.00 EA
$ 950.00
6.00
$ 5,700.00
100.00%
95
24" Conc Pipe Apron
5.00 EA
$ 950.00
5.00
$ 4,750.00
100.00%
96
48" Conc Pipe Apron
2.00 EA
$ 1,200.00
2.00
$ 2,400.00
100.00%
97
Remove Culvert, 48" Dia or less
265.00 LF
$ 12.00
202.00
$ 2,424.00
76.23%
TOTAL CONTRACT WORK
Sub Total I $ 771,614.80
$ 1,649,507.34
i
NO.
DATE
STORMWATER CHANGE ORDERS
CHANGE ORDER DESCRIPTION
TOTAL
CHANGE ORDER
AMOUNT
5.00
27- Feb -10
Tree removal along south bank of creek east of Key Way (291 - Inches)
$
5,820.00
6.00
27- Feb -10
2500 psi concrete fill under box culvert
$
24,243.71
7.00
10- Mar -10
Collar Storm Pipe
$
1,706.25
8.00
22- Mar -10
Locate buried phoneffiber conduits (Qwest)
$
3,480.00
9.00
24- Mar -10
Locate buried phone line conduit (McCloud)
$
1,640.00
14.00
12- Apr -10
2500 psi concrete fill under box culvert
$
3,919.32
15.00
17- Apr -10
2500 psi concrete fill under box culvert
$
3,468.75
16.00
3- May -10
Rip -Rap, toe of slope
$
6,531.60
17.00
11- May -10
15" & 30" Storm Sewer Aprons
$
3,694.93
19.00
16-Jun-10
Collar 30 -inch storm sewer
$
1,757.89
20.00
9-Jun-10
Shoring for retaining wall
$
3,200.00
21.00
9-Jun-10
Drill re -rod in rock for concrete footing _
$
385.20
23.00
15-Jul-10
Additional water main relocation on Rosemont
$
428.95
25.00
8-Sep-10
Storm Sewer Outfall Reconfiguration Into Creek
5
948.75
26.00
8-Sep-10
Adjust Fixtures, Key Way & Rosemont
$
1,575.00
NO.
DATE
SANITARY SEWER CHANGE ORDERS
CHANGE ORDER DESCRIPTION
TOTAL
CHANGE ORDER
AMOUNT
1.00
10- Feb -10
Connect 8 -inch sewer line from Kennedy Circle not shown in plans to the 84 -inch manhole.
$
848.24
2.00
10- Mar -10
72" Dia. Sanitary Manhole Flat Top (1)
$
1,050.00
3.00
10- Mar -10
60" Dia. Sanitary Manhole Flat Top (1)
$
610.00
4.00
10- Mar -10
48" Dia. Sanitary Manhole Flat Top (4)
$
1,400.00
10.00
5- Apr -10
12 -inch diameter sanitary extension
5
3,569.40
11.00
5- Apr -10
12 -inch x 4 -inch Tap with materials
$
523.25
12.00
5- Apr -10
12 -inch x 8 -inch reducer and pipe
$
490.48
13.00
5- Apr -10
16 -Inch casing pipe, installed
$
250.47
18.00
16-Jun-10
24 -inch, 45 degree bend
$
1,520.65
22.00
2- Jul -10
Raise sanitary manhole
$
925.75
24.00
17-Jul-10
Field Adjust Manhole due to location of existing sanitary lines
$
1,825.63
27.00
8-Sep-10
Fence Repairs behind 3585 Keystone & 3594 Keymeer
$
1,150.00
APPROVED:
Michael Van Milligan, ity
City of Dubuque, low
Total Contract Work Performed to Date:
Total Change Order Work Performed to Date:
Total Due Contractor: $ 1,626,471.56
Total miscellaneous Project Costs: $
Total Engineering Work Performed: $ 204,167.39
Total Land Acquisition and /or Easement Costs: $ 16,939.00
TOTAL PROJECT COST: $ 1,847,577.95
I hereby certify that the above statement shows, in detail, the correct
amount of all work required to complete the above Improvement.
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
PROJECT COST SUMMARY
Total Change Order Work Performed to Date:
Total Change Order Work Performed to Date:
$ 1,549,507.34
$ 76,964.22
APPROVED:
BY: 7)
$ 14,163.87
$ 62,800.35
The Undersigned, Portzen Construction, Inc., contractor for the above
improvement, does hereby accept the above 'Total Due Contractor", as
full settlement for all claims for said improvement.