Traffic Signal Mastarm Retrofit Project Central Avenue, 5th and 7th Street AcceptanceMasterpiece on the Mississippi Dubuque ketd All- Ameilcaeity 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Traffic Signal Mastarm Retrofit Project, Central Avenue at 5th and 7th Streets (CIPs 1001133, 3001133, 2501615, 1021609) DATE: November 24, 2010 City Engineer Gus Psihoyos is recommending acceptance of the Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets, as completed by A &G Electric, in the final contract amount of $156,897.58, which is an 11.5% increase from the original contract amount of $140,735.88. This increase was due to the addition of fiber optic conduit and electrical service feeds to adjacent signals located on Iowa Street (at 5th and 7 This additional work allowed the signals on Iowa Street to be on battery back- up and also allows for future fiber connectivity when these two signals on Iowa Street are rebuilt. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Mi ael C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Mana FROM: Gus Psihoyos, City Engineer SUBJECT: Traffic Signal Mastarm Retrofit Project, Central Avenue Streets (CIPs 1001133, 3001133, 2501615, 1021609) DATE: November 24, 2010 INTRODUCTION Dubuque kilkd AI-America City I 2007 at 5 and The enclosed resolution provides for the acceptance of the construction contract for the Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets. BACKGROUND The Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7th Streets included the standardization of mastarm- mounted signals along the Central Avenue corridor. The project also included: pre - emption capabilities; battery back -up systems; fiber optic interconnect between the signals; and monitoring equipment that will allow remote management via the Traffic Operation Center. DISCUSSION The Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets was completed by A &G Electric of Dubuque, Iowa, in the final contract amount of $156,897.58, which is an 11.5% increase from the original contract amount of $140,735.88. This increase was due to the addition of fiber optic conduit and electrical service feeds to adjacent signals located on Iowa Street (at 5 and 7 This additional work allowed the signals on Iowa Street to be on battery back -up and also allows for future fiber connectivity when these two signals on Iowa Streets are rebuilt. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $156,897.58 for the Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets. 7th BUDGET IMPACT The project cost summary for the Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets is as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost The project funding summary is as follows: CIP 1001133 3001133 2501615 1021609 Funding Source ACTION TO BE TAKEN Traffic Signal Mastarm Retrofit Traffic Signal Mastarm Retrofit Signal Intersection Reconstruction Fiber Optic Conduit — Private & Miscellaneous Total Project Funding The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $156,897.58 to A &G Electric for the Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets. Prepared by David Ness, PE cc: Jenny Larson, Budget Director Julie Neebel, IIW Engineers & Surveyors, PC Award $140,735.88 15,950.00 26,317.50 $183,003.38 Final $156,897.58 23,534.64 $180,432.22 Amount $ 61, 907.26 91,105.89 10,612.67 16,806.40 $180,432.22 ACCEPTING THE TRAFFIC SIGNAL MASTARM RETROFIT PROJECT, CENTRAL AVENUE AT 5 AND 7 STREETS, AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Traffic Signal Mastarm Retrofit, Signal Intersection Reconstruction, Fiber Optic Conduit — Private and Miscellaneous appropriations for the contract amount of $156,897.58 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 6th day of December 2 � i -e:- anne F. Schneider, CMC, City Clerk RESOLUTION NO. 451 -10 Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE TRAFFIC SIGNAL MASTARM RETROFIT PROJECT, CENTRAL AVENUE AT 5 AND 7 STREETS The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Traffic Signal Mastarm Retrofit Project, Central Avenue at 5 and 7 Streets, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $180,432.22. Dated this, yay of f&eX2010. City Et gineer Filed in the office of the City Clerk on theme/ day of/ y/ h 2010 4„ " ) -- eanne F. Schneider, CMC, City Clerk Masterpiece on the Mississippi PROJECT NAME: TRAFFIC SIGNAL MASTARM RETROFIT CENTRAL AVENUE AT 5TH AND 7TH STREET CONTRACTOR: BID ITEM DESCRIPTION City of Dubuque - Engineering Division Project Close Out Form A &G Electric CONTRACT AMOUNT: $ 140,735.89 UNIT CONTRACT QUANTITY CONTRACT UNIT COST FINAL QUANTITY DATE: 10- Nov -10 TOTAL AMOUNT EARNED COMP. SAFETY IMPROVEMENTS 1 MOBILIZATION & MISCELLANEOUS LS 1.00 $ 735.00 1.00 $ 735.00 100.00% 2 REMOVE CURB & GUTTER LF 81.50 $ 7.35 100.50 $ 738.68 123.31% 3 REMOVAL OF SIDEWALK SY 135.00 $ 14.17 204.78 $ 2,901.73 151.69% 4 REMOVAL OF HMA PAVEMENT SY 30.00 $ 18.90 51.46 $ 972.59 171.53% 5 SIDEWALK, P.C. CONCRETE, 4 IN. SY 135.00 $ 34.02 208.78 $ 7,102.70 154.65% 6 DETECTABLE WARNING - CURB RAMP SF 64.00 $ 23.62 56.00 $ 1,322.72 87.50% 7 PCC CURB & GUTTER LF 81.50 $ 14.70 100.50 $ 1,477.35 123.31% 8 HMA PAVEMENT PATCH, 6" TON 10.00 $ 131.25 11.84 $ 1,554.00 118.40% 9 TRAFFIC CONTROL LS 1.00 $ 2,992.00 1.00 $ 2,992.00 100.00% 10 INSTALL TRAFFIC SIGNAL CONTROL CABINET & FOUNDATION EA 2.00 $ 2,454.37 2.00 $ 4,908.74 100.00% 11 INSTALL TESCO BATTERY BACKUP AND FOUNDATION EA 2.00 $ 1,987.12 2.00 $ 3,974.24 100.00% 12 FIBER VAULT, SQUARE EA 1.00 $ 2,798.25 $ 13 24" ROUND HANDHOLES EA 2.00 $ 1,165.50 4.00 $ 4,662.00 200.00% PRECAST RECTANGULAR HANDHOLE WITH R6689 LID STATING 14 "TRAFFIC SIGNALS" EA 2.00 $ 1,963.50 2.00 $ 3,927.00 100.00% 15 REMOVAL OF TRAFFIC SIGNALIZATION LS 1.00 $ 8,022.00 1.00 $ 8,022.00 100.00% 16 TRAFFIC SIGNALIZATION LS 1.00 $ 61,449.53 1.00 $ 61,449.53 100.00% 17 INSTALL OPTICOM SYSTEM & RECEIVERS EA 6.00 $ 189.67 6.00 $ 1,138.02 100.00% 18 CONNECT TO EXISTING FIBER VAULT EA 5.00 $ 634.20 8.00 $ 5,073.60 160.00% 19 #8 XHHW CONDUCTOR LF 1320.00 $ 1.55 1320.00 $ 2,046.00 100.00% 20 #10 XHHW CONDUCTOR LF 1005.00 $ 1.17 1005.00 $ 1,175.85 100.00% 21 PRE EMPT CABLE (OPTICOM P138) LF 355.00 $ 1.65 355.00 $ 585.75 100.00% 22 12C #14 SIG LF 525.00 $ 2.55 525.00 $ 1,338.75 100.00% 23 #6 1C GROUND LF 865.00 $ 1.63 865.00 $ 1,409.95 100.00% 24 #10 1C TRACE LF 1335.00 $ 1.05 1335.00 $ 1,401.75 100.00% 25 CONDUIT, RIGID PVC, PUSHED OR TRENCHED, 2" LF 845.00 $ 13.26 1423.00 $ 18,868.98 168.40% 26 CONDUITS LF 385.00 $ 31.01 315.00 $ 9,768.15 81.82% 27 CONDUIT, RIGID PVC, PUSHED OR TRENCHED, 4" LF 120.00 $ 20.78 190.00 $ 3,948.20 158.33% TOTAL AMOUNT EARNED TO DATE: 1 $ 153,495.28 1 109.07% CHANGE ORDER - EXTRA WORK ITEMS CHANGE PREVIOUS CURRENT TOTAL ORDER TOTAL PAY PERIOD ADJUSTMENT AMOUNT ADJUSTMENT ADJUSTMENT TO DATE Comp. 1 18- Jan -10 Bid Item #12- Provided material only, did not install $ 1,388.00 $ 1,388.00 $ - $ 1,388.00 100.00% 2 18- Jan -10 Bid Item #13- Installation only for (2) City Provided 24" Round Handholes $ 1,000.00 $ 1,000.00 $ $ 1,000.00 100.00% 3 18- Jan -10 Bid Item #13- Adiustment to Estimated Price for Above Item $ 80.00 $ 80.00 $ $ 80.00 100.00% 4 18- Jan -10 Extra - 6" PCC patch at radius' of intersections where curb was replaced $ 934.30 $ 934.30 $ $ 934.30 100.00% 5 $ - $ $ $ - Total Amount Earned to Date - Change Order: 1 $ 3,402.30 Total Amount Earned to Date: I $ 156,897.58 PAYMENTS PREVIOUSLY APPROVED: CIP Description Amount to Date Total Contract 1011133 Traffic Signal Mastami Re $ 53,832.40 $ 53,832.40 1 $ 86,197.92 7 3001133 Traffic Signal Mastarm Re $ 79,222.51 $ 63,060.81 2 $ 31,587.65 8 3001615 Signal Intersection Reconstruction $ 9,228.41 $ 9,228.41 3 $ 31,267.12 9 1021609 Fiber Opt Con -Priv & amp; Misc $ 14,614.26 $ 14,614.26 4 $ 7,844.88 10 $ - 5 11 $ 6 12 $ - $ TOTAL PAYMENTS FORWARDED: 1 $ 156,897.58 1 $ $ Total $ 156,897.58 $ 140,735.88 Project Engineering Cost Summary Project Cost / Funding Summary Staff Consultant Total Eng. Construction Total Eng. Total Project CIP CIP Cost Costs Cost CIP Costs Cost Cost Funding 1011133 $ 8,074.86 $ 8,074.86 1011133 $ 53,832.40 $ 8,074.86 $ 61,907.26 $ 70,000.00 3001133 $ 11,883.38 $ 11,883.38 3001133 $ 79,222.51 $ 11,883.38 $ 91,105.89 $ 82,000.00 3001615 $ 1,384.26 $ 1,384.26 3001615 $ 9,228.41 $ 1,384.26 $ 10,612.67 $ 12,000.00 1021609 $ 2,192.14 $ 2,192.14 1021609 $ 14,614.26 $ 2,192.14 $ 16,806.40 $ 19,003.38 $ - $ - $ $ - $ $ - $ $ $ - $ - Total: $ 23,534.64 $ $ 23,534.64 Total: $ 156,897.58 $ 23,534.64 $ 180,432.22 $ 183,003.38 The undersigned, PROJECT SUMMARY Total Due Contractor: 1 $ 156,897.58 Total Engineering: 1 $ 23,534.64 Direct Material Purchases: CIP: 3001274 $ 28,750.00 CIP: 3001615 $ 16,500.00 CIP: 1012044 $ 11,839.00 1 $ 57,089.00 I CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correc mount of all work required to complete the above improvement. APPROVED: APPROVED: A &G Electric Total Project Cost: I $ 237,521.22 I Michael Van Milligen, City Manager City of Dubuque, low BY: ✓��� /. 7 TITLE: M A./096.- - DATE: /i /a 9//U Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: 1 contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for said improvement. CONTRACTOR: /i t& ELec77 /L