Asbury and IA 32 Traffic Signal_Grading Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No TSF -32 -1 (28)-- 92 -31) (CIP 3002029, 2501814 and 2501815) DATE: January 10, 2011 City Engineer Gus Psihoyos is recommending the City Council accept the resolution providing for the final construction contract at $365,630.85 for the Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No. TSF -32- 1(28)- 92 -31), which is a 15.5% increase from the original contract amount of $316,462.55. The increase is due to additional required subgrade stabilization along with the installation of subdrain along IA 32. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Dubuque ketil All-Amedca City 2007 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No. TSF -32- 1(28)-- 92 -31) (CIP 3002029, 2501814, and 2501815) DATE: January 7, 2011 INTRODUCTION Dubuque linineingli AI- amelcacnr ' 1 11 1' 2007 The enclosed resolution provides for the acceptance of the construction contract for the Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No. TSF -32- 1(28)-- 92 -31). BACKGROUND The Asbury Road and IA 32 Traffic Signal & Grading Project provided for the following improvements: grading of the southbound right -turn lane to accommodate shifting of through lanes for southbound and northbound dual left -turn lanes at Asbury Road and IA 32 (Northwest Arterial); milling HMA pavement; traffic signal modifications; HMA paving; temporary pavement marking; and drainage improvements. DISCUSSION The Asbury Road and IA 32 Traffic Signal & Grading Project was completed by McDermott Excavating of Dubuque, Iowa, in the final contract amount of $365,630.85, which is a 15.5% increase from the original contract amount of $316,462.55. The increase is due to additional required subgrade stabilization along with the installation of subdrain along IA 32. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $365,630.85 for the Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No. TSF -32- 1(28)-- 92 -31). BUDGET IMPACT The summary of project costs for the Asbury Road and IA 32 Traffic Signal & Grading Project is as follows: Award Final Construction Contract $316,462.55 $365,630.85 Contingency 47,290.00 0 Engineering /Contract Administration 70,500.00 65,547.48 Equipment Pre - Purchase 63,777.00 73,763.54 Total Project Cost $498,029.55 $504,941.87 The project funding summary is as follows: CIP Funding Source Amount 3002029 Iowa DOT Traffic Safety Grant $343,555.55 3002029 Iowa DOT U -STEP Grant 48,388.00 3002029 Traffic Consultant Services 46,575.00 2501814 NW Arterial Capacity Improvements 66,423.32 Total Project Funding $504,941.87 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $365,630.85 to McDermott Excavating for the Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No. TSF -32- 1(28)-- 92 -31). Prepared by David Ness, Civil Engineer II cc: Julie Neebel, IIW Engineers & Surveyors, PC Kent Ellis, Local Systems Engineer District 6 — Iowa DOT Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer ACCEPTING THE ASBURY ROAD AND IA 32 TRAFFIC SIGNAL & GRADING PROJECT (IOWA DOT PROJECT NO. TSF -32- 1(28)-- 92 -31) AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No. TSF -32- 1(28)-- 92 -31) (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and RESOLUTION NO. 7-11 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Iowa DOT .Traffic Safety Grant, Iowa DOT U -STEP Grant, Northwest Arterial Capacity Improvements, and Traffic Consultant Services appropriations for the contract amount of $365,630.85 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 18th day of January 2011. Att Jeanne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE ASBURY ROAD AND IA 32 TRAFFIC SIGNAL & GRADING PROJECT (IOWA DOT PROJECT NO. TSF -32- 1(28)-- 92 -31) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Asbury Road and IA 32 Traffic Signal & Grading Project (Iowa DOT Project No. TSF -32- 1(28)-- 92 -31), that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $504,941.87 h Dated this l0 day of 3nNtogY , 2011. Filed in the office of the City Clerk on the &` day o .�.< a , 2011 City Engineer nne F. Schneider, CMC, City Clerk ITEM NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS TOTAL TOTAL TO DATE PERCENT QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT 0010 2102- 2710070 Excavation, Class 10, roadway and borrow 1000 CY $11.05 1000 $11,050.00 1000 $11,050.00 100% 0020 2105- 8425005 Topsoil, furnish & spread 259 CY $20.85 122 $2,543.70 146 $3,044.10 56% 0030 2115- 0100000 Modified subbase * 791.74 CY $27.70 791.74 $21,931.20 791.74 $21,931.20 100% 0040 2123- 7450000 Shoulder construction, earth 11 STA $475.00 11 $5,225.00 11 $5,225.00 100% 0050 2214 - 5145150 Pavement scarification 6855 SY $2.75 6267 $17,234.25 6267 $17,234.25 91% 0060 2303 - 0001000 Hot mix asphalt mixture, wedge, leveling or strengthening course 11 TON $160.00 50.9 $8,144.00 50.9 $8,144.00 463% 0070 2303 - 0042500 Hot mix asphalt mixture (3,000,000 esal, intermediate course, 1/2 in mix 1100 TON $43.00 1102.8 $47,420.40 1102.8 $47,420.40 100% 0080 2303 - 0246428 Asphalt binder, pg 64 -28 65 TON $635.00 67 $42,545.00 67 $42,545.00 103% 0090 2435 - 0250110 Intake, SW -501 modified 2 EA $2,200.00 2 $4,400.00 2 $4,400.00 100% 0100 2435 - 0251100 Intake SW -511 3 EA $2,220.00 2 $4,440.00 2 $4,440.00 67% 0110 2502- 8212024 Subdrain longitudinal (backslope) 4" dia 374 LF $10.85 1604 $17,403.40 1604 $17,403.40 429% 0120 2502- 8220193 Subdrain outlet (RF -19C) 1 EA $75.00 1 $75.00 1 $75.00 100% 0130 2502 - 8220197 Subdrain outlet (RF -19F) 4 EA $120.00 5 $600.00 5 $600.00 125% 0140 2503 - 0114215 Storm sewer gravity main, trenched, RCP 2000D, 15" 160 LF $47.50 144 $6,840.00 144 $6,840.00 90% 0150 2503 - 0200036 Remove storm sewer pipe less than or equal to 36 in 20 LF $20.00 10 $200.00 10 $200.00 50% 0160 2510- 6745850 Removal of pavement 92.6 SY $20.50 168 $3,444.00 168 $3,444.00 181% 0170 2510- 6750600 Removal of intake and utility access 9 EA $250.00 10 $2,500.00 10 $2,500.00 111% 0180 2511- 6745900 Removal of sidewalk 72.8 SY $6.50 54.1 $351.65 72.8 $473.20 100% 0190 2524 - 6765010 Remove and reinstall sign as per plan 7 EA $100.00 4 $400.00 4 $400.00 57% 0200 2524- 9275100 Wood posts for type A or B signs, 4 in x 4 in 78 LF $10.35 0 $0.00 0 $0.00 0% 0210 2525 - 0000100 Traffic signalization 1 LS $66,536.00 1 $66,536.00 1 $66,536.00 100% 0220 2525- 0000120 Removal of traffic signalization 1 LS $6,672.00 1 $6,672.00 1 $6,672.00 100% 0230 2526 - 8285000 Construction survey 1 LS $7,935.00 1 $7,935.00 1 $7,935.00 100% 0240 2527 - 9263109 Painted pavement marking, waterborne or solvent -based 15 STA $90.00 34.4 $3,096.00 34.5 $3,105.00 230% 0250 2527- 9263130 Removable tape markings 1.5 STA $175.00 2.7 $472.50 2.7 $472.50 180% 0260 2527- 9263137 Painted pavement symbols & legends, waterborne or solvent -based 4 EA $105.00 8 $840.00 8 $840.00 200% 0270 2527 - 9263180 Pavement markings removed 3.75 STA $115.00 0 $0.00 0 $0.00 0% OWNER: City of Dubuque PROJECT: IA 32 & Asbury Road Traffic Signal and Grading Project IDOT PROJECT NO TSF -32- 1(28) -92 -31 / UST -32- 1(31) -4A -31 IIW PROJECT NO: 09192 -04 CONTRACTOR: McDermott Excavating ADDRESS: 14407 Hwy 20 West Dubuque, IA 52003 -9709 PHONE: 1563 -583 -4633 'FAX: I CONTRACTOR'S PAYMENT FORM CONTRACT PAYMENT NO. 'Council Final' WORKING DAYS: LATE START DATE: ACTUAL START DATE: June 17, 2010 DETAILED ESTIMATE OF CONTRACT WORK COMPLETED TO DATE AMOUNT OF CONTRACT ORIGINAL: $316,462.55 REVISED: $326,654.53 PAGE 1/3 * = Change Order Item Adjusted SUBTOTAL WORK COMPLETED - PAGE 1 $282,930.05 0280 2528- 8445110 Traffic control 1 LS $22,760.00 1 $22,760.00 1 $22,760.00 100% 0290 2533 - 4980005 Mobilization 1 LS $12,700.00 1 $12,700.00 1 $12,700.00 100% 0300 2599- 9999005 Connect to existing handhole 2 EA $547.00 7 $3,829.00 7 $3,829.00 350% 0310 2599- 9999005 Removable tape pavement symbols and legends 4 EA $145.00 2 $290.00 2 $290.00 50% 0320 2599 - 9999009 Conduit, rigid PVC, trenched, 2" 19 LF $43.50 76.5 $3,327.75 76.5 $3,327.75 403% 0330 2599- 9999009 Remove median fencing 554 LF $2.90 549 $1,592.10 549 $1,592.10 99% 0340 2599- 9999009 Reinstall median fencing 554 LF $5.75 348 $2,001.00 348 $2,001.00 63% 0350 2599- 9999020 Subgrade stabilization 100 TON $18.95 995.5 $18,864.73 1040.8 $19,723.16 1041% 0360 2601- 2634100 Mulch 0.32 ACRE $4,025.00 0.5 $2,012.50 0.5 $2,012.50 156% 0370 2601- 2636043 Seed & fertilize (rural) 0.32 ACRE $4,025.00 0.5 $2,012.50 0.5 $2,012.50 156% 0380 2602- 0000020 Silt fence 1660 LF $2.00 1707.5 $3,415.00 1707.5 $3,415.00 103% 0390 2602- 0000030 Silt fence for ditch check 50 LF $5.00 57.5 $287.50 57.5 $287.50 115% 0400 2602- 0000090 Clean out of silt fence 600 LF $2.00 0 $0.00 0 $0.00 0% 0410 2602 - 0000100 Clean out of silt fence for ditch check 50 LF $5.00 0 $0.00 0 $0.00 0% CONTRACT PAYMENT NO. Council Final CONTRACT WORK COMPLETED - CONTINUED PAGE 2/3 ITEM NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY' UNIT 1 UNIT COST PREVIOUS TOTAL QUANTITY 1 AMOUNT TOTAL TO DATE QUANTITY 1 AMOUNT PERCENT SUBTOTAL WORK COMPLETED - PAGE 2 TOTAL WORK COMPLETED TO DATE I $73,950.51 I $356,880.56 1 CH. ORD. NO. CHANGE ORDER ITEM DESCRIPTION CHANGE ORDER ITEM PREVIOUS TOTAL TOTAL TO DATE PERCENT QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT 1 2528 - 8445110 7001(0280)- Traffic control 1 LS $725.00 1 $725.00 1 $725.00 100% 1 2115 - 0100000 7002(0030)- Modified Subbase AA 81.74 CY $27.70 — -- — — — 1 2507- 3250005 8001 - Engineering Fabric 1500 SY $2.35 1850 $4,347.50 1850 $4,347.50 123% 1 2599- 9999010 8002 - Bolts for Mast Arm 1 LS $572.00 1 $572.00 1 $572.00 100% 2 2102 - 2710080 8003- Excavation, Class 10, Unstable Material 9.25 CY $22.10 9.25 $204.43 9.25 $204.43 100% 2 2303 - 0246422 8004 - Asphalt Binder PG 64 -22 2.23 TON $500.00 2.23 $1,115.00 2.23 $1,115.00 100% 2 2402 - 0425031 8005- Granular Backfill 71.96 TON $16.00 71.96 $1,151.36 71.96 $1,151.36 100% 2 2599 - 9999010 8006 - Installation of City Provided Handhole 1 LS $275.00 1 $275.00 1 $275.00 100% 2 2503 - 7182036 8007 - Remove and Reinstall Storm Sewer Pipe Less than or Equal to 36 In. 5 LF $72.00 5 $360.00 5 $360.00 100% CONTRACT PAYMENT NO. AA = Adjusted in Above Contract Quantity Payments Previously Approved 1 $ 2 $ 3 $ 4 $ 5 $ Total Payments Forwarded $ 34,456.10 142,385.42 176,375.71 1,444.69 10,968.93 365,630.85 Council Final DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLETED TO DATE CIP Total Change Order Work PAGE 3/3 $8,750.29 Total Amount Earned to Date $365,630.85 Description Amount to Date Total Contract 3002029 IOWA DOT Traffic Saftey Grant $ 343,555.55 $ 343,555.55 3002029 IOWA DOT U -STEP Grant $ 48,388.00 $ 48,388 00 2501814 NW Arterial Capacity Improvements 66423.32 $ 39,590 00 2501815 Traffic Consultant Servies 46575 $ 66,496.00 $ 504,941.87 $ 498,029 55 PROJECT SUMMARY Total Due Contractor. IIW Construction Engineering: City Engineering: Direct Material Purchases: Total Project Cost $ 365,630.85 $ 46,575.00 $ 18,972.48 $ 73,763.54 $ 504,941.87 CERTIFICATE OF THE CITY MANAGER: hereby certify that the above statement shows in detail the correct amount of l work required to complete the above improvement. APPROVED: APPROVED: Michael Van MiIIenrCi y ager City of Dubuqu Iowa Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, McDermott Excavating, Inc contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Nun BY: TITLE: DATE: :F-Vc`Saf