Loading...
2010 Drain Tile Project AcceptanceMasterpiece on the Mississippi TO: FROM: SUBJECT: DATE: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager 2010 Drain Tile Project CIP 7201354 December 27, 2010 MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael . VanMilligen Dubuque kighl All- Nnedca City 1 ' 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2010 Drain Tile Project, as completed by Drew Cook & Sons Excavating, in the final contract amount of $20,272.84, which is a 19.1% increase from the original contract amount of $17,019.50. The cost increase was the result of adding an additional location to the project scope. I concur with the recommendation and respectfully request Mayor and City Council approval. Masterpiece on the Mississippi TO: FROM: Gus Psihoyos, City Engineer SUBJECT: 2010 Drain Tile Project CIP 7201354 DATE: December 22, 2010 INTRODUCTION DISCUSSION RECOMMENDATION Michael C. Van Milligen, City Manager L) Construction Contract Contingency Construction Engineering & Inspection Total Project Cost Award $17,019.50 2,074.55 3,423.01 $22,517.06 Dubuque hltd AN- Ametica 2007 The enclosed resolution provides for the acceptance of the construction contract for the 2010 Drain Tile Project. BACKGROUND The 2010 Drain Tile Project added one storm sewer intake and extended approximately 655 lineal feet of 6 -inch drain tile to three locations —Earl Drive, Embassy West Drive, and Raven Oaks Drive. Based on Iowa Code § 384.103 and § 364.12(3)(c), and through the competitive quotation process for public improvements, this project was awarded on April 20, 2010 to Drew Cook & Sons Excavating of Dubuque, Iowa. The project was completed in the amount of $20,272.84, which is a 19.1% increase from the original contract amount of $17,019.50. The cost increase came about as the result of adding an additional location (Crissy Drive) to the project scope. The 2010 Drain Tile Project was completed by Drew Cook & Sons Excavating, in the final contract amount of $20,272.84. Final $20,272.84 0 3,858.00 $24,130.84 I recommend that the City Council accept the improvements and authorize the payment of the contract in the amount of $20,272.84 to Drew Cook & Sons Excavating for the 2010 Drain Tile Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description 7201354 Drain Tile Program Total Project Funding ACTION TO BE TAKEN Fund Amount $24,130.84 $24,130.84 I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract in the amount of $20,272.84 to Drew Cook & Sons Excavating for the 2010 Drain Tile Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Charlie Gau, Engineering Technician RESOLUTION NO. 2-11 ACCEPTING THE 2010 DRAIN TILE PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2010 Drain Tile Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Drain Tile Program appropriation for the contract amount of $20,272.84 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 3rd day of January ,, 2011. Jeanne F. Schneider, CMC, City Clerk s z Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2010 DRAIN TILE PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2010 Drain Tile Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $24,130.84. Dated this 2 5 "' day of 'Pc:,he-1 2010. Filed in the office of the City Clerk on the day of 7k / er City Eng neer 201(9 Panne F. Schneider, CMC, City Clerk Project Name: CIP Number: Project Contract Amount: Protect Completion Date: 2010 DRAIN TILE PROJECT EARL ST. / EMBASSEY WEST DR. / RAVEN OAKS DR 7201354 $17,019.50 Aug. 20, 2010 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Drew Cook & Sons 5200 Wolff Rd. Dubuque, Iowa 52002 563 - 582 - 9292 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE Intake, 101 -6 1 EA $ 1,850.00 1.00 $ 1,850.00 100.00% 129.63% 99.39% 75.13% 47.72% 80.31% 167.94% 20.48% 97 14% 100.00% 111 16% 100.00% 100.00% 100.00% 100.00% 100.00% 1 2 15" RCP, Class III 27 LF $ 26.00 35.00 $ 910.00 3 6" Drain tile, Non - Perforated 655 LF $ 6.50 651.00 $ 4,231.50 4 Bedding Stone, 1" Clean 63 Ton $ 13.00 47.33 $ 615.29 5 Backfill, Limestone 58 Ton $ 6.50 27.68 $ 179.92 6 Graded Stone Base 39 Ton $ 13.00 31.32 $ 407.16 7 PCC Curb & Gutter, Including Removal 68 LF $ 19.00 114.20 $ 2,169.80 8 4" PCC Sidewalk, Including Removal 420 SF $ 4.00 86.00 $ 344.00 9 6" PCC Sidewalk / Driveway, Including Removal 35 SY $ 43.00 34.00 $ 1,462.00 10 Tap Exisitng Intake 1 EA $ 500.00 1.00 $ 500.00 11 HMA Pavement, Remove & Replace 25 Ton $ 78.00 27.79 $ 2,167.62 12 Landscape Restoration 1 LS $ 500.00 1.00 $ 500.00 13 Traffic Control And Project Safety 1 LS $ 1 080.00 1.00 $ 1,080.00 Sub -Total $ 16,417 29 CHANGE ORDER 14 Stop Box Repalcement 1 $ 140.00 1.00 $ 140.00 15 Labor to replace stop box 1 $ 45.00 1.00 $ 45.00 16 Added Chrissy Dr. to Project, used Unit Prices from this Project 1 $ 3,670.55 1.00 $ 3670.55 Change order Total $ 3,855.55 Total Payment $ 20,272.84 Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. Michael Van Mi Dubuque, lo Gus Psihoyos, City Engineer Dubuque, Iowa Miscellaneous Costs Engineering PROJECT CLOSE OUT FORM Total Contract Work Performed to Date $ 16,417.29 Total Change Order Work Performed to Date: $ 3,855.55 Total Contract and Change Order Work Performed to Date: $ 20,272.84 The Undersigned &IC JoiS1.0 -NP contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for said improvement. APPROVED: APPROVED: l i k - > � C l44._ G ICL- ( BY: $ 3,858.00 TOTAL FINAL PROJECT COSTS: $ 24,130.84