Loading...
Signed Contract_WPC Plant Upgrade, Strand Assoc Construction Amendment #1Masterpiece on the Mississippi TO: FROM: SUBJECT: INTRODUCTION DISCUSSION Michael C. Van Milligen Steve Sampson Brown, Water Pollution Control Strand Associates, Inc. Amendment 1 DATE: October 15, 2010 , City Manager Project Manager Plant Upgrade Project — Construction - Related Services Agreement This memorandum is to seek your approval and execution of Amendment No. 1 to the July 19, 2010 Agreement for Construction - Related Services between the City of Dubuque and Strand Associates, Inc. (Strand) for the Water Pollution Control Plant (WPCP) Upgrade Project (Project). This Amendment provides for the redesign of the ultraviolet (UV) system that is used in the process of cleaning waste water. When Strand originally designed the ultraviolet system, it utilized a UV system manufactured by Siemens. In accordance with the plans and specifications, the awarded contractor can recommend an alternate manufacturer to the UV system. Thus, Miron Construction, Inc., the prime contractor, recommended that the UV system be provided by Ozonia, a worldwide manufacturer of ozone generation and UV technology for industrial and municipal water treatment. The City, as well as Strand, has reviewed the impact to the Project and approved Ozonia as the alternate UV system manufacturer. Ozonia's system is cost - comparable and can provide the necessary system reliability and technical support. Dubuque *ABM City 11111 r 2007 BUDGET IMPACT In order to implement the Ozonia solution, redesign services of $8,000 performed by Strand will be paid by the City. Miron, however, will compensate the City via deductive change order in the amount of $28,000 -- $20,000 for the plan /specification change; and $8,000 for reimbursement of the Strand redesign services. The net result will be a $20,000 savings for the City. This procedure follows the requirements of the WPCP contract documents as they apply to equipment alternate substitutions. ACTION TO BE TAKEN The execution of Amendment No. 1 to the July 19, 2010 Strand Associates agreement is requested. cc: Jenny Larson, Budget Director Jonathan Brown, Water Pollution Control Plant Manager Gus Psihoyos, City Engineer Attachs. K: \PROJECTS \Water Pollution Control Plant Replacement\ Construction Admin\ Contracts\2010 10 -15 -10 MVM Memo re Strand Construction Services, Amendment 1.doc Ea STRAND ASSOCIATES. INC. E N G I N E E R S 910 West Wingra Drive Madison, WI 53715 Phone: 608 - 251 -4843 Fax: 608 - 251 -8655 Madison, WI Joliet, IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH Phoenix, AZ www.strand.com Office Locations September 16, 2010 City of Dubuque 50 West 13th Street Dubuque, IA 52001 -4864 Attention: Mr. Michael C. Van Milligen, City Manager Re: Amendment No. 1 to the July 19, 2010, Agreement for Construction- Related Services Water Pollution Control Plant Modifications This is Amendment No. 1 to the referenced Agreement. Under Scope of Services, ADD the following: "UV System Redesign Services These Services include redesign of the UV System to accommodate an alternate equipment manufacturer." Under Compensation, ADD the following to the second table: "UV System Redesign Services $8,000 Hourly plus expenses" IN WITNESS WHEREOF the parties hereto have made and executed this Amendment. ENGINEER: OWNER: STRAND ASSOCIATES, INC. CITY OF DUBUQUE 9/2o//c s (/'4 ka Matthew S. Richards Date ichael C. Van Milligen Date Corporate Secretary City Manager RAW:mro\R:\ MAD\ Documents\Agreements\D\Dubuque, City of ( IA)\ WtrPollutionCn trlPlnt.2010\Agr\Amd \l 154.023.1.docx