TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Green Alley Project (15th - 16th, between Washington & Elm Streets)
(CIPs 2622044, 7401405, 7101335)
DATE: November 8, 2010
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Green Alley Project (15 — 16 between Washington & Elm Streets), as
completed by Connolly Construction, Inc. in the final contract amount of $164,306.81,
which is a 6.7% increase from the original contract of $154,046.52. The cost increase
was due to additional watermain valve replacement needed to properly shut down the
watermain during the project. Also, the storm sewer line in 15 Street had to be
repaired.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
Mich el C. Van Milligen
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Mana e
FROM: Gus Psihoyos, City Engineer
SUBJECT: Green Alley Project (15 — 16 between Washington & Elm Streets)
(CIPs 2622044, 7401405, 7101335)
DATE: November 5, 2010
INTRODUCTION
DISCUSSION
Dubuque
an- Amalcacily
1
2007
The enclosed resolution provides for the acceptance of the construction contract for the
Green Alley Project (15 — 16 between Washington & Elm Streets).
BACKGROUND
The Green Alley Project (15 — 16 between Washington & EIm Streets) included:
— Reconstruction of the alley pavement surface with interlocking concrete pavers
between Washington & Elm Streets, from 15 Street to 16 Street.
— Watermain reconstruction.
— Replacement of seven (7) lead water services with copper.
— New concrete sanitary manholes in the alley and on 15 and 16 Streets.
Since the project was funded utilizing Community Development Block Grant, American
Recovery & Reinvestment Act funds (CDBG /ARRA), no assessments were levied for
the project.
The Green Alley Project (15 — 16 between Washington & EIm Streets) was
completed by Connolly Construction, Inc. of Peosta, Iowa, in the final contract amount
of $164,306.81, which is a 6.7% increase from the original contract of $154,046.52.
The cost increase was due to additional watermain valve replacement needed to
properly shut down the watermain during the project. Also the storm sewer line in 15
Street had to be repaired.
RECOMMENDATION
I recommend that the City Council accept the improvements and establish the final
contract at $164,306.81 for the Green Alley Project (15 — 16 between Washington &
Elm Streets).
BUDGET IMPACT
The project cost summary for the Green Alley Project (15 — 16 between Washington
& Elm Streets) is as follows:
Construction Contract
Contingency
Construction Engineering & Inspection
Total Project Cost
The project funding summary is as follows:
CIP No.
2622044
7401405
7101335
ACTION TO BE TAKEN
Award
$154,046.52
13,643.95
15,008.35
$182,698.82
Fund
Fund Description Amount
Community Development Block Grant Recovery Funds $79,995.28
Water Main Replacement Program 71,825.56
Sanitary Sewer Manhole Replacement Fund 24,161.78
Total Project Funding $175,982.62
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $164,306.81 to
Connolly Construction, Inc. for the Green Alley Project (15 — 16 between Washington
& Elm Streets).
Prepared by Jon Dienst, P.E., Civil Engineer II
cc: Jenny Larson, Budget Director
Don Vogt, Public Works Director
John Klostermann, Street & Sewer Maintenance Supervisor
David Harris, Housing & Community Development Director
Bob Green, Water Department Manager
Bob Schiesl, Assistant City Engineer
Aggie Tauke, Community Development
Final
$164,306.81
0.00
11,675.81
$175,982.62
RESOLUTION NO. 437-10
ACCEPTING THE GREEN ALLEY PROJECT (15 — 16 BETWEEN
WASHINGTON & ELM STREETS) AND AUTHORIZING THE PAYMENT OF THE
CONTRACT AMOUNT TO THE CONTRACTOR
Whereas, the Public Improvement Contract for the Green Alley Project (15th —
16 between Washington & Elm Streets) (the Project) has been completed and the City
Engineer has examined the work and filed a certificate stating that the Project has been
completed according to the terms of the Public Improvement Contract and that the City
Engineer recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Community Development Block Grant Recovery Funds, Water Main Replacement
Program, and Sanitary Sewer Manhole Replacement Fund appropriations for the
contract amount of $164,306.81 Tess any retained percentage provided for therein as
provided in Iowa Code chapter 573, and to pay such retainage only in accordance with
the provisions of Iowa Code chapter 573.
Attest:
Jeanne F. Schneider, CMC, City Clerk
Passed, approved and adopted this 15th day of No vember 2010.
Roy D. uol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE GREEN ALLEY
PROJECT (15 —16 BETWEEN WASHINGTON & ELM STREETS)
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Green Alley Project (15 — 16 between Washington & Elm
Streets), that the Project has been performed in compliance with the terms of the Public
Improvement Contract, and that the total cost of the completed work is $175,982.62.
Dated this 4th day of November, 2010.
City Engineer
Filed in the office of the City Clerk on the 9th day of November, 2010.
eanne F. Schneider, CMC, City Clerk
PARTIAL PAYMENT NO: COUNCIL FINAL
PROJECT NAME:
CONTRACTOR:
Green Alley Pilot Project
Connelly Construction, Inc.
City of Dubuque - Engineering Division
FINAL PAYMENT FORM
BID ITEM DESCRIPTION
EXCAVATION & STONE
1 Remove Pavement SY
2 Remove Existing Manhole Each
3 Excavation, Unclassified CY
4 Select Backfill Ton
5 Bedding and Void Opening Aggregates (ASTM #8 Washed stone) Ton
6 Porous Aggregate (ASTM #57 washed stone) Ton
7 Porous Aggregate (ASTM #2 washed stone) Ton
8 Backfill, Topsoil SY
9 Existing Curb & Gutter Removal (as indicated /approved by City Engineer) LF
10 Subbase Granular Material (6" Thick) Ton
PAVEMENT
11 PCC Concrete Collar - Standard Concrete
12 Permeable Concrete Block Pavers
13 HMA 300k Headers & Streets, 1/2" (PG 64 -22)
14 HMA 300k Driveways, 1/2" (PG 64 -22)
15 PC Concrete Sidewalk, 4 ", Remove & Construct
16 PC Concrete Sidewalk, 6 ", Remove & Construct
17 PC Concrete Curb, 2.5', Construct
18 Geotechnical Fabric
19 Furnish & Install Green Alley Identifier Panel
20 PC Concrete Access Ramp, Detectable
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
WATER MAIN
10" DIP, Class 52 w. /Polywrap & Tracer Wire
3/4" Copper Service Line TYPE K
1" Copper Service Line TYPE K
3/4" Tap & Curb Box/Stop Box W/ installation
1" Tap & Curb Box/Stop Box W/ installation
10" RS Gate Valve & Box
6" RS Gate Valve & Box
10" x 10" Tee MJ
10 "x6" TeeMJ
10" 90 Degree Bend
10" Solid Sleeve
10" x 6" Reducer
10 "CapMJ
6" DIP w. /Polywrap & Tracer Wire
6" Solid Sleeve
10" Mega Lug
6" Mega Lug
Fixture Adjustment, Valves & Manholes
SANITARY SEWER
39 18" DIP w. /Bedding
40 48" Diameter Manhole Base
41 48" Diameter Manhole Sidewall
42 Manhole Frame & Cover
UNIT
SY
SF
Ton
Ton
SF
SF
LF
SY
Each
Each
LF
Each
VF
Each
MISCELLANEOUS
43 Sawcut, (Regardkess of Pavement Type) LF
UNIT COST
$3.85
$515.00
$9.15
$17.50
$17.50
$20.95
$26.70
$12.00
$6.85
$19.20
$38.30
$5.15
$106.01
$106.01
$4.35
$5.65
$16.80
$1.25
$155.00
$93.00
$126.00
$965.00
$125.00
$270.00
$3.15
CONTRACT AMOUNT: $154,046.52
QUANTITY
TO DATE
703.00
3.00
250.00
992.89
35.68
166.41
256.47
75.00
62.70
128.10
130.70
3136.00
61.90
37.00
50.80
166.25
62.30
809.00
2.00
4.00
LF $55.10 341.30
LF $19.80 139.00
LF $20.90 10.00
Each $585.00 16.00
Each $615.00 1.00
Each $1,490.00 4.00
Each $802.00 4.00
Each $358.00 3.00
Each $287.00 1.00
Each $289.00 1.00
Each $219.00 5.00
Each $171.00 3.00
Each $124.00 3.00
LF $36.80 11.00
Each $120.00 3.00
Each $93.00 34.00
Each $60.00 15.00
Each $396.00 11.00
16.85
2.00
19.50
2.00
DATE: November 2, 2010
AMOUNT EARNED
TO DATE
$ 2,706.55
$ 1,545.00
$ 2,287.50
$ 17,375.58
$ 624.40
$ 3,486.29
$ 6,847.75
$ 900.00
$ 429.50
$ 2,459.52
$ 5,005.81
$ 16,150.40
$ 6,562.02
$ 3,922.37
$ 220.98
$ 939.31
$ 1,046.64
$ 1,011.25
$ 310.00
$ 372.00
$ 18,805.63
$ 2,752.20
$ 209.00
$ 9,360.00
$ 615.00
$ 5,960.00
$ 3,208.00
$ 1,074.00
$ 287.00
$ 289.00
$ 1,095.00
$ 513.00
$ 372.00
$ 404.80
$ 360.00
$ 3,162.00
$ 900.00
$ 4,356.00
$ 2,123.10
$ 1,930.00
$ 2,437.50
$ 540.00
262.40 $ 826.56
44 6" Subdrain (Perforated Drain Tile)
45 Connect Subdrain to Storm Sewer Pipelines
46 Waterproofing Membrane
47 2" Insulation Board
48 Sod
49 Dust Control Surface Treatment
50 Erosion Control Plan - Operating Procedures
51 Traffic Control & Safety Control
52 Mobilization
C1 Connect 18" DIP to 15" Clay & Connect 8" Lateral- Sanitary Sewer
C2 Connect 6" Lateral on 15th Street
C3 Add 8" Lateral Opening to Manhole Base in 16th St. Manhole
C4 Install Gate Valves in Alley between 16th & 17th Street
C5 Remove & Replace clay Storm Sewer with 24" RCP
C6 6" Macro coupling
C7 Saw Manhole Top down 1.5" to 2"
C8 Tap 15" DIP
C9 Night Work for Water
C10 Concrete along Foundations
C11 Excavation for wall
LF $11.00 313.00
LS $555.00 1.00
SF $5.80
SY $9.50 64.10
SY $6.00 80.81
MGAL $40.00
LS $3,895.00 1.00
LS $3,445.00 1.00
LS $4,040.00 1.00
LS
LS
LS
LS
LS
LS
LS
LS
LS
CY
CY
TOTAL AMOUNT EARNED TO DATE:
1.00 $ 2,959.82
1.00 $ 419.97
1.00 $ 1,084.25
1.00 $ 150.00
1.00 $ 2,791.71
2.00 $ 147.30
1.00 $ -
1.00 $ 1,340.00
1.00 $ 490.00
10.00 $ 203.00
41.00 $ 12.00
TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS:
TOTAL AMOUNT EARNED TO DATE:
$ 3,443.00
$ 555.00
$ 608.95
$ 484.86
$ 3,895.00
$ 3,445.00
$ 4,040.00
152,254.46
$ 2,959.82
$ 419.97
$ 1,084.25
$ 150.00
$ 2,791.71
$ 294.60
$ -
$ 1,340.00
$ 490.00
$ 2,030.00
$ 492.00
$
$ 12,052.35
$ 164,306.81
TOTAL DUE CONTRACTOR: 1 $ 164,306.81 1
ENGINEERING: 1 $11,675.81 1
TOTAL CONSTRUCTION COST: 1 $175,982.62 1
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement shows in detail the correct amount of all wQ squired to complete the above improvement.
APPROVED:
Michael Van Milligen, Cit Manager
City of Dubu ue wa
APPROVED:
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR:
The undersigned, contractor for the above improvement, does hereby
accept the above "Total Due Contractor ", as full settlement for all claims for said improvement.
CONTRACTOR: C0 , r1. 1 ‘ , r1. 1 ‘ • I I ,/ /
BY: J:i
TITLE: L • P
DATE: //:- 2'-
PI J4rL