Loading...
Southfork Inter Sewer Phase IVMEMORANDUM December 19, 2003 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Southfork Interceptor Sewer Phase IV Connetion Charge This project is the fourth phase of the extension sewer along the Southfork of the Catfish Creek. This project provided service to the proposed Industrial Park at the south Siegert Farm property and the Dubuque Metropolitan Area Solid Waste Agency Landfill (DMASWA). In addition, other properties west of the landfill will eventually benefit from this extension as future extensions of the interceptor sewer are constructed. Assistant City Engineer Gus Psihoyos is recommending that the City Council establish the sanitary sewer connection fees for the Southfork Interceptor at $478.86 per acre. In addition to the interceptor sanitary sewer connection fee, $45,032.06 should be levied to the DMASWA for the construction of the 8-inch sewer to service their facility. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, Assistant City Engineer MEMORANDUM December 19, 2003 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Gus Psihoyos, Assistant City Engineer Southfork Interceptor Sewer Phase IV Connection Charge This project is the fourth phase of the extension of sanitary sewer along the Southfork of the Catfish Creek. This project provided service to the proposed Industrial Park at the south Siegert Farm and the Dubuque Metropolitan Area Solid Waste Agency Landfill (DMASWA). In addition, other properties west of the landfill will eventually benefit from this extension as future extensions of the interceptor sewer are constructed. I recommend that the City Council establish the sanitary sewer connection fees for the Southfork Interceptor at $478.86 per acre. In addition to the interceptor sanitary sewer connection fee, I recommend that the Dubuque Metropolitan Area Solid Waste Agency Landfill (DMASWA) be levied $45,032.06 for the construction of the 8-inch sewer to service its facility. CC: Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director Pauline Joyce, Administrative Svs. Mgr. Dawn Lang, Budget Manager Deron Muehdng, Engineering Prepared by: Gus Psihoyos, City of Dubuque, 50 W. 13th Street, Dubuque, Iowa (563) 5894270 ORDINANCE NO. 1-04 AN ORDINANCE ESTABLISHING A SCHEDULE OF SEWER CONNECTION FEES FOR THE CONNECTION OF PROPERTY TO THE SOUTHFORK INTERCEPTOR SEWER PHASE IV Whereas, after full consideration of the schedule of sanitary connection fees proposed to be made for the Southfork Interceptor Sewer Phase IV, which schedule of connection fees was filed in the office of the City Clerk on the 26th day of November, 2003; and Whereas, the City Council has determined that the amounts shown on said schedule are proper and are in proportion to the benefits conferred; and Whereas, the City Council further finds that the schedule of sewer connection fees for the Southfork Interceptor Sewer Phase IV be approved and adopted. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. There is hereby established a schedule of sewer connection fees of the Southfork Interceptor Sewer Phase IV for the connection of property to said City sewer. Section 2. Each property owner whose property will be served by connection to said City sewer shall pay a sewer connection fee to the City, as shown on the schedule of sewer connection fees attached hereto. Section 3. Such connection fee shall be due and payable when a sewer connection application is filed with the City. All fees collected under this Ordinance shall be paid to the City Treasurer. Section 4. The City Clerk is hereby authorized and directed to certify a copy of this Ordinance for recording in the office of the Dubuque County Recorder. Attest: Passed, approved and adopted this 5th day of January, 2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY OF DUBUQUE, IOWA CONNECTION FEE SCHEDULE SOUTH FORK PHASE IV INTERCEPTOR SANITARY SEWER $478.86 ConneDtion Fee Per Acre 20-Nov-2003 OWNER LOT DE8CRIPTION AREA Acres SARNETT, CHRISTOPHER & JANE SEHNKE, MELVIN J. & BARBARA SERGFELD, SHIRLEY A. ET AL BREHM, EARL J. & ESTHER A. BRIGGS, JUDSON G. CATE, PAUL W. & JAYNE H. CLARK, CHRIS CATE, PAUL W, & JAYNE H. CITY OF DUBUQUE CITY OF DUBUQUE CUPPS. CHRISTOPHER R. & CYNTHIA DUBUQUE COUNt' DUBUQUE COUNTY DSQ METROPOLITAN AREA SOLID WASTE AGENCY DSQ METROPOLITAN AREA SOLID.W~,STE AGENCY EHLERS, RICHARD A. & SERNICE L. FAGAN, GARY W. & JEANET~E L. FAGAN, GARY W. & JEANETTE L. GRAF, JAMES J. & DORIS A. GROSS, DALE J. & GINA L. HUMKE, STEVEN C. & JOLENE C. KIEFER, JOHN G, ~1, AMENDED TRUST KLEINSTIVER, JANANN M. KLUCK PARTNERSHIP KLUCK, THOMAS J. & DAVID M. MARTIN. DONALD C. MOTSCH, VERNON J. MOZENA, RODNEY M. & DIANN T,, MOZENA, RODNEY M. & DIANN T. O'MEARA, DEL ROSE PETSCHE, WILBUR D, & ARLENE M. , PFEIFFER, THOMAS & CHARLOTTE RET~ENBERGER, MAX &MAOONNA LOT 2-1-1-1-ff SW NE SEC. 31 T89N R2E 0.49 LOT 1-2-~-1-1 SW NE SEC. 31 T89N R2E 1.03 LOT 4 WINDY POINT SUBDIVISION 0.20 LOT 3 WINDY POINT SUB. 0.24 LOT 2-1-1-1-2 NW NE SEC. 31 T89N RBE 1.28 LOT 1 LAWRENCE CATE PLACE 43,89 LOT 2-2 of S 112 NE SEC. $ 8.30 LOT 2 LAWRENCE CATE PLACE 0.90 LOT I OF 1 SOUTH FORK SUB. #1 29,32 LOT 1 OF 2 SOUTH FORK SUB. #1 143,19 LOT 2-1-1-1-1-1-1-1 SW NE SEC. 31 TBgN R2E 0.59 LOT 2-3 E 1/2 NW SEC. 31 T89N R2E 2.08 LOT 2-2 E 1/2 NW SEC. 31 T89N R2E 1.68 LOT 1 SE NW & N 1/2 NW & SW NW SEC. 6 184.67 LOT 1-2-1 N 1/2 NE SEC. 8 47.51 LOT 2-1-1 SW NE N 88.71' SEC. 31 TBgN RBE 1.19 LOT 5 WINDY POINT SUB. 0.21 LOT 6 WINDY POINT SUB. 0.22 LOT 1-2-2 SW NW SEC. 31 7.g5 LOT 2-2-1-1-I SW NE SEC. 31 TBEN R2E 1.06 LOT 1-2 NW NW SEC. 32 0.85 LOT 5 EUGENE TIGGES SUB. 4.04 LOT 2 WINDY POINT SUB. 0.28 LOT 1-1 N t/2 NE SEC. 8 T88N R2E 17,42 LOT 2 NE 1/2 NE SEC. 8 T88N RBE 2.99 LOT 2-1-2 SW NW LOT 2-1-1-1-2- SW NW SEC, T83N RBE 0.40 N. 88.71' OF 2-1-I SW NE SEC. 31 TBSN RBE 0.87 LOT 2-1-2-1-1~2 SW NW SEC. 3~ T89N R2E 2.18 LOT 2-2-1-1~2 SW NW SEC. 31 TBgN R2E 0,51 LOTS 2-1-2 & 2-1-1-2 NW NE & LOT 2-2-1 SW NE SEC. 31 TBgN R2E 2.60 LOT 2 EUGENE TIGGES PLACE 7.61 LOT I-2 SW SE 8EC. 31 3.37 LOT 2-2 SE SW SEC. 29 TBgN RBE 0.17 ROKUSEK, ARTHUR D. & KAREN K, LOT 2-2 SW SE SEC. 31 SAELE, ARVID H, & CAROL A. LOT I-2 SW NE SEC, 31 T80N REE SAELE, CAROL A, & ARVID H. LOT 2-2 NW NE LOT 2-2 SW NE SEC, 3i T89N REE SANFORD, KlM W, LOT 3-2 SW SE SEC, 31 SCNARRINOHAUSEN, ERNST & JULIE LOT 2-1-2 E 1/2 NW SEC, TSgN REE 51BLEY. SHIRLEY A. - DEC OF TRUST LOT 4 EUGENE TIGGES SUB, SIEEE, LOREN D, & ROSE M. LOT 2 SE NE SEC. 31 T80N R2E SIEGERT, DAVID W. LOT 1 SIEGERTS SECOND PLACE SIEGERT, KENNETH J. & MAUREEN LOT 1 WINDY POINT SUB. SIE~GERT, ROBERT E, & VIRGINIA M. LOT 4 DIAMOND HEIGHTS SIEGERT, WILLIAM A, & JANET M. LOT 2 SIEGERTS SECOND PLACE SIEGERT, WILLIAM A. & JANET N, PT LOT 3 SIEOERTS SECOND PLACE SIEGERT, WILLIAM A, & JANET PT. LOT 3 AND LOT 2-1-I E 112 NW SIEGERT5 2ND PLACE TOTAL: 3,30 3,39 2.02 0.42 0.44 8,38 6.49 26.19 10.74 0,54 37.13 0.00 7.06 0.71 2.53 9.72 2.70 0,89 0.74 0.60 4.72 4.17 0.51 Total Gross Acreage: 692.88 Total Undevelopable Acreage: 49.42 Total Developable ADreage: 643.46 x Connection Fee per Acre: $478.86 Total connection Fees: $308,128.67