Loading...
Bee Branch Creek Deconstruction ProjectMasterpiece on the Mississippi Dubuque All- Amedcacily 1 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Deconstruction of Buildings for the Bee Branch Creek Restoration Project (CIP 7201654) DATE: February 1, 2011 The Deconstruction of Buildings for the Bee Branch Creek Restoration Project provided for the deconstruction and removal of 44 buildings. Through change orders, the amount of buildings was increased to 53. Deconstruction differs from demolition in that it involves the systematic disassembly of a building in order to maximize the recycling and reuse of the building materials. The goal of the project was to divert as much building materials from the landfill as reasonably possible through reuse and recycling of materials. City Engineer Gus Psihoyos is recommending acceptance of the improvements for the Deconstruction of Buildings for the Bee Branch Creek Restoration project, and authorize payment of the following contract amounts: Gronen Restoration in the amount of $332,058.65 for Bid Groups 1, 2, 4, 6, 12 and 13; Tschiggfrie Excavating in the amount of $622,097.28 for Bid Groups 3, 5, 8, 9, 10, 11, 14 and 15; and Ted Stackis Construction in the amount of $141,742.63 for Bid Group 7. Gronen Restoration achieved an average diversion rate of 85.6 %, Tschiggfrie Excavating achieved an average diversion rate of 81.0% and Ted Stackis Construction achieved an average diversion rate of 84.20 %. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Mi hael C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: January 27, 2011 Dubuque at- America City ,' 2007 SUBJECT: Deconstruction of Buildings for the Bee Branch Creek Restoration Project (CIP 7201654) INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contracts for the Deconstruction of Buildings for the Bee Branch Creek Restoration Project. BACKGROUND The Deconstruction of Buildings for the Bee Branch Creek Restoration Project (Project) provided for the deconstruction and removal of forty -four (44) buildings. Deconstruction differs from demolition in that it involves the systematic disassembly of a building in order to maximize the recycling and reuse of the building materials. The goal of the Project was to divert as much building materials from the landfill as reasonably possible through reuse and recycling of materials. DISCUSSION The deconstruction was performed under three separate contracts by three separate contractors. Because the goal was to divert as much material from the landfill as possible, i.e. salvage, reuse, and recycling of materials, the final payment due the contractor for each building was to be based on the percentage of material diverted from the landfill. The bids were based on the unit price of "% Diverted ". Therefore, the more a contractor was able to divert, the more they would be compensated for their efforts. Per the funds set aside for deconstruction in the budget, higher diversion rates were expected; the budget assumed a diversion rate of 85 %. The bid documents only called out for between 60 and 65% diversion depending on the type of building to be removed. For example, a higher diversion percentage was expected for brick buildings. So even though a higher diversion rate was anticipated, setting a diversion rate of 85% had the potential of limiting competition. And the secondary goal of the deconstruction project was to encourage local contractors to expand their services to include deconstruction. If the bid documents had demanded an 85% diversion rate, a newcomer to the deconstruction trade such as Ted Stackis Construction may not have even bid on the work as they might have concluded that they could not achieve such a high diversion rate. The bids identified fifteen individual bid groups that ranged from one (1) building to eight (8) buildings. So a contractor could choose to bid on one building, all forty -four buildings, or somewhere in between. This allowed small contractors the ability to compete against large contractors. The City received bids from three contractors and based on the bids, bid groups were awarded to each of the three contractors. Also, after the project was awarded, the City acquired additional buildings. These buildings were bid -let, awarded, and handled as change orders to the three contractors. Gronen Restoration was awarded a contract to deconstruct fifteen (15) buildings associated with Bid Groups 1, 2, 4, 6, 12, and 13. As an experienced deconstruction contractor, Gronen Restoration was able to achieve an average diversion rate of 85.6 %. This increased diversion rate resulted in a 41.46% contract increase. Again, this expense was expected and allowed for in the deconstruction budget which included funding for diversion rates of 85 %. Through a change order, an additional house and garage were also added to the contract with Gronen which increased the contract by another 6.76 %. Gronen Restoration has completed the work in the final contract amount of $332,058.65. The final contract amount represents a 48.22% increase from the original contract amount of $224,025.15. Tschiggfrie Excavating was awarded a contract to deconstruct twenty -five (25) buildings associated with Bid Groups 3, 5, 8, 9, 10, 11, 14, and 15. As an experienced demolition contractor, deconstruction was new to Tschiggfrie. They approached the challenge with their own ingenuity salvaging lumber for reuse as an energy source. The lumber was sent to the Cassville, Wisconsin power plant that was recently converted from a coal - fired facility to a 100 percent wood - waste - fueled facility. Tschiggfrie, relatively new to deconstruction, was able to achieve an average diversion rate of 81.0 %. This increased diversion rate resulted in a 35.04% contract increase. Through a change order, three additional buildings were added to the contract which increased the contract by another 13.76 %. Tschiggfrie Excavating completed the work in the final contract amount of $622,097.28, which is a 48.80% increase from the original contract amount of $418,080.00. Ted Stackis Construction was awarded a contract to deconstruct four (4) buildings associated with Bid Group 7. Ted Stackis Construction was also a newcomer to the deconstruction trade; but they were still able to achieve an average diversion rate of 84.20 %. This increased diversion rate resulted in a 32.12% contract increase. Through a change order, four additional buildings were added to the contract which essentially doubled their contract, increasing it by $62,468.97 or 104.11%. Ted Stackis Construction completed the work in the final contract amount of $141,742.63, which is a 136.24% increase from the original contract amount of $60,000.00. As a result of the Project, it is now clear that even relative newcomers to the deconstruction trade should be expected to achieve diversion rates of at least 80 %. In addition, the City may be better served by utilizing the proposal process versus the competitive bidding process as it would allow the City to consider the end use of buildings materials as part of the contractor selection process. For example, the City might judge that it is in the best interest of the City to pay more to hire a contractor who will salvage lumber for reuse as lumber versus a contractor that would salvage the lumber for reuse as an energy source. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the following contract amounts for the Deconstruction of Buildings for the Bee Branch Creek Restoration Project: Gronen Restoration in the amount of $332,058.65 for Bid Groups 1, 2, 4, 6, 12, and 13; Tschiggfrie Excavating in the amount of $622,097.28 for Bid Groups 3, 5, 8, 9, 10, 11, 14, and 15; and Ted Stackis Construction in the amount of $141,742.63 for Bid Group 7. BUDGET IMPACT The project cost summary for the Deconstruction of Buildings for the Bee Branch Creek Restoration Project is as follows: Award Final Construction Contract(s) $686,085.15 $1,095,898.56 Contingency 81,075.00 0 Engineering 62,158.00 39,000.00 Total Project Cost $829,318.15 $1,134,898.56 Even though the final cost to deconstruct the buildings shown above is $305,580.41 more than the award, it does not result in a funding shortfall as the higher diversion rates were anticipated and included in the budget established for building deconstruction. The project will be funded through the FY2010 Bee Branch Creek Restoration Project appropriation in the amount of $4,573,061 for property acquisitions (CIP 7201654). ACTION TO BE TAKEN respectfully request adoption of the attached resolutions accepting the improvements and authorizing payment of the following contract amounts for the Deconstruction of Buildings for the Bee Branch Creek Restoration Project: Gronen Restoration in the amount of $332,058.65 for Bid Groups 1, 2, 4, 6, 12, and 13; Tschiggfrie Excavating in the amount of $622,097.28 for Bid Groups 3, 5, 8, 9, 10, 11, 14, and 15; and Ted Stackis Construction in the amount of $141,742.63 for Bid Group 7. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Ken TeKippe, Finance Director Deron Muehring, Civil Engineer II RESOLUTION NO. 28-11 ACCEPTING THE BUILDING DECONSTRUCTION ASSOCIATED WITH THE BEE BRANCH CREEK RESTORATION PROJECT, BID GROUPS 1, 2, 4, 6, 12, AND 13 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Building Deconstruction Associated with the Bee Branch Creek Restoration Project, Bid Group(s) 1, 2, 4, 6, 12, and 13 has been completed by Gronen Restoration (Contractor) and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Bee Branch Creek Restoration Project appropriation for the contract amount of $332,058.65 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of February 1 11 eanne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BUILDING DECONSTRUCTION ASSOCIATED WITH THE BEE BRANCH CREEK RESTORATION PROJECT, BID GROUP(S) 1, 2, 4, 6, 12, AND 13 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Bee Branch Building Deconstruction Project, Bid Group(s) 1, 2, 4, 6, 12, and 13, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $345,058.65. Dated this gi {h day of �A,lunav , 2011. Filed in the office of the City Clerk on the day of 71', a I, 2011. ' y Engineer e ,/ eanne F. Schneider, CMC, City Clerk Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 1, 2, 4, 6, 12, & 13 7201654 563 - 542 $224,025.15 24 Sep Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Gronen Restoration 1056 Main Street Dubuque, lowa 52001 563 - 542 ITEM NO. Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 1 1 1552 Maple Street 1 2 1570 Maple Street 1 3 1576 Maple Street 2 1 1924 Kniest Street 4 1 2006 Kniest Street 4 2 505 Rhomberq Avenue 4 3 507 Rhomberq Avenue 4 4 509 Rhomberq Avenue 4 5 511 -513 Rhomberg Avenue 60 60 60 12 1 2345 Elm Street 60 13 1 2315 Prince Street 60 PROJECT CLOSE OUT FORM CONTRACT ITEM DESCRIPTION I QUANTITYNTRA IT IT UNIT PRICE I QUANTITY ECT TOTAL I COMPLETE % 60 % 269.71 82 16 $ 22,159.37 136 93% 60 % 159 3 89 02 $ 14,180.89 148.37% 60 % 106 2 89.02 $ 9,453.92 148 37% 60 % 218 47 89.02 $ 19,448.20 148 37% 60 % 179.36 89.02 $ 15,966.63 148.37% 65 % 611.91 89.02 $ 54,472.23 136 95% 6 1 2104 Kniest Street 60 % 226.56 83.51 $ 18,920.03 139 18% 6 2 2106 Kniest Street 60 % 273.09 83.51 $ 22,805 75 139 18% 6 3 2100 -2102 Kniest Street 60 % 242.74 83.51 $ 20,271.22 139 18% 6 4 509 Lincoln Avenue 60 % 269.71 83.51 $ 22,523.48 13918% Oh 242.74 19419 230 77 84 99 84 99 84.99 $ 20,630.47 $ 16,504.21 $ 19,613.14 141.65% 141.65% 141.65% 240.72 83.29 $ 20,049 57 138 82% 236 84.42 $ 19,923.12 140 70% TOTAL CONTRACT WORK $ 316,922.22 CHANGE ORDERS 311 East 22nd Street - Garage Only 60 % 36 60 00 $ 2,160.00 100 00% 2251 Elm Street 75 % 160.5 80.85 $ 12,976.43 107 80% TOTAL CHANGE ORDER WORK $ 15,136.43 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. improvement, does hereby accept the above 'Total Due Contractor', as full settlement for all claims for said improvement. APPROVED: Michael Van Milligan, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: $ 316,922.22 Total Change Order Work Performed to Date: $ 15,136.43 Total Contract and Change Order Work Performed to Date: $ 332,058.65 Miscellaneous Costs Engineering $ 13,000.00 TOTAL FINAL PROJECT COSTS: The Undersigned -t l � - W t for the above BY: $ APPROVED: 345,058.65 UP ii-S-10 Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 1, 2, 4, 6, 12, & 13 7201654 $224,025.15 24- Sep-10 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Gronen Restoration 1056 Main Street Dubuque, Iowa 52001 563-542-6867 Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 1 1 1552 Maple Street 1 2 1570 Maple Street 1 3 1576 Maple Street 2 1 1924 Kniest Street 4 1 2006 Kniest Street 4 2 505 Rhomberg Avenue 4 3 507 Rhomberq Avenue 4 4 509 Rhomberq Avenue 4 5 511-513 Rhomberg Avenue 12 1 2345 Elm Street 13 1 2315 Prince Street 60 60 60 PROJECT CLOSE OUT FORM ITEM I NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM PROJECT TOTAL QUANTITY UNIT UNIT PRICE I QUANTITY TOTAL PERCENT COMPLETE Oh Oh % 242.74 194 19 230.77 84.99 84 99 84.99 $ 20,630 47 $ 16,504.21 $ 19,613.14 141.65 % 141 65% 141 65% 60 % 269.71 8216 $ 22,159.37 136.93% 60 % 159.3 60 % 106 2 60 % 21847 60 % 179.36 65 % 611.91 89.02 89 02 89 02 89 02 89.02 $ 14, 180.89 $ 9,453.92 $ 19,448.20 $ 15,966.63 $ 54,472.23 148.37% 148.37% 148.37% 148.37% 136 95% 6 1 2104 Kniest Street 60 % 226.56 83.51 $ 18,920.03 139 18% 6 2 2106 Kniest Street 60 % 273.09 83 51 $ 22,805.75 139 18 % 6 3 2100 -2102 Kniest Street 60 % 242.74 83.51 $ 20,271.22 139.18% 6 4 509 Lincoln Avenue 60 % 269 71 83.51 $ 22, 523.48 139.18% 60 % 240.72 83.29 $ 20,049.57 138.82% 60 % 236 84.42 $ 19,923.12 140.70% TOTAL CONTRACT WORK $ 316,922 22 CHANGE ORDERS 311 East 22nd Street - Garage Only 60 % 36 60.00 $ 2,160.00 100 00% 2251 Elm Street 75 % 160 5 80.85 $ 12,976.43 107.80% TOTAL CI-tANGE ORDER WORK $ 15,136 43 Total Contract Work Performed to Date: $ 316,922 22 Total Change Order Work Performed to Date. $ 15,136.43 Total Contract and Change Order Work Performed to Date: $ 332,058.65 Miscellaneous Costs $ Engineering $ 13,000.00 TOTAL FINAL PROJECT COSTS: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa $ 345,058.65 Oa' The Undersig contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 1, 2, 4, 6, 12, & 13 7201654 $224,025 15 24 Sep Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Gronen Restoration 1056 Main Street Dubuque, lowa 52001 563 ITEM NO. Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 1 1 1552 Maple Street 1 2 1570 Maple Street 1 3 1576 Maple Street 2 1 1924 Kniest Street 4 1 2006 Kniest Street 4 2 505 Rhomberq Avenue 4 3 507 Rhomberq Avenue 4 4 509 Rhomberq Avenue 4 5 511 -513 Rhomberq Avenue 12 1 2345 Elm Street 13 1 2315 Prince Street CONTRACT ITEM DESCRIPTION PERCENT I I QUANTITY UNIT I UNIT PRICE I QUANTITY ECT TOTAL TOTAL I COMPLETE 60 % 60 % 60 % PROJECT CLOSE OUT FORM 242.74 194.19 230 77 84 99 84.99 84.99 60 % 269.71 82 16 $ 22,159.37 136.93% 60 % 159.3 89.02 $ 14,180.89 148 37% 60 % 106.2 89.02 $ 9,453.92 148 37% 60 % 218.47 89.02 $ 19,448.20 148.37% 60 % 179.36 89.02 $ 15,966.63 148 37% 65 % 611.91 89 02 $ 54,472.23 136.95% 6 1 2104 Kniest Street 60 % 226.56 83.51 $ 18,920.03 139 18% 6 2 2106 Kniest Street 60 % 273.09 83.51 $ 22,805.75 139 18% 6 3 2100 -2102 Kniest Street 60 % 242.74 83.51 $ 20,271.22 139 18% 6 4 509 Lincoln Avenue 60 % 269 71 83.51 $ 22,523.48 139 18 % 60 % 240 72 83.29 $ 20,049.57 138.82% 60 % 236 84.42 $ 19,923.12 140.70% TOTAL CONTRACT WORK $ 316,922.22 CHANGE ORDERS 311 East 22nd Street - Garage Only 60 % 36 60.00 $ 2,160.00 100 00% 2251 Elm Street 75 % 160 5 80.85 $ 12,976.43 107.80% TOTAL CHANGE ORDER WORK $ 20,630.47 $ 16,504.21 $ 19,613.14 $ 15,136.43 141 65% 141 65% 141 65% I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager...- - Dubuque, Iowa /x 4 \ Gus Psihoyos, City E sneer Dubuque, Iowa Total Contract Work Performed to Date: $ 316,922.22 Total Change Order Work Performed to Date: $ 15,136 43 Total Contract and Change Order Work Performed to Date: $ 332,058.65 Miscellaneous Costs Engineering $ 13,000.00 TOTAL FINAL PROJECT COSTS: $ The Undersigned contractor for the above improvement, does hereby accept the above 'Total Due Contractor', as full settlement for all claims for said improvement APPROVED: 346,058.65 yf Ir -, la RESOLUTION NO. 29 -11 ACCEPTING THE BUILDING DECONSTRUCTION ASSOCIATED WITH THE BEE BRANCH CREEK RESTORATION PROJECT, BID GROUPS 3, 5, 8, 9, 10, 11, 14 AND 15 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Building Deconstruction Associated with the Bee Branch Creek Restoration Project, Bid Groups 3, 5, 8, 9, 10, 11, 14, and 15 has been completed by Tschiggfrie Excavating (Contractor) and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Bee Branch Creek Restoration Project appropriation for the contract amount of $622,097.28 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of February, 2010. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BUILDING DECONSTRUCTION ASSOCIATED WITH THE BEE BRANCH CREEK RESTORATION PROJECT, BID GROUPS 3, 5, 8, 9, 10, 11, 14 AND 15 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Bee Branch Creek Restoration Project, Bid Group(s) Bid Group(s) 3, 5, 8, 9, 10, 11, 14, and 15, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $635,097.28. Dated this 29th day of January, 2011. Filed in the office of the City Clerk on the 3rd day of February, 2011. City Engineer Jeanne F. Schneider, CMC, City Clerk 201 Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 3, 5, 8, 9, 10, 11, 14, 815 7201654 $418,080.00 24 Sep Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Tschiggfrie Excavating 425 Julien Dubuque Drive Dubuque, Iowa 52003 563 557 - 7450 Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 ITEM NO. CONTRACT ITEM DESCRIPTION I QUANTITY N UNIT I UNIT PRICE I QUANTITY ECT TOTAL TOTAL I COMPLETE 3 1 506 Rhomberg Avenue 3 2 508 Rhomberg Avenue 3 3 502-505 Rhoberq Avenue 3 4 510-512 Rhomberq Avenue 5 1 2010 Kniest Street 5 2 2014 Kniest Street 5 3 2020 Kniest Street 8 1 500 East 22nd Street 60 % 260 73.40 $ 19,084.00 122.33% 8 2 504 East 22nd Street 60 % 258 77.30 $ 19,94340 128.83% 8 3 506 East 22nd Street 60 % 291 76 70 $ 22,319 70 127.83% 8 4 508 East 22nd Street 60 % 256 78.50 $ 20,096.00 130.83% 8 5 2128 Kniest Street 60 % 257 79.10 $ 20,328.70 131.83% 9 1 505 East 22nd Street 9 2 509 East 22nd Street 10 1 2249 Elm Street 11 1 2317 Elm Street 15 1 2404 -2406 Washington Street 60 60 60 60 CHANGE ORDERS 2238 -2240 Washington Street 75 2300 -2302 Washington Street 75 500 E 22nd Garage - Lump Sum 1 PROJECT CLOSE OUT FORM % % 257 267 302 290 60 % 277 75.50 $ 20,913.50 125.83% 60 % 260 85.20 $ 22,152.00 142.00% 60 % 257 7190 $ 18,992.30 123.17% 60 % 340 60 % 254 91.50 91.20 94.80 85.40 8226 89 96 $ 23,515.50 $ 24,350 40 $ 28,629.60 $ 24,766.00 $ 27,968.40 $ 22,849.84 152.50% 152.00% 158 00% 142 33% 137.10% 149 93% 60 % 265 83.60 $ 22,154.00 139.33% 60 % 263 6690 $ 17,594.70 111 50% 14 1 2241 Prince Street 60 % 257 72.52 $ 18,63764 120.87% 14 2 2243 Prince Street 60 % 267 85.22 $ 22,753.74 142.03% 14 3 2259 Prince Street 60 % 249 82.27 $ 20,485.23 137 12% 14 4 2249 -2251 Prince Street 60 % 406 75.92 $ 30,823.52 126.53% 14 5 2263 -2265 Prince Street 60 % 296 71 19 $ 21,072.24 118 65% 14 6 2269 2271 Prince Street 60 % 275 81.45 $ 22,398.75 135.75% 14 7 2273 -2301 Prince Street 60 % 284 79 53 $ 22,586.52 132.55% 14 8 2305 -2307 Prince Street 60 % 262 84.50 $ 22,139.00 140.83% 60 % 318 88.10 $ 28,015.80 146.83% LS TOTAL CONTRACT WORK $ 564,570.48 362 76.8 $ 27,801.60 102.40% 337 796 $ 26,825.20 106.13% 2900 1 $ 2,900 00 100.00% TOTAL CHANGE ORDER WORK $ 57,526.80 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligan, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: $ 564,570 48 Total Change Order Work Performed to Date: $ 57,526 80 Total Contract and Change Order Work Performed to Date: $ 622,097.28 Miscellaneous Costs Engineering $ 13,000.00 TOTAL FINAL PROJECT COSTS: The Undersigned / S i contractor for the above improvement, does hereby acc.F) above 'Total Due Contractor', as full settlement for all claims for said improvement. APPROVED: BY: 635,097.28 0/ -S-10 Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 3, 5, 8, 9, 10, 11, 14, 815 7201654 $418,080.00 24 -Sep -10 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Tschiggfne Excavating 425 Julien Dubuque Drive Dubuque, Iowa 52003 563- 557 -7450 ITEM NO. 3 3 3 3 Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 1 506 Rhomberg Avenue 2 508 Rhomberq Avenue 3 502 -505 Rhoberg Avenue 4 510-512 Rhomberg Avenue 5 1 2010 Kniest Street 5 2 2014 Kniest Street 5 3 2020 Kniest Street 9 1 505 East 22nd Street 9 2 509 East 22nd Sttreet 10 1 2249 Elm Street 11 1 2317 Elm Street 15 1 2404 -2406 Washington Street 60 60 60 60 60 % 60 % PROJECT CLOSE OUT FORM CONTRACT ITE N I QUANTITY UNIT I UNIT PRICE I QUANTITY I COMPLETE % 257 267 302 290 91.50 91.20 94.80 85.40 $ 23,515.50 $ 24,350.40 $ 28,629.60 $ 24,766.00 152.50% 152.00% 158.00% 142.33% 60 % 277 75.50 $ 20, 913.50 125 83% 60 % 260 85.20 $ 22,152.00 142 00% 60 % 257 73.90 $ 18,992.30 123 17% 8 1 500 East 22nd Sttreet 60 % 260 73.40 $ 19,084.00 122.33% 8 2 504 East 22nd Street 60 % 258 77.30 $ 19,943.40 128.83% 8 3 506 East 22nd Street 60 % 291 76.70 $ 22,319 70 127.83% 8 4 508 East 22nd Street 60 % 256 78.50 $ 20,096.00 130.83% 8 5 2128 Kniest Street 60 % 257 7910 $ 20,328.70 131.83% 340 82.26 $ 27,968.40 137.10% 254 8996 $ 22,849.84 149.93% 60 % 265 83.60 $ 22,154.00 139.33% 60 % 263 66.90 $ 17,594.70 111.50% 14 1 2241 Prince Street 60 % 257 72.52 $ 18,637.64 120.87% 14 2 2243 Prince Street 60 % 267 85 22 $ 22,753.74 142.03% 14 3 2259 Prince Street 60 % 249 82.27 $ 20,485.23 137.12% 14 4 2249 -2251 Prince Street 60 % 406 75.92 $ 30,823 52 126.53% 14 5 2263 -2265 Prince Street 60 % 296 71.19 $ 21,072 24 118.65% 14 6 2269 2271 Prince Street 60 % 275 81.45 $ 22,398.75 135.75% 14 7 2273 -2301 Prince Street 60 % 284 79 53 $ 22,586.52 132.55% 14 8 2305 -2307 Prince Street 60 % 262 84 50 $ 22,139.00 140.83% 60 % 318 8810 $ 28,015.80 146 83% TOTAL CONTRACT WORK $ 564,570.48 CHANGE ORDERS 2238 -2240 Washington Street 75 % 362 76.8 $ 27,801.60 102.40% 2300 -2302 Washington Street 75 % 337 79.6 $ 26,825 20 106.13% 500E 22nd Garage - Lump Sum 1 LS 2900 1 $ 2,900.00 100.00% TOTAL CHANGE ORDER WORK $ 57,526.80 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: $ 564,570.48 Total Change Order Work Performed to Date: $ 57,526.80 Total Contract and Change Order Work Performed to Date: $ 622,097.28 Miscellaneous Costs Engineering $ 13,00000 TOTAL FINAL PROJECT COSTS: 635,097.28 The Undersigned contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: BY: Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction 425 Julien Dubuque Drive Group 3, 5, 8, 9, 10, 11, 14, & 15 7201654 $418,080.00 24 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Tschrggfne Excavating 425 Julien Dubuque Drive Dubuque, Iowa 52003 563 557 - 7450 ITEM NO. 3 3 3 3 Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 1 506 Rhomberg Avenue 2 508 Rhomberg Avenue 3 502 -505 Rhoberg Avenue 4 510-512 Rhomberq Avenue 5 1 2010 Kniest Street 5 2 2014 Kniest Street 5 3 2020 Kniest Street 8 1 500 East 22nd Sttreet 8 2 504 East 22nd Street 8 3 506 East 22nd Street 8 4 508 East 22nd Street 8 5 2128 Kniest Street 9 1 505 East 22nd Street 9 2 509 East 22nd Sttreet 10 1 2249 Elm Street 11 1 2317 Elm Street 60 15 1 2404 -2406 Washington Street PROJECT CLOSE OUT FORM CONTRACT ITEM DESCRIPTION I CONTRACT ITEM QUANTITY UNIT UNIT PRICE 60 60 60 60 % 60 % 60 % 60 % OA 257 267 302 290 PROJECT TOTAL QUANTITY TOTAL 91.50 91.20 94.80 85.40 $ 23,515.50 $ 24,350.40 $ 28,629.60 $ 24,766.00 PERCENT I COMPLETE 152.50% 152 00% 158 00% 142.33% 277 75.50 $ 20,913.50 125.83% 260 85.20 $ 22,152.00 142.00% 257 73.90 $ 18,992.30 12317% 60 % 260 73.40 $ 19,084.00 122.33% 60 % 258 77.30 $ 19,943.40 128.83% 60 % 291 76.70 $ 22,319.70 127.83% 60 % 256 78.50 $ 20,096.00 130.83% 60 % 257 79.10 $ 20,328.70 131.83% 60 % 340 82.26 $ 27,968.40 137.10% 60 % 254 89.96 $ 22 849 84 149 93% 60 % 265 83.60 $ 22,15400 139.33% 263 66.90 $ 17, 594.70 111.50% 14 1 2241 Prince Street 60 % 257 72.52 $ 18,637.64 120 87% 14 2 2243 Prince Street 60 % 267 85.22 $ 22, 753.74 142 03% 14 3 2259 Prince Street 60 % 249 82.27 $ 20,485.23 137.12% 14 4 2249 -2251 Prince Street 60 % 406 75.92 $ 30,823.52 126.53% 14 5 2263 -2265 Prince Street 60 % 296 71.19 $ 21,072.24 11865% 14 6 2269 2271 Prince Street 60 % 275 81.45 $ 22,398.75 135.75% 14 7 2273 -2301 Prince Street 60 % 284 79 53 $ 22,586 52 132.55% 14 8 2305 -2307 Prince Street 60 % 262 84.50 $ 22,139 00 140 83% 60 % 318 8810 $ 28,015.80 146 63% TOTAL CONTRACT WORK $ 564,570.48 CHANGE ORDERS 2238 -2240 Washington Street 75 % 362 76.8 $ 27,801.60 102.40% 2300 -2302 Washington Street 75 % 337 79.6 $ 26,825.20 106 13% 500E 22nd Garage - Lump Sum 1 LS 2900 1 $ 2,900.00 100 00% TOTAL CHANGE ORDER WORK $ 57,526.80 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date $ 564,570.48 Total Change Order Work Performed to Date: $ 57,526.80 Total Contract and Change Order Work Performed to Date: $ 622,097.28 Miscellaneous Costs Engineering $ 13,000.00 TOTAL FINAL PROJECT COSTS: The Undersignedh ( `, !Y ( D contractor for the above improvement, does herebyacce.' t ��•ve'Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: BY: 635,097.28 RESOLUTION NO. 30 -11 ACCEPTING THE BUILDING DECONSTRUCTION ASSOCIATED WITH THE BEE BRANCH CREEK RESTORATION PROJECT, BID GROUP 7 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Building Deconstruction Associated with the Bee Branch Creek Restoration Project, Bid Group 7 has been completed by Ted Stackis Construction (Contractor) and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Bee Branch Creek Restoration Project appropriation for the contract amount of $141,742.63 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of February , 011. Atte . t: anne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BUILDING DECONSTRUCTION ASSOCIATED WITH THE BEE BRANCH CREEK RESTORATION PROJECT, BID GROUP 7 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Bee Branch Creek Restoration Project, Bid Group 7, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $154,742.63. Dated this 27th day of January, 2011. Filed in the office of the City Clerk on 3rd day of February, City E gineer anne F. Schneider, CMC, City Clerk H Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 7 7201654 $105,790.00 24- Sep -10 Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Ted Stack's Construction 206 Saunders Street Dubuque, Iowa 52001 563 - 451 - 3300 ITEM NO. Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589 -4270 7 1 2120 Kniest Street 7 2 2110 -2112 Kniest Street 7 3 2114 -2116 Kniest Street 7 4 2124 -2126 Kniest Street PROJECT CLOSE OUT FORM CONTRACT ITEM DESCRIPTION QUANTITY I UNIT PRICE I QUANTITYJECT TOTAL TOTAL I COMPLETE 65 60 65 65 OA OA OA ok 230 77 250 230.77 230.77 85.92 80.74 83.59 86 54 $ 19,82776 $ 20,185.00 $ 19,290.06 $ 19,970.84 TOTAL CONTRACT WORK $ 79,27366 132.18% 134.57% 128.60% 133.14% CHANGE ORDERS 1553 Maple Street 60 % 148.33 85.37 $ 12,662.93 142 28% 1575 Maple Street 60 % 181 67 83 21 $ 15,116.76 138 68% 1597 Maple Street 60 % 166.5 77.94 $ 12,977.01 129 90% 574 East 16th Street 60 % 266.67 81.42 $ 21,712 27 135.70% TOTAL CHANGE ORDER WORK $ 62,468.97 APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: $ 79,273.66 Total Change Order Work Performed to Date: $ 62,468.97 Total Contract and Change Order Work Performed to Date: $ 141,742.63 Miscellaneous Costs Engineering $ 13,000.00 TOTAL FINAL PROJECT COSTS: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. The Undep14nec l f / / �i',; <4 / 7� c o ntrador f h� above improvement, do he rreb),accept above - Total Due Contractor, as full settlement for al Ins for s i overaent. ,f \ yi 1 � '45 APPROVED: / BY: $ 154,742.63 Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 7 7201654 $105,790.00 24 Sep Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Ted Stackis Construction 206 Saunders Street Dubuque, Iowa 52001 563 ITEM NO. Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 7 1 2120 Kniest Street 7 2 2110 -2112 Kniest Street 7 3 2114 -2116 Kniest Street 7 4 2124 -2126 Kniest Street PROJECT CLOSE OUT FORM CONTRACT ITE I QUANTITY I UNIT PRICE I QUANTITY JECT TOTA TOTAL I COMPLETE 65 % 230.77 60 % 250 65 % 230.77 65 % 230.77 85.92 80 74 83 59 86.54 $ 19, 827.76 132 18% $ 20,185.00 134.57% $ 19,290.06 128 60% $ 19,970 84 133.14% TOTAL CONTRACT WORK $ 79,273.66 CHANGE ORDERS 1553 Maple Street 60 % 148.33 85 37 $ 12,662.93 142 28% 1575 Maple Street 60 % 181.67 83.21 $ 15,116.76 138.68% 1597 Maple Street 60 % 166.5 77.94 $ 12,977.01 129 90% 574 East 16th Street 60 % 266 67 81.42 $ 21,712 27 135.70% TOTAL CHANGE ORDER WORK $ 62,468.97 APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: $ 79,273.66 Total Change Order Work Performed to Date $ 62,468.97 Total Contract and Change Order Work Performed to Date: $ 141,742.63 Miscellaneous Costs Engineering $ 13,00000 TOTAL FINAL PROJECT COSTS: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement APPROVED: 154,742.63 The Undersigned /C 3 ,6 contractor for the above improvement, does hereby accept the above 'Total Due Contractor', as full settlement for all claims for said improvement. Project Name: CIP Number: Project Contract Amount: Project Completion Date: Bee Branch Deconstruction Group 7 7201654 $105,790 00 24 Sep Contractor Name: Contractor Address: City, State, Zip: Contractor Telephone: Ted Stackis Construction 206 Saunders Street Dubuque, Iowa 52001 563 - 451 - 3300 THE CITY OF DUB Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 CONTRACT ITEM DESCRIPTION I COTRACT I UNITPRICE I QUANTITY ECTTOTA TOTAL I COMPLETE I ITEM NO. 7 1 2120 Kniest Street 7 2 2110 -2112 Kniest Street 7 3 2114 -2116 Kniest Street 7 4 2124 -2126 Kniest Street CHANGE ORDERS 1553 Maple Street 1575 Maple Street 1597 Maple Street 574 East 16th Street 65 60 65 65 60 60 % 60 % 60 % PROJECT CLOSE OUT FORM 230.77 250 230 77 230.77 85.92 80 74 83 59 86.54 TOTAL CONTRACT WORK $ 79,273.66 148 33 85.37 $ 12,662.93 142.28% 181.67 83 21 $ 15,116.76 138.68% 166.5 77 94 $ 12,977.01 129.90% 266 67 81 42 $ 21,712.27 135 70% TOTAL CHANGE ORDER WORK $ 19,827.76 $ 20,185.00 $ 19,290.06 $ 19,970.84 $ 62,468.97 132 18% 134.57% 128.60% 133 14% 1 hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: $ 79,273.66 Total Change Order Work Performed to Date: $ 62,468.97 Total Contract and Change Order Work Performed to Date: $ 141,742.63 Miscellaneous Costs $ Engineering $ 13,000.00 TOTAL FINAL PROJECT COSTS: > The UndersignedTE A CX( 5 C 1 14 coMr or or the above improvement, does hereby accept the above 'Total Due Contractor, as full settlement for all claims for said improvement. APPROVED: 154,742.63