Central Avenue HMA Resurfacing Project from 21st to 32nd StreetsMasterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Central Avenue Resurfacing Project, from 21st to 32nd Street
Iowa DOT Project No. STPN- 052 - 2(106)- -2J -31
CIP 3002248
DATE: March 14, 2011
Dubuque
Ala- AmerlcaCity
If
2007
The Central Avenue Resurfacing Project, from 21st to 32nd Street, was originally
scheduled for the summer of 2010. Due to the history of private water service lateral
failures within the corridor, the City elected to take a proactive approach in requiring the
replacement of old lead water services prior to the resurfacing of Central Avenue. The
Central Avenue Water Main (21st — 32nd Street) Project was substantially completed in
December, 2010.
The Central Avenue Resurfacing Project is a partnership between the City of Dubuque
and the Iowa Department of Transportation. This is the first phase of a multi -year
project that will see the resurfacing of Central Avenue from 32nd Street to 9th Street
and White Street from 11th Street to 21st Street within the next five years. The project
will provide for:
• Pavement milling on U.S. 52 (Central Avenue) between 21st and 32nd Street.
• Pavement sub -base repair and patching as needed.
• Asphalt resurfacing of both thru lanes and parking areas.
• Spot curb, driveway, and sidewalk replacement.
• Storm sewer intake reconstruction.
• Installation of pedestrian access curb ramps.
Through the cooperative agreement, the Iowa DOT will be responsible for the eligible
construction costs associated with pavement rehabilitation for the center 24 feet (12 feet
in each direction from roadway centerline) and the costs associated with the pedestrian
access curb ramps for pedestrian crossings along U.S. 52 (Central Avenue). The City
will be responsible for the costs associated with pavement rehabilitation of the parking
lanes and the costs for curb and sidewalk replacement, underground utility work,
pedestrian access curb ramps for pedestrian crossing along the side streets and
landscape restoration. All other associated costs, such as engineering design, contract
administration, construction engineering and inspection, will be funded solely with City
funding.
The Iowa Department of Transportation will be funding $913,000 and the City of
Dubuque $743,055 of the $1,656,055 project.
City Engineer Gus Psihoyos is recommending approval of the plans, specifications,
form of contract and the estimated cost.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
'L_
Mic ael C. Van Milligen
DISCUSSION
Masterpiece on the Mississippi
TO:
FROM: Gus Psihoyos, City Engineer
INTRODUCTION
BACKGROUND
Michael C. Van Milligen, City Manager
DATE: March 11, 2011
SUBJECT: Central Avenue HMA Resurfacing Project, from 21 to 32 Street
Iowa DOT Project No. STPN- 052 - 2(106)- -2J -31
CIP 3002248
Dubuque
kutal
AI- America Cull
11111 I
2007
The enclosed resolution is in reference to the public hearing on the Central Avenue HMA
Resurfacing Project, from 21 to 32 Street.
The Central Avenue HMA Resurfacing Project, from 21 to 32 Street, was originally
scheduled for the summer of 2010. Due to the history of private water service lateral failures
within the corridor, the City elected to take a proactive approach in requiring the replacement
of old lead water services prior to the resurfacing of Central Avenue. The Central Avenue
Water Main (21st — 32 Street) Project was substantially completed in December, 2010.
The Central Avenue HMA Resurfacing Project, from 21 to 32 Street, is a joint partnership
project between the City and the Iowa Department of Transportation (Iowa DOT). The
pavement rehabilitation project on Central Avenue will provide for the following improvements:
— Pavement milling on U.S. 52 (Central Avenue) between 21 and 32 Street.
— Pavement sub -base repair and patching as needed.
— Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas.
— Spot curb, driveway, and sidewalk replacement.
— Storm sewer intake reconstruction.
— Installation of pedestrian access curb ramps.
Through the cooperative agreement, the Iowa DOT will be responsible for the eligible
construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in
each direction from roadway centerline) and the costs associated with the pedestrian access
curb ramps for pedestrian crossings along U.S. 52 (Central Avenue). The City will be
responsible for the costs associated with pavement rehabilitation of the parking lanes and the
costs for curb and sidewalk replacement, underground utility work, pedestrian access curb
ramps for pedestrian crossing along the side streets and landscape restoration. All other
associated costs, such as engineering design, contract administration, construction
engineering and inspection, will be funded solely with City funding.
RECOMMENDATION
recommend that the City Council approve the plans, specifications, form of contract and the
estimated cost for the Central Avenue HMA Resurfacing Project, from 21 to 32 Street.
BUDGET IMPACT
The estimate of probable cost for the Central Avenue HMA Resurfacing Project, from 21 to
32 Street, is as follows:
Estimate
Construction Contract $1,379,818.95
Contingency 137,981.90
Administration, Design, Construction Engineering & Inspection 137,981.90
Total Project Cost $1,655,782.75
The construction amount shown ($1,655,782.75) is slightly different then the amount
shown in the Agreement Memo with the Iowa DOT dated January 26, 2011
($1,655,847.40) because an updated estimate was done on the project.
The total available project funding summary is as follows:
Fund
CIP No. Fund Description Available Amount
3002248 Iowa DOT Funding $ 913,000.00
3002248 Central Avenue Pavement Rehabilitation 743,055.00
Total Project Funding $1,656,055.00
The City currently has $363,330 budgeted in FY11 and an additional $379,725
budgeted in FY12 to cover the City's portion of the improvement costs. The initiate
memo that was submitted to council on March 7 showed City funding of $766,237.59 for
the project which was incorrect. The actual City funding shown for the project is
$743,055.
ACTION TO BE TAKEN
The City Council is requested to approve the plans, specifications, form of contract and
the estimated cost for the Central Avenue HMA Resurfacing Project, from 21 to 32
Street.
Prepared by Robert Schiesl, Assistant City Engineer
cc: Jenny Larson, Budget Director
Jon Dienst, PE
Greg Doeden, Civil Engineer
Lu
z
2
\�
Hwy 52 Pavement
Rehabilitation
Phase I - FY2012
Phase II - FY2014
Phase III - FY2015
40. ' Phase IV - FY2016
Iowa "DOT /City of Dubuque Partner Projects
FY 2012 -2016
.
t�l'ir�TMENT.
<ruk
�� � = '°it�'
��. 7i'.�' ".
T R RAM:. - -
O:G - .,�.:
•k"•
,,
�'$'L..::<�. �<:. �. - S,
- ' ice:'_ G :��: '•.a:•`;'°�
PROM � TITLE:.: , r;: � , ,
ECT�� <�,� -k :. �= = `: ,�� ,
•'��e�
<fe - ",. ^.f.3'..'..: x 't':? ; : r =
r✓.' e x ." -<='a b
tOint � eef�la• tttl °at%e�f ... --
:,`�7'. ":
"s �. - : , •:'' . v - - . �,'}o� .�...�. •
f
RtIK3 ; � { �� j( -
P :" �••r >: :,��..
.. .
- r<.•' I
C,'� ".
�tC . �,,,�� �:�2 -
�� "`.
.• . tf.' -
- -
TAI.t s::.
3
_
"�,�,` �{i/ ='
.t'
t'.t.T: �.:< ... d,
. F �. r.. .ri'riN�.
.. v.. ..! .tea. .. °. ..•.. .. ....< §
-. ... _ ...lc ..A .. ...
r r
�.
...�.. ..
.H dn'
EXP PRIOR
ESTIMATED
PROJECT BUDGET
2011
2012
2013
2014
2015
BEYOND
TO FY 11
FY 11
-12
-13
-14
-15
-16
2016
A. EXPENDITURE ITEMS
$ 80,130
Design & Engineering
$ 57,860
Land and R.O.W.
$ 881,500
Construction
$ 636,360
Other
$ -
$ 961,630
TOTAL
$ 694,220
$
-
$
-
$
-
$
-
$
-
B. PROJECT FINANCING
$ 598,300
IDOT Funding
$ 314,495
$ 363,330
Sales Tax Fund (30 %)
$ 379,725
$ -
$ 961,630
TOTAL
$ 694,220
$
-
$
-
$
-
$
-
$
-
PROJECT DESCRIPTION
This project provides for the resurfacing of Central Avenue (IA 3/52) from 21st Street to 32nd Street. This project also includes the reconstruction of all the handicap ramp
areas to bring them up to ADA compliance. Additional funding is required for this project due to the existing condition of the concrete base.
JUSTIFICATION
The existing asphalt street is showing stress from the volume of the truck traffic and needs to be resurfaced.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Element: Goals 1.1, 1.3 and 3.3; and Infrastructure Element: Goals 4.2, 4.4, 4.5, 4.6, 5.1 and 5.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
337
-r N'I• �
, ;• � -
y .�:..�,'. daaf�'" P � q ,
»K ` "a..�K .� ?'
t # L:' .I.-..
f'"'p r�;r�:.. �"
-
,. ... ... .. ... . -.:_.
;� C�C R AM` - =�
v � . R t. �'�S`a "!:. -..
.G ,�5
i '�.. . « « ' . � �
iY► fir: i:±h,•� .d {r. �.
fir. . ;`�,� . : •4 • �:� ,.. ° � 9. ...`..• - z,:,: :z�,�#
.. ...
e' .
PROJE CT:.TIT IiE
R�. y w a r
, ^p* . y '
Q �. -,-►i
:.�v,; ;.
tO �
-.' '_:.:, � �
- ��tiri�i" ..:'ro^� ^.sue
`' "•s « ` � ir:� h ,
.���G � f.
,y,. .r »(: : ,;�;.y
- .. �_.:�'.
�RV\A
::e.o �
- ' "`k:••.�
'.a:.
�
> •t, ?"
:?' .
rv '.�,�:", «
"
, x:s ."„»; ° '
-
..:.te>�tr: '.•aft."...
-. -:.
-k �,.5. •`��. {'�°.s„«
- r s•;.. .�.�.:.
, s ?,��- ;� `�3�3 w"�
:� �• :�::
>M > �:
�'�.c <.y �
s�
"•� .. , ......
�j
y1
G 11
EXP PRIOR
ESTIMATED
PROJECT BUDGE
1
2012
2013
2014
2015
BEYOND
TO FY 11
FY 11
-12
-13
-14
-15
-16
2016
A EXPENDITURE ITEM.
Design & Engineering
$ 75,473
Land and R.O.W.
Construction
$ 867,946
Other
$ -
$ -
TOTAL
031
$
-
$ 943,419
$
-
$
-
$
-
B. PROJECT FINANCING
IDOT Funding
$ 490,578
Sales Tax Fund (30 %)
$ 452,841
$ -
$ -
TOTAL
$
-
$ 943,419
$
-
$
-
$
-
PROJECT DESCRIPTION
This project provides for the resurfacing of White Street & 21st Street (IA 3/52) from 11th Street to Central Avenue. This project also includes the reconstruction of all the
handicap ramp areas to bring them up to ADA compliance.
JUSTIFICATION
The existing asphalt street is showing stress from the volume of the truck traffic and needs to be resurfaced.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Element: Goals 1.1, 1.3 and 3.3; and Infrastructure Element: Goals 4.2, 4.4, 4.5, 4.6, 5.1 and 5.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
342
., NT
" •: . A
'F...r'
r: _. �
F
<. .
'`
- O R AMA Vii ,.
t 4W. ti �h- ,�.. •11 �'i �.. �.4"y. ;.v
r b Y Y a
l .r'.. i '
� �; u: 7 +, "�,• ��... hit
.�. ,. a . -. �,.... , t r,. ;.x ., ; ..
PROD CT,yr��T
1.5 ?.�'if I��i
k. (';} '+�, pia, y th
a Pi�, C I - �ll[
r �`�c � ✓
• 1 �44 � I.V �� Nd1
� : .;„ 1?11 CF
Y x
x�
�
S if:�3
.
�s�
y f .y „�'
'i i -4
_
�' � � . v , �� rs ,
''
..., :.
.pi-.
_. ✓a '" "
. :'--
`"
�iy�Yl`
aq
... ::'a[a . u
:. ; 536:''
,.:
? .. ..
w .;
.... •...
EXP PRIOR
ESTIMATED
PROJECT BUDGET
2011
2012
2013
2014
2015
BEYOND
TO FY 11
FY 11
-12
-13
-14
-15
-16
2016
A. EXPENDITURE ITEMS
Design & Engineering
$ 23,306
Land and R.O.W.
Construction
$ 276,230
Other
$ -
$ -
TOTAL
$
-
$
-
$
-
$ 299,536
$
-
$
-
B. PROJECT FINANCING
IDOT Funding
$ 145,662
Sales Tax Fund (30 %)
$ 153,874
$ -
$ -
TOTAL
$
-
$
-
$
-
$ 299,536
$
-
$
-
PROJECT DESCRIPTION
This project provides for the resurfacing of l l th Street (IA 3/52) from Elm Street to White Street. This project also includes the reconstruction of all the handicap ramp
areas to bring them up to ADA compliance.
JUSTIFICATION
The existing asphalt street is showing stress from the volume of the truck traffic and needs to be resurfaced.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Element: Goals 1.1, 1.3 and 3.3; and Infrastructure Element: Goals 4.2, 4.4, 4.5, 4.6, 5.1 and 5.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
347
i ce'; _:; , . ; . °"
d
.�... ,. �,,,..�•�§ •: ' fi'
�'. :,
a^ .:.
'i."'k'M
- iGl�"�M +.�.�, , ':���.�; °�
� Y • 4C � � '� •.pl ak .�
'
�i � -r' � (r "f ..• y ,:rig � "„'
�
PRi�! ,CTl:E
S I .� ^, 4,kU�i�51��5�1t
.�r.,
�
- �;�,;4f
► « ^: `,
-�
.{� Vi
,a.� ...fir: t
�,
'" Y
..
'� � y } A7. �
.. y-.Y it
-�i i - .a, .
� +� °:' +:: �.. `.� ta�.�
�,t:.;
p
"'' n fit •
s
�
'� Q�
H f: fi{�
.',4; .z
EXP PRIOR
ESTIMATED
PROJECT BUDGET
2011
2012
2013
2014
2015
BEYOND
TO FY 11
FY 11
-12
-13
-14
-15
-16
2016
A. EXPENDITURE ITEMS
Design & Engineering
$ 99,622
Land and R.O.W.
Construction
$ 1,1 06,846
Other
$ -
$ -
TOTAL
$
-
$
-
$
-
$
-
$ 1,206,468
$
-
B. PROJECT FINANCING
IDOT Funding
$ 679,240
Sales Tax Fund (30 %)
$ 527
$ -
$ -
TOTAL
$
-
$
-
$
-
$
-
$ 1,206,468
$
-
PROJECT DESCRIPTION
This project provides for the resurfacing of Central Avenue (IA 3/52) from 9th Street to 21st Street. This project also includes the reconstruction of all the handicap ramp
areas to bring them up to ADA compliance.
JUSTIFICATION
The existing asphalt street is showing stress from the volume of the truck traffic and needs to be resurfaced.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Element: Goals 1.1, 1.3 and 3.3; and Infrastructure Element Goals 4.2, 4.4, 4.5, 4.6, 5.1 and 5.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
349
RESOLUTION NO, 103 -11
APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND
ESTIMATED COST FOR THE CENTRAL AVENUE HMA RESURFACING PROJECT,
FROM 21 TO 32 STREET (IOWA DOT PROJECT NO. STPN- 052 - 2(106)-- 2J -31)
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the proposed plans, specifications, form of contract and estimated cost for
the Central Avenue HMA Resurfacing Project, from 21 to 32 Street (Iowa DOT
Project No. STPN- 052 - 2(106)-- 2J -31), in the estimated amount $1,655,782.75, are
hereby approved.
Attest:
Passed, adopted and approved this 21st day of
anne F. Schneider, CMC, City Clerk
March
11.
Pic/
Roy D. Buol, Mayor