Loading...
Historic Millwork District Streetscape and Utilities Amendment 2_V&KMasterpiece on the Mississippi Dubuque hittg AUmedca City 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Historic Millwork District Streetscape & Utilities Veenstra & Kimm (V &K) Amendment No. 2 to Professional Engineering Services Agreement DATE: February 1, 2011 City Engineer Gus Psihoyos recommends City Council approval of Amendment No. 2 to the Historic Millwork District Streetscape & Utilities Professional Engineering Services Agreement between the City of Dubuque and Veenstra & Kimm, Inc. (V &K). This amendment covers assistance during the construction phase of the project, over a time period of 24 months. The total additional cost is $88,500, with the option to add additional services described in tasks #8 and #9. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Masterpiece on the Mississippi MEMORANDUM TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: January 31, 2011 SUBJECT: Historic Millwork District Streetscape & Utilities Veenstra & Kimm (V &K) Amendment No. 2 to Professional Engineering Services Agreement INTRODUCTION This memorandum is to request your review and execution of Amendment No.2 to the Historic Millwork District Streetscape & Utilities Professional Engineering Services Agreement between the City of Dubuque & Veenstra & Kimm, Inc. (V &K). Direction is also requested on the funding source /s for this agreement. BACKGROUND Amendment No. 1, approved by City Council on April 5, 2010, authorized additional professional design services with V &K for an expanded project scope. Amendment No. 2 covers assistance during the construction phase of the project, over a time period of 24 months. Amendment No. 2 tasks and associated expenses as noted in the attached are defined as: 1. Veenstra & Kimm attendance at 24 regularly scheduled construction update meetings and via telephone for every other property owner meeting. 2. Review for input/approval of shop drawings, material samples and mock -ups. 3. Develop, assist in preparation, and review of drawings and specifications for up to 10 change orders. 4. Review and comment on 24 partial pay estimates during project construction. 5. Final walk- through attendance, input, generate punchlist for contractor. 6. Respond and issue up to 18 request for information by City or contractor. 7. Prepare plans and specifications incorporating Addendum No.1 & No.2 for complete plan set in format for City reproduction for staff and contractor. 8. (OPTIONAL) Construction observer on a hourly rate of $65 /hour. This fee not included in total. 9. (OPTIONAL) Provide CAD assistance during record drawings /as- builts at end of construction at an hourly rate of $78 per hour. This fee not included in total. The associated costs for tasks #1- #7 of this Amendment No. 2 is $88,500. This does not include optional tasks #8 or #9. The Existing Agreement plus Amendment No.1 was $448,220 and by adding this Amendment No.2 ( #1- #7) the "Total" costs would be $536,720. The professional services of Amendment No. 2 are being requested to assist City staff during the construction phase of the project in the areas of administration, updating construction plans with approved base bid and bid alternates #1, #2 and #3, as submitted to council for approval on February 7, 2011, and input on project construction, change orders and completion approvals. Option #8 and #9 tasks would assist with inspections during the project and with as -built drawings at the end of the project. It is requested that the tasks #1- #7 be approved in the amount of $88,500 and the options of #8 and #9 be considered at a future date if staff finds that the additional professional services would be beneficial to the successful completion of the project. BUDGET IMPACT The funding summary for the V &K agreement is as follows: Since the $5.6 million TIGER grant could not be used for design services, City Council approved funding from the CIP's for sanitary sewer, storm, water and the downtown Housing Incentive Program TIF bond for the V &K Existing Agreement and Amendment No. 1 in the amount of $448,220. The addition of Amendment No. 2 in the amount of $88,500 would bring the total Veenstra & Kimm Inc. expenses to $536,720. FY10 CIP FY10 CIP Name Funding 7102129 Warehouse — Sanitary Sewer $ 89,931 7402131 Warehouse — Storm 114,854 7402145 Warehouse — Water 215,500 Downtown Housing Incentive Program TIF Bond 27,935 Existing Agreement & Amendment #1 $ 448,220 FY 11 CIP FY 11 CIP Name 7102129 Warehouse — Sanitary Sewer $ 18,937 7402131 Warehouse — Storm 24,185 7402145 Warehouse — Water 45,378 Amendment 2 88.500 Total V & K Agreement $ 536,720 ACTION TO BE TAKEN The execution of Amendment No.2 to the Historic Millwork District Streetscape & Utilities Professional Engineering Services Agreement between the City of Dubuque & Veenstra & Kimm, Inc. (V &K). cc: Jenny Larson, Budget Director Bob Green, Water Department Manager Deron Muehring, Civil Engineer II Jon Dienst, PE Attach. AMENDMENT NO. 2 To HISTORIC MILLWORK DISTRICT STREETSCAPE & UTILITIES PROFESSIONAL ENGINEERING SERVICES Between the CITY OF DUBUQUE, IOWA and VEENSTRA & KIMM, INC. This Contract amendment is made by and between the City of DUBUQUE, Iowa, a municipal corporation, and Veenstra & Kimm, Inc., an Iowa Corporation this th day of , 2011. Whereas, it is the mutual desire of the parties hereto to amend the CITY'S PROFESSIONAL ENGINEERING SERVICES AGREEMENT entered into in July of 2009, hereinafter called the Existing Agreement. The City desires assistance during the construction phase of the project, over a time period of 24 months. The described services are listed below. Some of these services are optional and not specifically defined at this time and listed at an hourly rate. These services are not included in the fees below. These services are based on hourly rates up to a not -to- exceed fee. Therefore, it is hereby agreed that the Existing Agreement and scope of project with associated fees be amended as follows: 1. Veenstra & Kimm, Inc will attend 24 regularly scheduled construction update meetings for the project. Veenstra & Kimm, Inc will also attend every other property owner meeting via phone. 2. Review shop drawings, materials samples and mock up panels for input/approval. 3. Develop drawings and specifications for, assist in the preparation of and review up to 10 change orders. Assumed to include one drawing per change order. 4. Provide review and comments on 24 partial pay estimates throughout construction of the project 5. Attend and provide input during a final walk - through and punchlist generation for distribution to the contractor 6. Respond and issue up to 18 requests for information, either generated by the contractor or the City 7. Prepare a set of plans and specifications that will incorporate Addendum No 1 and No 2 requirements and changes into a complete plan set reflecting full pre - construction intent and requirements. This plan set and specification will be put into PDF format for City reproduction for staff and contractors use. Two sets of plans will be saved (1 reduced 11x17 and 1 full size 22 x 34). 8. (OPTIONAL) Provide a construction observer to assist City staff/personnel during the construction activities. This person will be billed on an hourly rate of $65 per hour. This service is not included in the fees below. This rate is inclusive of normal expenses 9. (OPTIONAL) Provide CAD assistance during the creation of the record drawings /as -built documents at the end of the construction. This erson would be billed at an hourly rate of $78 per hour. This service is not included in the fees below The Change in "Total" cost associated with this Amendment No. 2 is to increase the authorized fee by a total of $88,500 to a total of $536,720. The Total cost is the same amount set forth in the Existing Agreement plus Amendments 1 and 2. This amendment will be deemed a part of, and subject to, all terms and conditions of the existing Agreement. Except as modified above, the Existing Agreement will remain in full force and effect. VEENSTRA & KIMM, INC. By President CITY OF DUBUQUE, IOWA By H. R. Veenstra Jr. Mike Van Milligen City Manager