Loading...
North Fork Catfish Creek Stormwater, Sanitary Sewer Phase III AcceptanceMasterpiece on the Mississippi Dubuque heal ALAmedcaCity 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project - Phase III DATE: October 25, 2010 City Engineer Gus Psihoyos is recommending acceptance of the public improvements project and the construction contract for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III, as completed by Portzen Construction, Inc., in the final contract amount of $1,626,471.56, which is a 2.5% increase from the original contract amount of $1,587,080.25. The main reason for the increase was due to the rock/soil conditions found under the box culvert constructed at Key Way Drive. Conditions required the placement of concrete to fill the void between rock and the bottom of the culvert. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Mis;hael C. Van Milligen Masterpiece on the Mississippi Dubuque All- America city 11 11 1' 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III DATE: October 22, 2010 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvements project and the construction contract for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III. BACKGROUND The North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III involved the replacement of just over 4,700 feet of 12 -inch diameter clay sanitary sewer from Keystone Drive to the Northwest Arterial (IA32) with a combination of 24 -inch and 18 -inch diameter ductile iron sanitary sewer. Phase III also included stormwater management improvements outlined in the Drainage Basin Master Plan: replacement of the Key Way culverts (CIP 7201662); an additional culvert at Rosemont Street (CIP 7201911); and creek improvements to improve flow and stabilize the creek banks from Key Way to the Northwest Arterial (CIP 7201807 & CIP 7202018). DISCUSSION The North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $1,626,471.56, which is a 2.5% increase from the original contract amount of $1,587,080.25. The main reason for the increase was due to the rock/soil conditions found under the box culvert constructed at Key Way Drive. Conditions required the placement of concrete to fill the void between rock and the bottom of the culvert. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $1,626,471.56 to Portzen Construction, Inc. for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III. BUDGET IMPACT The summary of costs for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III is as follows: Phase I Phase II Phase III TOTAL PROJECT COST $ 3,960,327.84 Construction Contract $1,587,080.25 Contingency 167,756.93 Engineering 237,100.00 Property Acquisitions 20,000.00 Sanitary Sewer Construction Funds Stormwater Utility Funds FEMA HMGP Funds ARRA Funds Award Project Cost $ 896,932.65 $ 1,215,817.24 $ 1,847, 577.95 Final $ 1,102, 959.13 $ 875,945.88 $ 1,627,112.50 $ 354,310.33 TOTAL PROJECT FUNDING $ 3,960,327.84 $1,626,471.56 204,167.39 16, 939.00 $1,991,937.18 $1,847,577.95 The sanitary sewer portion of the project will be funded from the Fiscal Year 2007, 2008, and 2009 appropriations for the North Fork Catfish Creek Interceptor Upgrade — University Avenue to the Northwest Arterial (CIP #7101802) in the amount of $1,904,250. The stormwater improvements will be funded from Fiscal Year 2006 and 2007 appropriations for Key Way Channel and Culvert Improvements (CIP# 7201662), the Fiscal Year 2007 and 2008 appropriations for Key Way to Rosemont Channel Improvements (CIP #7201807), the Fiscal Year 2008 appropriation for Rosemont Culvert Improvements (CIP #7201911); and the Fiscal Year 2009 appropriation for Rosemont to NW Arterial Channel Improvements (CIP #7202018). Sanitary sewer improvements associated with all three phases of the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project are eligible for the FEMA Hazard Mitigation Grant Program funds. The City borrowed the balance of funds through the State Revolving Loan Fund (SRF) program and was awarded ARRA stimulus funds through the SRF program in the form of a forgivable loan. The funding source breakdown for all three phases of North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project is outlined below: ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolutions accepting the improvements and authorizing the payment of the contract amount of $1,626,471.56 to Portzen Construction, Inc. for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III. Prepared by Deron Muehring cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Ken TeKippe, Finance Director Deron Muehring, Civil Engineer II Masterpiece on the Mississippi Z A 10 I C o P HILLCREST R m W Z 0 w C t7 p. R Q O J 3 �! A p Z O == m SHORT ST 91 m m O 111 JO S p OC Z l7 91 P I p O Z '1 Ip X O HILLCREST RD 0 -1 AURORA ST j C • i A a u . n W W - I KEYSTONE DR m CRESTON ST 131 X V = 0 n = s fA ffl 0 F KEYMONT DR ! c.. Z sy ANNE DR co 10 F1 I- co 4 i 7 cu ~0 _ m D ANIELS ST a IDEAL LN / NOS C n W E LD p R m BOG A� 4 v 4 X co P CHAVENELLE RD C STONEMAN RD 4y gt, ,�O F C,' D6Gan,» v., compiled using the Du ' .�rai inl fDAGIS., wh4A b .A.. data cleated by bal he City of Db ,a bug and Dubudue County. It is understood that, while City of Iwwgoa and participating agencies uullzed the Most and act, Informal. eventide, DAGIS and ,ppli actin. actin. an not warrant the accuracy or currency of the Mfarmatbn or data contai. herein. The sty and participate° agencies shat) pl M held liable for any area indirect, direct, guid s!, u onseq entW punitive, hive, or special damages, whether eaeeable or nforeseeable, arising om of me authorized or unaumndzed ,de of Ms data Or the Noddy to use this date or out of any beach of warranty whatsoever. North Fork Catfish Creek Interceptor Sewer Improvements s Phase I Phase II Phase III N W +E ogoosc 1 inch = 1,000 feet UNIVERSITY A CONN DODGE ST Dubuque An- AmerkaCity " 'II I ► 200 Map Prepaired by City of Dubuque Engineering Department 50 West 13th Street Dubuque, Iowa 52001 Phone: (563) 589 -4270 Fax: (563) 589 -4205 RESOLUTION NO. 419 -10 ACCEPTING THE NORTH FORK CATFISH CREEK STORMWATER AND SANITARY SEWER IMPROVEMENTS PROJECT — PHASE III AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Catfish Interceptor Reconstruction, North Fork Sanitary Sewer Improvements, Key Way Channel and Culvert Improvements, Key Way to Rosemont Channel Improvements, Rosemont Culvert Improvements, Rosemont to NW Arterial Channel Improvements appropriations for the contract amount $1,626,471.56 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Att Passed, approved and adopted this 1St day of November X 10. -644/ I Ii _ LIO eanne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE NORTH FORK CATFISH CREEK STORMWATER AND SANITARY SEWER IMPROVEMENTS PROJECT — PHASE III The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the North Fork Catfish Creek Stormwater and Sanitary Sewer Improvements Project — Phase III, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,847,577.95. Dated this ,219 day of Cie.. , 2010. Filed in the office of the City Clerk on th City Engineer 2010. eanne F. Schneider, CMC, City Clerk 15 NON -FEMA Eligible Items (Sanitary) 0.1 LS $95,000.00 0.10 $ 9,500.00 100.00% 24 Seeding - Urban Mix 3.00 AC $ 2,500.00 0.00 $ - 0.00% 25 SWPPP - inspections, maintainence, misc. 0.50 LS $ 5,000.00 0.00 $ - 0.00% 26 PVC SDR 26 Drain Pipe w /connection to existing, 6" dia or is 100.00 LF $ 20.00 0.00 $ - 0.00% 27 CPE Drain Pipe w /connection to existing, 6" dia or less 100.00 LF $ 15.00 608.00 $ 9,120.00 608.00% 28 HMA Pavement 75.00 TON $ 74.00 72.66 $ 5,376.84 96.88% 29 Base Stone 150.00 TON $ 12.00 150.00 $ 1,800.00 100.00% 30 8 DIP Class 51 Sanitary Sewer w /push -on joint 100.00 LF $ 85.00 115.41 $ 9,809.85 115.41% 31 8" DIP Class 51 Sanitary Sewer w /restralned gasket joint 20.00 LF $ 120.00 20.00 $ 2,400.00 100.00% 32 10" DIP Class 51 Sanitary Sewer w /push -on joint 20.00 LF $ 150.00 0.00 $ - 0.00% 33 PCC Pipe Encasement - 8" DIP 20.00 LF $ 95.00 20.00 $ 1,900.00 100.00% 34 Silt Fence or Filter Sock - Install and remove 5000.00 EA $ 1.75 0.00 $ - 0.00% 35 Temporary Construction Entrance - Install and remove 3.00 EA $ 1,500.00 0.00 $ - 0.00% 36 Temporary Stream Crossing - Install and remove 4.00 EA $ 1,500.00 4.00 $ 6,000.00 100.00% 37 Temporary Safety Fencing, remove & replace 3500.00 LF $ 1.25 425.00 $ 531.25 12.14% 38 Deciduous Tree, 2 -1/2" Caliper, B &B 50.00 EA $ 310.00 50.00 $ 15,500.00 100.00% 39 Shrubs, 18" - 24" height, container 20.00 EA $ 40.00 0.00 $ - ,0.00% 40 Fence, Chain Link, 48" Height (remove exist.,install new) 2200.00 LF $ 16.85 300.00 $ 5,055.00 13.64% 41 Fence, Wood Stockade, 48" Height (remove exist., install ne 220.00 LF $ 21.00 0.00 $ - 0.00% A1.1 Increase pipe size: 18" DIP to 24" DIP 1140.00 LF $ 16.00 1133.66 $ 18,138.56 99.44% A1.2 Increase restrained gasket joint pipe size: 18" DIP to 24" DIF 117.00 LF $ 32.00 108.00 $ 3,456.00 92.31% A1.3 Increase manhole sidewall: 48" ID to 60" ID 39.00 LF $ 65.00 35.26 $ 2,291.90 90.41% A1.4 Increase manhole base size: 48" MH to 60" MH 4.00 EA $ 150.00 4.00 $ 600.00 100.00% A1.5 Increase PCC pipe encasement for 18" DIP to 24" DIP 117.00 LF $ 20.00 119.00 $ 2,380.00 101.71% 15 FEMA Eligible Sanitary Sewer Manhole Mobilization and Miscellaneous 0.1 LS $95,000.00 0.10 $ 9,500.00 100.00% 16 Manhole Base for 60" Diameter Manhole 2.00 EA $ 900.00 2.00 $ 1,800.00 100.00% 17 Manhole Base for 48" Diameter Manhole 19.00 EA $ 750.00 19.00 $ 14,250.00 100.00% 18 Manhole Base for 84" Diameter Manhole 1.00 EA $ 1,500.00 1.00 $ 1;500.00 100.00% 19 48" ID Manhole Sidewall 158.00 LF $ 150.00 128.02 $ 19,203.00 81.03% 20 60" ID Manhole Sidewall 28.00 LF $ 180.00 25.97 $ 4,674.60 92.75% 21 84" ID Manhole Sidewall 11.00 LF $ 350.00 9.50 $ 3,325.00 86.36% 22 Manhole Cover and Frame 22.00 EA $ 450.00 22.00 $ 9,900.00 100.00% 23 Internal Manhole Chimney Seal 22.00 EA $ 415.00 11.00 $ 4,565.00 50.00% 7 FEMA Eligible Ductile Iron Sanitary Sewer (18 -Inch) Mobilization and Miscellaneous 0.30 LS $ 95 000.00 0.30 $ 28,500.00 100.00% 8 Clearing and Grubbing 0.25 LS $ 25,000.00 0.25 $ 6,250.00 100.00% 9 Rock Excavation 666.00 CY $ 50.00 463.14 $ 23,157.00 69.54% 10 By -Pass Pumping 1.00 LS $ 20,000.00 1.00 $ 20,000.00 100.00% 11 Select Sanitary Sewer Trench Backfill 800.00 TON $ 9.00 590.70 $ 5,316.30 73.84% 12 PCC Pipe Encasement - 18" DIP 263.00 LF $ 105.00 265.00 $ 27,825.00 100.76% 13 18" DIP Class 51 Sanitary Sewerw /push- onjoirit 3853.00 LF $ 94.00 3910.51 $ 367,587.94 101.49% 14 18" DIP Class 51 Sanitary Sewer w /restrained gasket joint 263.00 LF $ 138.00 252.00 $ 34,776.00 95.82% ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE FINAL QUANTITY TOTAL PERCENT COMPLETE FEMA Eligible Ductile Iron Sanitary Sewer (24 -Inch) 1 Mobilization and Miscellaneous 0.10 LS $ 95,000.00 0.10 $ 9,500.00 100.00% 2 Clearing and Grubbing 0.25 LS $ 25,000.00 0.25 $ 6,250.00 100.00% 3 Rock Excavation 334.00 CY $ 50.00 301.24 $ 15,062.00 90.19% 4 PCC Pipe Encasement -24" DIP 56.00 LF $ 125.00 58.50 $ 7,312.50 104.46% 5 24" DIP Class 51 Sanitary Sewer w /push -on joint 450.00 LF $ 110.00 451.88 $ 49,706.80 100.42 % 6 24" DIP Class 51 Sanitary Sewerw /restrained gasket joint 120.00 LF $ 166.00 142.00 $ 23,572.00 118.33% Masterpiece on the Mississippi Project Name: CIP Number: Project Contract Amount: Project Completion Date: North Fork Catfish Creek Slormwater & Sanitary Sewer Improvements - Phase!!! 7101802, 7102178, 7201662 & 7201807 1,587,080.25 30- Sep -10 Contractor Name: Contractor Address: City, State, Zip: Contractor Te lephone: PROJECT CLOSE OUT FORM Portzen Construction Co. 205 Stone Valley Drive Dubuque, IA 52003 563 - 557 -7642 Sub Total Sub Total 1 $ Sub Total 1 $ 111,403.30 513,412.24 City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 68,717.60 Sub Total $ 84,359.40 TOTAL CONTRACT WORK Sub Total I $ 771,614.80 $ 1,649,507.34 i NON -FEMA Eligible Items (STORMWATER) 42 Mobilization and Miscellaneous 0.50 LS $95,000.00 0.50 $ 47,500.00 100.00% 43 Traffic Control 1.00 LS $ 6,600.00 0.75 $ 4,950.00 75.00% 44 Clearing and Grubbing 0.50 LS $25,000.00 0.50 $ 12,500.00 100.00% 45 SWPPP - inspections, maintainence, misc. 0.50 LS $ 5,000.00 1.00 $ 5,000.00 200.00% 46 Riprap 900.00 TONS $ 21.00 670.58 $ 14,082.18 74.51% 47 Seeding - Native Grasses 4.00 AC $ 1,300.00 5.16 $ 6,708.00 129.00% 48 Seeding - Urban Mix 3.00 AC $ 2,500.00 1.79 $ 4,480.00 59.73% 49 Seeding - Rural Mix 2.00 AC $ 1,700.00 0.00 $ - 0.00% 50 Turf Reinforcement Mat - Permanent (TRM) 6575.00 SY $ 8.65 6650.00 $ 57,522.50 101.14% 51 Erosion Control Blanket - Extended Term 7885.00 SY $ 1.10 8500.00 $ 9,350.00 107.80% 52 Erosion Control Blanket - Short Term 7200.00 SY $ 0.92 18250.00 $ 16,790.00 253.47% 53 Excavation (Streambank Enhancement) 9120.00 CY $ 8.00 9120.00 $ 72,960.00 100.00% 54 PCC Pavement, T = 6" 60.00 SY $ 45.00 23.11 $ 1,039.95 38.52% 55 HMA Pavement 250.00 TON $ 74.00 350.22 $ 25,916.28 140.09% 56 Base Stone 350.00 TON $ 12.00 935.67 $ 11,228.04 267.33% 57 Engineering Fabric (Under Riprap) 650.00 SY $ 2.50 543.75 $ 1,359.38 83.65% 58 6" DIP Cl. 52 Water Main, w/ poly wrap and tracer wire 135.00 LF $ 55.00 48.50 $ 2,667.50 35.93% 59 8" DIP Cl. 52 Water Main, w/ poly wrap and tracer wire 125.00 LF $ 65.00 89.75 $ 5,833.75 71.80% 60 16" ID Steel Casing Pipe (1/4 ") w/End Seals 45.00 LF $ 80.00 36.00 $ 2,880.00 80.00% 61 8 "Gale Valve with Box 2.00 EA $ 1,250.00 2.00 $ 2,500.00 100.00% 62 Water Main Fittings (Compact MJ DI) 500.00 LBS $ 7.50 522.00 $ 3,915.00 104.40% 63 Select Water Main Trench Backfill 1100.00 TON $ 9.00 596.58 $ 5,369.22 54.23% 64 Select Storm Sewer Trench Backfill 110.00 TON $ 9.00 68.01 $ 612.09 61.83% 65 Select Backfill - Key Way Box Culvert 660.00 TON $ 9.00 660.00 $ 5,940.00 100.00% 66 Select Backfill - Rosemont 72" Culvert 450.00 TON $ 9.00 308.29 $ 2,774.61 68.51% 67 Catch Basin, Type 104 -B 2.00 EA $ 2,400.00 2.00 $ 4,800.00 100.00% 68 Catch Basin, Type 104 -8 Special 2.00 EA $ 3,000.00 2.00 $ 6,000.00 100.00% 69 72" RCP, Class III 78.00 LF $ 225.00 78.00 $ 17,550.00 100.00% 70 72" Cone Pipe Apron 2.00 EA $ 1,650.00 2.00 $ 3,300.00 100.00% 71 Pipe Apron Guard, 72" 4.00 EA $ 1,450.00 4.00 $ 5,800.00 100.00% 72 Structural Concrete (Box Culvert) 631.00 CY $ 300.00 670.20 $ 201,060.00 106.21% 73 Reinforcing Steel 97272.00 LBS $ 0.75 98788.51 $ 74,091.38 101.56% 74 Excavation, CI. 23 - Key Way Culvert 2740.00 CY $ 7.00 6077.00 $ 42,539.00 221.79% 75 Excavation, CI. 23 - Rosemont Culvert 660.00 CY $ 7.00 693.00 $ 4,851.00 105.00% 76 Remove Culvert, 78" RCP 80.00 LF $ 35.00 156.00 $ 5,460.00 195.00% 77 Storm Sewer Manhole - 48" dia (complete) 1.00 EA $ 3,800.00 1.00 $ 3,800.00 100.00% 78 Storm Sewer Manhole - 60" dia (complete) 1.00 EA $ 4,300.00 1.00 $ 4,300.00 100.00% 79 Storm Sewer Manhole - 72" dia (complete) 1.00 EA $ 5,800.00 1.00 $ 5,800.00 100.00% 80 PCC Curb and Gutter, 30" 550.00 LF $ 19.00 575.00 $ 10,925.00 104.55% 81 PCC Sidewalk, T = 4" 165.00 SY $ 45.00 248.44 $ 11,179.80 150.57% 82 Silt Fence or Filter Sock - install and remove 5000.00 LF $ 1.75 0.00 $ - 0.00 83 Temporary Concrete Washout - Install and remove 1.00 EA $ 1,000.00 1.00 $ 1,000.00 100.00% 84 Temporary Construction Entrance - install and remove 2.00 EA $ 1,500.00 5.00 $ 7,500.00 250.00% 85 Temporary Safety Fencing, remove & replace 1000.00 LF $ 1.25 1646.50 $ 2,058.13 164.65% 86 Fence, Chain Link, 48" Height (installed on culvert wall) 280.00 LF $ 18.00 280.00 $ 5,040.00 100.00% 87 12" RCP, Class III 12.00 LF $ 40.00 0.00 $ - 0.00% 88 15" RCP, Class III 18.00 LF $ 50.00 32.00 $ 1,600.00 177.78% 89 18" RCP, Class III 100.00 LF $ 47.00 60.00 $ 2,820.00 60.00% 90 24" RCP, Class III 110.00 LF $ 46.00 88.00 $ 4,048.00 80.00% 91 30" RCP, Class III 30.00 LF $ 65.00 54.00 $ 3,510.00 180.00% 92 48" RCP, Class III 35.00 LF $ 90.00 32.00 $ 2,880.00 91.43% 93 12" Cone Pipe Apron 1.00 EA $ 550.00 1.00 $ 550.00 100.00% 94 18" Conc Pipe Apron 6.00 EA $ 950.00 6.00 $ 5,700.00 100.00% 95 24" Conc Pipe Apron 5.00 EA $ 950.00 5.00 $ 4,750.00 100.00% 96 48" Conc Pipe Apron 2.00 EA $ 1,200.00 2.00 $ 2,400.00 100.00% 97 Remove Culvert, 48" Dia or less 265.00 LF $ 12.00 202.00 $ 2,424.00 76.23% TOTAL CONTRACT WORK Sub Total I $ 771,614.80 $ 1,649,507.34 i NO. DATE STORMWATER CHANGE ORDERS CHANGE ORDER DESCRIPTION TOTAL CHANGE ORDER AMOUNT 5.00 27- Feb -10 Tree removal along south bank of creek east of Key Way (291 - Inches) $ 5,820.00 6.00 27- Feb -10 2500 psi concrete fill under box culvert $ 24,243.71 7.00 10- Mar -10 Collar Storm Pipe $ 1,706.25 8.00 22- Mar -10 Locate buried phoneffiber conduits (Qwest) $ 3,480.00 9.00 24- Mar -10 Locate buried phone line conduit (McCloud) $ 1,640.00 14.00 12- Apr -10 2500 psi concrete fill under box culvert $ 3,919.32 15.00 17- Apr -10 2500 psi concrete fill under box culvert $ 3,468.75 16.00 3- May -10 Rip -Rap, toe of slope $ 6,531.60 17.00 11- May -10 15" & 30" Storm Sewer Aprons $ 3,694.93 19.00 16-Jun-10 Collar 30 -inch storm sewer $ 1,757.89 20.00 9-Jun-10 Shoring for retaining wall $ 3,200.00 21.00 9-Jun-10 Drill re -rod in rock for concrete footing _ $ 385.20 23.00 15-Jul-10 Additional water main relocation on Rosemont $ 428.95 25.00 8-Sep-10 Storm Sewer Outfall Reconfiguration Into Creek 5 948.75 26.00 8-Sep-10 Adjust Fixtures, Key Way & Rosemont $ 1,575.00 NO. DATE SANITARY SEWER CHANGE ORDERS CHANGE ORDER DESCRIPTION TOTAL CHANGE ORDER AMOUNT 1.00 10- Feb -10 Connect 8 -inch sewer line from Kennedy Circle not shown in plans to the 84 -inch manhole. $ 848.24 2.00 10- Mar -10 72" Dia. Sanitary Manhole Flat Top (1) $ 1,050.00 3.00 10- Mar -10 60" Dia. Sanitary Manhole Flat Top (1) $ 610.00 4.00 10- Mar -10 48" Dia. Sanitary Manhole Flat Top (4) $ 1,400.00 10.00 5- Apr -10 12 -inch diameter sanitary extension 5 3,569.40 11.00 5- Apr -10 12 -inch x 4 -inch Tap with materials $ 523.25 12.00 5- Apr -10 12 -inch x 8 -inch reducer and pipe $ 490.48 13.00 5- Apr -10 16 -Inch casing pipe, installed $ 250.47 18.00 16-Jun-10 24 -inch, 45 degree bend $ 1,520.65 22.00 2- Jul -10 Raise sanitary manhole $ 925.75 24.00 17-Jul-10 Field Adjust Manhole due to location of existing sanitary lines $ 1,825.63 27.00 8-Sep-10 Fence Repairs behind 3585 Keystone & 3594 Keymeer $ 1,150.00 APPROVED: Michael Van Milligan, ity City of Dubuque, low Total Contract Work Performed to Date: Total Change Order Work Performed to Date: Total Due Contractor: $ 1,626,471.56 Total miscellaneous Project Costs: $ Total Engineering Work Performed: $ 204,167.39 Total Land Acquisition and /or Easement Costs: $ 16,939.00 TOTAL PROJECT COST: $ 1,847,577.95 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above Improvement. Gus Psihoyos, City Engineer City of Dubuque, Iowa PROJECT COST SUMMARY Total Change Order Work Performed to Date: Total Change Order Work Performed to Date: $ 1,549,507.34 $ 76,964.22 APPROVED: BY: 7) $ 14,163.87 $ 62,800.35 The Undersigned, Portzen Construction, Inc., contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement.