Iowa 32 Bike Hike Trail Phase 2 Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Iowa 32 Bike /Hike Trail Phase 2 Project, CIP #100 -1157 DATE: November 29, 2010 Leisure Services Manager Marie Ware is recommending acceptance of the Iowa 32 Bike /Hike Trail Phase 2 Project (between JFK Road and Plaza Drive), as completed by Connolly Construction, in the final contract amount of $266,265, which is an increase of $79,017 from the bid amount of $187,248. This increase is due to change orders for more stone base to stabilize trail, installation of drain tile along trail, and French drains for seepage; remobilization; payment for actual on quantity items for erosion control; and addition of detectable warning panels at crossing. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Marie L. Ware, Leisure Services Manager Mic el C. Van Milligen Dubuque bitd All- America City ' 2007 Masterpiece on the Mississippi TO: FROM: SUBJECT: DATE: INTRODUCTION The purpose of this memorandum is to recommend that the City Council accept the Iowa 32 Bike /Hike Trail Phase 2 Project (between JFK Road and Plaza Drive). DISCUSSION The Iowa 32 Bike /Hike Trail Phase 2 Project has been completed by Connolly Construction in the final contract amount of $266,265. A summary of the project costs is as follows: Construction contract Contingency Engineering TOTAL ACTION STEP Michael C. Van Milligen, City Manager Marie L. Ware, Leisure Services Manager Iowa 32 Bike /Hike Trail Phase 2 Project, CIP #100 -1157 November 29, 2010 The change orders included more stone base to stabilize trail, installation of drain tile along trail, and French drains for seepage; remobilization; payment for actuals on quantity items for erosion control; and addition of detectable warning panels at crossing. Additional engineering charges related to stabilization of the trail and drainage in addition to work and numerous meetings to resolve asphalt depth issue. City Engineering was responsible for inspection services not included in contract with the engineering firm hired and assistance with resolution of drainage and depth issues. The action requested is that the City Council adopt the attached resolution accepting the improvement and setting the final cost. MLW:et attachment copy Jon Dienst / Gus Psihoyos / Laura Carstens Estimated cost Bid amount Actual cost $ 180,942 $ 187,248 $ 266,265 $ 3,617 $ 15,441 $ 15,441 $ 41,829 $ 200,000 $ 202,689 $ 308,094 Dubuque kilizi M- America Clty ' s 2007 Preparer: Marie L. Ware ACCEPTING THE IOWA 32 BIKE /HIKE TRAIL PHASE 2 PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Iowa 32 Bike /Hike Trail Phase 2 Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Iowa 32 Bike /Hike Trail Phase 2 Project appropriation for the contract amount of $266,265 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 6th day of December , 2010. eanne F. Schneider, CMC, City Clerk Address: 2200 Bunker Hill Rd Phone: (563) 589 -4263 RESOLUTION NO. 454 -10 Roy D. Buol, Mayor J TO: Michael C. Van Milligen, City Manager FROM: Marie L. Ware, Leisure Services Manager SUBJECT: Covering final overages for Iowa 32 Hike/Bike Trail Phase 2, CIP 100 -1157 DATE: November 29, 2010 INTRODUCTION The purpose of this memorandum is to provide the account changes to accommodate the final overages for the Iowa 32 Hike /Bike Trail Phase 2 project that runs from JFK to Plaza Drive. BACKGROUND The City of Dubuque received a REAP grant in 2008 for $200,000 for the project. The original construction project of $202,027 was approved by Council in late July of 2009. This small overage was to come from savings by other FY 2010 Park Division CIP's. The project through a series of four change orders most relating to drainage and additional engineering costs is now estimated to be $291,333. This is $91,333 over the REAP grant. The Council in September, 2010 approved paying for this overage through Pamela/Ramona Joint Repair savings of $39,980, Library HVAC Maintenance savings of $17,275 and funds from CIP 3501453 Eagle Point Park Overlook Sidewalk of $34,078. DISCUSSION As you are aware the original layer of asphalt for the trail had depth issues throughout the length of the trail. We worked between the contractor, Connolly Construction, our hired engineer, Ken Buessing & Associates as well as the city engineering staff to come to a resolution for the depth problem. An additional course of asphalt was overlaid on the trail recently which addressed the depth issues. Connolly Construction and their sub River City Paving completed this repair at no charge to the city. This however resulted in additional charges to the project from Buessing & Associates as well as the City Engineering Department for additional meetings to come up with a resolution to the issue, design review of the proposed resolution, and inspection of the overlay project. This work was mainly done September through November. The additional engineering cost was about $6550. This project was also bid with erosion control that to be billed for time and materials. The rainy year and a half since the project started caused this number, which was never budgeted for in the project to grow throughout the entire project. This final total is a little over $7000. Several other minor improvements that were approved for time and materials throughout the project have now been billed. The final overage is $16,041 for this project. The plan to cover this final overage is as follows: CIP 3501158 Renovate park water system $16,041 $20,000 was budgeted for engineering and we will be doing most of this project via expertise in -house in the Parks Division. This would leave $3959 as necessary for expertise outside the department. RECOMMENDATION Jenny and I recommend the above plan to cover the overage. ACTION REQUESTED I request approval of this recommendation. Attachment: Project breakdown spreadsheet cc: Laura Carstens Gus Psihoyos Jon Dienst Jenny Larson Bob Fritsch EXPENSES BUDGET ACTUAL Ken Buesing & Associates for design and staking $ 15,441 $ 15,441 original amount approved by committee Additional work $ 5,874 $ 14,006 changes associated in construction, earthwork quantities, change orders, to topo work Estimated additional $ 5,000 $ 39,980 Approved by Council 9 -10 work related to problems $ 17,275 Approved by Council 9 -10 CIP 3501453 Eagle Point Park Overlook Sidewalk $ 26,315 $ 29,447 Approved by Council 9 -10 $ 16,041 Proposed to come from CIP 3501158 Connolly Construction $ 187,248 $ 187,248 original bid approved by Council change order #1 $ 19,884 $ 19,884 increase stone quantity to widen base, earth work related to topo being inaccurate change order #2 $ 9,901 $ 9,901 drain tile placed on upper side trail change order #3 $ 5,812 $ 7,726 add detectable warning panels at crossings remobilization $ 1,200 $ 2,400 remobilization twice change order #4 $ 32,000 $ 30,973 drainage for sloughing problem water valve height adjusted $ 244 Erosion control as allowed by contract billed for time and materials. $ 7,020 Bid outlined this expense to be billed as actuals, the rainy season affected this number that was not a part of the original project estimates greatly Rip rap - billed time & materials $ 869 $ 256,045 $ 266,265 City Engineering $ 7,973 $ 12,382 construction inspection, oversight, expertise Estimated addtl city eng inspection $ 1,000 TOTAL EXPENSE $ 291,333 $ 308,094 I IY V J,yI C 2008 REAP Grant $ 200,000 $ 200,000 (received $180,000 to date) sidewalk funds for crosswalks and pedestrian activ signals at two intersections $ 10,000 Improvement paid separately by this account FY 10 Pamela/Ramona Joint Repair Savings $ 39,980 Approved by Council 9 -10 FY 10 Library HVAC Maintenance $ 17,275 Approved by Council 9 -10 CIP 3501453 Eagle Point Park Overlook Sidewalk $ 34,798 Approved by Council 9 -10 $ 16,041 Proposed to come from CIP 3501158 TOTAL INCOME $ 308,094 IOWA 32 HIKE -BIKE TRAIL PHASE 2 (Northwest Aertial #2) JFK to Plaza Drive CIP 100 -1157 ACTUAL 11 -29 -10