Loading...
Mississ Riverwalk Ph II Amenit D~ ~ck~ MEMORANDUM March 31,2004 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Mississippi Riverwalk Phase II and Amenities The Mississippi Riverwalk Phase II and Amenities Project provided for the construction of the riverfront promenade and amenities along the Mississippi River and Ice Harbor from the existing American Trust River's Edge Plaza, north to the Alliant Energy (Star Brewery) Amphitheater and from the Welcome Center-Port Side Building, west to the National Mississippi River Museum and Aquarium site. Public Works Director Mike Koch is recommending acceptance of the Mississippi Riverwalk Phase II and Amenities Project, as completed by Portzen Construction, Inc. in the final contract amount of $3,783,606.08, which is a 9% increase from the original contract in the amount of $3,472,612.50 The reason for the increase in cost associated with this project resulted from multiple approved change orders to the original project scope of work to address unforeseen conditions and changes, design-build modifications and the overall project development and coordination with other projects within the Port of Dubuque. In addition, other non-contract construction charges and construction engineering and inspection costs have been charged to the Riverwalk, resulting in a total project cost of $4,155,204. The total project costs are approximately $108,975 over budget, however, this overrun was covered by reserve funds available ($206,712) by not constructing Bid Altemate #1 , the Riverwalk section north of the railroad bridge. I concur with the recommendation and respectfully request Mayor and City Council approval. (VWJ~A2J- , Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director D~ ~ck~ MEMORANDUM March 31,2004 FROM: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director ¿¡¡;;{ ¡( d TO: SUBJECT: Mississippi Riverwalk Phase II and Amenities INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Mississippi Riverwalk Phase II and Amenities Project. BACKGROUND The completed Mississippi Riverwalk Phase II and Amenities Project is a key element in the successful efforts to revitalize the Port of Dubuque Riverfront and an integral public component of the $188 million dollar America's River Project. The Mississippi Riverwalk Phase II and Amenities Project provided for the construction of the riverfront promenade and amenities along the Mississippi River and Ice Harbor from the existing American Trust River's Edge Plaza, north to the Alliant Energy (Star Brewery) Amphitheater and from the Welcome Center-Port Side Building, west to the National Mississippi River Museum and Aquarium site. The following is a summary of the notable components which were completed as part of the Riverwalk Phase II project: . Construction of the Alliant Energy (Star Brewery) Amphitheater plaza area. . Construction of a 400-foot pier wall for docking transient boats and lower river walkway. . Construction of two sets of concrete steps which extend from the Riverwalk down to the river's edge. . Construction of approximately 2400 lineal feet of main Riverwalk decorative concrete pavement which extends from the River's Edge Plaza to the Amphitheatre. . Construction of the Grand River Center riverfront cascading stairs. . Installation of the River's Edge Plaza pavilion. Installation of four (4) shade structures along the Riverwalk. Construction of Ice Harbor Park and the Museum East Logsdon Entrance. . Reconstruction of approximately 36,700 square feet of decorative concrete pavement around the Welcome Center-Port Side entrances and rear plaza. . Installation of decorative railing at the Welcome Center-Port Side Plaza and at Ice Harbor Park. . Amenities included: ornamental lighting, decorative benches, litter receptacles, bicycle loops, drinking fountains, landscaping and automated irrigation systems. DISCUSSION The Mississippi Riverwalk Phase II and Amenities Project has been completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $3,783,606.08, which is a 9% increase from the original contract in the amount of $3,472,612.50. The reason for the increase in cost associated with this project resulted from multiple approved change orders to the original project scope of work to address unforeseen conditions and changes, design-build modifications and the overall project development and coordination with other projects within the Port of Dubuque. The amount of change orders incurred to the Portzen Construction Contract was approximately $329,035. The following is a partial summary of the approved change order - extra work items associated with the Riverwalk Phase II project: Upgrade pavement design from 6" to 7" at the Amphitheater to accommodate the potential for heavy equipment on the decorative concrete plaza area as may be required during renovation activities and periodic maintenance to the brewery building. Upgrade pavement design from 4" to 6" at the Portside Building rear plaza to accommodate the potential for heavy equipment on the decorative concrete plaza area as may be required for periodic maintenance of the building HVAC roof top units and the Diamond Jo Casino boat. Install enclosure around electric service meters on east side of Portside Building to improve aesthetics and to comply with Port of Dubuque Design Standards. . Architectural and structural design modifications and construction changes to the Pavilion at River's Edge Plaza. Install telecommunications infrastructure along entire length of Riverwalk, which interconnects River's Edge Plaza to the Amphitheater. Install telecommunication capability to River's Edge Plaza Pavilion and Riverwalk shade structures. . Watermain relocation was required for the construction of Ice Harbor Park and the Museum's Logsdon East Entrance. . Reconstruction and realignment of the adjoining drive lane and modifications to the bordering parking lot was required for the construction of Ice Harbor Park and the Museum's Logsdon East Entrance. . In partnership with the Grand Harbor Hotel, the City was responsible for final grading and constructing the sidewalk which connects the Riverwalk and the Grand Harbor outdoor plaza. . In partnership with the Museum, the City constructed the decorative concrete sidewalk located along the north side of the Woodward Freighthouse as part of the Riverwalk project. . The construction of a utility pad and enclosure in the north parking lot of the Grand River Center and the associated utility relocations and pavement replacement. The utility pad provides both electric and telecommunication service to the Riverwalk, the Amphitheatre and the north parking lot. In addition, other non-contract construction costs of approximately $173,021 have been charged to the Riverwalk Project. The total project costs are approximately $108,975 over budget; however, this overrun was covered by reserve funds available ($206,712) by not constructing the Riverwalk Bid Alternate No.1, which is the Riverwalk section north of the Railroad bridge - Shot Tower area. RECOMMENDATION I recommend that the City Council accept the improvements and recommend that the final Portzen Construction contract amount be established at $3,783,606.08 for the Mississippi Riverwalk Phase II and Amenities Project. PROJECT FUNDING The project cost summary for the Mississippi Riverwalk Phase II and Amenities Project are as follows: Estimate Bid Final Construction Contract $3,472,612.50 $3,472,612.50 $3,783,606.08 Other Contracted Work (Non Portzen) $205,485.92 Less Reimbursements -$32,465.00 Contingency $375,040.00 $375,040.00 Construction Engineering & Inspection $198,577.00 $198,577.00 $198,577.00 Total Project Cost $4.046.229.50 $4.046.229.50 $4.155.204.00 The Mississippi Riverwalk Phase II and Amenities Project was a funded capital improvement budget and includes $3,043,997 of G.O. bond funds sold in December 2001, a $500,000 Iowa DOT State Trails grant, a $150,000 DRA grant and a DRA Surplus Distribution in the amount of $461,207 for a total of $4,155,204. Additional, expense reimbursements were received from both the National Mississippi River Museum & Aquarium and the Diamond Jo Casino. As per the agreement between the City and the Museum, the City would incorporate Museum site improvements as part of the Riverwalk project and the Museum would reimburse the City for any incurred cost. Based upon itemized costs for Museum related site improvements, the National Mississippi River Museum & Aquarium has reimbursed the City in the amount $21,849.83. Additionally, the Diamond Jo Casino has reimbursed the City in the amount of $10,615 for the added cost to upgrade the pavement design from 4" to 6" on the Portside Building rear plaza due to the need for periodic maintenance of the building HVAC roof top units and the Diamond Jo Casino boat. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount for the Mississippi Riverwalk Phase II and Amenities Project. Prepared by Robert Schiesl, P.E. cc: Dawn Lang, Budget Director Laura Carstens, Planning Services Manager RESOLUTION NO. 127-04 ACCEPTING IMPROVEMENT Whereas, the contract for the Mississippi Riverwalk Phase \I and Amenities Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the. terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE,IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Obligation bond funds, Iowa DOT State Trails grant, a ORA grant, and a ORA Surplus Distribution Fund in amounts equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this ~ day of Apri 1 Attest: RESOLUTION NO. 128-04 FINAL ESTIMATE Whereas, the contract for the Mississippi Riverwalk Phase \I and Amenities Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE,IOWA: Section 1. That the cost of said improvement is hereby determined to be $4,155,204.00 and the said amount shall be paid from the General Obligation bond funds, Iowa DOT State Trails grant, a ORA grant, and a ORA Surplus Distribution Fund of the City of Dubuque, Iowa. Passed, approved and adopted this ~ day of City of Dubuque. Engineeñng Division Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL DATE: 19-Mar-Q4 PROJECT: MISSISSIPPI RIVERWALK PHASE II CONTRACTOR: PORTZEN CONSTRUCTION INC. CONTRACT AMOUNT: $3,472,612,50 UNIT UNIT COST QUANTITY AMOUNT EARNED No, BID ITEM DESCRIPTION TO DATE TO OATE 1 MOBILIZATION LS $ 61,500,00 1,0 $ 61,500,00 2 FIELO OFFICE EA $ 3,000,00 1,0 $ 3,000,00 3 SITE SAFETY AND SECURITY LS $ 10,000.00 1,0 $ 10,000,00 4 CONSTRUCTION STAKING LS $ 33,000,00 1,0 $ 33,000,00 5 DEWATERING LS $ 30,000.00 1,0 $ 30,000,00 6 CLEAR AND GRUB TREE EA $ 200,00 21,0 $ 4,200,00 7 PRE-DREDGING SOUNDING SURVEY LS $ 4,000,00 1,0 $ 4,000,00 8 POST-DREDGING SOUNDING SURVEY LS $ 4,000,00 1,0 $ 4,000,00 9 MECHANICAL DREDGING (BV) CY $ 12,00 1531,0 $ 18,372.00 10 SALVAGE & INSTALL RIPRAP (STONE REVETMENT) CY $ 18,90 3280,0 $ 61,992,00 11 RIPRAP CLASS B BORROW (STONE REVETMENT) TON $ 19,40 5134,4 $ 99,607,55 12 OWNER FURNISHED GRANULAR BORROW (CV) CY $ 4,00 23077.0 $ 92,308,00 13 GRANULAR BORROW (CV) CY $ 13,60 23351,0 $ 317,573,60 14 COMMON EXCAVATION (BV) CY $ 5.20 281,0 $ 1,461.20 15 TOPSOIL BORROW (LV) CY $ 13,60 3528,0 $ 47,980,80 16 CRUSHED AGGREGATE BASE (LV) TON $ 13,00 1013.7 $ 13,177.84 17 SUBGRADE CORRECTION EXCAVATION (BV) CY $ 12,00 34,0 $ 408.00 18 CONSTRUCT STAIRWAY #1 LS $ 19,215,00 1,0 $ 19,215,00 19 CONSTRUCT STAIRWAY #2 LS $ 33,000,00 1,0 $ 33,000,00 20 CONSTRUCT STAIRWAY #6 LS $ 253,000,00 1,0 $ 253,000,00 21 CONSTRUCT PIER LF $ 974,00 400,0 $ 389,600,00 22 FURNISH AND INSTALL 12" DIA CONCRETE FILLED PILING LF $ 95,00 148,0 $ 14,060,00 23 CLOSURE GATE INFILL (12' WIDTH) LS $ 3,805,00 1,0 $ 3,805,00 24 CLOSURE GATE INFILL(16'WIDTH) LS $ 4,830,00 1,0 $ 4,830,00 25 STANDARD CONCRETE WALKWAY -4" DEPTH SF $ 5,40 8904,88 $ 48,086,35 26 STANDARD CONCRETE WALKWAY" 6" DEPTH SF $ 5,95 917,62 $ 5,459,84 27 INTEGRALLY COLORED CONCRETE WALKWAY - 4" DEPTH SF $ 7,10 32583,61 $ 231,343,63 28 INTEGRALLY COLORED CONCRETE WALKWAY - 6" DEPTH SF $ 7,70 32426,88 $ 249,686,98 INTEGRALLY COLORED CONCRETE WALKWAY WI THICK, EDGE - 6" 29 DEPTH SF 8.05 25615.70 206,206,39 30 PEDESTRIAN CURB RAMP EA 1,500,00 1,0 1,500,00 31 CONCRETE CURB & GUTTER - TYPE A LF 13,50 1102,1 14,877.68 32 INTEGRALLY COLORED CONCRETE PLANTER CURB LF 27.50 352,7 9,698,43 33A FURNISH AND INST ALl LIMESTONE BLOCK (STAR BREWERY PLAZA) FSF 57,75 825,0 47,643.75 33B :~~:~~~~CRETE FOOTING FOR LIMESTONE BLOCK (STAR LF $ 17.50 216,5 3,788.75 33C FURNISH AND INSTALL LIMESTONE BLOCK (PIER WALL) FSF $ 38,15 1139,3 43,462,39 REINFORCED CONCRETE FOOTING FOR LIMESTONE BLOCK (PIER 33D WALL) LF $ 17,50 340,0 $ 5,950,00 34 BITUMINOUS MIXTURE FOR PATCHING TON $ 150,00 98,1 $ 14,718,00 35 CONSTRUCT LIGHT FOUNDATION EA $ 1,053,00 47,0 $ 49.491,00 36 FURNISH AND INSTALL CONCRETE BOLLARD EA $ 500,00 3,0 $ 1,SOO.00 37 FURNISH AND INSTALl LITTER RECEPTACLE EA $ 775.00 27,5 $ 21,312,50 38 FURNISH AND INSTALL CAST IRON TREE GRATE EA $ 1,050,00 17,0 $ 17,850,00 39 FURNISH AND INSTALL DECORATIVE GUARDRAIL LF $ 134.40 38,55 $ 5,181,12 40 FURNISH AND INSTALl HANDRAIL LF $ 51,45 921,84 $ 47,428.67 41A FURNISH AND INSTALL BENCH (4' RIB BENCH) EA $ 702,00 4.0 $ 2,808,00 41B FURNISH AND INSTALL BENCH (4' RIB ADD-ON BENCH) EA $ 555,00 4,0 $ 2,220,00 41C FURNISH AND INSTALL BENCH (6' RIB BENCH) EA $ 837,00 15,0 $ 12,555,00 41D FURNISH AND INSTALl BENCH (6' RIB BENCH WIO BACK) EA $ 772,00 8.0 $ 6,176,00 42 FURNISH AND INSTALL BIKE LOOP EA $ 151,00 8.0 $ 1,208,00 43 FURNISH AND INSTALL PRECAST CONCRETE PLANTER EA $ 475,00 10,0 $ 4,750,00 44 FURNISH AND INSTALl PAVILION (RIVER'S EDGE PLAZA) LS $ 95,000,00 1,0 $ 95,000,00 45 INTEGRALLY COLORED CONCRETE SEA TISTEP EA $ 6,600,00 3,0 $ 19,800,00 46 FURNISH AND INSTALL EMERGENCY CALL BOX EA $ 2,800.00 2,0 $ 5,600,00 47 ADJUST WATER VALVE & BOX EA $ 250.00 6,0 $ 1,500,00 48 FURNISH & INSTALL HYDRANT EA $ 1,800,00 1,0 1,800.00 49 FURNISH & INSTALL 6" VALVE & BOX EA $ 525,00 1,0 525,00 50 FURNISH AND INSTALL 6" DIP WATERMAIN (CL 52) LF $ 30,00 27,5 825,00 51 FURNISH AND INSTALL DIP WATERMAIN FITTINGS LB $ 3,50 346,0 1,211,00 52 CONNECT TO EXISTING WA TERMAIN EA $ 550,00 1,0 550,00 53 FURNISH AND INSTALL DRINKING FOUNTAIN EA $ 1,800,00 2,0 3,600,00 54 FURNISH AND INSTALL 314" COPPER WATER SERVICE PIPE (TYPE K) LF $ 25,00 205,0 5,125,00 55 FURNISH AND INSTALL SERVICE CURB STOP AND BOX (TYPE K) EA $ 200,00 1,0 200.00 56 FURNISH AND INSTALL 314" CORPORATION STOP & BOX (TYPE K) EA $ 375,00 1,0 375,00 57 ADJUST MANHOLE RIM AND CASTING (REGARDLESS OF TYPE) EA $ 300,00 4,0 1,200.00 58 RAISE 48" MANHOLE (REGARDLESS OF TYPE) LF $ 225,00 10,5 2,364,75 59 TOE DRAIN RISER EXTENSION EA $ 600,00 DELETED 60 INSTALL SALVAGED MANHOLE CASTING OR CA TCHBASIN GRATE EA $ 500,00 1,0 500,00 61 BULKHEAD PIPE (4" TO 27" PIPE) EA $ 500,00 DELETED 62 ABANDON PIPE (FILL WITH FLOWABLE FILL) CY $ 100,00 7,5 $ 750,00 63 FURNISH AND INSTALL 48" STORM MANHOLE LF $ 125,00 71.3 $ 8,916.25 64 FURNISH AND INSTALL MANHOLE RIM AND CASTING EA $ 285,00 12,0 $ 3,420,00 65 FURNISH AND INSTALL CATCHBASIN (TYPE 101-B) EA $ 1,350,00 1,0 $ 1,350,00 66 FURNISH AND INSTALL MANHOLEICA TCHBASIN FLAT GRATE EA $ 1,950,00 2,0 $ 3,900.00 67 FURNISH AND INSTAll 12" RCP STORM SEWER EA $ 32,00 54,0 $ 1,728,00 68 FURNISH AND INSTALL 15" RCP STORM SEWER EA $ 40,00 54,0 $ 2,160,00 69 FURNISH AND INSTALL 24" RCP STORM SEWER LF $ 48,00 10,5 $ 504,00 70 CONSTRUCT CONCRETE CRADLE (24" RCP) LF $ 100,00 10.5 $ 1,050,00 71 FURNISH AND INSTALL 6" PERF, DRAIN PIPE LF $ 7,50 302,0 $ 2,265,00 72 FURNISH AND INSTALL 12" PERF, DRAIN PIPE EA $ 12,00 620,0 $ 7.440,00 73 FURNISH AND INSTALL 6" DRAIN PIPE CLEANOUT EA $ 75,00 3,0 $ 225,00 74 FURNISH AND INSTALL 12" DRAIN PIPE CLEANOUT EA $ 100,00 1,0 $ 100,00 75 FURNISH AND INSTALL 4" PVC STORM SEWER (STAR BREWERY) LF $ 40,00 DELETED 76 FURNISH AND INSTALL 8" PVC STORM SEWER (STAR BREWERY) LF $ 35.00 78,0 2,730,00 77 FURNISH AND INSTALL DOWNSPOUT DRAIN (STAR BREWERY) LF $ 15,00 DELETED 78 CONNECT TO EXISTING MANHOLE OR CATCHBASIN (4" TO 15" PIPE) EA $ 225.00 5,0 $ 1,125,00 79 GATEWELL EXTENSION LS $ 1,500,00 1,0 $ 1,500,00 80 CONSTRUCT REINFORCED CONCRETE TRENCH DRAIN LF $ 75,00 184,0 $ 13,800,00 81 CONSTRUCT CONCRETE HEADWALL LS $ 10,000,00 1,0 $ 10,000,00 82 FURNISH AND INSTALL TRENCH DRAIN GRATE LF $ 84,00 184,0 $ 15,456,00 83 INSTALL SALVAGED SIGN (REGARDLESS OF SIZE OR TYPE) EA $ 300,00 DELETED 84 SALVAGE HYDRANT EA $ 1,500,00 2,0 $ 3,000,00 85 SALVAGE VALVE & BOX EA $ 500,00 1,0 $ 500,00 86 SALVAGE WATERMAIN LF $ 50,00 35,0 $ 1,750,00 87 REMOVE CURB & GUTTER (REGARDLESS OF TYPE) LF $ 6,00 1544,0 $ 9,264,00 88 REMOVE PAVEMENT (REGARDLESS OF TYPE OR DEPTH) SY $ 3,00 8195,5 $ 24,586,38 89 SAWCUT PAVEMENT-FULL DEPTH (REGARDLESS OF TYPE OR DEPTH) LF $ 3,00 1451,7 $ 4,355,10 90 REMOVE RAILING (REGARDLESS OF TYPE) LF $ 15,00 40.0 $ 600,00 91 SANDBLAST AND PAINT RAILING, POSTS AND MOORING KEVELS (ICE HARBOR) LS $ 40,169,00 DELETED 92 REMOVE LIGHT FOUNDATION EA $ 250,00 11.0 $ 2,750,00 93 SALVAGE LIGHTING UNIT EA $ 315,00 11,0 $ 3,465,00 94 REMOVE UNDERGROUND ELECTRICAL LF $ 5,00 DELETED 95 REMOVE ELECTRICAL JUNCTION BOX EA $ 300,00 1,0 $ 300,00 96 REMOVE CA TCHBASIN EA $ 250,00 3,0 $ 750,00 97 SALVAGE MANHOLE CASTING OR CATCHBASIN GRATE EA $ 100,00 3,0 $ 300,00 98 REMOVE PIPE SEWER (4" TO 27") (REGARDLESS OF TYPE) LF $ 20,00 449,5 $ 8,990,00 99 REMOVE CONCRETE HEADWALL (GATEWELL OUTlED LS $ 2,750,00 1,0 $ 2,750,00 100 SALVAGE CANOPY AND SUPPORTS LS $ 2,250,00 DELETED 101 SALVAGE SIGN (REGARDLESS OF SIZE OR TYPE) EA $ 150,00 4,0 600,00 102 REMOVE CONCRETE BIKE PADlOCK EA $ 75,00 1,0 75,00 103 SALVAGE BENCH EA $ 75,00 DELETED 104 SALVAGE flOOD GATE - 12' WIDTH EA $ 2,500,00 1,0 $ 2,500,00 105 SALVAGEFLOODGATE-16'WIDTH EA $ 3,000.00 1,0 $ 3,000,00 106 REMOVE GUARD RAIL LF $ 25,00 59,0 $ 1,475,00 107 REMOVE CONCRETE & STEEL LOADING DOCK LS $ 2,250.00 1,0 $ 2,250,00 108 REMOVE RAILROAD RAILS LF $ 12,00 250,0 $ 3,000,00 109 REMOVE WOOD RAILROAD TIES EA $ 50,00 21,0 $ 1,050,00 110 REMOVE CONCRETE BLOCK CY $ 50,00 3,0 $ 150,00 111 REMOVE CONCRETE PLANTER CY $ 50,00 12,0 $ 600,00 112 FURNISH AND INSTALL SINGLE LUMINAIRE PEDESTRIAN LIGHT EA $ 2,250,00 36,0 $ 81,000,00 113 FURNISH AND INSTALL DOUBLE LUMINAIRE PEDESTRIAN LIGHT EA $ 4,810,00 11,0 $ 52,910,00 114 ~~~~~~I~M~::~STWITHIN EXISTING DOUBLE LUMINAIRE EA 352.00 10,0 $ 3,520,00 116 HANDHOLE EA 850,00 24,0 $ 20,400,00 117 1-1/4" CONDUIT LF 4.80 7737,0 $ 37,137,60 118 #6CONDUCTORS LF 1,00 27793,0 $ 27,793,00 119 #8 CONDUCTOR LF 0,90 4929,0 $ 4,436,10 120A SERVICE ENClOSURE EA 6,700,00 1,0 $ 6,700,00 120B POWER PEDESTAL (BREWERY PLAZA) EA 420,00 0,0 $ 121 TORO EZ-ADJUST ROTORARY SPRINKLER, NOZZLES, ADJUSTABLE EA 39,90 147,0 $ 5,865,30 122 ~~~.JE 570Z-PRX-4P-COM, 4" SPRAY HEAD, PRESS, REG" SHUT-OFF, C'K EA 18,40 74,0 1,361,60 123 ~~R~~~Z-PRX-12P-COM, 12" SPRAY HEAD, PRESS, REG" SHUT-OFF, EA $ 30,50 90,0 2,745,00 124 TORO P220 11/2" ELECTRIC VALVE WITH FLOW CONTROL EA $ 125,00 36,0 4,500,00 125 TORO 1" 264 ELECTRIC VALVE, FILTER, 40 PSI PRESSURE REGULATOR EA $ 178,50 4,0 714,00 126 ~~~~~-¡;~;~gRCE, TAP,11/2"COPPERLlNE, RPZ, METR, LS $ 5,775,00 1,0 5,775,00 CONFERENCE WATER SOURCE, TAP, 2 1/2" COPPER LINE, RPZ, 127 METER, ETC, LS 4,610,00 DELETED 128 TORO CUSTOM COMMAND METAL CASING 12 STATION CC-M12 LS 857,00 1,0 857,00 129 TORO LTCP48 STATION STAINLESS STEEL PEDESTAL LTCP-48S6A4 LS 3,875,00 1,0 3,875,00 130 TORO 474-00 1" QUICK COUPLER, KEY, 1" HOSE SWIVEL EA 183.75 14,0 2,572,50 131 RAINBIRD RW8-BCG ROOT WATERING SYSTEM, BUBBLER, CH' VALVE, GRATE, FABRIC EA 75,60 42,0 3,175,20 132 6~~~~,¡]~~7~~~~ 12" SPACING, AIR RELIEF, FLUSH VALVE, LF $ 0,90 700,0 630,00 133 11/2 CLASS 160 PVC MAINLINE, ZONE WIRES LF $ 1.75 395,0 691.25 134 2 1/2 ClASS 160 PVC MAINLINE, ZONE WIRES LF $ 2,05 2053,0 4,208.65 135 4" SCHEDULE 40 PVC SLEEVING, REBAR LF $ 4,20 2396,0 10,063.20 TORO RAIN SWITCH 850-74 AND TORO RAIN SWITCH BYPASS 136 "RSBYPASS" EA $ 87.20 2,0 174,40 137 ~I~~S~D~~~~~~~TE MRC-48-48 STATION COMPLETE KIT AND EA $ 1,628.00 DELETED 138 ISOLATION VALVE, WHEEL, FITTINGS, VALVE BOX EA $ 63,00 3,0 189,00 139 1" POLY PIPE HIGH DENSITY CLASS 100 LF $ 0,65 7578,0 4,925.70 140 1 1/2" POlY PIPE HIGH DENSITY CLASS 100 LF $ 1,35 1580,0 2,133,00 141 FURNISH AND INSTALL DECIDUOUS TREE (2.5" CAL) EA $ 462,00 62,0 28,644,00 142 FURNISH AND INSTALL DECIDUOUS TREE (ORNAMENTAL) EA $ 283,50 12,0 3,402,00 143 FURNISH AND INSTALL EVERGREEN TREE (8' HGT,) EA $ 315,00 7,0 2,205,00 144 FURNISH AND INSTALL DECIDUOUS SHRUB (5 GAL) EA $ 37,80 41,0 1,549,80 145 FURNISH AND INSTALL EVERGREEN SHRUB (24" Width) EA $ 59,85 57,0 3,411.45 146 FURNISH AND INSTALL PERENNIALS (1 GAL) EA $ 9.45 1678,0 15,857,10 147 FURNISH AND INSTAll ANNUALS (4" POT) EA $ 6.80 70,0 476,00 148 FURNISH AND INSTALL STEEL LANDSCAPING EDGER LF $ 4.20 503,0 2,112,60 149 FURNISH AND INSTALL SHREDDED MULCH (4" DEPTH) CY $ 42,00 105,0 4,410.00 150 WOOD FIBER BLANKET SY $ 1.20 DELETED 151 HYDROSEEDING ACRE $ 2,575,00 2,1 $ 5,484,75 152 SODDING SY $ 3.40 2812,0 $ 9,560.80 153 FURNISH AND INSTALL SILT FENCE (TYPE HEAVY DUTY) LF $ 3,00 DELETED 154 CONSTRUCT TEMPORARY ROCK CONSTRUCTION ENTRANCE EA $ 825,00 4,0 $ 3,300.00 155 FURNISH AND INSTALL BALE CHECKS EA $ 10,00 DELETED BID ALTERNATE #2 204 FURNISH AND INSTALL SHADE STRUCTURE EA $ 24,000,00 4,0 $ 96,000.00 205 SHADE SHELTER LIGHTING EA $ 709,00 4,0 $ 2,836,00 BID ALTERNATE #3 206 FURNISH AND INSTALL DECORATIVE GUARDRAIL (ICE HARBOR) LF $ 134,40 611,35 82,165,44 207 REMOVE RAILING (ICE HARBOR) LF $ 20,00 589,37 11,787,40 BID ALTERNATE #4 208 STANDARD CONCRETE WALKWAY -4" DEPTH SF 5,40 MERGED IN BID ITEM 25ABOBE 209 INTEGRALLY COLORED CONCRETE WALKWAY -4" DEPTH SF 7,10 MERGED IN BID ITEM 27 ABOBE 210 SALVAGE LIGHTING UNIT EA 315,00 MERGED IN BID ITEM 93ABOBE 211 SAWCUT CONCRETE OR BITUMINOUS PAVEMENT (FULL DEPTH) LF 3.00 MERGED IN BID ITEM 89 ABOBE 212 REMOVE PAVEMENT (REGARDLESS OF TYPE OR DEPTH) SY 3.00 MERGED IN BID ITEM 88 ABOBE 213 REMOVE LIGHT FOUNDATION EA 250.00 MERGED IN BID ITEM 92 ABOBE 214 REMOVE UNDERGROUND ELECTRICAL LF 5,00 DELETED 215 FURNISH AND INSTALL SILT FENCE (TYPE HEAVY DUTY) LF 3,00 DELETED BID ALTERNATE #5 216 CONSTRUCT STAIRWAY #3 LS $ 20,245,00 1,0 $ 20,245,00 217 INTEGRALLY COLORED CONCRETE WALKWAY - 6" DEPTH SF $ 7,70 MERGED IN BID ITEM 28 ABOBE 218 INSTALL OWNER FURNISHED BRICK PAVERS SY $ 37,80 DELETED 219 ADJUSTWATERVALVE&BOX EA $ 250,00 MERGED IN BID ITEM 47 ABOBE 220 REMOVE PAVEMENT (REGARDLESS OF TYPE OR DEPTH) SY $ 3,00 MERGED IN BID ITEM 88 ABOBE 221 FURNISH AND INSTALL BIKE LOOP EA $ 151,00 2,3 $ 347,30 = FURNISH AND INSTALL CONCRETE BOLLARD EA $ 250,00 MERGED IN BID ITEM 36 ABOBE 223 FURNISH AND INSTALL LITTER RECEPTACLE EA $ 775,00 1,0 $ 775,00 224 FURNISH AND INSTALL HANDRAIL LF $ 51,45 MERGED IN BID ITEM 40 ABOBE 225 FURNISH AND INSTALL STEEL EDGER LF $ 4.20 MERGED IN BID ITEM 148 ABOBE 226 SODDING SY $ 3.40 MERGED IN BID ITEM 152 ABOBE CHANGE ORDER - ADD EXTRA WORK 227 ELIMINATING PAINTING FOR SHEET PILE PIER WALL LS $ (25,000,00) 1,0 $ (25,000,00) 228 REMOVE EXISTING 60')(11' LOADING DOCK AT BREWERY LS $ 1,186,62 1,0 $ 1,186,62 229 BENCH SUPPLIER CHANGE, WABASH TO VICTOR STANLEY LS $ 3,081,00 1,0 $ 3,081,00 230 PROJECT SIGN INCREASE LS $ 275,00 1,0 $ 275,00 231 RAILING ACCESS GATES, PORTSIDE BLDG REAR PLAZA DOCK SIDE LS $ 3,825,00 1,0 $ 3,825,00 232 REPAIR HOLES IN EAST BREWERY WALL LS $ 1,591,50 1,0 $ 1,591,50 233 STORM SEWER CHANGES AT BREWERY LS $ 4,364,07 1,0 $ 4,364,07 234 ADDITIONAL ELECTRICAL CONDUIT AT BREWERY LS $ 3,821,00 1,0 $ 3,821,00 235 ~;~I~~~~ORED CONCRETE WALKWAY -1" UPGRADE AT SF 0,60 13116,0 7,869.60 236 ~~D:~~~ETEWALKWAY - 2" UPGRADE AT PORTSIDE BLDG, SF 0,55 5720,5 3,146.29 237 :;g-~~S~~L~L~~L~:~~R;;~AWALKWAY -2" UPGRADE AT SF $ 0,60 17599,3 10,559.56 238 :;¡l:1NATING OF FILTER FABRIC AND DRAIN HOLES, SHEET PILE PIER LS $ (2,300,00) 1.0 $ (2,300,00) 239 HANDRAIL SIZE CHANGE (ITEM NO, 40) LF $ 2,45 921,84 $ 2,258,51 240 CHANGING OUT EXISTING LIGHT POLES, RIVER'S EDGE PLAZA EA $ 402,00 10,0 $ 4,020,00 241 GRASS REMOVAL FOR LANDSCAPING, RIVER EDGE PLAZA LS $ 817,00 1,0 $ 817,00 242 REPAIR UNDERMINED LOWER RAMP WALK AT RIVER EDGE PLAZA LS $ 6,933,30 1,0 $ 6,933,30 243 ~~~~~~~g~T¿~~g~I~~A~~~E~¿¡~R~~ ~~:~N~~~~F LS 4,974,00 1.0 4,974,00 244 gg~::JE OBSTRUCTION REMOVAL, SHEET PILE PIER WALL- LS $ 1,397,00 1,0 1,397,00 245 CONCRETE SEALER UPGRADE-MASTER SEAL SF $ 0,35 44630,18 15,620,56 246 ~g~g~~6~~BSTRUCTION REMOVAL, SHEET PILE PIER WALL- LS $ 6,602,98 1,0 $ 6,602,98 247 ELIMINATING WOOD PLANKING, SHEET PILE PIER WALL- SCHROEDER LS $ (3,626.40) 1,0 $ (3,626.40) 248 LOOP RAILING AT STAR BREWERY LS $ 1,925,00 1.0 $ 1,925,00 249 BANDING AROUND STAR AT AMPHITHEATER LS $ 3,297,00 1,0 $ 3,297,00 250 REMOVE EXISTING 19'X15'LOADING DOCK AT BREWERY LS $ 1,329,00 1,0 $ 1,329,00 251 THICKENED EDGE SIDEWALL AT STAIRWAY #1 LS $ 1,009,00 1,0 $ 1,009.00 252 ADDITIONAL LANDING SIDEWALK STAIRWAY #1 LS $ 350,51 1,0 $ 350,51 253 ;h'DEN FOOTINGS FOR LANDING NOTCH AT STAIRWAY #1 & STAIRWAY LS $ 737,89 1,0 737,89 254 SIXFOOTSIDEWALLSFORSTAIRWAY#2 LS $ 4,243,00 1,0 4,243,00 255 ~~~=~ ~DGE SIDEWALL AT LANDING BETWEEN STEPS OF LS 772,00 1,0 772,00 256 SODDING AT AMPHITHEATRE SY 3,40 2400,0 8,160,00 257 ELECTRIC SERVICE ENClOSURE, CASINO BLDG, LS 10,665,00 1,0 10,665,00 258 ~~~~~ (~i~~OE£¡~E PLAZA) - DESIGN & CONSTRUCTION LS 40,535,00 1,0 40,535,00 259 ~~~:: ~g;O) CITY COST SHARE - DESIGN & CONSTRUCTION CHANGES LS 5,400,00 1,0 $ 5,400,00 260 ~E~2-:~ SERVICE CONTROLLER, UPGRADE TO MILBANK (ITEM LS 2,540,00 1.0 $ 2,540,00 261 COLORED CONCRETE WALKWAY - SHOT BLAST SURFACE SAMPLE LS 1,000,00 1,0 $ 1,000,00 262 COLORED CONCRETE WALKWAY - SHOT BLAST SURFACE AT CASINO SF 0.90 8130,0 $ 7,317,00 263 ~~~~';'o';:fruRE LIGHTING - CHANGE TO METAL HALIDE FIXTURES EA $ 402,00 4,0 $ 1,608,00 264 ~~~~~~~~~~T~~NDUIT 2" PVC, RlVERWALK - RIVER'S EDGE LF 5,10 1618.0 $ 8,251,80 265 TELECOMMUNICATION CABLE CA T5 DIRECT BURIAL LF 1,07 1384,0 $ 1.480,88 266 STORM SEWER, 18" RCP - ICE HARBOR PARK LF 45.00 18,0 $ 810,00 267 ~=N~N RELOCATION, ICE HARBOR PARK & LOGSDON EAST LS 24,395,69 1,0 24,395,69 268 WATER HYDRANT RELOCATION, ICE HARBOR PARK & PORTSIDE BLDG LS $ 4,075,09 1,0 $ 4,075,09 269 SAFETY FENCE, GREEN, ICE HARBOR PARK LS $ 185,00 1,0 $ 185,00 270 Ace STREET PATCH, ICE HARBOR PARK & PARKING LOT LS $ 24,792,80 1,0 $ 24,792,80 271 IRRIGATION LINE RELOCATION, ICE HARBOR PARK LS $ 459,00 1.0 $ 459.00 272 WATER SERVICE (2") & HYDRANT FOR ICE HARBOR PARK LS $ 2,000,00 1,0 $ 2,000,00 273 CONCRETE PIER CAP AT ICE HARBOR PARK LS $ 3,956,00 1.0 $ 3,956,00 274 ~~V~\ON (RIVER'S EDGE PLAZA) - FOUNDATION MODIFICATIONS (ITEM LS 1,486,00 1,0 1,486,00 275 ~~g~";':¿VE GUARDRAIL, ADDITIONAL AT NORTH RAILRAOD LS 3,520.00 1,0 3,520,00 276 ~~~~~1~~~~ING LOT LIGHT BASE FOR UTILITY PAD LS 406.70 1.0 406,70 Zl7 ~~~N~~~~O ELECTRIC SERVICE ENClOSURE, CASINO BLDG, (CO LS 2,197,58 1,0 2,197,58 278 ~~:~~~T~~TURE - ADD GFI RECEPTICLES AND TELCOM ACCESS LS 1,269,16 1,0 1,269,16 279 ~~~~T:~RVICE CONTROL CABINET MODIFICATIONS, RIVER'S LS 987.52 1.0 987,52 280 ~~~T~~RVICE CONTROL CABINET MODIFICATIONS, RIVER'S LS 1,979,32 1,0 1,979,32 281 RELOCATE LIGHT BASE AT ICE HARBOR PARK, MRDC BOATYARD ENTRANCE LS 368,80 1.0 368,80 282 :~~~~~~ ~~~~~ CONDUIT AT ICE HARBOR PARK, MRDC LS 252,90 1,0 252,90 283 ~~~.?'PE TREE PLANTERS, ADD RAISED CURB, ICE HARBOR PARK & EA 185,25 14.0 2,593,50 284 ~~I~g~~ER'S EDGE PLAZA) - ELECTRICITELCOM MODIFICATIONS LS 18,883.13 1.0 18,883,13 285 UTILITY PAD CONSTRUCTION, CONDUIT RELOCATION LS 43,194,54 1.0 43,194,54 286 UTILITY PAD, SCREENING WAU AND CAP STONE LS 3.290,00 1,0 3,290,00 287 COLUMNAR MAPLES EA 181,00 5,0 905,00 288 ~~c~~'iO~~f~~N:L~~~ ~::~~~; g::OPLACEMENT LIGHT LS $ 5,555,00 1,0 $ 5,555,00 289 STAIR NO,6 - FURNISH HANDRAIL, NOT INSTALLED LS $ 1,293,75 1,0 $ 1,293,75 290 CONCRETE FINISH SEAlER. VEXCON - DEDUCT FOR CITY PURCHASE LS $ (400.00) 1,0 $ (400,00) 291 ~~~g~~~ ~~~~~;~gg~~~~lE~~L~~~~ DEPTH SF 7,10 2829,00 $ 20,085,90 29 2 ~~~~LRÃ~t:~: ~ ~g~6~~~~;~L:;¡~':' :"L~ E~~ N ECT ION SF 7,10 1190,84 8,454,96 1$ 3,783,606,08 I TOTAL DUE CONTRACTOR: CERTIFICATE OF THE CITY MANAGER: Michael Van Milligan, City Manager City of Dubuque, Iowa APPROVED: ,:q;;~t,.¿;.. !l7{/Of' Michael A, Koch, Public Works Director City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, PORTZEN CONSTRUCTION INC, contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full se!ltement for all claims for said improvement. CONTRACT::: ~V'O~J TITLE: PRoD.) é=e--r /ÝIc.IZ., 3-1C:¡-o~ Tþc, DATE: ~'