Locust St Connector finalMEMORANDUM November 19, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Locust Street Connector Public Works Director Mike Koch is recommending acceptance of the Locust Street Connector Project, as completed by Portzen Construction, Inc., in the final contract amount of $66,582.31. ' I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director MEMORANDUM November 19, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Locust Street Connector INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Locust Street Connector Project. DISCUSSION Work has been completed on the project by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $66,582.31. The reconstruction of the Locust Street Connector was a joint venture between the City and the Iowa Department of Transportation (IDOT) for the widening of the Locust Street Connector. This project widened northbound Locust Street to allow the creation of two right-turn lanes from Locust Street onto the Locust Street Connector, which would, in turn, connects to Highway 61/151. This reconstruction provides two-lane continuity from eastbound US 20 continuously to connect with US 61/151. This improves the efficiency of this connector while at the same time creating better utilization of the outside left-turn lane for eastbound US 20 traffic, which currently carries little traffic in comparison to the inside left-turn lane. RECOMMENDATION I recommend that the City Council accept the improvements and the final contract be established at $66,582.31. BUDGET IMPACT A summary of the project cost is as follows: Bid Award Final Construction Contract Contingency Engineering $56,920.20 $66,582.31 7,268.44 0 5,572.47 6,319.48 Total Project Cost $69,761.11 $72,901.79 The project was funded as follows: Sales Tax Fund Iowa Department of Transportation $35,390.14 34,370.97 $36,281.52 36,620.27 Total Project Funding $69,761.11 $72,901.79 The Iowa Department of Transportation will pay 55 percent (55%) of the project cost, excluding the engineering. The remaining balance for the project will be taken from the Fiscal Year 2003 appropriation of $67,503. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Michael Felderman, Civil Engineer cc: Pauline Joyce, Administrative Services Manager Iowa Department of Transportation RESOLUTION NO. 472-03 ACCEPTING IMPROVEMENT Whereas, the contract for the Locust Street Connector Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE iT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Sales Tax Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 1st day of December, 2003. Terrence M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk ~,~eanne F. Sc~-~eider, CMC, City Clerk RESOLUTION NO. 473-03 FINAL ESTIMATE Whereas, the contract for the Locust Street Connector Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $72,901.79 and the said amount shall be paid from the Sales Tax Fund of the City of Dubuque, iowa. Passed, approved and adopted this 1st day of December ,2003. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk PARTIAL PAYMENT: PROJECT NAME: CONTRACTOR: CODE City of Dubuque FINAL ITEM DATE: Nov 3, 2003 CONTRACT AMOUNT: $56,920.20 Q3~'. UNIT COST TO DATE COST 9 i0 12 13 14 15 E-I 1103.0200 Excavation, Unclassified 1105.0100 Backfill Limestone 1105.0103 Backfill Topsoil 1201.0100 Cffaded StoneBase 1301.1302 ACC Surface Course (Temporal) 1401.1600 PC Concrete Pavement, (10"), M4, CD 1402.0162 PC Concrete Pavement, (4"), Class 'C" Median 1402.0500 Removal of Concrete Pavement (w/curbs) 1402.0700 Adjusmaent of Fixture in Concrete Pavement 1403.0100 PC Concrete Carb & Gutter Placement Modify Existing RA 41 Intake 1602.0100 Sodding 1705.0100 Sawcut Concrete 1801.0000 Pavement Maddng 2000.00o0 Traffic Control EXTRA WORK 101 B Intake ACC Surface Course (Temporaw)Machine CY Ton CY Ton Ton SY SY SY Each LF Each SY LF LS LS Ton $0.00 6.00 I08.79 $652.74 8.00 0 $0.00 18.00 95.84 $1,725.12 9.50 155.97 $1,481.72 50.00 0 $0.00 38.33 920.06 $35,265.90 27.00 40.87 $1,103.49 6.00 1092.24 $6,553.44 275.00 1 $275.00 15.00 0 $0.00 800.00 1 $800.00 7.00 615 $4,305.00 3.00 514.1 $1,542.30 500.00 I $500.00 6400.00 1 $6,400.00 t750.00 I $1,750.00 65.00 65.04 $4,227.60 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST $66,582.3i $6,319.48 $72,901.79 I hereby certify that the above ~atement shows in detail the correct amotmt o f/a~3ork ~e~l~k/d/o complete th~a;,bove improvement. Michael V~an Milligen, City Manager City of Dubuque,Iowa Michael ~.. Koch Public Works The undea~gned, , contractor for the above m~prOvement, does hereby accept li~e above "Total Due Contractoff', as full settlement for alt claims for said improvement.