City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Woodland Drive Stormwater Project, as completed by McDermott Excavating, in
the final contract amount of $21,942.75, which is an 18.8% decrease from the original
contract amount of $27,018.20.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
MicI ael C. Van Milligen
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Mana
FROM: Gus Psihoyos, City Engineer
SUBJECT: Woodland Drive Stormwater Project
CIP 7202244
DATE: December 10, 2010
DISCUSSION
Dubuque
keLti
AI- AmaicaCml
1 1 '
2007
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Woodland Drive Stormwater Project.
BACKGROUND
On November 12, 2010, the Engineering Department awarded McDermott Excavating
for the construction of approximately 60 feet of curb and gutter and 1,820 square feet of
a pervious pavement runoff collection system in front of the north entrance to Kennedy
Elementary School. This collection system was necessary to relieve the ponding issues
in this corridor due to the street grade. This area in the past had significant ice build -up
from sump pumps and poor drainage. All of the sump pump drains in the area have
been connected to the storm sewer. Pervious asphalt pavement was installed to assist
in reducing the icing in the area.
Based on Iowa Code § 384.103 and § 364.12(3)(c), and through the competitive quotation
process for public improvements, this project was awarded on November 2, 2010 to
McDermott Excavating of Dubuque, Iowa, in the amount of $27,018.20.
The Woodland Drive Stormwater Project was completed by McDermott Excavating of
Dubuque, Iowa, in the final contract amount of $21,942.75, a 18.8% decrease from the
original contract amount of $27,018.20.
Award Final
Construction Contract $27,018.20 $21,942.75
Contingency 2,701.82 0.00
Construction Engineering & Inspection 4,458.00 1,404.87
Total Project Cost $34,178.02 $23,347.62
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the contract in the amount of $21,942.75 to McDermott Excavating for the Woodland
Drive Stormwater Project.
BUDGET IMPACT
The project funding summary is as follows:
CIP No. Fund Description
7202244 Woodland Storm
3501041 Curb and Catch Basin Replacement
Total Project Funding
ACTION TO BE TAKEN
Fund Amount
$21,000.00
2,347,62
$23,347.62
I respectfully request that the City Council adopt the attached resolution accepting the
improvements and authorizing payment of the contract in the amount of $21,942.75 to
McDermott Excavating for the Woodland Drive Stormwater Project.
Prepared by Jon Dienst, PE
cc: Jenny Larson, Budget Director
Deron Muehring, Civil Engineer II
RESOLUTION NO. 463 -10
ACCEPTING THE WOODLAND DRIVE STORMWATER PROJECT AND
AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Public Improvement Contract for the Woodland Drive Stormwater
Project (the Project) has been completed and the City Engineer has examined the work
and filed a certificate stating that the Project has been completed according to the terms
of the Public Improvement Contract and that the City Engineer recommends that the
Project be accepted; and •
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Woodland Storm and Curb and Catch Basin Replacement fund appropriations for
the contract amount of $21,942.75 Tess any retained percentage provided for therein as
provided in Iowa Code chapter 573, and to pay such retainage only in accordance with
the provisions of Iowa Code chapter 573.
Attest:
Passed, approved and adopted this 20th day of Decembe ! 2010.
eanne F. Schneider, CMC, City Clerk
Roy D. Buol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE WOODLAND
DRIVE STORMWATER PROJECT
The undersigned City Engineer of the City of _Dubuque, Iowa, hereby certifies that he
has inspected the Woodland Drive Stormwater Project, that the Project has been
performed in compliance with the terms of the Public Improvement Contract, and that
the total cost of the completed work is $23,347.62.
Dated this I3 h day of OustAKF A , 2010.
Filed in the office of the City Clerk on the i,5 day of/ 1,1,44,,201
City Engineer
anne F. Schneider, CMC, City Clerk
Masterpiece on the Mississippi
PARTIAL PAYMENT NO: COUNCIL FINAL
PROJECT NAME: WOODLAND DRIVE STORMWATER PROJECT
CONTRACTOR: McDermott Excavating
BID ITEM DESCRIPTION
EXCAVATION & STONE
1 Remove Pavement
2 Excavation, Unclassified
3 Granular Subbase
4 Porous Aggregate (ASTM #57 washed stone)
5 Porous Agqreqate (ASTM #2 washed stone)
6 Fixture Adjustment, Valves & Manholes
MISCELLANEOUS
10 Sawcut, (Repardkess of Pavement Type)
11 6" Subdrain (P erforated Drain Type)
12 Connect Subdrain Tile to Catch Basin (Core)
13 Erosion Control Plan - Operating Procedures
14 Traffic Control & Safety Control
15 Mobilization
CHANGE ORDER - EXTRA WORK ITEMS
City of Dubuque - Engineering Division
Council Final Payment Form
UNIT
SY
CY
TON
TON
TON
EA
CONTRACT AMOUNT: $24,562.00
CONTRACT
UNIT COST
$2.50
$9.50
$19.00
$20.00
$30.00
$350.00
TOTAL AMOUNT EARNED TO DATE:
273.30 $
125.00 $
54.87 $
44.85 $
87.44 $
1.00 $
TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS:
TOTAL AMOUNT EARNED TO DATE:
TOTAL DUE CONTRACTOR:
ENGINEERING:
TOTAL CONSTRUCTION COST:
QUANTITY
TO DATE
DATE: November 30, 2010
AMOUNT EARNED
TO DATE
683.25
1,187.50
1,042.53
897.00
2,623.20
350.00
PAVEMENT
7 Pervious HMA Pavement (7" Thick) Ton $91.00 97.32 $ 8,856.12
8 PC Concrete Curb, 2.5', Remove & Construct LF $24.50 54.70 $ 1,340.15
9 Geotechnical Fabric SY $2.00 250.00 $ 500.00
LF $2.00 246.00 $ 492.00
LF $3.50 206.00 $ 721.00
LS $100.00 1.00 $ 100.00
LS $100.00 1.00 $ 100.00
LS $850.00 1.00 $ 850.00
LS 82,200.00 1.00 $ 2,200.00
$ 21,942.75
$ 21,942.75
$ 21,942.75
$ 1,404.87
$ 23,347.62
CONTRACTOR:
BY:
TITLE:
DATE:
APPROVED:
APPROVED:
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement sh ws in detail the correct amount of all work required
to complete above improvement.
Michael Van Milligen, C
City of Dubu. lo a
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
he undersigned, McDermott Excavating contractor for the above improvement, does
hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement.
O1f r-.GI/ F-x CA Vcf n�