Loading...
Carnegie_Stout Public Library Renovation Project Contract No. 12Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Carnegie -Stout Public Library Renovation Project Contract No. 12 - Electrical Systems (CIP 7001961) DATE: April 12, 2011 City Engineer Gus Psihoyos is recommending acceptance of the Carnegie -Stout Public Library Renovation Project — Contract No. 12, Electrical Systems, as completed by Westphal & Co., Inc., in the final contract amount of $1,142,863.37, which is an 8.4% increase from the original contract in the amount of $1,053,930.00. The contract overage was due to upgrades and modifications to the voice and data communications system in the historic portion of the library, fire alarm system modifications to meet building code requirements, security system additions to meet the needs of the library, exterior /interior lighting changes to better illuminate spaces and perform ICN video conference cable work that was not originally part of this contact. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michel C. Van Milligen Dubuque All-America City 1 1 r 2007 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manag FROM: Gus Psihoyos, City Engineer SUBJECT: Carnegie -Stout Public Library Renovation Project Contract No. 12 — Electrical Systems (CIP 7001961) Dubuque kittd Al-America City h 2007 DATE: April 11, 2011 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Carnegie -Stout Public Library Renovation Project — Contract No. 12, Electrical Systems. BACKGROUND The Carnegie -Stout Public Library Renovation Project included: — A complete renovation of all public and staff spaces. — Update of the obsolete HVAC system to one that is designed to be environmentally efficient. — New furnishings and equipment. — Expanded wireless access and computer services. — New roof on the original building — New sidewalk and steps including a snow melt system for the newer building. — Upgraded security system. — Reopening of the stairwell to the second level in the original building. — Reopening of the original mezzanine and uncovering of the rear skylight in the original building. Multiple prime construction bids were awarded for this project. Contract No. 12 — Electrical Systems, along with Alternates 1 and 3 -5, was awarded to Westphal & Co., Inc. DISCUSSION The Carnegie -Stout Public Library Renovation Project — Contract No. 12, Electrical Systems was completed by Westphal & Co., Inc. of Dubuque, Iowa, in the final contract amount of $1,142,863.37 which is a 8.4% increase from the original contract in the amount of $1,053,930 ($999,550, base bid; $54,380, Alternates 1 and 3 — 5). The PROJECT COSTS Award Final Construction Hard Costs `Amount Base Construction Work $ 999,550.00 $1,088,483.37 Optional Construction Add Alternates: General Funds $ 1,210,589 1) Installation of New Elevator $ 1,420.00 $ 1,420.00 2) Misc. Technology - Window treatments/ Projection Screens $ 0.00 $ 0.00 3) CCTV Security System $ 52,960.00 $ 52,960.00 4) Replace North Skylight on Historic Building $ 0.00 $ 0.00 Alternate Subtotal $ 54,380.00 $ 54,380.00 TOTAL PROJECT COST $1,053,930.00 $1,142,863.37 CITY FUNDING SOURCES CIP: No. ' Fund.Description Fundinci `Amount 1001141/ 1011141 GO Bond (TIF Abated) $ 2,400,000 General Funds $ 1,210,589 Total City Funding $ 3,610,589 contract overage was due to: upgrades and modifications to the voice and data communications system in the historic portion of the library; fire alarm system modifications to meet building code requirements; security system additions to meet the needs of the library; exterior /interior lighting changes to better illuminate spaces and perform ICN video conferencing cable work that was not originally part of this contract. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $1,142,863.37 to Westphal & Co., Inc. for the Carnegie -Stout Public Library Renovation Project — Contract No. 12, Electrical Systems. BUDGET IMPACT The summary of probable total cost for the Carnegie -Stout Public Library Renovation Project is summarized as follows: The project funding summary is as follows: LIBRARY FUNDING SOURCES Fund Source Funding Amount Available Fundraising to Date (Cash and Pledges) * ** $ 1,746,782 Curtis Collection Sale $ 501,750 Heade Painting Sale (Estimated) $ 253,710 Total Library Funding $ 2,502,242 Total City Funding Total Library Funding $ 3,610,589 $ 2,502,242 Total Project Funding 1 $ 6,112,831 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $1,142,863.37 to Westphal & Co., Inc. for the Carnegie -Stout Public Library Renovation Project — Contract No. 12, Electrical Systems. cc: Jenny Larson, Budget Director Susan Henricks, Library Director Steve Sampson Brown, Project Manager RESOLUTION NO. 128 -11 ACCEPTING THE CARNEGIE -STOUT PUBLIC LIBRARY RENOVATION PROJECT, CONTRACT NO. 12 — ELECTRICAL SYSTEMS AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Carnegie -Stout Public Library Renovation Project, Contract No. 12 — Electrical Systems (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the General Obligation Bonds (TIF Abated), Library Renovation General Funds, Library Fund - Raising (cash and pledges), Curtis Collection Sale, and Heade Painting Sale appropriations for the contract amount of $1,142,863.37 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 18th day of April , 2011. Atte . -anne F. Schneider, CMC, City Clerk OL, Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CARNEGIE- STOUT PUBLIC LIBRARY RENOVATION PROJECT, CONTRACT NO. 12 — ELECTRICAL SYSTEMS The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Carnegie -Stout Public Library Renovation Project, Contract No. 12 — Electrical Systems, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,142,863.37. Dated this 1'S day of t\ I , 2011. kh Filed in the office of the City Clerk on the 1 day of 4„ALArl' City E 'gineer 2011. Kevin S. Firnstahl, Assistant City Clerk CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner 88,933.37 Total approved this Month TOTAL 88,933.37 NET CHANGES by Change Order 88,933.37 APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 /CMa TO OWNER: Dubuque Public Works Engineering 50 West 13th Street Dubuque, IA 52001 FROM CONTRACTOR: Westphal & Company, Inc. 750 Cedar Cross Road Dubuque, IA 52003 CONTRACT FOR: Electrical Construction CONTRACTOR'S APPLICATION FOR PAYMENT 1. ORIGINAL CONTRACT SUM 2. Net Change by Change Orders 3. CONTRACT SUM TO DATE . (LINE 1 +2) . . 4. TOTAL COMPLETED AND STORED TO DATE (Column G on G702) 5. RETAINAGE: a. 5 % of Completed Work 0.00 (Columns D + E on G703) b. 5 % of Stored Material 0.00 (Columns F on G703) Total Retainage (Line 5a + 5b or Total in Column I of G703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE . . 9. BALANCE TO FINISH, INCLUDING RETAINAC (Line 3 less Line 6) .VAIARCHITECT: OPN Architects, Inc. 200 5th Street SE #201 Cedar Rapids, IA 52401 1,053,930.00 88,933.37 1,142,863.37 1,142,863.37 1,000.00 I 0.00 CONSTRUCTION MANAGER - ADVISER EDITION PAGE 1 OF 23 09/24/] Q0900l1ff -�O2 1 CONTRACT DATE: 10/20/2008 • DURRAN PROJECT: Carnegie Stout Public Library APPLICATION NO.: 360 West 11 Street PERIOD TO: Dubuque, IA 52001 INVOICE NO.: PROJECT NO.: The undersigned Contractor certifies that to the best of the Contractor's knowledge, infor- Application is made for payment, as shown below, in 6enn etion- wltlrthe-Contrac$_':. `nation and belief the Work covered by this Application for Payment has been completed Continuation Sheet AIA Document G703, is attached. in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and pay- ments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: State of: ., --� County of: Subscribed and swofore me this ! y day of Notary -�c My Commission expires. o , 4 PAGES Distribution to: OWNER 2 tV O M M GER AR64ITECT CONTRACTOR iA Date: \Z - 1c1 0.00 CERTIFICATE FOR PAYMENT 1,142,863.37 In accordance with the Contract Documents, based on on -site observations and the data comprising this application, the Construction Manager and Architect certify to the Owner that to the best of their knowledge, information and belief the Work has progressed as 1,141,863.37 indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor in entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED $ 7 / 00()-(30 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on this application and on the Continuation Sheet that changed to conform to the amount ce -d.) CONS - Wel ki ARCHITECT: B: Date: /Z• /L./ Date: 1 L ZQ�ho This Certificate is not negoti. e. T AMOUNT CERTIFIED is payabl only to the Con- tractor named herein. Issuance, payment and acceptance of payment are without prejudice= n rights of the Owner or Contractor under this contract. £f_// 011 A B C D E 1 F G H I ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED TOTAL COMPLETE & STORED TO DATE (D + E + F) % [G /C] BALANCE TO FINISH [C -G] RETAINAGE FROM PREVIOUS APPLICATION (D + E) THIS APPLICATION WORK IN PLACE STORED MATERIAL [NOT D &E] 10 Mobilization 8,515.00 8,515.00 0.00 8,515.00 100% 0.00 0.00 20 LEED Cert Documentation 1,500.00 1,500.00 0.00 1,500.00 100% 0.00 0.00 30 Project Closeout, O &M's, Docum 2,000.00 2,000.00 0.00 2,000.00 100% 0.00 0.00 40 Temporary 8,750.00 8,750.00 0.00 8,750.00 100% 0.00 0.00 50 Clean Up 3,500.00 3,500.00 0.00 3,500.00 100% 0.00 0.00 60 Conduit/Fittings /Box Materials 42,625.00 42,625.00 0.00 42,625.00 100% 0.00 0.00 70 Conduit/Fittings /Boxes Labor 71,650.00 71,650.00 0.00 71,650.00 100% 0.00 0.00 80 Device Materials 1,425.00 1,425.00 0.00 1,425.00 100% 0.00 0.00 90 Device Labor 4,500.00 4,500.00 0.00 4,500.00 100% 0.00 0.00 100 Fire Alarm Materials 26,450.00 26,450.00 0.00 26,450.00 100% 0.00 0.00 110 Fire Alarm Labor 8,850.00 8,850.00 0.00 8,850.00 100% 0.00 0.00 120 Floor Box Materials 13,400.00 13,400.00 0.00 13,400.00 100% 0.00 0.00 130 Floor Box Labor 6,800.00 6,800.00 0.00 6,800.00 100% 0.00 0.00 140 Incidental Materials 13,075.00 13,075.00 0.00 13,075.00 100% 0.00 0.00 150 Incidental Labor 20,760.00 20,760.00 0.00 20,760.00 100% 0.00 0.00 160 Lighting Control Materials 20,300.00 20,300.00 0.00 20,300.00 100% 0.00 0.00 170 Lighting Control Labor 2,650.00 2,650.00 0.00 2,650.00 100% 0.00 0.00 180 Light Fixture /Lamp Materials 305,265.00 305,265.00 0.00 305,265.00 100% 0.00 0.00 190 Light Fixture /Lamp Labor 60,270.00 60,270.00 0.00 60,270.00 100% 0.00 0.00 200 Panelboard /Breakers Materials 10,925.00 10,925.00 0.00 10,925.00 100% 0.00 0.00 210 Panelboard/Breakers Labor 4,200.00 4,200.00 0.00 4,200.00 100% 0.00 0.00 Page Total 637,410.00 637,410.00 0.00 0.00 637,410.00 100% 0.00 0.00 CONTINUATION SHEET - AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's sign Certification, is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on on Contracts where variable retainage for line items may apply. AIA DOCUMENT G703 APPLICATION NO: APPLICATION DATE: PERIOD TO: ARCHITECTS PROJECT NO.: PAGE 2 OF 4 PAGES 23 09/24/10 09/24/10 06080.00 A B C D E 1 F G H I ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED TOTAL COMPLETE & STORED TO DATE (D + E + F) % (G /C] BALANCE TO FINISH [C-G] RETAINAGE FROM PREVIOUS APPLICATION (D + E) THIS APPLICATION WORK IN PLACE STORED MATERIAL [NOT D &E] 220 VFD Materials 26,965.00 26,965.00 0.00 26,965.00 100% 0.00 0.00 230 VFD Labor 7,000.00 7,000.00 0.00 7,000.00 100% 0.00 0.00 240 Wire Materials 28,325.00 28,325.00 0.00 28,325.00 100% 0.00 0.00 250 Wire Labor 43,500.00 43,500.00 0.00 43,500.00 100% 0.00 0.00 300 O'Dowd Saw Cutting /Concrete 15,405.00 15,405.00 0.00 15,405.00 100% 0.00 0.00 310 Globalcom Mobilization 1,675.00 1,675.00 0.00 1,675.00 100% 0.00 0.00 320 Globalcom Clean Up 1,250.00 1,250.00 0.00 1,250.00 100% 0.00 0.00 330 Telecommunications Materials 40,830.00 40,830.00 0.00 40,830.00 100% 0.00 0.00 340 Telecommunications Labor 31,605.00 31,605.00 0.00 31,605.00 100% 0.00 0.00 350 Electronic Access Ctrl Materia 46,060.00 46,060.00 0.00 46,060.00 100% 0.00 0.00 360 Electronic Access Ctrl Labor 25,795.00 25,795.00 0.00 25,795.00 100% 0.00 0.00 370 Intrusion Detection System Mat 6,575.00 6,575.00 0.00 6,575.00 100% 0.00 0.00 380 Intrusion Detection System Lab 3,930.00 3,930.00 0.00 3,930.00 100% 0.00 0.00 390 Video Surveillance Materials 53,645.00 53,645.00 0.00 53,645.00 100% 0.00 0.00 400 Video Surveillance Labor 9,940.00 9,940.00 0.00 9,940.00 100% 0.00 0.00 410 Professional AudioNideo Mat 49,295.00 49,295.00 0.00 49,295.00 100% 0.00 0.00 420 Professional AudioNideo Labor 13,835.00 13,835.00 0.00 13,835.00 100% 0.00 0.00 430 Sound Reinforcement Materials 7,230.00 7,230.00 0.00 7,230.00 100% 0.00 0.00 440 Sound Reinforcement Labor 3,660.00 3,660.00 0.00 3,660.00 100% 0.00 0.00 510 C.O. #1 20,502.60 20,502.60 0.00 20,502.60 100% 0.00 0.00 Page Total 437,022.60 437,022.60 0.00 0.00 437,022.60 100% 0.00 0.00 CONTINUATION SHEET - AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's sign Certification, is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on on Contracts where variable retainage for line items may apply. AIA DOCUMENT G703 APPLICATION NO: APPLICATION DATE: PERIOD TO: ARCHITECTS PROJECT NO.: PAGE 3 OF 4 PAGES 23 09/24/10 09/24/10 A B C D E 1 F G H I WORK COMPLETED TOTAL ITEM SCHEDULED FROM THIS APPLICATION COMPLETE BALANCE NO. DESCRIPTION OF WORK VALUE PREVIOUS WORK IN STORED & STORED % TO FINISH RETAINAGE APPLICATION PLACE MATERIAL TO DATE [G /C] [C -G] (D + E) [NOT D &E] (D + E + F) 520 C.O. #2 41,817.22 41,817.22 0.00 41,817.22 100% 0.00 0.00 530 C.O. #3 5,514.16 5,514.16 0.00 5,514.16 100% 0.00 0,00 540 C.O. #4 9,997.95 9,997.95 0.00 9,997.95 100% 0.00 0.00 550 C.O. #5 7,675.99 7,675.99 0.00 7,675.99 100% 0.00 0.00 560 C.O. #6 3,425.45 3,425.45 0.00 3,425.45 100% 0.00 0.00 Page Total 68,430.77 68,430.77 0.00 0.00 68,430.77 100% 0.00 0.00 Grand Total 1,142,863.37 1,142,863.37 0.00 0.00 1,142,863.37 100% 0.00 0.00 CONTINUATION SHEET - AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's sign Certification, is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column 1 on on Contracts where variable retainage for line items may apply. AIA DOCUMENT G703 APPLICATION NO: APPLICATION DATE: PERIOD TO: ARCHITECTS PROJECT NO.: PAGE 4 OF 4 PAGES 23 09/24/10 09/24/10 06080.00