Loading...
Wartburg Pl Reconstruct FinalMEMORANDUM February 9, 2004 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Wartburg Place Reconstruction Project Public Works Director Mike Koch is recommending acceptance of the Wartburg Place Reconstruction Project, as completed by Portzen Construction, Inc., in the final contract amount of $638,398.68, and recommending adoption of the preliminary schedule of final assessments. I concur with the recommendation and respectfully request Mayor and City Council approval. Miehael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director MEMORANDUM TO: FROM: SUBJECT: February 9, 2004 Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director War[burg Place Reconstruction Project INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract and the preliminary schedule of final assessments for the War[burg Place Reconstruction Project. DISCUSSION The project consisted of the complete reconstruction of the existing base and pavement surface for Wartburg Place. The street width is 31 feet in front of Wartburg Seminary with parking on one side. To the east of War[burg Seminary, the street width is 25 feet with a 6-inch wide curb. The project also included an upgrade of the existing watermain to 8-inch ductile iron pipe from the existing 6- inch, plus the installation of a new sanitary sewer at the Fremont Avenue intersection. These utility upgrades were part of a proposed subdivision along War[burg Place, and the upgrade of these utilities will be billed to the developer, Tim Conlon. Por[zen Construction, Inc. has completed this reconstruction in the amount of $638,398.68. Based upon final construction costs, the final amount of the special assessments for the paving improvement is $80,343.08, which is a reduction of $28,339.43 or 26.1% below the preliminary estimates that were mailed to the property owners for the public hearing. To allow sufficient administrative time to process financial assistance payments for Iow- to moderate-income families, the adoption of the schedule of final assessments will be delayed approximately 45 days. In its place is a resolution adopting a preliminary schedule of final assessments. Properly owners may use this period to apply for financial assistance that may reduce the amount of the assessment payable by the property owner. RECOMMENDATION I recommend that the City Council accept the improvements, accept the final contract be established at $638,398.68, and adopt the preliminary schedule of final assessments. BUDGETIMPACT The summary of the project is as follows: Award Final Construction Contract Contingency Sodding/Trees Engineering $464,434.42 $638,398.68 55,784.00 0 18,119.25 92,043.60 64,589.18 Total Project Cost $612,262.02 $721,107.11 The project is funded as follows: Award Final Road Use Tax Special Assessment to Private Properties Special Assessment to Sidewalk Special Assessment - Water Services Sanitary Sewer Construction Fund Watermain Construction Fund Developer Cost $385,554.58 $374,730.18 90,937.09 80,343.08 13,104.59 0 13,360.27 4,057.48 51,687.26 153,179.74 57,618.23 99,514.47 0 9,282.16 Total Project Funding $612,262.02 $721,107.11 The project will be funded through the Fiscal Year 2002 ClP appropriation of $2,515,000 for the annual street program. The project, as outlined, will require $374,730.18 in City street funds. Low- to moderate-income property owners subject to street assessments will be eligible for financial assistance ranging from 20 to 100 percent of the street assessment for owner-occupied resident property, depending on family size and income level. This financial assistance program is made available through the 1% Local Option Sales Tax. The cost of the water service laterals will be assessed directly to the benefited individual properties. Financial assistance to Iow- to moderate-income families is available also to fund the water service laterals. ACTION TO BE TAKEN The City Council is requested to adopt the resolutions accepting the improvements, establishing the final contract amount, and approving the preliminary schedule of final assessments. Prepared by Michael Felderman, PE cc: Dawn Lang, Budget Director Gus Psihoyos, Assistant City Engineer Bob Green, Water Plant Manager Michael Felderman, PE RESOLUTION NO. 65-04 ACCEPTING IMPROVEMENT Whereas, the contract for the Wartburg Place Reconstruction Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance· NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from Road Use Tax, the Sanitary Sewer Construction Fund, and the Watermain Construction Fund in amounts equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 16th :day of February ,2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CIty Clerk RESOLUTION NO. 66-04 FINAL ESTIMATE Whereas, the contract for the Wartburg Place Reconstruction Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $721,107.11 and the said amount shall be paid from Road Use Tax, the Sanitary Sewer Construction Fund, and the Watermain Construction Fund of the City of Dubuque, Iowa. Section 2. That $84,400.56 of the cost thereof shall be assessable upon private property and $627,424.39 shall be paid from Road Use Tax, the Sanitary Sewer Construction Fund, and the Water Construction Fund. Passed, approved and adopted this 16th day of February, 2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk ~ City of Dubuque PARTIA~'-PAYMENT: FINAL DATE: Feb. 5, 2004 PROJECT NAME: W~rtburg place Reconstruction CONTRACT AMOUNT: $449,830.98 CONTRACTOR: Portzen Construction, Inc. QTY. CODE ITEM UNIT UNIT COST TO DATE COST 2 3 4 5 6 7 8 9 13 2O 22 23 24 25 26 27 28 29 30 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 52 53 54 55 E-2 E-3 A-2 A~3 A4 1 I01.0130 Clearing & Grabbing 30" 1o 36" 1103.0200 Excavation, Unclassified 1105.0100 Backfill Limestone 1105.0102 Backfill Topsoil 1201.0100 Graded SteneBase 1203.0100 3" Crushed Stone Base 1205.0200 Bedding Stone, (1') Clean 1301.0500 RenaoyaJ of Asphalt Pavement 1301.I302 ACC Surface Course (Headers) 13012100 Asphalt, Surfadng of Driveway and Patches 1402.0162 PC Collcrete Pavement, (7') w/Integral Curb, Class "C" 1402.0500 Removal of Concrete Pavement (w/curbs) 1403.0301 Remove and Replacement of PC Concrete Curb & Gutter 1404.0114 PCC Sidewalk, 4" 1404.0546 PCC Driveway, 6", Remove and Construct 1404.0554 PCC Sidewalk, 4", Remove and Construct 1501.1010 Sanitery Sew-er Pipe, 10" DIP 1501.2210 Sanitary Se~ver, Manhole Sidewall 48" 1501.2220 Saltitery Sewer, Manhole Base 48" 1501.2280 Saltitaly Sc~ver Mmlhole, Ring (Fire/lo) and Cover I501.2801 Sanitary Sewer, Tee 8" x 4'* 1501.2910 Saait/tl y Sewer, 4" C.LP. Lateral i5ff2.2II5 RCP Storm Sewer 15" 15022196 DIP Storm Sewer 16"DIP 1502_2202 Storm Sewer Manhole, (48'), Complete 1502.2250 Storm Sc-~ver, Maabole RIng & Cover 1502.2510 Storal Sewer, Intake I01-B 1502.2512 Storm Sewer, Intake 10i-C 1503.1100 Watermain 4" DIP, Push on Joint w/Polywarp, Class 52 1503.1261 Watermain 6" DIP, Push on JoInt w/Polywarp, Class 52 1503.1281 Watermain 10" DIP, Push on Joint w/Polywarp, Class 52 1503.2631 Fitting 10x6 MJ Cross I503.2646 Fitting 6x6x4 Anchor Tee 1503.2648 Fitting 6x6x6 Anchor Tee Special 1503.2661 Bend 6" (22 1/2 deg) MJ PE 15032661 Bend 10" (45 dug) MJ PE 1503.2670 Mega Lug 6" 1503.2671 Mega Lug 10" 1503.2700 Valve, Gate (4') RS "O" Ring MJ 1503.2701 Valve, Gate (6') RS "O" Ring MJ 1503.2708 Valve, Gate (10') RS "O" Ring MJ 1503.2900 Hydrants MJ 1503.4256 Sleeves #441, 4" MJ 1503.4258 Sleeves ~441, 6" MJ 1503.4251 Sleeves ~441, t0" MJ 1503.4252 Solid Sleeves, 6" 1503.7006 Water Service Line, 3/4" Copper pipe ALTERNATE 1901.0100 Traffic Signal and Street Light. Conduit 1" PVC, in Trench 1902.O100 Electrical Cable gl0 AWG 19o7.o10o Steel Street Light Pole 1903.0100 PCC Foundation, 16"x16" x 54' Deep Special ADS N-12 Pipe I8" w/Thermo-mold FittIng EXTIL~ WORK Watermain 6" DIP, Push on Joint w/Polywarp, Class 52 Fi/ling 10xI0xl0 Tee Fitting 8xSx6 Anchor Tee Each 450.00 9 $4,050.00 CY 3.25 4404.3 $14,313.98 Ton 5.90 8485.41 $50,063.92 SY 2.20 2000 $4,400.00 Ton 8.40 3563.07 $29,929.79 Ton 7.25 4693.57 $34,028.38 Ton 9.95 615.2 $6,121.24 SY 1.75 4214.03 $7,374.55 Toll 100.00 82.12 $8,212.00 Ton 10lk00 103.01 $10,301.0/3 SY 21.60 5846.3 $126,280.08 SY 2.50 2062.39 $5,155.98 LF I4.75 95 $1,401.25 SF 2.25 0 $0.00 8Y 26.00 657.69 $17,099.94 SF 2.75 10234.96 $28,146.14 LF 26.97 0 $0.00 LF 85.00 70.33 $5,978.05 Each 350.00 9 $3,150.00 Each 275.00 8 $2,200.00 Each 200.00 4 $800.00 LF 27.00 4 $108.00 LF 24.00 175.5 $4,212.00 LF 34.00 333.5 $11,339.00 Each 1550.00 5 $7,750.00 Each 275.00 0 $0.00 Each 1225.00 6 $7,350.00 Each 1750.00 1 $1,750.00 LF 24.50 0 $0.00 LF 24.50 164.25 $4,024.13 LF 32.50 3 $97.50 Each 310.00 0 $0.00 Each 173.14 0 $lk00 Each 175.00 0 $0.00 Each 150.00 2 $300.00 Each 205.00 0 $0.00 Each 50.00 24 $1,200.00 Each 75.00 1 $75.00 Each 390.00 0 $0.00 Each 550.00 8 $4,400.00 Each 950.00 0 $0.00 Each 1350.00 5 $6,750.00 Each 115.00 0 $lk00 Each 125.00 6 $750.00 Each 185.00 2 $370.00 Each 89.00 0 S0.00 LF 19.00 119 $2,261.00 Each 325.00 8 $2,600.00 Each 700.00 0 $0.00 LF 6.50 3813 $24,784.50 LF 3.00 104.8 $314.40 LF 2.00 241.9 $483.80 LF 13.00 433.2 $5,631.60 Each 690.00 5 $3,450.00 LS 9768.00 1 $9,768.00 LF 3.85 1144.5 $4,406.33 LF 1.35 1807.5 $2,440.I3 Each 1057.00 4 $4,228.00 Each 400.00 4 $I ,60lk00 LF 23.16 0 $0.00 LF 29.00 1781.05 $51,650.45 Each 350.00 I $350.00 Each 230.00 8 $1,840.00 PART? PAYMENT: FINAL PROJECT NAME: Wanburg Place Reconstruction CONTRACTOR'. Por~zen Construction, lue. CODE City of Dubuque ITEM DATE: Feb. 5, 2004 CONTRACT AMOUNT: $449,830.98 QTY. UNIT COST TO DATE COST E4 Reducer 6x4 E-5 Reducer 8x6 E4 Reducer 10x8 E-7 Bend 6" (45 deg) MJ PE E-8 Bend 8" (45 deg) MJ PE E-9 Mega Lug 8" E-10 Valve, Gate (8") RS "O" Ring MJ E-I 1 Sanilray Sewer Plug E-12 8" SDR-26 PVC E-14 8x4 SDR-26 WYE E-15 4" SDR-26 PVC E-16 Special Backfill E- 17 Manhole Drop E-I 8 ACC Patch E-19 Sodding E-20 Water Service Umes 1", Copper Pipe E-2I Water Service Umes Stop Box, l" Tap lusta0ation E-22 Water Service Line~ I 1/.2", Copper Pipe E-23 Water Service Umes Stop Box, i I/2" Tap Installation E-24 Water Service Line~ 2", Copper Pipe E-25 Water Service Lines Stop Box,2" Tap lustallation E-26 Fitting 8" x 8" Tee E-27 Solid Slecwe, 8" E-28 Water Main Plugs E-29 Fitting 6" Bend 90 E-30 Trenching & Backfill (Electrical cable~) w/Fiber Optic E-31 Trenching & Backfill (Electrical cables) E-32 Clearing & Grabbing 15" to 18" E-33 K-Crete E-34 Adjuslment of Fixture in asphalt pavement E-35 Adjus~nent of FLxture in concrete pavement E-36 Tree Removal E-37 PCC Sidewalk w/Wall E-38 Concrete Steps E-39 Limestone wall I hereby ceniPy that the above statement shows in detail the correct mount of ali work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque,Iowa Each 170.00 1 $170.00 Each 195.00 2 $390.00 Each 230.00 1 $230.00 Each 150.00 0 $0.00 Each 180.00 0 $0.00 Each 65.00 12 $780.00 Each 800.00 5 $4,000.00 LS 87.00 3 $261.00 LF 33.50 1173 $39,295.50 LF 39.00 337 $13,143.00 Each 120.00 4 $480.00 LF 25.50 37.5 $956.25 Ton 9.50 456.71 $4,338.75 Each 750.00 I $750.00 Ton 59.00 157.35 $9,283.65 SY 7.70 1078.89 $8,307.45 LF 21.00 70 $1,470.00 Each 350.00 3 $1,050.00 LF 25.00 5.5 $137.50 Each 550.00 1 $550.00 - LF 28.00 36 $1,008.00 Each 575.00 2 $1,150.00_ Each 275.00 1 $275.00 Each 185.00 0 $0.00 Each 175.00 3 $525.00 Each 0.00 0 $0.00 LF 3.00 390 $1,170.00 LF 6.00 1670 $10,020.00 Each 350.00 2 $700.00 CY 95.00 4 $380.00 Each 300.00 3 $900.00 Each 125.00 9 $1,125.00_ LS 1.00 2029.37 $2,029.37 SF 8.25 257.4 $2,123.55 LF 45.00 5.8 $261.00 SF 33.50 73.3 $2,455.55 TOTAL DUE CONTRACTOR ENGINEEKING TOTAL CONSTRUCTION COST Michaei~A. Koch' Public Works $635,005.71 $64,589.18 $699,594.89 RESOLUTION NO. 67-04 RESOLUTION APPROVING PRELIMINARY SCHEDULE OF FINAL ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets, I to 1 inclusive, are hereby determined to be the preliminary schedule of final assessments for the Wartburg Place Reconstruction Project and the valuations set out herein are hereby approved. Passed, approved and adopted this 16th day of February, 2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneder, CMC, City Clerk CITY OF DUBUQUE, IOWA WARTBURGSTREET ( FREMONT AVE. TOSUNSETRIDGE STREET) PRELIMINARY SCHEDULE OF FIANL ASSESSMENTS The following schedule Is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque PARCEL VALUATION w/ NETPAVING SIDEWALK DEFICIENCY GROSS WATER SERVICE TOTALNET OWNER LOTDESCRIPTION No. IMPROVEMENT ~SSESSMENT~SSESSMENT ASSESSMENT ASBESSMEN1 ASSESSMENT ASSESSMENT SIMPSON's ADD. SchmId, James A. & Mary S. Schmld, James A. & Mary S. Beechen, Raymond J, & Mary Hartley, Mary Louise Hartley, Mary Louise Hartley, Mary Louise Conlon Partners Conlon Partners Conlon, Christine Wartbu~g Theologlcal Seminary: After SIMPSON'S ADD of Lot I - 4 - 64 SIMPSON% ADD. Of Lot l-t of 2-64and 1~64 and 10-26-453-010 Lot 2 ML 144 and Lot 2-2-1 Sub 2-64 $216,846.65 $3,166,65 $0.00 $0.00 $3,166,65 $522.62 $3,689.27 ESTHER MCGUIRE PLACE ESTHER MCGUIRE PLACE of Lot I 10-26-453-013 $386,907,45 $1,057.45 $0,00 $0,00 $1,057.45 $0,00 $%057,45 ESTHER MCGUIRE PLACE of Lot 2- 2 10-26-453-013 ESTHER MCGUIRE PLACE of Lot 1 - 2 10-26-453-011 $207,958.82 $1,838.82 $0.00 $0,00 $1,838.82 $0.00 $1,838.82 in Slmpson's Add. & 2 - M.L. 144 $126,048,82 $1,838.82 $0,00 $0.00 $1.838.82 $0,00 $1,838,82 Slmpson's Add. & 2 ~ M.L. 144 Sly. 89' - Wly. 10' - 1 ~ 2 - 1 - Sub 1 - 3 - 64 and 2. 10-26-453-012 64 In Slmpson's Add, & M.L. 144 MINERAL LOT 139 MINERAL LOT 139 of Lot I 10-35-201-009 $119,817.32 $1,757.32 $0.00 $0,00 $1,757,32 $0.00 $1,757.32 MINERAL LOT 139 of Lot 2 - 1 - 1 - 1 - 2 - 1 - 1, 1. 10-35-201-010 2-2-1-1,2-1-1-2-1-1,2-2-2-1-1 -I $155,369,31 $2,749.31 $0,00 $0.00 $2,749.31 $522.62 $3,271,93 1-i $340,222,15 $7,642.15 $0.00 $0.00 $7,642.15 $0.00 $7,642,15 MINERAL LOT 139 of Lot 1 - 1 - 2 10-35-201-006 $532,202,71 $6,772,71 $0.00 $0.0g $6,772,71 $0.00 $6,772,71 All McDonald - Wartbung Place 10-35-201-007 $448,743.53 $18,583.53 $0.00 $0,00 $15,583,53 $632.50 $16,216.03 SIMPSON'S ADD 10-38-128-001 $0.00 $37,938.31 $2,379.74 $40,310.05 $9,955,336.31 $37,936.31 $0.00 80343.08 O,Og 0,00 80343.08 4057.48 84400.58 NOTICE OF FILING OF THE FINAL SCHEDULE OF ASSESSMENTS AGAINST BENEFITED PROPERTIES FOR THE WARTBURG PLACE RECONSTRUCTION PROJECT WITHIN THE CITY OF DUBUQUE, IOWA TO THE PERSONS OWNING LAND LOCATED WITHIN THE DISTRICT DESCRIBED AS THE WARTBURG PLACE RECONSTRUCTION PROJECT WITHIN THE CITY OF DUBUQUE, IOWA: The improvement type(s) and the location(s) is (are) as follows: Wartburg Place Reconstruction Project Consisting of the properties which are described as follows: All property included with the areas described so as to include one-half of the privately owned property between each such street to be improved and the next street, whether such privately owned property situated more than 300 feet from the street to be improved be assessed. You are hereby notified that the final schedule of assessments against benefited properties within the District described as the Wartburg Place Reconstruction Project has been adopted and assessments confirmed and levied by the City Council of Dubuque, Iowa, and that said schedule of assessments has been certified to the County Treasurer of Dubuque County, Iowa. YOU ARE FURTHER NOTIFIED THAT ASSESSMENTS MAY BE PAID IN FULL OR IN PART WITHOUT INTEREST AT THE OFFICE OF THE CITY TREASURER, CITY HALL, 50 W. 13TM STREET, DUBUQUE, IOWA, 52001 UNTIL After unpaid special assessments of $50.00 or more are payable in 10 annual installments and will draw annual interest at nine percent (9%) computed to the December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. Property owners may elect to pay any annual installment semiannually in advance. All properties located within the boundaries of the War[burg Place Reconstruction Project above described have been assessed for the cost of the making of said improvements, the amount of each assessment and the amount of any conditional deficiency assessment having been set out in the schedule of assessments accompanying the same, which are now on file in the office of the County Treasurer of Dubuque County, Iowa. For further information you are referred to said schedule of assessments. This Notice given by direction of the City Council of the City of Dubuque, Iowa, as provided in Section 384.60 of the Code of Iowa. Jeanne F. Schneider, CMC, City Clerk