Loading...
Signed Contracts_Change Orders for Central Avenue Parking RampMasterpiece on the Mississippi February 3, 2011 Dubuque blind All- America City 111111 2007 cc: David Heiar, Economic Development Director Parking Division 830 Bluff Street Dubuque, IA 52001 563 - 589.4267 www.cityofdubuque.org/parking To: Michael C. Van Milligen, City Manager From: Tim Horsfield, Parking System Supervisor Subject: Signature Request — Change Orders for Fire Station Expansion & 975 Central Ramp Construction I am attaching Change Orders numbered 003 — PS (Parking Structure) and 003 — FS (Fire Station) for you review and signature. Change Order 003 — FS reflects a contract addition in the amount of $ 6141.00. This addition is for the cement block grinding and painting of the north interior wall of the old fire station were the previous overhead door tracks were removed. In addition, this change order also reflects a cost addition in the application of the roofing materials to the flexcore roof. The second request is for Change Order 003 — PS. This change order has a zero direct cost on the construction of the ramp. Due to exceptionally cold weather and snow in December, JP Cullen is requesting as time extension to the contract of 7 (seven) days. They have attached weather documentation from NOAA and this has been discussed at our weekly construction meetings. Including these change orders, the total change order amount for the Fire Station Expansion is $ 23,652 and a total change order amount for the parking ramp of $ 39,037.00. The total contract for the project was $ 7,712,379.00 so I believe this reflects well on the design and construction team on the project. Please sign and return all three copies and if you have any questions, please call at your convenience. 0 == Document G701 Tt" — 2001 Change Order PROJECT: (Name and address) CHANGE ORDER NUMBER: 003 - PS City of Dubuque, Iowa DATE: January 24, 2011 10th & Central Parking Facility & Fire Headquarters Expansion ARCHITECT'S PROJECT NUMBER: 50 -09164 TO CONTRACTOR: (Nance and address) J.P. Cullen & Sons, Inc. 330 E. Delavan Drive Janesville, WI 53546 The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Per the following attached: 1. RQ #023 - December Weather Day Delays $0.00 TOTAL The original (Contract Sum) (Ehtarxntced- kitilc ri un- Price) was $ 7,712,379.00 The net change by previously authorized Change Orders $ 62,689.00 The (Contract Sum) (E ritnteed -Mtmii tritrPf ee) prior to this Change Order was $ 7,775,068.00 The (Contract Sum) (6rtnrarrtertl itmrrrf'tiee) will be4iHete d) (- c}eeree5e4) (unchanged) by this Change Order in the amount of The new (Contract Sum) (filreranteed-Mtmimttrn -Price) including this Change Order will be The Contract Time will be (increased) ( eereaaetl) f bittehraii e4) by SEVEN ( 7 ) days The date of Substantial Completion as of the date of this Change Order therefore is JUNE 01, 2011 (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maxintutn Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. DESMAN, INC. ARCHITECT (Firm name) JEFF HENRIKSEN (Typed name) JANUARY 24, 2011 DATE CONTRACT DATE: July 20, 2010 CONTRACT FOR: Parking Structure Construction J.P. Cullen & Sons, Inc. CONTRACTOR (Firer name) 20 N CLARK ST., CHICAGO, IL 330 E. Delavan Drive ADDRESS BY (Sigrrcrnur ) 3✓vr9i t_LJS (Typed name) J DATE //411 ( A ',;,u . )t .u . Ili;l , +n ntililn :r1 (I/ (.gill 1 1)„ tun nl, r:l, +atif it lili t 1;1 n f r 1 tired City of Dubuque, Iowa OWNER (Finn name) ADD (Signature) (Typed name) DATE OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD ❑ OTHER ❑ 0.00 7,775,068.00 1 r.l 1, u : in Petit) An l s °. tw > I11n1 $0.00 AIA Document G701 *u — 2001. Copyright's 1979. 1987. 2000 and 2001 by The American Institute of Architects. Alt rights reserved. WAIIIIInc;• 1111. la' 1). , �.,,,�srt I; I i F , t�,l by 113 (opy;luhI 1. i a,,1 r,.. .ti:.. )Inauth,vl�ei r,. , . h; li i , ,,, ll .1,lliotlon of 11,i-, ■111 ;n ,y t, ;rill in :.:. rivfl :11)11 .111 : )';ill 1,r 111 /S$PUted le Ih• MO [Inun et1-71 pi,'.aibl, tinrle th — L,v, Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. e 0,74 1/21/2011 Desman Associates Attn: Jeffrey S. Henriksen 20 North Clark Street Chicago, IL 60602 Fax: 312.263.8406 General Contractor Since 1892 Re: 10th & Central Ramp -Fire Station Exp RQ #023 - December Weather Days Additional remarks: Sincerely, J.P. Cullen & Sons, Inc. cc: Job, File www.jpcullen.com We are pleased to submit our quotation in the amount of ... $ 0 for the above referenced proposal request. Attached is an itemized cost breakdown for your review. Upon acceptance, please notify us by written change order. Should you have any questions, please advise. Due to the unusual December weather, we are requesting additional days to the contract. This is not a request for extra costs, only for a time extension. See the attached backup data from the NOAA weather service website. The current contract Substantial Competion date for the Parking Ramp portion is May 23, 2011. Based off of the attached data, we are requesting a time extension of 7 working days, making the new Substantial Completion date June 1, 2011. f_pco_05 Daily Data Dubuque Area (ThreadEx Station) Observed Daily Data Month: Dec 2010 Smry 23.8 7.9 Q75.13) 1516 0 1)e_.C-aLb '.,,:,,� . ,' . Day MaxT MinT AvgT HDD CDD Pcpn 0 1 24 17 20.5 44 0 T 11;, 2 28 16 22.0 43 0 0.00 F' 3 24 13 18.5 46 0 0.44 4 , , :� � ' 4 27 20 23.5 41 0 0.24 ;■.;,^ 5 20 5 12.5 52 0 T / 6 16 3 9.5 55 0 T - ri. -' 7 17 5 11.0 54 0 0.00 ',/e.d 8 18 -2 8.0 57 0 0.00 114 A`' 9 29 1 15.0 50 0 0.09 P; 10 30 14 22.0 43 0 0.00 s, 11 33 22 27.5 37 0 0.74 ,;, 12 27 2 14.5 50 0 0.17 4v1 13 7 -4 1.5 63 0 0.00 rif -N 14 15 -6 4.5 60 0 0.00 a,tsid 15 18 -4 7.0 58 0 0.14 lit." 16 18 7 12.5 52 0 0.23 (•e.; 17 12 -1 5.5 59 0 0.00 5k;t 18 14 0 7.0 58 0 0.00 •-■ 19 14 -4 5.0 60 0 0.00 /1,0.•. 20 29 12 20.5 44 0 0.39 T. /., 21 32 12 22.0 43 0 0.01 i, -.0 22 32 11 21.5 43 0 0.00 111. 23 27 5 16.0 49 0 0.02 (.;; 24 25 21 23.0 42 0 0.55 :; -- 25 27 21 24.0 41 0 0.02 5,) 26 23 -4 9.5 55 0 T i44)-< 27 14 -9 2.5 62 0 0.00 -1)` -0 28 20 6 13.0 52 0 0.00 tA:Y 29 34 8 21.0 44 0 0.00 - 1"14'1 30 42 34 38.0 27 0 0.01 (:/ 31 42 23 32.5 32 0 0.03 3.08 27.5) 8.3 This station's re ord may include data from mo locations. It re the longest available Official data and Centers and the 1 l ata for additional locations and year ational Climatic Data Center. (J,001 A44 X27, f1`� http: // nowdata. rcc- acis.org /DVN /pubACIS_results Snow Snwg T 0 0.0 0 5.9 0 2.2 8 T 7 T 7 0.0 7 0.0 6 0.7 5 0.0 6 3.8 1.5 0.0 0.0 0.8 2.8 0.0 0.0 0.0 3.4 0.0 0.0 10 0.2 9 6.0 11 0.2 14 T 14 0.0 144 --- O (1 - .f - ..%,40 , J 0.0 13 0.0 13 0.0 12 0.0 5 5 10 8- w-- 1so (.wl 84-- 'Gr, ( _ c 7 t. U'_! 9 .,... .. • 11 10 9 9 10 0.1 ',q,, than one, possibly incompatible, r cord for the Dubuque Area. Page 1 of 1 are available from the Regional Climate 0I / "lr1 ;.1 i P( 1 1/3/2011 Daily Results NOWData NOAA Online Weather Data Dubuque Area (ThreadEx Station) Daily Climate Normals Average Temperature (degrees F) 1971 -2000 Day Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1 18 19 28 42 54 65 71 72 66 57 43 28 2 18 19 29 42 54 65 71 72 66 56 42 28 3 17 19 29 42 54 65 72 72 66 56 42 27 4 17 20 30 43 55 65 72 72 66 55 41 27 5 17 20 30 43 55 66 72 72 65 55 41 26 6 17 20 31 44 56 66 72 72 65 55 40 26 7 17 21 31 44 56 66 72 72 65 54 40 26 8 17 21 31 44 56 67 72 72 64 54 39 25 9 17 21 32 45 57 67 72 71 64 54 39 25 10 17 21 32 45 57 67 72 71 64 53 38 24 11 16 22 33 46 57 67 72 71 63 53 38 24 12 16 22 33 46 58 68 72 71 63 52 37 24 13 16 22 34 47 58 68 72 71 63 52 37 23 14 16 23 34 47 58 68 72 71 62 51 36 23 15 16 23 34 47 59 68 72 70 62 51 36 23 16 16 23 35 48 59 69 73 70 62 51 35 22 17 16 24 35 48 59 69 73 70 61 50 35 22 18 16 24 36 49 60 69 73 70 61 50 34 22 19 17 25 36 49 60 69 73 70 61 49 34 21 20 17 25 37 49 61 70 73 69 60 49 34 21 21 17 25 37 50 61 70 73 69 60 48 33 21 22 17 26 37 50 61 70 73 69 60 48 33 20 23 17 26 38 51 62 70 73 69 59 47 32 20 24 17 26 38 51 62 70 73 69 59 47 32 20 25 17 27 39 51 62 70 73 68 59 46 31 19 26 17 27 39 52 63 71 73 68 58 46 31 19 27 18 28 39 52 63 71 72 68 58 46 30 19 28 18 28 40 52 63 71 72 68 58 45 30 19 29 18 28 40 53 64 71 72 67 57 45 29 18 30 18 - 41 53 64 71 72 67 57 44 29 18 31 19 - 41 64 - 72 67 43 - 18 Month 17.0 23.1 34.8 47.5 59.1 68.3 72.3 70.0 61.8 50.4 35.7 22.5 Sum /average of daily normals might not match monthly normal due to rounding. Normals used in this product are from DUBUQUE RGNL AP Page 1 of 1 Official data and data for additional locations and years are available from the Regional Climate Centers and the National Climatic Data Center. http: // nowdata. rcc- acis.org /DVN /pubACIS_results 12/22/2010 Daily Results Dubuque Area (ThreadEx Station) Daily Climate Normals Snowfall (inches) 1971 -2000 Day Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1 0.4 0.4 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 2 0.4 0.4 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 3 0.4 0.4 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 4 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 5 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 6 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.G 0.1 0.3 7 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 8 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 9 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 10 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 11 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 12 0.4 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 13 0.4 0.3 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 14 0.3 0.3 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 15 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 16 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 17 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 18 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 19 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 20 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 21 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 22 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 23 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 24 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 25 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 26 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 27 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 28 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 29 0.3 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 30 0.3 - 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 31 0.3 - 0.2 - 0.0 - 0.0 0.0 - 0.1 - 0.4 Month 10.6 8.7 7.6 3.2 0.0 0.0 0.0 0.0 0.0 0.1 4.5 10.5 Sum /average of daily normals might not match monthly normal due to rounding. Normals used in this product are from DUBUQUE RGNL AP Page 1 of 1 Official data and data for additional locations and years are available from the Regional Climate Centers and the National Climatic Data Center. http:// nowdata. rcc- acis.org /DVN /pubACIS_results 12/22/2010 .,AIA Document G7OITM - 2001 Change Order PROJECT: (Name and address) CHANGE ORDER NUMBER: 003 - FS OWNER ❑ City of Dubuque, Iowa DATE: January 24, 2011 10th & Central Parking Facility ARCHITECT ❑ & Fire Headquarters Expansion ARCHITECT'S PROJECT NUMBER: 50 -09164 CONTRACTOR ❑ TO CONTRACTOR: (Name and address) FIELD ❑ J.P. Cullen & Sons, Inc. CONTRACT DATE: July 20, 2010 330 E. Delavan Drive OTHER ❑ Janesville, WI 53546 CONTRACT FOR: Fire Headquarters Expansion Construction The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Per the fdllowing attached: 1. RQ #021 -Paint Existing Steel Angles @ Infill Panels on North Wall of Addition $2,547.00 $2,547.00 1. RQ #024 - Roofing Installation Method Resolution $3.594.00 $3 594.00 TOTAL $6,141.00 The original (Contract Sum) ( Otti?rrnti�eel- Mitxtnrtlm-Priee) was $ 7,712,379.00 The net change by previously authorized Change Orders $ 56,548.00 The (Contract Sum) (Ottarrmteeei -1 faltitlltntrPriee) prior to this Change Order was $ 7,768,927.00 The (Contract Sum) (Qttararrteed rxnntrarf'rice) will be (increased) (.deereased) (ttrteltern f) by this Change Order in the amount of $ 6,141.00 The new (Contract Suni) (6eararrteed -khr imt1m -Pr ee) including this Change Order will he $ 7,775,068.00 The Contract Time will be (increased) (flec- rtes#) (ttrtefitate 1 by FOURTEEN ( 14 ) days The date of Substantial Completion as of the date of this Change Order therefore is December 20, 2010 (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. DESMAN, INC. ARCHITECT (Firm name) 20 N CLARK ST., CHICAGO, IL ADDRESS (Typed name) JEFF HENRIKSEN JANUARY 24, 2010 DATE J.P. Cullen & Sons, Inc. CONTRACTOR (Firm name) 330 E. Delavan Drive ADDRESS BY (Sig (Typed name) DATE City of Dubuque, Iowa OWNER (Firm name) ADDRE BY =. ignalure) (Typed name) DATE l' it 1 11: ' r , ,u • h .,ign ;tit oririin.tl AIA (mitt 1 f n • unr nl, (:r, t.hich chi:. text ;■p - ai > in fiEO An origin tl 7, ur =.::. Iht,l most AIA Document G701" — 2001. Copyright ffd 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WA111111lt1 1 ht. 11" n ., ,ni ,l I : , ,1. ,1 by 11 s, Copyilulit t.. + + .t„J iiii' , 71.t07777:,1 ft • :II, . Itneuth •I, ,. 717 ,iIilaiitto11 ur this All P t„„ ■.I • ..■ I7 1,,,,, 771 11 u:.,y ,,- ;till in s: °ve•1F civil rind r 11/n47117 • .77771 volt ba laut:ectrtrd to the n,axlnn,hs it •L., p„•+sible U liu 1,,v Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org 1/6/2011 Desman Associates Attn: Jeffrey S. Henriksen 20 North Clark Street Chicago, IL 60602 Fax: 312.263.8406 Re: 10th & Central Ramp -Fire Station Exp RQ #021 - Prep /Paint Existing Angles We are pleased to submit our quotation in the amount of ... $ 2547 for the above referenced proposal request. Attached is an itemized cost breakdown for your review. Upon acceptance, please notify us by written change order. Should you have any questions, please advise. Additional remarks: During the punchlist walkthrough for the Fire Station, it was brought up to paint the existing steel angles where the precast infill panels were placed on the north side of the existing fire station. Sincerely, J.P. Cullen & Sons, Inc. cc: Job, File General Contractor Since 1892 f_pco_05 www.jpcullen.corn DESCRIPTION QTY UNIT l U/P I Labor U/P Material U/P I Equip U/P Subcontr JPC Work: 1 LS 0 0 0 0 Rockwell 1 LS 0 0 0 2,378 2,378 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 SUBTOTAL $0 $0 $0 $2,378 PTI (38.5 %) $0 Tax Exempt $0 $0 Tax (7 %) - for mist purchases $0 $0 SUBTOTAL $0 $0 $0 Overhead & Profit (10 %) $0 $0 $0 SUBTOTAL $2,378 Subcontractor Fee (5 %) $119 J.P. Cullen & Sons, Inc. P O. Box 1957, Janesville, Wisconsin 53547 Job Number: 5114 Project: Dubuque Parking Ramp & Fire Station RQ #: 021 Other Reference: Date: Description: SUBTOTAL 1/6/2011 Prep /paint the existing steel angles on the north side of the existing fire station $0 $0 $0 $2,497 Total $2,497 $50 Bond & Insurance 2% 1 Grand Total: $2,5471 PROPOSAL SUBMITTED TO JP Cullen and Sons PHONE 608- 754 -6601 FAX 608- 754 -9171 DATE 12 - 2010 STREET 330 E DELEVAN ST JOB NAME Dubuque Fire Department/ Parking Garage Janesville Wisconsin 53546 JOB LUt-A 1 IUN Dubuque Iowa ARCHITECT Desman & Associates DATE OF PLANS 4 -5 -2010 PHONE 815 - 266 -4216 total $ 2,378.00 PROPOSAL We hereby submit specifications and estimates The ockwel1Group 500 WEST SOUTH ST. FREEPORT, IL 61032 FAX 815- 266 -8916 EXISTING FIRE DEPARTMENT; Protect the surrounding areas, hand scrape, hand sand and apply one coat of Sherwin Williams Macro epoxy and one coat of Acrolon Polyurethane to 8 pieces of 20' long corner angle iron NOTE: This proposal may be withdrawn by us if not accepted within 30 days. 1 of 1 Authorized Signature Daniel Lease Daniel Lease Director of Painting 1/21/2011 Desman Associates Attn: Jeffrey S. Henriksen 20 North Clark Street Chicago, IL 60602 Fax: 312.263.8406 General Contractor Since 1 892 Re: 10th & Central Ramp -Fire Station Exp RQ #024 - Roofing Issue Resolution Additional remarks: Sincerely, J.P. Cullen & Sons, Inc. cc: Job, File www.jpcullen.com We are pleased to submit our quotation in the amount of ... $ 3594 for the above referenced proposal request. Attached is an itemized cost breakdown for your review. Upon acceptance, please notify us by written change order. Should you have any questions, please advise. On January 11, 2011, JPC, the City, Straka Johnson, Windco and Tremco met to resolve the issue with the roof fastening system required for the project. There was a conflict between the type of fastening system that could be used, mechanical or adhesive, on the substrate for this project, which is concrete. It was determined at this meeting that a 3 -way split would occur between Wiindco, Tremco and the City. This quote is for the portion that the City has agreed to pay. f_pco_05 DESCRIPTION QTY UNIT U/P Labor 1 U/P Material U/P I Equip 1 U/P Subcontr JPC Work: 1 LS 0 0 0 0 Wlndco 1 LS 0 0 0 3,355 3,355 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 1 LS 0 0 0 0 SUBTOTAL SO $0 50 53,355 PTI (38.5 %) SO Tax Exempt 50 50 Tax (7 %) - for misc purchases 50 50 SUBTOTAL $0 50 50 Overhead & Profit (10 %) $0 50 $0 SUBTOTAL 53,355 Subcontractor Fee (5 %) 5168 J.P. Cullen & Sons, Inc. P O. Box 1957, Janesville, Wisconsin 53547 Job Number: 5114 Project: Dubuque Parking Ramp & Fire Station RQ #: 024 Other Reference: Date: Description: SUBTOTAL Resolution to Roofing Issue 1/21/2011 $0 $0 $0 $3,523 Total 53,523 570 Bond & Insurance 2% 1 Grand Total: $3,5941 To: Steve Brown/City of Dubuque From: Martin K Winders /Jeremy Yoder - Tremco Re: Dubuque Fire Station & Parking Ramp 10 & Central Attached is all documentation to support a change order for adhesively installing insulation as opposed to specifications which called for mechanically fastened insulation. Breakdown is as follows: Add for materials: Fas -n -Free Adhesive - $11,200.00 Fas -n -Free applicator - 716.35 11,916.35 Deduct for materials: Fasteners & plates Add for labor to adhesively install insulation Deduct for mechanically installing insulation 3271 Central Ave. Dubuque, Iowa 52001 Phone 563 -583 -5516 Fax 563- 583 -5596 Total proposed change order for changing insulation installation: $12,016.35 12/10/10 iy g 10 (X' (: , > -1 � y -1.0-00"() Y .n ti 's 0 1. [ fro /L 0f0 Total add for materials c�.00 00 Total add for labor Tremco has verified that their base specification was not made project specific prior to bidding which is the reason for the discrepancy. Their base specification assumes a metal deck.