Loading...
North Grandview_Rosedale Avenues Emergency Storm Sewer Repair Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project (CIP 7202241) DATE: January 10, 2011 MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Mi ael C. Van Milligen Dubuque hfr011 An- AmeicaCity ' 2007 City Engineer Gus Psihoyos is recommending the acceptance of the improvements and to authorize the payment of the contract in the amount of $52,275.67 to McDermott Excavating for the North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project I concur with the recommendation and respectfully request Mayor and City Council approval. Masterpiece on the Mississippi TO: FROM: SUBJECT: DATE: January 10, 2011 INTRODUCTION BACKGROUND DISCUSSION Michael C. Van Milligen, City Mana Gus Psihoyos, City Engineer North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project (CIP 7202241) Construction Contract Contingency Construction Engineering & Inspection Total Project Cost Award $49,846.99 0 6,093.10 $55,940.09 Dubuque bitti Al- Amedca City ' 2007 The enclosed resolution provides for the acceptance of the construction contract for the North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project. On October 18, 2010, the City Council authorized (Resolution 401 -10) emergency repairs to the storm sewer west of the intersection of North Grandview Avenue and Rosedale Avenue. Due to the heavy rain events that occurred on July 22, and 23, 2010, the existing twin 18- and 24 -inch diameter storm sewer pipes under North Grandview Avenue failed and caused undermining of the pavement and sidewalk areas. Based on Iowa Code § 384.103 and § 364.12(3)(c), and through the competitive quotation process for public improvements, this project was awarded on October 22, 2010, to McDermott Excavating of Dubuque, Iowa, in the amount of $49,846.99. The North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project was completed by McDermott Excavating of Dubuque, Iowa, in the final contract amount of $52,275.67, which is a 4.87% increase from the original contract amount of $49,846.99. There was an increase in the contract value because of actual final measurements. Final $52,275.67 0 4,450.96 $56,726.63 RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract in the amount of $52,275.67 to McDermott Excavating for the North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description 7202241 North Grandview Storm Reconstruction Total Project Funding Fund Amount $56,726.63 $56,726.63 As a result of the Presidential Disaster Declaration for Dubuque County, the City is eligible for public assistance. Thus the City submitted a Detailed Damage Inspection Report and received approval for Federal ER Funding to complete the emergency repair work. ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract in the amount of $52,275.67 to McDermott Excavating for the North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project. cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II Greg Doeden, Civil Engineer II ACCEPTING THE NORTH GRANDVIEW AVENUE AND ROSEDALE AVENUE EMERGENCY STORM SEWER REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and RESOLUTION NO. 8 -11 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. • Section 2. The Finance Director is hereby directed to pay to the Contractor from the North Grandview Storm Reconstruction appropriation for the contract amount of $52,275.67 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 18th day of January , 011. Attest: eanne F. Schneider, CMC, City Clerk D oy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE NORTH GRANDVIEW AVENUE AND ROSEDALE AVENUE EMERGENCY STORM SEWER REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the North Grandview Avenue and Rosedale Avenue Emergency Storm Sewer Repair Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $56,726.63. Dated this to day of AuUaitY , 2011. City E 'gineer Filed in the office of the City Clerk on the / 4 ' day o / A , 2011 APY `GL /I"' nne F. Schneider, CMC, City Clerk PARTIAL PAYMENT NO: COUNCIL FINAL City of Dubuque - Engineering Division Final Payment Form PROJECT NAME: Grandview Avenue Storm Sewer Repair (Just west of the Intersection of Grandview & Rosedale) CONTRACTOR: McDermott Excavating BID ITEM DESCRIPTION 1 Remove Existing Storm Sewer 2 Remove Existing Storm Intake 3 Remove Existing Storm Manhole 4 Backrill, Limestone 5 Backrill, Topsoil 6 Graded Stone Base 7 3" Crashed Stone Base 8 Trench Stabilization Stone 24 Conduit, 4" PVC Sch 40 w/Trace Wire & Pull Tape 25 Sawcut, Asphalt, Full Depth f 26 Sod 27 Watering 28 Erosion Control Plan - Operating Procedures 29 Traffic Control & Safety Control 30 Mobilization LF $9.00 $400.00 $400.00 $93.00 $375.00 $5.95 $7.25 $21.15 $95.00 TON $5.90 432.41 $ 2,551.22 SY $3.00 125.00 $ 375.00 TON $12.30 75.99 $ 934.68 TON $12.30 0 $ - TON $16.00 61.38 $ 982.08 68.69 1 312.0 0 75.0 0 $ 6,388.17 $ 375.00 $ 1,856.40 $ 1,586.25 eT 9 HMA 300k Surface Course, 1/2" (PG 64-22) 10 Fixture Adjustment 11 PC Concrete Sidewalk, 4 ", Remove & Construct 12 PC Concrete Sidewalk, 6 ", Remove & Contract 13 PC Concrete Curb and Gutter, 2.5', Remove & Construct 14 PC Concrete Access Ramp, Detectable 15 Manhole 84" Diameter, Complete 16 Storm Sewer, 42" RCP, CL III 17 Tie Into Existing Storm Sewer Structure at Aubum ( Manhole No. 3) 18 Tie Into Existing Storm Sewer Structure ( Manhole No. 1) 19 6" DIP, Class 52 wJPotywrap 20 6 " -45 Deg Bend MJxMJ 21 6" Mega Lug MJ 22 6" Valve MJ w/Bax 23 4' X 8', 2" Extruded Polystyrene Insulation TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY MANAGER: APPROVED: APPROVED: CERTIFICATE OF THE CONTRACTOR: UNR EACH EACH TON EACH SF SF LF EACH UNIT COST EACH $5,200.00 LF $102.48 LS $600.00 LS $600.00 $2.00 $11.00 $82.00 $300.00 $5,265.00 $2,800.00 $48.15 $187.00 $38.00 $761.00 $35.00 LF SY MGAL LS LS LS CONTRACT AMOUNT: $49,846.99 QUANTITY TO DATE 124.0 1 TOTAL AMOUNT EARNED TO DATE - BASE BID: C.O. #1 6 -Inch, Hymax Coupling EACH $244.00 4 C.O. #2 Davis Bacon Wage Rate Correction LS $678.25 1 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: Micha0l Van Milligan City of Dubu Gus Psihoyos, City Engineer City of Dubuque, Iowa $ 56,726.63 $ 4,450.96 TOTAL AMOUNT EARNED TO DATE: I $ 52,275.67 accept the above 'Total Due Contractor", as full settlement for all claims for said Improvement. CONTRACTOR: McDERMOTT EXCAVATING BY: C TITLE: Su v lsor DATE: / /D - /f DATE: January 7, 2011 $ AMOUNT EARNED TO DATE I hereby certify that the above statement shows In detail the correct amount of ajV4/brk required to complete the above improvement. 432.00 400.00 400.00 $ 5,200.00 $ 12,707.52 E 600.00 $ 600.00 1,637.10 $ 748.00 $ 380.00 $ 761.00 $ 280.00 288.00 E 2,090.00 $ 164.00 E 300.00 $ 5,265.00 $ 2,800.00 $ 50 621.42 976.00 678.25 $ 1,654.25 $ 52,275.67 The undersigned, contractor for the above improvement, does hereby 1 ITEM NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS TOTAL TOTAL TO DATE PERCENT QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT 0010 2102- 2710070 Excavation, Class 10, roadway and borrow 1000 CY $11.05 1000 $11,050.00 1000 $11,050.00 100% 0020 2105- 8425005 Topsoil, furnish & spread 259 CY $20.85 122 $2,543.70 146 $3,044.10 56% 0030 2115 - 0100000 Modified subbase " 791.74 CY $27.70 791.74 $21,931.20 791.74 $21,931.20 100% 0040 2123 - 7450000 Shoulder construction, earth 11 STA $475.00 11 $5,225.00 11 $5,225.00 100% 0050 2214 - 5145150 Pavement scarification 6855 SY $2.75 6267 $17,234.25 6267 $17,234.25 91% 0060 2303 - 0001000 Hot mix asphalt mixture, wedge, leveling or strengthening course 11 TON $160.00 50.9 $8,144.00 50.9 $8,144.00 463% 0070 2303 - 0042500 Hot mix asphalt mixture (3,000,000 esal, intermediate course, 1/2 in mix 1100 TON $43.00 1102.8 $47,420.40 1102.8 $47,420.40 100% 0080 2303- 0246428 Asphalt binder, pg 64 -28 65 TON $635.00 67 $42,545.00 67 $42,545.00 103% 0090 2435 - 0250110 Intake, SW -501 modified 2 EA $2,200.00 2 $4,400.00 2 $4,400.00 100% 0100 2435 - 0251100 Intake SW -511 3 EA $2,220.00 2 $4,440.00 2 $4,440.00 67% 0110 2502- 8212024 Subdrain longitudinal (backslope) 4" dia 374 LF $10.85 1604 $17,403.40 1604 $17,403.40 429% 0120 2502- 8220193 Subdrain outlet (RF -19C) 1 EA $75.00 1 $75.00 1 $75.00 100% 0130 2502 - 8220197 Subdrain outlet (RF -19F) 4 EA $120.00 5 $600.00 5 $600.00 125% 0140 2503- 0114215 Storm sewer gravity main, trenched, RCP 2000D, 15" 160 LF $47.50 144 $6,840.00 144 $6,840.00 90% 0150 2503 - 0200036 Remove storm sewer pipe less than or equal to 36 in 20 LF $20.00 10 $200.00 10 $200.00 50% 0160 2510 - 6745850 Removal of pavement 92.6 SY $20.50 168 $3,444.00 168 $3,444.00 181% 0170 2510- 6750600 Removal of intake and utility access 9 EA $250.00 10 $2,500.00 10 $2,500.00 111% 0180 2511 - 6745900 Removal of sidewalk 72.8 SY $6.50 54.1 $351.65 72.8 $473.20 100% 0190 2524- 6765010 Remove and reinstall sign as per plan 7 EA $100.00 4 $400.00 4 $400.00 57% 0200 2524- 9275100 Wood posts for type A or B signs, 4 in x 4 in 78 LF $10.35 0 $0.00 0 $0.00 0% 0210 2525- 0000100 Traffic signalization 1 LS $66,536.00 1 $66,536.00 1 $66,536.00 100% 0220 2525- 0000120 Removal of traffic signalization 1 LS $6,672.00 1 $6,672.00 1 $6,672.00 100% 0230 2526- 8285000 Construction survey 1 LS $7,935.00 1 $7,935.00 1 $7,935.00 100% 0240 2527- 9263109 Painted pavement marking, waterborne or solvent -based 15 STA $90.00 34.4 $3,096.00 34.5 $3,105.00 230% 0250 • 2527- 9263130 Removable tape markings 1.5 STA $175.00 2.7 $472.50 2.7 $472.50 180% 0260 2527- 9263137 Painted pavement symbols & legends, waterborne or solvent -based 4 EA $105.00 -8 $840.00 8 $840.00 200% 0270 2527 - 9263180 Pavement markings removed 3.75 STA $115.00 0 $0.00 0 $0.00 0% OWNER: City of Dubuque PROJECT: IA 32 & Asbury Road Traffic Signal and Grading Project IDOT PROJECT NO: TSF -32- 1(28) -92 -31 / UST -32- 1(31) -4A -31 IIW PROJECT NO: 09192 -04 CONTRACTOR: McDermott Excavating ADDRESS: 14407 Hwy 20 West Dubuque, IA 52003 -9709 PHONE: 1563 -583 -4633 I FAX: I . CONTRACTOR'S PAYMENT FORM CONTRACT PAYMENT NO. WORKING DAYS: LATE START DATE: ACTUAL START DATE: June 17, 2010 = Change Order Item Adjusted SUBTOTAL WORK COMPLETED - PAGE 1 ( Council Final DETAILED ESTIMATE OF CONTRACT WORK COMPLETED TO DATE AMOUNT OF CONTRACT ORIGINAL: $316,462.55 REVISED: $326,654.53 $282,930.05 PAGE 1/3 0280 2528- 8445110 Traffic control 1 LS $22,760.00 1 $22,760.00 1 $22,760.00 100% 0290 2533- 4980005 Mobilization 1 LS $12,700.00 1 $12,700.00 1 $12,700.00 100% 0300 2599- 9999005 Connect to existing handhole 2 EA $547.00 7 $3,829.00 7 $3,829.00 350% 0310 2599- 9999005 Removable tape pavement symbols and legends 4 EA $145.00 2 $290.00 2 $290.00 50% 0320 2599- 9999009 Conduit, rigid PVC, trenched, 2" 19 LF $43.50 76.5 $3,327.75 76.5 $3,327.75 403% 0330 2599- 9999009 Remove median fencing 554 LF $2.90 549 $1,592.10 549 $1,592.10 99% 0340 2599- 9999009 Reinstall median fencing 554 LF $5.75 348 $2,001.00 348 $2,001.00 63% 0350 2599- 9999020 Subgrade stabilization 100 TON $18.95 995.5 $18,864.73 1040.8 $19,723.16 1041% 0360 2601- 2634100 Mulch 0.32 ACRE $4,025.00 0.5 $2,012.50 0.5 $2,012.50 156% 0370 2601- 2636043 Seed & fertilize (rural) 0.32 ACRE $4,025.00 0.5 $2,012.50 0.5 $2,012.50 156% 0380 2602- 0000020 Silt fence 1660 LF $2.00 1707.5 $3,415.00 1707.5 $3,415.00 103% 0390 2602- 0000030 Silt fence for ditch check 50 LF $5.00 57.5 $287.50 57.5 $287.50 115% 0400 2602- 0000090 Clean out of silt fence 600 LF $2.00 0 $0.00 0 $0.00 0% 0410 2602- 0000100 Clean out of silt fence for ditch check 50 LF $5.00 0 $0.00 0 $0.00 0% CONTRACT PAYMENT NO. Council Final 'CONTRACT WORK COMPLETED - CONTINUED PAGE 2/3 ITEM NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY' UNIT I UNIT COST PREVIOUS TOTAL QUANTITY AMOUNT TOTAL TO DATE QUANTITY I AMOUNT PERCENT SUBTOTAL WORK COMPLETED - PAGE 2 TOTAL WORK COMPLETED TO DATE $73,950.51 $356,880.56 CH. ORD. NO. CHANGE ORDER ITEM DESCRIPTION CHANGE ORDER ITEM PREVIOUS TOTAL TOTAL TO DATE PERCENT QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT 1 2528 - 8445110 7001(0280)- Traffic control 1 LS $725.00 1 $725.00 1 $725.00 100% 1 2115- 0100000 7002(0030)- Modified Subbase AA 81.74 CY $27.70 — — — — — 1 2507- 3250005 8001 - Engineering Fabric 1500 SY $2.35 1850 $4,347.50 1850 $4,347.50 123% 1 2599- 9999010 8002 - Bolts for Mast Arm 1 LS $572.00 1 $572.00 1 $572.00 100% 2 2102 - 2710080 8003- Excavation, Class 10, Unstable Material 9.25 CY $22.10 9.25 $204.43 9.25 $204.43 100% 2 2303 - 0246422 8004 - Asphalt Binder PG 64 -22 2.23 TON $500.00 2.23 $1,115.00 2.23 $1,115.00 100% 2 2402 - 0425031 8005- Granular Backfill 71.96 TON $16.00 71.96 $1,151.36 71.96 $1,151.36 100% 2 2599 - 9999010 8006- Installation of City Provided Handhole 1 LS $275.00 1 $275.00 1 $275.00 100% 2 2503- 7182036 8007- Remove and Reinstall Storm Sewer Pipe Less than or Equal to 36 In. 5 LF $72.00 5 $360.00 5 $360.00 100% CONTRACT PAYMENT NO. DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLETED TO DATE AA = Adjusted in Above Contract Quantity Payments Previously Approved 1 $ 2 $ 3 $ 4 $ 5 $ Total Payments Forwarded $ 34,456.10 142,385.42 176,375.71 1,444.69 10,968.93 365,630.85 Council Final' CIP 3002029 3002029 2501814 2501815 Description IOWA DOT Traffic Saftey Grant IOWA DOT U -STEP Grant NW Arterial Capacity Improvements Traffic Consultant Servies Total Change Order Work PAGE 3/3 $8,750.29 Total Amount Earned to Date $365,630.85 Amount to Date Total Contract $ 343,555.55 $ 343,555.55 $ 48,388.00 $ 48,388.00 66423.32 $ 39,590.00 46575 $ 66,496.00 $ 504,941.87 $ 498,029.55 The undersigned, CONTRACTOR: BY: TITLE: DATE: PROJECT SUMMARY Total Due Contractor. IIW Construction Engineering: City Engineering: Direct Material Purchases: Total Project Cost: CERTIFICATE OF THE CITY MANAGER: hereby certify that the above statement shows in detail the correct amount o II work required to complete the above improvement. APPROVED: Michael Van Milligen7City VIatyager City of Dubuqu , Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: McDermott Excavating, Inc contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for said improvement. $ 365,630.85I $ 46,575.00I $ 18,972.48 I [ $ 73,763.54 $ 504,941.87I