MEMORANDUM
April 12, 2004
TO:
The Honorable Mayor and City Council Members
FROM:
Michael C. Van Milligen, City Manager
SUBJECT: Napier Street Storm and Sanitary Sewer Reconstruction Project
Public Works Director Mike Koch is recommending acceptance of the Napier Street
Storm and Sanitary Sewer Reconstruction Project, as completed by Fondell Excavating,
in the final contract amount of $100,631.22.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
~f ¡J l£~ ¡;J¿
Mic~ael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Michael A. Koch, Public Works Director
D~~~E
~<k-~
MEMORANDUM
April 12, 2004
TO:
FROM:
Michael C. Van Milligen, City Manager
Michael A. Koch, Public Works Director 1J!Jj{J,
SUBJECT: Napier Street Storm and Sanitary Sewer Reconstruction Project
INTRODUCTION
The attached resolutions provide for the acceptance of the construction contract for the
Napier Street Storm and Sanitary Sewer Reconstruction Project.
DISCUSSION
The existing sanitary sewer that serves homes on Napier Street was increased in size
to an 8-inch diameter and laid at a steeper slope. The storm sewer was replaced and
the catch basins improved.
Fondell Excavating of Dubuque, Iowa, has completed the project with a final contract
amount of $100,631.22.
RECOMMENDATION
I recommend that the City Council adopt the attached resolutions accepting the
improvements and establishing a final contract amount of $100,631.22.
BUDGET IMPACT
A summary of the project budget is as follows:
Total Project Cost
Bid Final
$ 97,862.80 $100,631.22
9,773.35 0
16,126.02 3.708.00
$123,762.17 $104,339.22
Construction Contract
Contingency
Engineering
The project was funded with a Fiscal Year 2002 General Fund appropriation of $46,000
(CIP 010582) and a Fiscal Year 2002 Sanitary Sewer Construction Fund appropriation
of $68,000 (CIP 310576).
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolutions accepting the
improvement and establishing the final contract amount for the Napier Street Storm and
Sanitary Sewer Reconstruction Project.
CC:
Dawn Lang, Budget Director
Gus Psihoyos, Assistant City Engineer
Deron Muehring, Civil Engineer II
RESOLUTION NO. 146-04
ACCEPTING IMPROVEMENT
Whereas, the contract for the Napier Street Storm and Sanitary Sewer
Reconstruction Project has been completed and the City Manager has examined
the work and filed his certificate stating that the same has been completed
according to the terms of the contract, plans and specifications and recommends
its acceptance.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved
and that said improvement be and the same is hereby accepted.
BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby
directed to.pay to the contractor from the Fiscal Year 2002 General Fund and the
Fiscal Year 2002 Sanitary Sewer Construction Fund in amount equal to the
amount of his. contract, less any retained percentage provided for therein.
Passed, approved and adopted this 19th day of April, 2004.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, City Clerk
RESOLUTION NO. 147-04
FINAL ESTIMATE
Whereas, the contract for the Napier Street Storm and Sanitary Sewer
Reconstruction Project has been completed and the City Engineer has submitted
his final estimate showing the cost thereof including the cost of estimates, notices
and inspection and all miscellaneous costs.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the cost of said improvement. is hereby determined to
be $104,339.22 and the said amount shall be paid from the Fis.cal Year 2002
General Fund and the Fiscal Year 2002 Sanitary Sewer Construction Fund of the
City of Dubuque, Iowa.
Passed, approved and adopted this 19th day of April, 2004.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, City Clerk
City of Dubuque
ENGINEERING DIVISION
DATE: 4-02-04
FINAL ESTIMATE FOR: Napier Street Storm and Sanitary Sewer Reconstruction Project
ITEM QTY. UNIT UNIT COST TOTAL COST
Clearing and Grubbing 1.00 LS $600.00 $600.00
6" Topsoil Spreading 1205.00 SY $1.50 $1,807.50
Remove Retaining Wall as Needed 1.00 LS $665.00 $665.00
Graded Stone Base 265.29 Ton $13.00 $3,448.77
Trench Bedding 171.00 Ton $11.00 $1,881.00
8" D.I.P. w/Wrap (Class 51) 563.00 LF $28.00 $15,764.00
Connect to Existing Sanitary Sewer 2.00 EA $400.00 $800.00
4" CIP Lateral 124.00 LF $25.00 $3,100.00
48" Sanitary Manhole Base 5.00 EA $300.00 $1,500.00
Sanitary Sewer Sidewall (48" ID) 34.00 LF $100.00 $3,400.00
Sanitary Sewer Manhole Ring f Cover 5.00 EA $350.00 $1,750.00
Pavement Replacement (3" ACC) 121.80 Ton $70.00 $8,526.00
Full Depth Sawcut (ACC) 300.00 LF $2.50 $750.00
ACC Surface Removal 567.00 SY $4.00 $2,268.00
Curb & Gutter Replacement 145.00 LF $16.00 $2,320.00
Limestone Backfill 1077.93 Ton $5.00 $5,389.65
Sidewalk (4") 134.00 SF $3.50 $469.00
Flowable Mortar 18.00 CY $100.00 $1,800.00
Remove Existing Sanitary Sewer 1.00 LS $600.00 $600.00
Sod 130.00 SY $9.00 $1,170.00
Hydro Seed (lOOT Urban Mix) 2133.00 SY $1.10 $2,346.30
8" x 4" DIP Tee 8.00 EA $200.00 $1,600.00
Erosion Control 1.00 LS $200.00 $200.00
Traffic Control 1.00 LS $1,050.00 $1,050.00
15"RCP 63.00 LF $30.00 $1,890.00
18"RCP 325.50 LF $36.00 $11,718.00
101-B Intake, Complete 2.00 EA $1,200.00 $2,400.00
104-BINTAKE COMPLETE 3.00 EA $2,200.00 $6,600.00
48" Storm Manhole Base 3.00 EA $300.00 $900.00
Storm Manhole Sidewall (48" 10) 26.57 LF $100.00 $2,657.00
Manhole Frame & Cover (Neenah R-1916-D) 2.00 EA $300.00 $600.00
Remove Existing Storm Sewer 1.00 LS $800.00 $800.00
Manhole Frame & Cover (Neenah R-2501) 1.00 EA $300.00 $300.00
Remove Existing Steps (Identified In Plans) 1.00 LS $600.00 $600.00
Concrete Pipe Anchor 7.00 EA $160.00 $1,120.00
Rock Excavation 149.78 Ton $50.00 $7,489.00
Raise Water Valves 2.00 EA $176.00 $352.00
TOTAL DUE CONTRACTOR $100,631.22
ENGINEERING $3,708.00
TOTAL CONSTRUCTION COST $104,339.22
I hereby certify that the above statement shows in detail the
correct amount of all work required to complete the above improvement.
APPROVED:
Michael Van Milligan, City Manager
City of Dubuque,lowa
1ljiu Ij-/.zr.<>:!
Michael A. Koch
Public Works Director
The undarsigned, , contractor for the above
improvement, does hereby accept the above "Total Due Contractor", as
full settlement for all claims for said improvement.
;~"V1~>«4V' 411' )c.