Central Avenue Water Service Lateral Project_21st to 32nd Street AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Central Avenue Water Main (21 - 32 Street) Project FY11 CIP 7401405 DATE: March 1, 2011 Dubuque bgtd An- AmdicaCily 2007 City Engineer Gus Psihoyos is recommending acceptance of the Central Avenue Water Main (21 — 32 Street) Project, as completed by Drew Cook & Sons Excavating Co., Inc., in the final contract amount of $476,035, which is a 3.35% decrease from the original contract amount of $492,512. It is further recommended that the City Council approve the Final Schedule of Assessments for this project. Based upon final construction costs, the total amount of special assessments for water service lateral improvements is in the amount o $229,109.77, which is 45.95% ($423,870.03) below the preliminary special assessment estimate that was presented to the property owners and approved at the project public hearing. This decrease is attributed to a favorable low bid and the ability for the contractor to pull 99% of the water services rather than full street excavations. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michael C. Van Milligen Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager, FROM: Gus Psihoyos, City Engineer SUBJECT: Central Avenue Water Main (21 — 32 Street) Project FY11 CIP 7401405 DATE: March 1, 2011 INTRODUCTION BACKGROUND DISCUSSION RECOMMENDATION PROJECT COST — BUDGET IMPACT 1 1 The project cost summary for the Central Avenue Water Main (21 — 32 Street) Project is summarized as follows: Dubuque kiltd AN- America City 2007 The Central Avenue Water Main (21 — 32 Street) Project was completed by Drew Cook & Sons Excavating Co. Inc., of Dubuque, Iowa, in the final contract amount of $476,035.00, which is a 3.35% decrease from the original contract amount of $492,512.00. The enclosed resolution provides for the acceptance of the construction contract for the Central Avenue Water Main (21 — 32 Street) Project. The Central Avenue Resurfacing Project, from 21 to 32 Street, was scheduled for the summer of 2010. Due to the history of water service failures in this corridor, the City opted to replace the lead services. The actual resurfacing of Central Avenue will be completed in the summer, 2011. I recommend that the City Council accept the improvements, establish the final contract at $476,035.00 and adopt the Final Schedule of Assessments for the Central Avenue Water Main (21 — 32 Street) Project. Award Construction Contract $492,512.00 Contingency 0 Construction Engineering & Inspection 101,658.59 Total Project Cost $594,170.59 The estimated project category costs are as follows: The project funding summary is as follows: CIP No. 7401405 Fund Description Water Main Replacement Program Special Assessments — Funding Total Total Project Funding SPECIAL ASSESSMENTS FINANCIAL ASSISTANCE Final $476,035.00 0 50 751.04 $526,786.04 Cost Summary /Description Amount Water Main Improvements $ 292,282.61 Special Assessment - Water Service, Residential, Commercial Properties 229,109.77 Special Assessment - Water Improvement Deficiency, Paid by the City 5,393.66 Total Project Funding $ 526,786.04 Fund Amount $ 297,676.27 229,109.77 $ 526,786.04 The Central Avenue Water Main (21 — 32 Street) Project, as outlined, will require Special Assessments in the amount of $229,109.77. Based upon final construction costs, the total amount of special assessment for water service lateral improvements is in the amount of $229,109.77, which is 45.95% ($423,870.03) below the preliminary special assessment estimate that were presented to the property owners and approved at the project public hearing. This decrease is attributed to a favorable low bid and the ability for the contractor to pull 99% of the water services rather than full street excavations. Property owners subject to water service lateral assessment may be eligible for the City's low and moderate income special assessment assistance program, ranging from 20% to 100% of the assessment, for the owner - occupied residential property depending on family size and income level. To allow sufficient administrative time to process financial assistance applications for low- to moderate - income families, eligible property owners will be given approximately 30 days from the date of mailing the Notice of Filing the Final Schedule of Assessments to apply for financial assistance that may reduce the amount of the assessment payable by the property owner. During this 30 -day period, assessments may be paid in full or in part without interest at the City of Dubuque, Office of the City Treasurer. After approximately 30 days, any unpaid assessment will be levied against said benefited property with the Dubuque County Treasurer and will be payable in 10 annual installments at the County Treasurer's Office, and will draw annual interest at nine percent (9 %). FINAL ASSESSMENT SCHEDULE The schedule for the Final Assessment process is as follows: Council Approve Final Schedule of Assessments Mail Final Special Assessment Notice to Property Owners Mail Financial Assistance Information to Property Owners Publish Notice of Final Assessment 1st Publication: 2nd Publication: Deadline for Financial Assistance Applications Deadline for Paying Assessment to City, Without Interest ACTION TO BE TAKEN Prepared by Greg Doeden, Civil Engineer II cc: Jenny Larson, Budget Director Bob Green, Water Department Manager Gus Psihoyos, City Engineer Bob Schiesl, Assistant City Engineer Don Vogt, Director of Public Works John Klostermann, Street & Sewer Maintenance Supervisor Jon Dienst, Civil Engineer March 7, 2011 March 11, 2011 March 11, 2011 March 11, 2011 March 18, 2011 April 11, 2011 April 11, 2011 The City Council is requested to adopt the attached resolutions accepting the improvements, establishing the final contract amount, and approving the Final Schedule of Assessments for the Central Avenue Water Main (21 — 32 Street) Project. RESOLUTION NO. 69 -11 ACCEPTING THE CENTRAL AVENUE WATER MAIN (21 - 32 STREET) PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Central Avenue Water Main (21St — 32 Street) Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Water Main Replacement Program appropriation for the contract amount of $476,035.00 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of March , 2011 At - t: /J/ eanne F. Schneider, CMC, City Clerk 0 Roy D. uol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CENTRAL AVENUE WATER MAIN (21 — 32 STREET) PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Central Avenue Water Main (21 — 32 Street) Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $526,786.04. Dated this S day of / r1 , 2011. Filed in the office of the City Clerk on theAlday •f/ -t t_<2011 City ngineer anne F. Schneider, CMC, City Clerk PAYMENT NO: COUNCIL FINAL PROJECT NAME: CENTRAL AVENUE WATER MAIN PROJECT (21st TO 32nd STREET) City of Dubuque - Engineering Division Final Payment Form CONTRACTOR: DREW COOK & SONS EXCAVATING CO., INC. BID ITEM DESCRIPTION DEEKMAKW&REAKWAL 1 Clearing & Grubbing, Inch Diameter 2 Remove Pavement 3 Remove Water Valve Manhole IAA & S T 4 Excavation, Rock 5 Backfill, Limestone 6 Backfill, Topsoil 7 Graded Stone Base 8 3" Crushed Stone Base 9 Trench Stabilization Stone UNIT PAVEMENT 10 PC Concrete Pavement, 12 - IN., Class "C" SY $65.00 2,251.77 $ 146,365.05 11 HMA 300k Surface Course, 1/2" (PG 64 -22) Ton $122.00 34.52 $ 4,211.44 12 Temporary Patch at Fixture Each $170.00 32 $ 5,440.00 13 PC Concrete Driveway, 6 ", Remove & Construct SY $34.00 33.04 $ 1,123.36 14 PC Concrete Sidewalk, 4 ", Remove & Construct SY $27.00 128.35 $ 3,465.45 15 PC Concrete Sidewalk, 6 ", Remove & Construct SY $34.00 17.49 $ 594.66 16 PC Concrete Access Ramp, Detectable Each $150.00 2 $ 300.00 17 PC Concrete Curb and Gutter, 2.5', Remove & Construct LF $35.00 23.2 $ 810.60 SANITARY SEWER 18 4" PVC Lateral w. /Bedding LF 19 8 "x4" PVC Wye Each UNIT COST ID $15.00 SY $5.00 Each $1,350.00 CY $90.00 30.0 $ 2,700.00 Ton $6.00 3,802.90 $ 22,817.40 SY $4.00 159.51 $ 638.04 Ton $15.00 $ Ton $15.00 $ Ton $17.50 $ $26.50 $310.00 CONTRACT AMOUNT: $492,512.00 QUANTITY TO DATE DATE: February 28, 2011 AMOUNT EARNED TO DATE 15.5 $ 2,302.82 $ 11,514.10 4.00 $ 106.00 232.50 WATER MAIN 20 12" DIP Water Main CL 52 W/. Polywrap LF $64.00 28.33 $ 1,813.12 21 12" Solid Sleeve W/. Acc. (81 lbs.) LB $7.40 $ - 22 12" X 6" Anchoring Tee, MJ W/. Acc. (132 lbs.) LB $5.40 132 $ 712.80 23 12" X 4" Tee, MJ W/. Acc. (108 lbs.) LB $6.00 $ 24 12" RS Gate Valve & Street Box Each $1,875.00 3 $ 5,625.00 25 12" - 45 Deg. Bend (102 Ibs,) LB $7.00 $ 26 12" X 12" Tee, MJ W/. Acc. (171 lbs.) LB $5.40 $ 27 12" X 8" Anchor Tee, MJ W/. Acc. (149 lbs.) LB $5.60 $ 28 8" DIP Water Main CL 52 W/. Polywrap LF $42.00 137.48 $ 5,774.16 29 8" - 45 Deg. Bend (56 lbs.) LB $7.00 224.00 $ 1,568.00 30 8" X 6" Reducer (39 lbs.) LB $7.00 156.00 $ 1,092.00 31 8" RS Gate Valve & Street Box Each $990.00 5 $ 4,950.00 32 8" Solid Sleeve W/. Acc. (55 lbs.) LB $6.00 55.00 $ 330.00 33 8" X 8" Anchor Tee, MJ W/. Acc. (116 lbs.) LB $5.00 348 $ 1,740.00 34 8" X 6" Anchor Tee, MJ W/. Acc. (105 lbs.) LB $5.40 210.00 $ 1,134.00 35 6" DIP Water Main CL 52 W/. Polywrap LF $30.00 318.48 $ 9,554.28 36 6" - 45 Deg. Bend (39 lbs.) LB $5.80 117 $ 678.60 37 6" X 4" Reducer (28 lbs.) LB $6.20 28.00 $ 173.60 38 6" RS Gate Valve & Street Box Each $765.00 27 $ 20,655.00 39 6" Solid Sleeve W/. Acc. (39 lbs.) LB $6.20 $ - 40 6" X 6" Anchor Tee, MJ W/. Acc. (68 Ibs,) LB $6.40 816.00 $ 5,222.40 41 6" X 4" Anchor Tee, MJ W/. Acc. (57 lbs.) LB $6.80 57.00 $ 387.60 42 6" Mega Lug Each $45.00 20 $ 900.00 43 6" X 6" Cross, MJ W/. Acc. (79 lbs.) LB $7.10 $ - 44 4" DIP Water Main CL 52 W/. Polywrap LF $28.00 43.33 $ 1,213.24 45 4" RS Gate Valve & Street Box Each $710.00 2 $ 1,420.00 46 4" Solid Sleeve W/. Acc. (25 lbs.) LB $9.00 $ - 47 4" Mega Lug Each $60.00 3 $ 180.00 48 Fire Hydrant MJ Each $1,750.00 9 $ 15,750.00 49 Fire Hydrant Extension 6" Each $500.00 2 $ 1,000.00 50 4' X 8', 2" Extruded Polystyrene Insulation Each $56.00 6 $ 336.00 51 3/4" Copper Service Line TYPE K LF $16.50 1686.27 $ 27,823.44 52 Water Service Lines Stop Box, Curb Stop, Tap Installation 3/4" Each $500.00 82 $ 41,000.00 53 Locate Existing Water Service/Exploration Each $81.00 100 $ 8,100.00 54 Cap Lead Service Line / Copper Service Line Each $590.00 17 $ 10,030.00 55 Remove and Salvage Hydrant Each $632.00 9 $ 5,688.00 miscewetneous 56 Sawcut, Concrete, Full Depth 57 Sawcut, Asphalt, Full Depth 58 Sod 59 Watering 60 Tree Preservation Measures 61 Erosion Control Plan - Operating Procedures 62 Traffic Control & Safety Control 63 Mobilization CH (CENTRAL AVE MAIN) - new C1 Remove Existing Water Box Each $100.00 16 $ 1,600.00 C1 PC Concrete Pavement, 12 - IN., Class "M" SY $75.00 113.86 $ 8,539.50 C2 4 -Inch Romax Coupler (28 lbs.) LB $11.83 84 $ 993.72 C2 6 -Inch Romax Coupler (34 lbs.) LB $10.86 1,224 $ 13,292.64 C2 8 -Inch Romax Coupler (36 lbs.) LB $12.12 504 $ 6,108.48 C2 12 -Inch Romax Coupler (62 lbs.) LB $8.70 372 $ 3,236.40 C3 12 -Inch Hydrant Extension Each $625.00 1 $ 625.00 C3 18 -Inch Hydrant Extension Each $685.00 1 $ 685.00 C3 24 -Inch Hydrant Extension Each $775.00 1 $ 775.00 C3 14 -Inch Valve Box Extension Each $120.00 2 $ 240.00 C3 18 -Inch Valve Box Extension Each $130.00 3 $ 390.00 C3 24 -Inch Valve Box Extension Each $145.00 1 $ 145.00 C3 8" Mega Lug Each $74.00 15 $ 1,110.00 C3 Storm Sewer Repair at Intersection of 30th & Central LS $1,151.50 1 $ 1,151.50 C3 Unit Price Difference Between C-4 ($65 /S.Y.) & M-4 ($75/S.Y.) Mix SY $10.00 923.79 $ 9,237.90 TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: CERTIFICATE OF THE CITY MANAGER: APPROVED: APPROVED: LF $1.90 5,763.63 $ 10,950.90 LF $1.50 52.8 $ 79.13 SY $8.00 196.00 $ 1,568.00 MGAL $35.00 $ - TOTAL AMOUNT EARNED TO DATE - BASE BID: Michael Van City of Du LS $235.00 LS $540.00 LS $32,842.00 LS $10,000.00 TOTAL AMOUNT EARNED TO DATE: Gus Psihoyos, City Engineer City of Dubuque, Iowa 1 $ 540.00 0.90 $ 29,597.00 1 $ 10,000.00 I $ 476,035.00 $ 50,751.04 $ 526,786.04 $ 427,904.86 $ 48,130.14 $ 476,035.00 I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. CERTIFICATE OF THE CONTRACTOR: The undersigned, ,.ljee r Lnl'/( i f -5�S . �/W , contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: D BY: TITLE: DATE: EW COOK & SONS EXCAV j ING CO., INC. RESOLUTION NO. 70 -11 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: After full consideration, the Final Schedule of Assessments as shown on the attached sheet(s), Page 1 to Page 2 inclusive, is hereby approved for the Central Avenue Water Main (21 — 32 Street) Project. There is hereby assessed and levied as a special tax against and upon each of the benefited properties, the respective sums indicated. The amounts shown in said Final Schedule of Assessments as deficiencies are found to be proper and levied conditionally against the respective properties benefited by the improvements as shown in the Final Schedule of Assessments, subject to the provisions of Iowa Code § 384.63. Said assessments against said lots are hereby declared to be in proportion to the special benefits conferred and not in excess of twenty -five percent of the value of same. The City Clerk be and is hereby directed to certify the Final Schedule of Assessments to the County Treasurer of Dubuque County, Iowa, and to publish notice of said certification once each week for two consecutive weeks in the manner provided in Iowa Code § 362.3, the first publication of which shall be not more than fifteen days from the date of filing of the Final Schedule of Assessments. On or before the date of the second publication of the notice, the City Clerk shall also mail a copy of said notice to property owners whose property is subject to assessment, as provided in Iowa Code § 384.60. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13 Street, Dubuque, Iowa, at any time within 30 days after the date of the first notice of the Final Schedule of Assessments. Thereafter, unpaid assessments of $100.00 or more are payable in 10 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9 %) computed to December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi - annually in advance. Atte t: ADOPTING THE FINAL ASSESSMENT SCHEDULE FOR THE CENTRAL AVENUE WATER MAIN (21 — 32 STREET) PROJECT Passed, approved and adopted this 7th Jeanne F. Schneider, CMC, City Clerk day of March / 2011. $oy D. Buol, Mayor PROPERTY OWNER NAME LOT DESCRIPTION PARCEL 8 VALUATION WITH IMPROVEMENT WATER SERVICE PRIVATE LATERAL COSTS WATER SERVICE PRIVATE LATERAL DEFICIENCY TOTAL NET ASSESSMENT LESLEIN, JAMES LOT 4A & 51/3 OF LOT 5 L H LANGWORHTYS ADD 1024252003 575,000.00 5000 50.00 LESLEIN, JAMES BAL S 42' LOT 12 L H TANGS ADD 1024207013 518,422.40 51,722.40 51,722.40 UDELHOFEN, JANET E77'4 "- 535' -N50' LOT6 & LOT 2- W122'8" -535' -N50' LOT 6 ALL IN L H LANGWORTHYS ADD 1024135003 $76,715.36 53,315.36 53,315.36 NATIONAL RETAIL PROPERTIES LP LOT2 -1 BEATRICE FOODS PLACE 1024135005 5508,476.68 57,276.68 - 51,276.68 56,000.00 GENESIS THREE HOLDINGS LLC LH TANGS ADD 5 35' OF 5 60' LOT 10 EXCEPT PT FOR WHITE 1024207007 518,200.32 52,100.32 52,100.32 GENESIS THREE HOLDINGS LLC LOT 4 -9 L H LANG'S ADD 1024207003 5163,490.38 51,990.38 $1,990 38 GERHARD, CURTIS L LOT 3 -9 L H LANG'S ADD 1024207002 59,400.00 50.00 50.00 PLASTIC CENTER INC LOT 2 "13" L H LANGWORTHYS ADD 2204 - 22041/2 & 2206 CENTRAL AVE 1024201006 5243 000.00 50.00 50.00 COURSEY, WAYNE M & L EILEEN LOT 1 -1 -4D L H LANGWORTHYS ADD 2222 -2222 1/2 CENTRAL AVE 1024201005 5165,927.17 52,727.17 - 5262.00 52,465.17 HARTIG REALTY IV LC 5 20'8" 8254" LOT 1, S24'8 "LOT 1, 94'8" 925'4" LOT 1, 518' OF 2 1024129037 $460,321.53 $1,121.53 51,121.53 HARTIG REALTY VI LC LOT 2 OF 4D AND LOT 2 OF 6F IN L H LANGWORTHY'S ADD 1024201003 5111,151.06 52,951.06 - $485.89 $2,465.17 HARTIG REALTY VI LC LOT 1 OF 1 OF 6F IN L. H. LANGWORTHY'S ADD 1024130011 547,000.00 50.00 50.00 HEINOLD, DAVID M W 1/2 -5 1/2 -LOT 8 "H" l H LANGWORTHY'S ADO 1024130010 $64,733.72 52,733.72 - $268.55 52,465.17 WINTER, JASON W W 1/2-5 1/2-LOT 10 "1" L H LANGWORTHY'S ADD 1024130009 $49,663.36 $2,863.36 - $398.19 52,465.17 SCHMITT, RICHARD W & JUDY K 5 1/2 OF LOT 8 TIVOLI ADD 1024129026 570,700.88 52,600.88 52,600.88 HOIST, REBECCA L LOT 12 "l" L H LANGWORTHY'S ADD 1024130007 565,850.31 51,350.31 51,350.31 CONRAD, JR., RONALD 1. N 1/2 OF LOT 8 TIVOLI ADD 1024129025 $64,658.38 $2,858.38 52,858.38 HAAS, DANIEL J & AMANDA J LOT 9 TIVOLI ADD 2255 -2257 CENTRAL AVE 1024129024 587,86752 52,767.52 52,76752 JELLISON, KELLY M 511 & DAWN M LOT 1 -14N L H LANGWORTHY'S ADD 1024130006 $9,973.11 $1,673.11 $1,673 11 HELICON RESOURCES LLC LOT RICHARDSON PLACE 102 413 000 1 $77,489.86 52,789.86 - 5324.69 52,465.17 CARNER PROPERTIES LLC LOT 1 VALERIA PLACE NO.2 1024126032 5157,600.00 50.00 50.00 REAVIS PROPERTIES LLC, DAN LOT 2 VALERIA PLACE NO 2 1024126031 $368,257.80 51,157.80 51,157.80 PUETZ, JOSEPH F & JAMMIE L W 1/2 - 1/2 -LOT 20 L H LANGWORTHY'S ADD 1013383006 $42,323.74 $2,823.74 - $358.57 52,465.17 SMOTHERS, PATRICIA A & N 1/2 -LOT 21 L H LANGWORTHY'S ADD 1013383004 $88,163.77 $2,763.77 - 5298.60 52,465.17 CITY OF DUBUQUE LOT4 & N 96' LOT 3 BREWERY ADD 1013382001 5399,066.69 511,726 69 511,726.69 MARO, GERALD F & JANELDA R 5 1/2 LOT 2 -171 & LOT 1 -2 -1 -171 L H LANGWORTHYS ADD 1013378024 $42585.32 $2,685.32 - $220.15 52,465.17 SCHMITZ, LYNN F LOT 1 -10 WULLWEBER SUB 1013 37 705 0 $11,608.36 $1,608.36 51,608.36 STOWERS, MICHAEL R LOT 9 WULLWEBERS SUB 1013377048 576,570.29 52,470.29 52,470.29 SMITH, STEVE 1 W 95' LOT2 -172 1 H LANGWORTHYS ADD 1013378013 511,879.69 51,379.69 51,379.69 SMITH, STEVE 1 LOT 1 -172 & W 8' OF E 75' LOT 2 OF 172 L H LANGWORTHYS ADD 1013378012 5114,829.98 52,429.98 52,429.98 ROUTLEY, JONATHAN J & MARY F LOT 1 -1 F FOSSELMANS SUB 2420 - 24201/2 CENTRAL AVE 1013378011 $53,241.86 52,941.86 - 5476.69 52,465.17 ROUTLEY, JONATHAN J & MARY F LOT2 -1 F FOSSELMANS SUB 1013378010 540,600.00 50.00 50.00 5TRAUB, HAROLD H. 9 1/2 - E 180'- LOT 1-6, JHON KING'S DUBUQUE 1013377046 5113,300.00 $0.00 50.00 HESS, RICHARD.' & NANCY M N 1/2 LOT 2 FRANK FOSSELMANS 1013378008 $57,582.03 52,482.03 - 516.86 52,465.17 FROMMELT, DAVID C 5 1/2 & N 1/2 LOT 3 F FOSSELMANS SUB 1013378007 $43,438.41 54,138.41 54,138.41 HEIDERSCHEIT, BENJAMIN L NE 1/4 LOT 8 JOHN KING'S DUBUQUE 1013377044 545,684.69 52,884.69 52,884.69 MOOTZ, CLETUS J & MARGARET A N 1/2 LOT4 & S 12 1/2 LOT5 FRANK FOSSELMANS SUB 1013378005 574,569.39 52,369.39 52,369.39 COPELAND, DENNIS W NE 1/4 LOT 10 JHON KING'S DUBUQUE 1013377042 $76,026.70 52,826.70 52,826.70 SODAWASSER, LAURA N 15' LOT 6 & 5 35' LOT 7 F FOSSELMANS SUB 1013378002 592,370.12 52,770.12 - 5304.95 52,465.17 BRIE5, JEROME A & SUSAN M E 1/2 -LOT 12, JOHN KING'S DUBUQUE 1013377041 $116,198 99 $2,698.99 52,698 99 MUELLER, ROBERT E & SHARON M N 34 1/2' LOT 226 & 5 25' LOT 227 DAVIS FARM ADD 1013376018 590,588.04 52,188 04 52,188.04 PLUYM, DANIEL L & SUSAN E LOT 1 -N 35' OF W 170' OF LOT 227 DAVIS FARM ADD 1013376014 571,715.80 $2,215.80 52,215.80 PARR, LAURA K LOT 2 -16 -JOHN KING'S DUBUQUE 1013377036 560,671 90 52,671.90 52,671.90 FINN, JAMES P & PAMELA A LOT 1- 1- 2 -1 -18 JOHN KING'S DUBUQUE 2523 -2525 CENTRAL AVE 1013377035 584,400.00 50.00 50.00 DELIRE, STEPHEN P & JANET M LOTS 1,2 & 4 & LOTS 1 & 2 OF 3 IN DUNN'S SUB & LOT 2- 1- 2 -1 -18 JOHN KINGS DUBUQUE 1013377034 5281,200.00 $000 50.00 DUBUQUE COMMUNITY SCHOOL LOTS 231, 232, 233, 234, & 235 LOTS 1 & 2 OF 230, N 28' -LOT 229, & 5 1/2 -LOT 236 1013376020 5749,571.73 $1,991.73 51,991.73 EVEN, JOHN W. & SANDRA LOT 1 -1 -1 -241 DAVIS FARM ADD 1013314020 567,139.87 $3,539.87 53,539.87 SHAPPEL, JOHN J & THERESA M LOT 2 -2 OF 238 DAVIS FARM ADD 1013376001 569,581.93 51,681.93 51,681.93 SILVESTRI, MICHAEL A & DOROTHY LOT 1 -243 DAVIS FARM ADD 1013314018 525,342.00 52,762.00 $2,762.00 GENESIS TWO HOLDINGS LLC 5 1/2 - 269 DAVIS FARM ADD 1013328016 565,361.98 $2,261.98 52,261.98 HESS, RICHARD.' & NANCY M E 1/2 OF LOT 246 DAVIS FARM ADD 10133140I4 546,104.74 52,604.74 52,604.74 HARRISON, GLORIA & JAMES W LOT 247 DAVIS FARM ADD 1013314012 $61,594.95 $2,794.95 52,794.95 LUHER, KATHRYN MARIE LOT248 DAVIS FARM ADD 1013314011 574,043.12 52,743 12 52,743.12 WEDERT, JOSEPH W & KATHLEEN M N 1 /2 -E 1/2 -272 DAVIS FARM ADD 1013328022 564,300.00 50.00 $0.00 MATLOCK LARRY & JEAN LOT 249 DAVIS FARM ADD 1013314010 $28,198.49 52,198.49 52,198.49 KUHLE, MARK] & KAREN M W 85' -51/2 -274 DA515 FARM ADD 1013328006 549,467.20 51,667.20 51,667.20 THEN, RICHARD HENRY N 28' -275 DAVIS FARM ADD 1013328003 $61,702.61 52,102.61 52,102 61 SCHMITT, GARY C & MARY LOU E 1/2 OF LOT 250 DAVIS FARM ADD 1013314009 $55,359.91 52,759 91 52,759.91 6155, RANDALL 1 & SHIRLEY M LOT 251 & 5 1/2 OF LOT 252, DAVIS FARM ADD 1013307024 $34,833.97 53,573.97 $3,573.97 VOGT, EMIL F. & DELAINE 10T 253 & N 1/2 OF LOT 252, DAVIS FARM ADD 1013307023 $3,194.65 51,394.65 - $595 99 $798.66 CRY OF DUBUQUE, IOWA CENTRAL AVENUE WATER SERVICE REPLACEMENT FINAL SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE March 7, 2011 The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to he assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the Crt r of Dubuoue PAGE 1 PROPERTY OWNER NAME LOT DESCRIPTION PARCEL # VALUATION WITH IMPROVEMENT WATER SERVICE PRIVATE LATERAL COSTS WATER SERVICE PRIVATE LATERAL DEFICIENCY TOTAL NET ASSESSMENT JONES, JAMES C JR & SHIRLEY A LOT 1 -W 170' -278 DAVIS FARM 1013308010 576,897.74 51,997 74 $1,997.74 VOGT, DELAINE A LOT 254, DAVIS FARM ADD 1013307022 567,240.81 $2,440.81 $2,440.81 SCHMITT, EUGENE F JR & LOT 2 -W 170' OF LOT 278 DAVIS FARM ADD 1013308009 561,427.96 _ 52,027.96 52,027.96 KAUNE, DAVID M W 170' -279 DAVIS FARM ADD 1013308008 562,196.43 _ $1,496 43 51,496.43 FARFAN, SANTOS L & SALOME LOT 255 DAVID FARM ADD 1013307021 517,049.96 51,549.96 51,549.96 FARFAN, SANTOS L & SALOME 5 1/2 OF LOT 256 DAVIS FARM ADD 2735 -2735 1/2 CENTRAL AVE 1013307020 564,200.00 50.00 50.00 SCHROMEN, ELDON L & MILDRED W 170' -280 DAVIS FARM ADD 1013308007 $103,996.76 52,396.76 52,396.76 BRIMEYER, RANDALL J LOT 257 DAVIS FARM ADD 1013307017 549,033 76 52,833.76 52,833.76 WLOCHAL, DALE G & LINDA ANN LOT 258 DAVIS FARM ADD 1013307016 564,617.39 $2,717.39 52,717.39 WEINER, JOSEPH 1 & CATALINA C 5 1/2-W 170' -281 DAVIS FARM 1013308006 578,610.08 52,520.08 - 554.91 52,465.17 O'BRIEN, RAYMOND C & MARY N 1/2 - W 170' -281 DAVIS FARM ADD 1013308005 $60,116.24 52,096.24 $2,096.24 JAEGER, THEODORE L & AGNESE L W 170' -1 -282, & W 170' -5 1/2 OF 283 DAVIS FARM ADD 1013308003 580,840.05 51,640.05 51,64005 KOSTER, RANDALL 1. & SUSAN M LOT 262 DAVIS FARM ADD 1013307012 584,529.32 $2,429.32 52,429.32 BARGER, SHAUNTAE D 5 23.5' OF E 112' OF LOT 263 DAVIS FARM ADD 1013160002 558,299.45 52,599.45 52,599.45 W ITTMAN, MARLIN 1 & FONDA F W 84' -W 170' -287 DAVIS FARM 1013156015 574,900.00 50.00 50.00 TITRE, ROBERTG & MARY L 5 1/2-W 170' -288 DAVIS FARM 1013156014 553,723 75 $2,323.75 52,323.75 SCHMITT, DARLENE M & WILLIS C LOT2 -265 DAVIS FARM ADD 1013155012 $75,474.25 52,574.25 52,574.25 SARRIS - MATHEOS, DEBBIE 5. & MICHAEL LOT 2 -W 170' -290 DAVIS FARM 1013156010 584,295.20 $2,395.20 52,395.20 MAUS, RICHARD A & NEVA M N 1 /2 -W 170' -291 DAVIS FARM 1013156008 571,199.39 52,499.39 - $34.22 52,465.17 DIETZ, DONALD 1 & SUSAN M 5 39'6" OF LOT 2 G R WEST'S DUBUQUE 1013155007 562,176 20 $2,076.20 52,076.20 POTHOFF, ALVIN 1 & KATHRYN E & N 20.5' OF LOT 2 & 5 3' OF LOT 3 G R WEST'S ADD 1013155006 560,849.23 52,149.23 52,149.23 POTHOFF, ALVIN 1 & KATHIE E & LOT 2 OF N 57' OF LOT 3 IN G R WESTS ADD 1013155005 551,927.77 52,227.77 52,227.77 AVENARIUS, HAROLD LOT 1 OF 0 57' OF LOT 3 IN G R WEST'S ADD , 1013155004 533,300.33 52,200 33 $2,200.33 KEUTER, MARK & JESSICA W 1/2 -294 DAVIS FARM ADD 1013156004 587,635.98 52,415.98 $2,415.98 JOHNSON, KEITH A W 80' -E 1/2 -294 DAVIS FARM ADD 1013156018 594,243.14 $2,443.14 52,443.14 REIFF, ALBERT 1 & MELISSA L LOT 1 -N 2' -W 170' OF 295 & LOT 1 -1 W 170' OF 296 DAVIS FARM ADD 2880 -2882 CENTRAL AVE 1013156002 590,581.89 52,481.89 - 516.72 52,465.17 PUETSCH, TIMOTHY A W 85' OF W 170' OF LOT 297 DAVIS FARM ADD 1013152014 576,644.02 52,344.02 52,344.02 KERNALL, KRIS D & MARY K N 30' OF W 170' OF LOT 298 DAVIS FARM ADD 1013152012 564,820.91 51,520.91 51,520.91 PARAGON LLC LOT 1 -1 PARAGON SQUARE 1013155016 5253,771.23 54,278.23 54,278.23 GATEWAYS TO HOME 5 1/2 OF W 170' OF 301 DAVIS FARM ADD 1013152009 568,951.77 $2,351.77 $2,351.77 HENKELS, FRANCIS WM 51/2 OF W 170' OF LOT 302 DAVIS FARM ADD 1013152007 597,217.72 $2,217.72 52,217.72 VONHOLLEN, HERBERT C & VERNA N 1/2 OF W 170' OF LOT 302 DAVIS FARM ADD 1013152006 $69,578.58 $2,278.58 52,278.58 OTTING, JASEN & TRACY LOT 13 G R WESTS ADD 1014232030 585,347.00 52,347.00 52,347 00 STAVER, CHRISTOPHER T LOT 2 OF LOT 308 DAVIS FARM 1013151006 $11,893.93 $1,293.93 51,293.93 SCHROEDER, RICHARD J & LOIS 1 LOT 14 G R WESTS DUB ADD 1014232029 553,024.00 $2,424.00 52,424.00 HARTZELL, CRAIG H & ROSE A W 170' OF LOT 309 DAVIS FARM 1013151002 5146,774.95 51,574 95 51,574.95 DUGGAN, DUSTAN 1 W 170' OF LOT 310 DAVIS FARM ADO 1013151001 $130,334.48 $2,034.48 52,034.48 LEWIN, JENNIFER L LOT 16 G R WESTS ADD 1014232027 596,200.00 50.00 50.00 MILLER, FRANKLIN W JR & SHEREE W 170' OF LOT 312 DAVIS FARM 1014233015 $116,108.72 $2,308.72 52,308.72 EISBACH, DOROTHY W 85' OF W 170' OF LOT 313 DAVIS FARM ADD 1014233011 $84,942.73 52,242.73 52,242.73 STILES, JEFF & MINDY LOT 17 G R WESTS ADD 1014232026 520,700.00 50.00 50.00 STILES, JEFF & MINDY LOT 18 G R WESTS ADD 1014232025 5114,200.78 $3,100.78 53,100.78 511105, JEFF JOHNSTON W 100' OF N 50' OF W 170' OF LOT 315 DAVIS FARM ADD 1014233009 574,147.65 52,247.65 52,247.65 DEUTSCHE BANK NATI. TR CO OCWEN LOAN SERVICING LLC W 170' OF LOT 316 DAVIS FARM ADD 1014233008 $77,137.78 $2,237.78 52,237.78 LAU, BRIAN A W 170' OF LOT 317 DAVIS FARM 1014233007 5118,444.36 $2,114.36 52,114.36 BRENNAN, MICHAEL & KNOCKEL, LOT 22 AND 545' OF LOT 23 IN G R WESTS ADD 1014232021 5120,299.98 $4,899.98 54,899.98 HOHL, THEODORE R & MURIEL LOT 1 KRETZ CORNER 1014233018 5445,500.00 50.00 50.00 PAGE 2 TOTALS = 5234,503.43 45,393.66 $229,109.77 NOTICE TO PROPERTY OWNERS OF FILING OF THE FINAL SCHEDULE OF ASSESSMENTS FOR THE CENTRAL AVENUE WATER MAIN (21 - 32 STREET) PROJECT TO THE PERSONS OWNING PROPERTY WITHIN THE DISTRICT DESCRIBED AS FOLLOWS IN THE CITY OF DUBUQUE, IOWA: The public improvement and location is as follows: Central Avenue Watermain (21 — 32 Street) Project Consisting of the properties which are described as follows: All property included on Central Avenue, from 21 — 32 Street. You are hereby notified that the Final Schedule of Assessments against the benefited properties within the District described above, a copy of which Final Schedule of Assessments is attached hereto, has been adopted and the assessments confirmed by the City Council of the City of Dubuque, Iowa, and that said Final Schedule of Assessments has been certified to the Dubuque County Treasurer. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13 Street, Dubuque, Iowa, at any time within 30 days after the date of the first notice of the Final Schedule of Assessments. Thereafter, unpaid assessments of $100.00 or more are payable in 10 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9 %) computed to December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi - annually in advance. Jeanne F. Schneider, CMC, City Clerk