Woodland Drive Storm Sewer Project AcceptanceMasterpiece on the Mississippi TO: FROM: SUBJECT: DATE: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Woodland Drive Stormwater Project CIP 7202244 December 14, 2010 Dubuque bilkd All- America City 11111! ' 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Woodland Drive Stormwater Project, as completed by McDermott Excavating, in the final contract amount of $21,942.75, which is an 18.8% decrease from the original contract amount of $27,018.20. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer MicI ael C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Mana FROM: Gus Psihoyos, City Engineer SUBJECT: Woodland Drive Stormwater Project CIP 7202244 DATE: December 10, 2010 DISCUSSION Dubuque keLti AI- AmaicaCml 1 1 ' 2007 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Woodland Drive Stormwater Project. BACKGROUND On November 12, 2010, the Engineering Department awarded McDermott Excavating for the construction of approximately 60 feet of curb and gutter and 1,820 square feet of a pervious pavement runoff collection system in front of the north entrance to Kennedy Elementary School. This collection system was necessary to relieve the ponding issues in this corridor due to the street grade. This area in the past had significant ice build -up from sump pumps and poor drainage. All of the sump pump drains in the area have been connected to the storm sewer. Pervious asphalt pavement was installed to assist in reducing the icing in the area. Based on Iowa Code § 384.103 and § 364.12(3)(c), and through the competitive quotation process for public improvements, this project was awarded on November 2, 2010 to McDermott Excavating of Dubuque, Iowa, in the amount of $27,018.20. The Woodland Drive Stormwater Project was completed by McDermott Excavating of Dubuque, Iowa, in the final contract amount of $21,942.75, a 18.8% decrease from the original contract amount of $27,018.20. Award Final Construction Contract $27,018.20 $21,942.75 Contingency 2,701.82 0.00 Construction Engineering & Inspection 4,458.00 1,404.87 Total Project Cost $34,178.02 $23,347.62 RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract in the amount of $21,942.75 to McDermott Excavating for the Woodland Drive Stormwater Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description 7202244 Woodland Storm 3501041 Curb and Catch Basin Replacement Total Project Funding ACTION TO BE TAKEN Fund Amount $21,000.00 2,347,62 $23,347.62 I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract in the amount of $21,942.75 to McDermott Excavating for the Woodland Drive Stormwater Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II RESOLUTION NO. 463 -10 ACCEPTING THE WOODLAND DRIVE STORMWATER PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Woodland Drive Stormwater Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and • NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Woodland Storm and Curb and Catch Basin Replacement fund appropriations for the contract amount of $21,942.75 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 20th day of Decembe ! 2010. eanne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE WOODLAND DRIVE STORMWATER PROJECT The undersigned City Engineer of the City of _Dubuque, Iowa, hereby certifies that he has inspected the Woodland Drive Stormwater Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $23,347.62. Dated this I3 h day of OustAKF A , 2010. Filed in the office of the City Clerk on the i,5 day of/ 1,1,44,,201 City Engineer anne F. Schneider, CMC, City Clerk Masterpiece on the Mississippi PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: WOODLAND DRIVE STORMWATER PROJECT CONTRACTOR: McDermott Excavating BID ITEM DESCRIPTION EXCAVATION & STONE 1 Remove Pavement 2 Excavation, Unclassified 3 Granular Subbase 4 Porous Aggregate (ASTM #57 washed stone) 5 Porous Agqreqate (ASTM #2 washed stone) 6 Fixture Adjustment, Valves & Manholes MISCELLANEOUS 10 Sawcut, (Repardkess of Pavement Type) 11 6" Subdrain (P erforated Drain Type) 12 Connect Subdrain Tile to Catch Basin (Core) 13 Erosion Control Plan - Operating Procedures 14 Traffic Control & Safety Control 15 Mobilization CHANGE ORDER - EXTRA WORK ITEMS City of Dubuque - Engineering Division Council Final Payment Form UNIT SY CY TON TON TON EA CONTRACT AMOUNT: $24,562.00 CONTRACT UNIT COST $2.50 $9.50 $19.00 $20.00 $30.00 $350.00 TOTAL AMOUNT EARNED TO DATE: 273.30 $ 125.00 $ 54.87 $ 44.85 $ 87.44 $ 1.00 $ TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL AMOUNT EARNED TO DATE: TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: QUANTITY TO DATE DATE: November 30, 2010 AMOUNT EARNED TO DATE 683.25 1,187.50 1,042.53 897.00 2,623.20 350.00 PAVEMENT 7 Pervious HMA Pavement (7" Thick) Ton $91.00 97.32 $ 8,856.12 8 PC Concrete Curb, 2.5', Remove & Construct LF $24.50 54.70 $ 1,340.15 9 Geotechnical Fabric SY $2.00 250.00 $ 500.00 LF $2.00 246.00 $ 492.00 LF $3.50 206.00 $ 721.00 LS $100.00 1.00 $ 100.00 LS $100.00 1.00 $ 100.00 LS $850.00 1.00 $ 850.00 LS 82,200.00 1.00 $ 2,200.00 $ 21,942.75 $ 21,942.75 $ 21,942.75 $ 1,404.87 $ 23,347.62 CONTRACTOR: BY: TITLE: DATE: APPROVED: APPROVED: CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement sh ws in detail the correct amount of all work required to complete above improvement. Michael Van Milligen, C City of Dubu. lo a Gus Psihoyos, City Engineer City of Dubuque, Iowa he undersigned, McDermott Excavating contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. O1f r-.GI/ F-x CA Vcf n� 5operv so,- )a - — lG CERTIFICATE OF THE CONTRACTOR